DOMICILIO:
JOSE LUIS CASTILLO HERNANDEZ GALEANA No.1, CHIGNAHUAPAN, PUEBLA.
FECHA Oct-14
SOLICITANTE: XXXXXXXXXXXXXXXXXXXXX LOCALIDAD: XXXXXXXXXXXXXXXXXXXXX
DESCRIPCION 1 2 3 4 5 6 7 8 9 10 11 12 13 14
CEMENTO GRIS CAL VARILLA DE 3/8'' ALAMBRE ALAMBRE RECOCIDO RECOCIDO CLAVO DE 2'' LAMINA GALVANIZADA DE 5.50M * .82M CaL. 32 MONTEN ESTRUCTURAL DE 6'' * 2'' MONTEN ESTRUCTURAL DE 3'' POR 1 1/2'' BLOCKS DE CONCRETO DE 0.14*0.20*0.40 M. HERRAJES PARA SUJETAR LAMINAS ALAMBRON ALAMBRON PIEDRA BRAZA (INCLUYE ACARREO) ARENA (INCLUYE (INCLUYE ACARREO) ACARREO) GRAVA ( INCLUYE ACARREO)
UNIDAD ton ton kg kg kg pzas pzas pzas pzas pzas kg m3 m3 m3
CANTIDAD 13.42 1.53 647.67 53.00 25.00 60.00 25.00 44.00 4,484.22 240.00 358.47 34.65 27.86 18.07
P.U 2,163.00 1,312.00 12.00 13.00 21.00 425.00 384.00 286.00 4.83 4.00 15.00 236.00 205.00 24.00 SUB-TOTAL= I.V.A= TOTAL=
NOTA: LOS PRECIOS YA INCLUYEN FLETE
IMPORTE 29,027.46 2,007.36 7,772.04 689.00 525.00 25,500.00 9,600.00 12,584.00 21,658.78 960.00 5,377.05 8,177.40 5,711.30 433.68 130,023.07 2 0 ,8 0 3 .6 9 150,826.76
NOMBRE DE LA OBRA: LOCALIDAD: MUNICIPIO:
CONSTRUCCION Y EDIFICACION CHIGNAHUPAN S.A. DE C.V. CLAVE
PROPIETARIO ELABORO LOCALIZACION
CONCEPTO
LIMPIA, TRAZO Y CONSTRUCCION)
NAVE INDUSTRIAL (26 X 35) FECHA: XXXXXXXXXXXXXXXXXXXXX CHIGNAHUAPAN XXXXXXXXXXXXXXXXXXXXX Ing. FRANCISCO CORTÉS CASTILLA
EJE
NIVELACION
DEL
TERRENO
(AREA
TRAMO
LARGO
TIPO
ANCHO
N°
ALTO
PZAS
Oct-14
UNIDAD
PARCIAL
TOTAL
DE
35.00
26.00
1.50 -
1.50 -
1.00
M2
910.00
910.00
16.00 -
M3 M3 M3 M3
43.20 0.00 0.00 0.00
43.20
M3 M3
43.20 1.58
41.62
EXCAVACION A MANO CUALQUIER TERRENO TIPO "A" INVESTIGADO EN OBRA, CUALQUIER PROFUNDIDAD, INCLUYE AFINE DE TALUD Y ACARREO DENTRO Y FUERA DE LA OBRA DE MATERIAL NO UTILIZABLE
1.20 -
RELLENO Y COMPACTACION DE MATERIAL PRODUCTO DE LA EXCAVACION CON PISON Y AGUA EN CAPAS DE 20 CM ESPESOR INCLUYE ACARREO DENTRO DE LA OBRA, MEDIR COMPACTACION EXCAVACION MENOS ZAPATAS CONCRETO F'c=200 KG/CM2 EN CIMENTACION, T.M.A. 3/4", INCLUYE COLOCADO, VIBRADO Y CURADO desplante
1.50
1.50
0.20
16.00
M3
7.20
dado
0.45
0.45
1.00
16.00
M3
3.24
desplante
1.50
4.00
8.00
M2
48.00
dado
0.45
4.00
8.00
M4
14.40
10.44
CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 3a. ACABADO COMUN, INCLUYE CIMBRADO Y DESCIMBRADO
62.40 ACERO DE REFUERZO EN CIMENTACION CON ALAMBRON #2 F'y=2530 KG/CM2 INCLUYE SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, GANCHOS Y DESPERDICIO PESO POR ML= 0.25 KG
CIM.INT.CER.
60.00 / 0.20 = 300 * 0.90 = 270 * 1.15 (desperdicio)= 310.5 ml * 0.25 = 77.63 kg
3.00
KG
77.63
232.89
CIM.INT.CER.
60 * 4 pzas = 240 ml * 1.15 (desperdicio) = 276 ml * 0.557 = 153.73 kg
3.00
KG
153.73
461.19
ACERO DE REFUERZO DIAMETRO #3 F'y=4200 KG/CM2 INCLUYE SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, GANCHOS Y DESPERDICIO PESO POR ML= 0.557 KG
Página 2 de 6
NOMBRE DE LA OBRA: LOCALIDAD: MUNICIPIO:
CONSTRUCCION Y EDIFICACION CHIGNAHUPAN S.A. DE C.V. CLAVE
CONCEPTO
PROPIETARIO ELABORO
NAVE INDUSTRIAL (26 X 35) XXXXXXXXXXXXXXXXXXXXX FECHA: CHIGNAHUAPAN XXXXXXXXXXXXXXXXXXXXX Ing. FRANCISCO CORTÉS CASTILLA
LOCALIZACION EJE
TRAMO
LARGO
TIPO
ANCHO
N°
ALTO
PZAS
Oct-14
UNIDAD
PARCIAL
TOTAL
MAMPOSTERIA DE PIEDRA DE LA REGION ASENTADA CON MORTERO CEMENTO-CAL-ARENA PROPORCION 1:2:6 EN CIMENTACION
ANCHO= 0.30+0.80/2= 0.1.10/2= 0.55 CM
10.00 20.00 10.00 20.00
0.55 0.55 0.55 0.55
0.70 0.70 0.70 0.70
1.00 1.00 1.00 1.00
M3 M3 M3 M3
3.85 7.70 3.85 7.70
7.45 7.25 9.17 9.17
8.00 12.00 2.00 4.00 2.00
M2 M3 M2 M2 M2
59.59 87.05 36.66 146.64 15.00
344.94
23.10
MU RO D E BLO CK MACIZ O CO MU N DE 14 * 20 * 40 CM ASENTADO CON MORTERO CEMENTO-ARENA 1:3 ACABADO COMUN
PIÑON
8.00 12.00 2.00 4.00 7.50
CAST. K1
0.20
CAST. K1
0.20
LATERALES LATERALES FRENTE POSTERIOR
CONCRETO F'c=200 KG/CM2 EN CASTILLO, T.M.A. 3/4", INCLUYE COLOCADO, VIBRADO Y CURADO
3.82X1.95 3.72X1.95 4.70X1.95 4.70X1.95
4.50
14.00
M3
2.52
2.52
4.50
28.00
M2
25.20
25.20
5.2 / 0.15 = 34.67 * 0.90 = 31.20 * 1.15 (desper dicio)= 35.88 ml * 0.25 = 8.97 kg
14.00
KG
8.97
125.58
5.20 * 4 pzas = 20.8 ml * 1.15 (desperdicio) = 23.92 ml * 0.557 = 13.32 kg
14.00
KG
13.32
186.48
1.00
M3
19.11
19.11
1.00
PZA
25.00
25.00
0.20
CIMBRA PARA COLUMNA CON MADERA DE PINO DE 3a. ACABADO COMUN, INCLUYE CIMBRADO Y DESCIMBRADO
ACERO DE REFUERZO EN CASTILLO CON ALAMBRON #2 F'y=2530 KG/CM2 INCLUYE SUMINISTRO, HABILITADO, ARMADO, TRASLAPES GANCHOS Y DESPERDICIO
CAST. K1 ACERO DE REFUERZO DIAMETRO #3 F'y=4200 KG/CM2 INCLUYE SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, GANCHOS Y DESPERDICIO
CONCRETO F'c=200 KG/CM2 EN PISO, T.M.A. 3/4", INCLUYE COLOCADO, VIBRADO Y CURADO
CAST. K1
PISO
19.70
25.00
9.70
0.10
MONTEN ESTRUCTURAL, SECCION 6" * 2"
Página 3 de 6
NAVE INDUSTRIAL (26 X 35) XXXXXXXXXXXXXXXXXXXXX FECHA: CHIGNAHUAPAN XXXXXXXXXXXXXXXXXXXXX Ing. FRANCISCO CORTÉS CASTILLA
NOMBRE DE LA OBRA: LOCALIDAD: MUNICIPIO:
CONSTRUCCION Y EDIFICACION CHIGNAHUPAN S.A. DE C.V. CLAVE
PROPIETARIO ELABORO LOCALIZACION
CONCEPTO
EJE
TRAMO
LARGO
TIPO
ANCHO
N°
ALTO
PZAS
Oct-14
UNIDAD
PARCIAL
TOTAL
MONTEN ESTRUCTURAL, SECCION 3" * 1 1/2" LARGEROS
44.00
1.00
PZA
44.00
44.00
60.00
PZA
60.00
60.00
PZAS
240.00
240.00
LAMINA GALVANIZADA CAL 32, 5.50 * 0.82
HERRAJES PARA FIJAR LAMINA
60.00
4.00
CUANTIFICACION DE MATERIALES PETREOS CONCRETO f'c= 200 KG CEMENTO ARENA GRAVA
MORTERO CEMENTO CAL HIDRA ARENA 1:1:6
CADENA + CASTILLO + PISO = 32.07 0.37 32.07 0.531 32.07 0.643
10.44 11.80 17.03 20.62
2.52 TON M3 M3
19.11
32.07
MUROS = area muro M2 * 0.0113 M3/M2 = mortero M3 3.90 MUROS = 344.94 0.01 MAMPOSTERIA = volum mampo M3 * 0.33 M3/M3 = mortero M3 MAMP. = 7.62 23.10 0.33 CEMENTO CALHIDRA ARENA
11.52 11.52 11.52
0.267 0.1329 1.12
BLOCK PIEDRA BRAZA
344.94 23.10
13 1.5
3.08 1.53 12.94
TON TON M3
4,484.22 34.65
PZAS M3
Página 4 de 6
NOMBRE DE LA OBRA: LOCALIDAD: MUNICIPIO:
CONSTRUCCION Y EDIFICACION CHIGNAHUPAN S.A. DE C.V. CLAVE
PROPIETARIO ELABORO
NAVE INDUSTRIAL (26 X 35) XXXXXXXXXXXXXXXXXXXXX FECHA: CHIGNAHUAPAN XXXXXXXXXXXXXXXXXXXXX Ing. FRANCISCO CORTÉS CASTILLA
LOCALIZACION
CONCEPTO
EJE
TRAMO
TIPO
LARGO
ANCHO
ALTO
N° PZAS
Oct-14
UNIDAD
PARCIAL
TOTAL
RESUMEN CEMENTO CALHIDRA ARENA GRAVA BLOCK PIEDRA BRAZA ALAMBRON VARILLA # 3 MONTEN ESTRUCTURAL, SECCION 6" * 4" MONTEN ESTRUCTURAL, SECCION 4" * 1 1/2"
LAMINA 3.60 * 0.80 HERRAJES CIMBRA
14.88 1.53 29.97 20.62 4,484 34.65 358.47 647.67 4 7 60.00 240.00 87.60
TON TON M3 M3 PZA M3 KG KG PZA PZA PZA PZA
Página 5 de 6
Presupuesto Nombre del Proyecto: Propietario: Municipio: Localidad: Fecha
NAVE INDUSTRIAL (26 X 35) XXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXX Oct-14
Clave ó No.
Conceptos de Trabajo
CONSTRUCCION Y EDIFICACION CHIGNAHUPAN S.A. DE C.V.
Unidad de Medida
Cantidad ó Volumen
Precios Costos Directos $
Importe $
1 2 3 4 5 6 7 8 9 10 11 12 13
MATERIALES INDUSTR IALIZADOS. CEMENTO GRIS CAL VARILLA DE 3/8'' ALAMBRE RECOCIDO CLAVO DE 2'' LAMINA GALVANIZADA DE 5.50M * .82M CaL. 32 MONTEN ESTRUCTURAL DE 6'' * 2'' MONTEN ESTRUCTURAL DE 3'' POR 1 1/2'' RENTA DE CIMBRA BLOCKS DE CONCRETO DE 0.14*0.20*0.40 M. HERRAJES PARA SUJETAR LAMINAS SAGUAN 4.7X4.10 ALAMBRON
ton ton kg kg kg pzas pzas pzas m2 pzas pzas pzas kg
13.42 1.53 647.67 53.00 25.00 60.00 25.00 44.00 97.20 4,484.22 240.00 1.00 358.47 SUBTOTAL
2,163.00 1,312.00 12.00 13.00 21.00 425.00 384.00 286.00 20.00 4.83 4.00 18,500.00 15.00
29,027.46 2,007.36 7,772.04 689.00 525.00 25,500.00 9,600.00 12,584.00 1,944.00 21,658.78 960.00 18,500.00 5,377.05 136,144.69
14 15 16 17
MATERIALES PETREOS PIEDRA BRAZA (INCLUYE ACARREO) ARENA (INCLUYE ACARREO) GRAVA ( INCLUYE ACARREO) AGUA
m3 m3 m3 m3
34.65 27.86 18.07 0.00 SUBTOTAL
236.00 205.00 24.00 0.00
8,177.40 5,711.30 433.68 0.00 14,322.38
m2 m3 m3 ml m3 ml m2
200.00 33.60 10.50 180.00 23.10 65.80 344.94
2.70 55.00 35.00 60.00 400.00 65.00 55.00
540.00 1,848.00 367.50 10,800.00 9,240.00 4,277.00 18,971.70
lote
1.00
9,000.00
9,000.00
m2
200.00
11.00
2,200.00
m2
191.10
80.00
15,288.00
18 19 20 21 22 23 24 25 26 27
MANO DE OBRA TRAZO Y NIVELACION DEL TERRENO EXCAVACION PARA MAMPOSTERIA. RELLENO CON MATERIAL PRODUCTO DE EXCAVACION CADENAS DE DESPLANTE Y CERRAMIENTO 0.20*0.15M. MAMPOSTERIA ASENTADA CON MORTERO C-A 1:1:6 CASTILLO DE CONCRETO ARMADO 0.20*0.20M MURO DE BLOCKS COLOCACION DE MONTENES ESTRUCTURALES Y VIGAS SOBRE Y COLUMNAS PARA RECIBIR LAMINA GALVANIZADA COLOCACION DE LAMINA GALVANIZADA CONSTRUCCION DE PISO DE CONCRETO ARMADO DE 10 CM.
SUBTOTAL
R
E S
U M
E
72,532.20
N
MATERIALES INDUSTRIALIZADOS. MATERIALES PETREOS MANO DE OBRA FORMULO
ING. FRANCISCO CORTÉS CASTILLA CED. PROF. 3772810
136,144.69 14,322.38 72,532.20 COSTO DIRECTO =
222,999.27
SUB-TOTAL: I.V.A. 16 % TOTAL:
222,999.27 35,679.88
258,679.16
Página 6 de 6