FTCO AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME NAME :GRAIN SOILS SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE :
HOT WATER DEMAND DEMAND CALC ULATION
From ASPE Data Data Book Table 4-6 page 4-15 Occupancy : Office Building
All Buildings ROOM NAME: ROOM NO. Fixture
Demand
TYPE
L/H
Private Lavatory
7.6
public Lavatory
22.7
shower
113.6
kitchen sink
75.7
jointer sink
37.9
DISHWASHER
378.6
Possible Max.Demand Demand factor Storage factor
= = =
Pro. max. demand (LPH)=D. factor*po. max.Demand Possible Max.Demand (LPH)=
UNIT NO.
All Buildings 2 No. OF EWH 1 Total L/H No.Of Fix. 15 114.00 87 1974.90 4 454.40 21 1589.70 17 644.30 2 757.20 5534.50 0.30 2.00 1660.35
C Tempreture Out
Tout=
60
Tempreture in
Tin =
20
T rise=
40
Tempreture Diff.
m= Probable max.Demand max.Demand in L/s P= Density of water = 1 kg/L
1
n= Thermal efficiency
95
=
Cp=specific heat of water =
4.18
pi(kw )= (m*cp*p*trise)/n
storage tank capacity(Litters)=Prob.Max.Demand*storage capacity(Litters)=Prob.Max.Demand*storage factor
40.00
C
0.46
L/S
1.00 0.95 4.18 81.17
Kg/L
3320.70
kj/(kg.k) KW
Liters
FTCO AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
: COLD WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE
PUBLIC & PRIVATE
All Building All Building
RISER NO. ROOM NO.
TOTAL
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM
Fixture type Estern WC Western WC Bedit Lavatory Shower Kitchen sink Service sink Hose Bibb Faucet
CW FU 1 1 1 1 2 1.5 3 1 1
Fixture QTY 34 69 25 114 4 21 17 20 9 Total
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION L OSS(psi/100) PIPE SIZE (in)
FTCO AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
: COLD WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE
PUBLIC & PRIVATE
1 All B uilding
RISER NO. ROOM NO.
TOTAL
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM
Fixture type Estern WC Western WC Bedit Lavatory Shower Kitchen sink Service sink Hose Bibb Faucet
CW FU 1 1 1 1 2 1.5 3 1 2 SUB- TOTAL FU
Fixture QTY 0 3 3 5 0 0 0 10 0 Total
CW FU 0 3 3 5 0 0 0 10 0 21
DEMAND GPM
15
PIPE VELOCITY(FPS)
5.5 6.5 1
PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)
Legend : C W = Cold water FU =fixture unit
FTCO AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
: COLD WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE
PUBLIC & PRIVATE
2 All Building
RISER NO. ROOM NO.
TOTAL
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM
Fixture
CW
Fixture
CW
type Estern WC Western WC
FU 1 1
QTY 11 23
FU 11 23
Bedit
1
5
5
Lavatory Shower Kitchen sink Service sink Hose Bibb Faucet
FTCO AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
: COLD WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE
PUBLIC & PRIVATE
3 All Building
RISER NO. ROOM NO.
TOTAL
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM
Fixture type Estern WC
CW FU 1
Fixture QTY 5
CW FU 5
Western WC
1
11
11
Bedit Lavatory Shower Kitchen sink Service sink Hose Bibb Faucet
FTCO AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
: COLD WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE
PUBLIC & PRIVATE
RISER NO. ROOM NO.
4 All Building
TOTAL
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM
Fixture type Estern WC Western WC Bedit Lavatory Shower Kitchen sink Service sink Hose Bibb Faucet
CW FU 1 1 1 1 2 1.5 3 1 2
Fixture QTY 18 21 1 36 0 8 16 0 0 Total
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION L OSS(psi/100) PIPE SIZE (in)
Legend : C W = Cold water FU =fixture unit
CW FU 18 21 1 36 0 12 48 0 0 136 60 10 12 1.5
FTCO AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
: GRAY WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5)
RISER NO.
TYPE OF FIXTURE
ROOM NO.
PUBLIC & PRIVATE
All Building All Building TOTAL
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM
Fixture type Estern WC Western WC
CW FU 5 2.5
Fixture QTY 34 69 Total
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION L OSS(psi/100) PIPE SIZE (in)
Legend : G W =gray water FU =fixture unit
(63mm)
CW FU 170 172.5 342.5 115 7.5 4 2.5
(63mm)
FTCO -
.
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
: GRAY WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE
PUBLIC & PRIVATE
RISER NO. ROOM NO.
1 All Building TOTAL
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM
Fixture type Estern WC Western WC
CW FU 5 2.5
Fixture QTY 0 3 Total
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION L OSS(psi/100) PIPE SIZE (in)
Legend : G W =gray water FU =fixture unit
CW FU 0 7.5 7.5 15 5.7 6.5 1
(25mm)
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department
(25mm) PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA
TITLE
: GRAY WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5)
RISER NO.
2
TYPE OF FIXTURE
ROOM NO.
All Building
PUBLIC & PRIVATE
TOTAL
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM
Fixture type Estern WC Western WC
CW FU 5 2.5
Fixture QTY 11 23 Total
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)
Legend : G W =gray water FU =fixture unit
FTCO
CW FU 55 57.5 112.5 55 9.5 10 1.5
(40mm)
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
: GRAY WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5)
(40mm)
TYPE OF FIXTURE
PUBLIC & PRIVATE
RISER NO. ROOM NO.
3 All Building
TOTAL
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM
Fixture type Estern WC Western WC
CW FU 5 2.5
Fixture QTY 5 11 Total
SUB- TOTAL F U DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION L OSS(psi/100) PIPE SIZE (in)
Legend : G W =gray water FU =fixture unit
FTCO
CW FU 25 27.5 52.5 40 7 6 1.5
(40mm)
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
: GRAY WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE
FTCO AL-FOUZAN TRADING AND GENE Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
: PLUMBING FIXTURE LOAD CALCULATION
From UPC Table A-2&7-3 & CHART A-5
RISER N
ROOM NAME FLUSH TANK FOR WWC & FLUSH VALVE FOR EW ROOM N Fixture CW D type FU FU Estern WC 1 8 Western WC 1 5.5 Bedit 1 1 Lavatory 1 1 Shower 2 2 Kitchen sink 1.5 2 Service sink 1.5 2 washing machine 4 4 D.F. 0.75 1 TYPE OF FIXTURE
PUBLIC & PRIVATE
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS)
Fixture QTY 2 1 0 4 3 1 1 1 1 Total
PIPE FRICTION L OSS(psi/100) PIPE SIZE (mm)
Legend : WS = water sup
D = CW = Cold
FTCO AL CONSTRUCTION CO.
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : HOT WATER DEMAND CALC ULATION From ASPE Data Book Table 4-6 page 4-15
All Building All Building All Building TOTAL CW D FU FU 2 16 1 5.5 0 0 4 4 6 6 1.5 2 1.5 2 4 4 0.75 1 20.75 40.5 35 47 2.5
Occupancy : Office Building
ROOM NAME: ROOM NO. Fixture
Demand
UNIT NO.
L/H Private Lavato
7.6
public Lavator
22.7
shower
113.6
kitchen sink
75.7
jointer sink
37.9
Possible Max.Demand (LPH)= Demand fact = Storage fact
=
Pro. max. demand (LPH)=D. factor*po. max.Demand
First Basemant Floor ClinicToilet Guard B 03 B 56 EWH 1 EWH No.Of Fix. Total L/H No.Of Fix. 0 0 1 1 22.7 0 0 0 0 0 0 0 1 37.9 0 60.6 0.3 2 18.18
L/H
L
0.6 50
rain
C
100
Tempretu
Tout=
Tempretu
Tin =
10
Tempretu
T rise=
45
1
1
n= Thermal efficiency= Cp=specific heat of water
45 0.00505
m= Probable max.Demand in L/s P= Density of water =1 k
Water
55
95 4.18
pi(kw)=(m*cp*p*trise)/n
L/S Kg/L
0.95 4.18 0.9999
storage tank capacity(Gallons)=Prob.Max.Demand*storage factor storage tank capacity(Litters)=Prob.Max.Demand*storage factor Heaters selection based on A.O.Smith catalogue
Model No. Available storage tank capacity (Gallons) Recovery rate (GPH) Elemant Power Dimensions (Diameter.Height) mm
36.36
FTCO AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : HOT WATER DEMAND CALC ULATION From ASPE Data Book Table 4-6 page 4-15 Occupancy : Office Building
storage tank capacity(Gallons)=Prob.Max.Demand*storage factor storage tank capacity(Litters)=Prob.Max.Demand*storage factor Heaters selection based on A.O.Smith catalogue
Model No. Available storage tank capacity (Gallons) Recovery rate (GPH) Elemant Power Dimensions (Diameter.Height) mm
1278.75
FTCO AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE
:
PLUMBING FIXTURE LOAD CALCULATION
From UPC Table A-2&7-3 & CHART A-5 TYPE OF FIXTURE
(W.SUPPLY&DRIANGE)
62
BUILDING NO.
PUBLIC & PRIVATE
ROOM NAME FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC ROOM NO. Fixture CW D type FU FU Estern WC 1 8 Western WC 1 5.5 WASHING MACH. 4 4 Lavatory 1 1 Shower 2 2 Kitchen sink 1.5 2 D.F. 0.75 0.75 SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION L OSS(psi/100) PIP E SIZE (mm)
Fixture QTY 4 8 8 16 12 4 4 Total
All B uilding All B uilding TOTAL CW FU 4 8 32 16 24 6 3 90 65 7 3.5 50