drilling checklist to aid efficient impementation of drilling and casing cementing requirements
Descripción: lista de chuequeo para equipos de perforacion
Descripción completa
Descripción completa
Descripción completa
Descripción completa
checklistDescripción completa
Descripción: check list caminhao
Descripción completa
Actividades de BuceoDescripción completa
Check List
Check List do CarroDescrição completa
Descrição: Check list - Industria
Descripción: calidad profesional.
Check list - Industria
Electrical drg check list
check list
Descripción: Primer pozo perforado con casing drilling en Bolivia
Ventajas y desventajas de la tecnologia casing drilling.Descripción completa
Full description
Menu List Drive Pipe
CkLst1
NU Diverter
CkLst2
Prepare to Spud
CkLst3
Run Conductor
CkLst4
Cement Conductor
CkLst5
Install Conductor Spool
CkLst6
Drill Surface Hole
CkLst7
Run Surface Casing
CkLst8
Cement Surface Casing
CkLst9
ND Diverter / NU Stack
CkLst10
Drill Inter. Casing Hole
CkLst11
Run Intermediate
CkLst12
Cement intermediate
CkLst13
Install Inter. Casing
CkLst14
Drill Out for Liner
CkLst15
Running Liner String
CkLst16
Cement Liner String
CkLst17
Install liner Spool
CkLst18
Skidding Operations
High Island 9 CHECKLIST HAMMER DRIVE PIPE ITEM Drive Pipe Measurement On Pipe Running Order Pipe Tongs Drivepipe Hammer & Unit Hammer Crew Drivepipe handling equip. Pick-up Slings Hammer Rig Up Slings Rotary Bushings Texas Deck RKB To Drivepipe Cut Drive Pipe Flange Oxy-Ace Torch or cold cut equip. Oxy-Ace Supply Drawworks Brakes Elmago Brake Bit sub for drill/drive assy. Bit breaker DC's (5x8") HWDP (7x4 1/2IF) XO (6 5/8RPx4 1/2IFB) LIFT CAPS 7 5/8R 6 5/8R 4 1/2IF Hole opener if needed
OPERATOR_PERENCO_________________ MONTH/YEAR__March 04_____________ WELL NUMBER_EBOME KB-4 DAY REMARKS G.M. SUPERVISOR OPERATOR
High Island 9 CHECKLIST OPERATOR_____ADDAX_____________ NIPPLE UP DIVERTER 29.5 MONTH/YEAR JULY 06_______ WELL NUMBER___OKW-4____________ ITEM DAY REMARKS GSF. SUPERVISOR OPERATOR Diverter/Element Hydraulic Controll Lines
choke control line and closed annular hose
Overboard Lines/Valves Diverter Flange-Nuts&Bolts
verify flanges are compatable
Ring Gaskets/Spares
R 73
B.O.P. Hoist
3/8 allen key function test 1.5 60' slings for drawworks check shackles and slings rated for load
Pickup Slings/Shackles Oxy-Ace Torch Bell Nipple Lenght Flow Line/Fill Line Impact Wrench&Sockets Hammer Wrenches Sledge Hammers B.O.P. Accumulator Unit B.O.P. Fluid Function Test Diverter Seals For Slip On Flanges
100PSI over expected working psi
Verify flanges are compatable correct unions for fill up line chains and binders permits for manriding bucket ep2 (manual gun)
grease gun w/ psi gauge radios rope
50' x 1/2"
packing plate bell nipple
16-Sep
1
SLINGS 60' 1.5 FOR BLOCK 30' FOR MUD CROSS 30' FOR CRANE WITH LONG STINGER KEEL HAUL FROM STARBOARD CRANE TO BLOCK PASS ROPE TO DRIVE PIPE DECK FROM SHAKER DECK (TO PULL SLINGS) 2 11/16 WRENCH FOR NO WELD ADAPTER BOLTS 28 STUDS ENSURE TO BACKTHEY OUT DIES BACK BOLTS ALL THE WAY JUMP STARBOARD TUGGER TO PORT SIDE WITH SNATCH BLOCK TO HANDLE VENT LINE CLOSE ALL VALVES ON KOMMEY UNIT 5 AGL BUCKET GREASE AND GUN WITH GAUGE BELL NIPLLE USING 30" SEAL RUBBER FOR PACKING 9/16 WRENCH FOR PACING BOLTS 29.5 diverter secure to stump install plug for closed inlet clean threads and lube clean ring grovves and lube same bop stump chase threads and lube same and cover
High Island 9 CHECKLIST PREPARE TO SPUD ITEM DC/DP Elevators DC/DP Slips Rotary Bushings DC Safety Clamp Bit & Nozzles Bit Breaker Hole Opener DC Lifting Subs Stabilizers X/O Subs Drill Collars Heavy Weight Drill Pipe Drill Pipe Drill Collar/Drill Pipe Dope Float Valve Inside BOP TIW Valve Pipe Spinner Drill Pipe Tong/Jaws Drill Collar Tongs If Required Tong Sublines/Jerklines Mouse Hole Mud Bucket w/ Inserts Drawwork Break Bands Elmago Break Wireline Unit Single Shot Survey Totco Landing Ring Mud Pumps/Spares Mud Mixed Desilter Unit Desander Unit Mud Cleaner & Screens Degasser If Required Shale Shaker Screens Bulk Mud System Checked Barite On Board Pressure Test Diverter Drill Water On Board Trip Tank Operational
OPERATOR PERENCO MONTH/YEAR March 04 DAY REMARKS
WELL NUMBER_____EBOME KB-4 G.M. SUPERVISOR OPERATOR
High Island 9 CHECKLIST RUN CONDUCTOR ITEM Conductor Casing Measurements On Casing Running Sequence Shoe/Float Collar Thread Lock Barite & Wire Brushes Cap. & Disp. Of Casing Hydraulic Tongs & Unit Manual Casing Tongs Rotary Bushings Casing Slips & Spider Safety Clamp Casing Elevators Stabbing Board Pick-up Slings Casing Dope Solf Rope Oxy-Ace Torch Drawworks Brakes Elmago Brake Casing Fill Up Line Casing Cent. & Pins Casing Make Up Torque
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR
High Island 9 CHECKLIST CEMENT CONDUCTOR ITEM Cement On Board Cement Additives Cement Unit Lines Pumped Through Chicksan Lines Required Cementing Head Bulk Cement System Cement Lines Purged Hopper Weight Indicator Air Compressors Checked Bulk Pod Fluffed Weight Scales Sample Containers Diverter Wash Tool Check For Cmt At Shakers
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR
High Island 9 CHECKLIST OPERATOR_________________ INSTALL CONDUCTOR SPOOL MONTH/YEAR_______________ WELL NUMBER_________________________ ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR RKB-LMF Measurement Conductor Pipe Spool Cross Over Swedge Double Studded Adapter Ring Gaskets For Same Flange Bolts & Nuts Diverter OVBD Lines BOP Hoist Impact Wrench & Sockets Hammer Wrenches Sledge Hammers Bell Nipple Lenght Oxy-Ace Torch
High Island 9 CHECKLIST DRILL SURFACE HOLE ITEM D.P. Elevators
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR
Drill Pipe Dope Float Valve Inside BOP Stabbing Valve DP Tongs/Dies Tong Snublines/Chains Mouse Hole Mud Bucket Drawworks Brake Bands Elmago Brake Wire Line Unit Totco Angle Recorder Totco Landing Ring Mud Pumps/Spares Mud Mixed Mud Supply Desilter/Desander Degasser Shale Shaker & Screens Bulk Mud System Pressure Test Divertor D.P./D.C. Disp & Cap Directional Equipment Minimum 1000 sx Barite Minumum 2000 bbl Water Minimum 500 bbl Diesel
High Island 9 CHECKLIST RUN SURFACE CASING ITEM Surface Casing Measurements on Casing Running Sequence Shoe/Float Collar Thread lock Compound Casing Disp/Cap Cal. Hydraulic Tongs/Unit Jaws f/ Back up tongs to size csg. Manual Casing Bushings Manual Slips/Elevators Spider Slips/Elevators Casing Fill Up Line Stabbing Board Pick up Slings Casing Dope Solf Rope Quick Release Protectors Casing Cent. & Pins Casing Scratchers/Pins Drawworks Brake Bands Elmago Brake Casing Makeup Torque Casing Drifted
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER___________________ DAY REMARKS G.M. SUPERVISOR OPERATOR
High Island 9 CHECKLIST OPERATOR_________________ CEMENT SURFACE CASING MONTH/YEAR_______________ WELL NUMBER_________________________ ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR Class & Amt. of Cement Cement Additives Cement Unit Pump Through Cmt. Lines 8 Hrs. Prior to Job Chicksan Lines Cementing Head & Plugs Bulk Cement System Purge Cement Lines Check Out Air Compressor Bulk Pods Fluffed Mud Scales Sample Containers Displacement Calculation Diverter Wash Tool Man to Dump Cmt. @ S.S.
High Island 9 CHECKLIST ND DIVERTER/NU STACK ITEM Surface Casing Spool
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR
Double Studded Adapter
Psi Ratings
Ring Gaskets
#-
Choke & Kill Wing Valves
Ring Gaskets # -
BOP Stack Bell Nipple Lenght Bell Nipple: Nuts & Bolts C & K Valve: Nuts & Bolts Wellhead: Nuts & Bolts Impact Wrench & Sockets Hammer Wrenches Air Hoist Stack PU Slings Oxy-Ace Torch Texas Deck C & K Lines to Floor BOP Hydralic Control Lines Casing Spool Testing Equip Bebe Winches Flowline/Fillup Line Rig Floor C & K Manifold Adjustable Chokes BOP Control Panel
Rig Floor & Remote
Accumulator System BOP Fluid "Poor Boy" Degasser BOP Test Tool/O Rings Bore Protector & R.T. RKB Measurements Test BOP & Manifold
PSI Low:
PSI High:
SLINGS 60' 1.5 FOR BLOCK 30' FOR MUD CROSS 30' FOR CRANE WITH LONG STINGER KEEL HAUL FROM STARBOARD CRANE TO BLOCK PASS ROPE TO DRIVE PIPE DECK FROM SHAKER DECK (TO PULL SLINGS) 2 11/16 WRENCH FOR NO WELD ADAPTER BOLTS 28 STUDS TO BACK OUT DIES ENSURE THEY BACK BOLTS ALL THE WAY JUMP STARBOARD TUGGER TO PORT SIDE WITH SNATCH BLOCK TO HANDLE VENT LINE CLOSE ALL VALVES ON KOMMEY UNIT 5 AGL BUCKET GREASE AND GUN WITH GAUGE BELL NIPLLE USING 30" SEAL RUBBER FOR PACKING 9/16 WRENCH FOR PACING BOLTS 29.5 diverter secure to stump install plug for closed inlet clean threads and lube clean ring grovves and lube same bop stump chase threads and lube same and cover
High Island 9 CHECKLIST OPERATOR_________________ DRILL INTER. CASING HOLE MONTH/YEAR_______________ WELL NUMBER_________________________ ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR Trip Tank Operational DC & DP Elevators DC & DP Slips Spare Inserts/dies for Above Rotary Bushings DC Safety Clamp Bit w/ Nozzles Bit Breaker DC Lift Nipples Stabilizers X-O Subs Drill Collars
High Island 9 CHECKLIST OPERATOR_________________ RUN INTERMIATE CASING MONTH/YEAR_______________ WELL NUMBER_________________________ ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR Intermiate Casing Measurements on Casing Running Sequence Shoe/Float Collar Thread lock Compound Casing Disp/Cap Cal. Hydraulic Tongs/Unit Manual Casing Bushings Manual Slips/Elevators Spider Slips/Elevators Casing Fill Up hose & valve. Stabbing Board Pick up Slings Casing Dope Solf Rope Quick Release Protectors Casing Cent. & Pins Casing Scratchers/Pins Oxy-Ace Torch Drawworks Brake Bands Elmago Brake Casing Makeup Torque Casing Drifted
stab board insp. Check list
High Island 9 CHECKLIST CEMENT INTER. CASING ITEM Class & Amount of Cement Cement Additives Cement Unit Pump Through Cmt Lines 8 Hours Prior to Job Chicksan Lines Cement head & Plugs Bulk Cement System Check Out Air Compressor Bulk Pods Fluffed Weight Scales Sample Containers Displacement Calculations Man to Dump Cmt @ S.S.
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR
High Island 9 CHECKLIST OPERATOR_________________ INSTALL INT. CSG. SPOOL MONTH/YEAR_______________ WELL NUMBER_________________________ ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR Intermediate Casing Spool Casing Slips Double Studded Adapter
PSI Rating:
Ring Gaskets
Ring #
Bell Nipple Lenght Wellhead Flange & Bolts Impact Wrench Hammer Wrenches BOP Hoist Oxy-Ace Torch Texas Deck C & K Lines to Rig Floor Bebe Winches Flow Line/Fill up Line BOP Test Tools Bore Protector Distance to RKB Pipe Rams Test BOP Casing Spool Test Equip.
Test Low:
Test High:
High Island 9 CHECKLIST DRILL OUT FOR LINER ITEM Trip Tank Operational
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR
DC & DP Elevators DC & DP Slips Spare Inserts/dies for Above Rotary Bushings DC Safety Clamp Bit w/ Nozzles Bit Breaker DC Lift Nipples Stabilizers X-O Subs Drill Collars
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR
High Island 9 CHECKLIST CEMENT LINER STRING ITEM Class & Amount of Cement Cement Additives Cement Unit Pump Through Liner 8 Hour Prior to Job Rabbit Landing String Chicksan Lines Cement Head &n Plugs Bulk Cement System Check Out Air Compressor Bulk Pods Fluffed Weight Scales Sample Containers Displacement Calculations
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR
____________
High Island 9 CHECKLIST INSTALL LINER SPOOL ITEM Liner Casing Spool
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR
Casing Slips Double Studded Adapter
PSI Rating:
Ring Gaskets
Ring #
Bell Nipple Lenght Wellhead Flange & Bolts Impact Wrench Hammer Wrenches BOP Hoist Oxy-Ace Torch Texas Deck C & K Lines to Rig Floor Bebe Winches Flow Line/Fill up Line BOP Test Tools Bore Protector Distance to RKB Pipe Rams Test BOP Casing Spool Test Equip.
Test Low:
Test High:
High Island 9 CHECKLIST Skidding Operations ITEM Skidder Control
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_______________________ DAY REMARKS GSF SUPERVISOR OPERATOR Test emergency stop prior to use - motorman to stand by breakers in scr room
Handrails
Handrails inboard of skid beam removed to allow bop setback area to clear Handrails outside skid beam swung inward for teeth rack to pass
Walkway - stairs
All stairs removed or lifted up & secured Items secured or removed from both walkways under cantilever Walk along upper cantilever walkways to ensure nothing attached
Skid beams
Fittings greased - located along inside of skid beam - EP2 Bottom & outside edge of beam lubricated w/ pipe dope Bronze wear strips lubricated w/ pipe dope Teeth rack cleaned & doped w/ pipe dope
Mud return trough
Ensure small pipe extension removed - located on end of trough going into shakers - extension usually left inside trough when removed
Electrical umbilical cord
Man to watch constantly to ensure trolley system operating properly
BOP control lines
Men to watch when going over the fire station to ensure no hang ups Watch when going over handrails & drive pipe deck
Supply & drain hoses
Completely removed prior to skid - Note air line has bleed off line by 30" diverter
Accumulator unit
Check height of anything in hwdp bay because the accumulator unit skids in over it
Skid in location
Skid in to were end of cantilever & end of skid beam are flush
Jumper hoses - C & K hose
Always hang in proper rack prior to skidding Small 4" co-flex hose hang off at drill floor level next to v-door stairs
Derrickman escape cable
Connects port side monkey board to padeye on aft walkaround on port leg
Skid motors
Check for obstructions on teeth - remove outside covers
Hi -pressure washer
Ensure electrical supply cable disconnected and clear
High Island 9 CHECKLIST change annular element ITEM
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_______________________ DAY REMARKS GSF SUPERVISOR OPERATOR
Verify JRA Verfiy new element on board make and type
long life hydril p/n 3131189
Verfiy seals are on board
head gasket= 38150 upper u seal= 38151
verfiy lifting eyes for element verfiy lifting eyes for annular head wrench for lock down bolt
1 1/2" torque= 100 ft/lb
function bop hoist sheaves for tuggers sling for block
1 1/2 x 60'
shackle for block
20 ton
safety belts check sala lines rags
1 box
soap
three buckets
wrenches for bell nipple slings for bell nipple shackles for bell nipple
2 x 30' x 7/8 2 x 7/8
pull mouse hole
weight of equipment screw head element total annular
3445 lb 480 lb 14800 lb
High Island 9 CHECKLIST
ITEM
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_______________________ DAY REMARKS GSF SUPERVISOR OPERATOR
High Island 9 CHECKLIST
ITEM
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_______________________ DAY REMARKS GSF SUPERVISOR OPERATOR