HARGA PERKIRAAN SENDIRI ( HPS ) KEGI KEGIAT ATAN AN
: PENI PENING NGKA KATA TAN N PEM PEMBA BANG NGUN UNAN AN PASA PASAR R PED PEDES ESAA AAN N DI DI KECA KECAM MATAN ATAN MERBA ERBAU U
PEKE PEKERJ RJAA AAN N
: PEMB PEMBAN ANGUN GUNAN AN MCK MCK UNTU UNTUK K PAS PASAR AR PEDES PEDESAA AAN N DI DI KEC. KEC. MERB MERBAU AU 2 UNI UNIT T
LOKASI
: KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI
TAHUN
: 2011
NO
URAIAN PEKERJAAN
VOLUME
A
B
C
A.
HAR GA GA SAT UA UA N
JUMLAH HARGA
( Rp )
( Rp )
D
E
PEKE PEKERJ RJAA AAN N PENDA PENDAHUL HULUA UAN N
1
Pek. Pembersihan lokasi
1.00 Ls Ls
200,000.00
2
Pek. Pe Pengukuran dan pas. bowplank
1.00 Ls Ls
300,000.00
200,000.00 300,000.00 --------------------------------
Sub Jumlah
B.
500,000.00
PEKERJ PEKERJAA AAN N TANA TANAH H DAN DAN PONDAS PONDASII
1
Pek. Galian tanah pondasi
6.00 M3 M3
29,400.00
176,400.00
2
Pek. Pas cerocok kayu
96.00 Bt B tg
22,000.00
2,112,000.00
3
Pek. Urugan pasir, tebal 5 cm
0.60 M3 M3
332,350.00
199,410.00
4
Pek. Co C or lantai kerja 1 : 3 : 5, tebal 5 cm
0.60 M3 M3
960,720.00
576,432.00
5
Pek. Cor pondasi setempat
0.44 M3 M3
3,113,750.00
1,370,050.00
6
Pek. Cor sloof 12/20 cm
0.58 M3 M3
3,297,790.00
1,912,718.20
7
Pek. Pas pondasi 1 bata 1 : 4
7.68 M2 M2
431,290.00
3,312,307.20
8
Pek. Raben pondasi
15.36 M2 M2
32,970.00
506,419.20
9
Pek. Urugan kembali bekas galian ( tanah timbun )
2.44 M3 M3
344,350.00
840,214.00 --------------------------------
C.
Sub Jumlah
11,005,950.60
PEKE PEKERJ RJAA AAN N STRU STRUKT KTUR UR
1
Pek. Cor kolom 12/12 cm
0.35 M3 M3
4,727,650.00
1,654,677.50
2
Pek. Cor ring balok 15/15 cm
0.54 M3 M3
4,097,360.00
2,212,574.40
3
Pek. Cor ring balok 10/15 cm ( pagar selasar / teras )
0.09 M3 M3
4,097,360.00
368,762.40 --------------------------------
D.
Sub Jumlah
4,236,014.30
PEKE PEKERJ RJAA AAN N DINDI DINDING NG
1
Pek. Pas dinding 1/2 bata 1 : 4
32.02 M2 M2
213,140.00
6,824,742.80
2
Pek. Plesteran dinding 1 : 4
64.04 M2 M2
55,150.00
3,531,806.00
3
Pek. Pas dinding batu kerawang
6.08 M2 M2
102,780.00
624,902.40
4
Pek. Pa P as kosen dan pintu fiber, lengkap
2.00 Bh Bh
300,000.00
600,000.00 --------------------------------
E.
Sub Jumlah
11,581,451.20 1,826,632.40
PEKE PEKERJ RJAA AAN N LANT LANTAI AI
1
Pek. Pas lantai keramik 20/20 cm
10.82 M2 M2
168,820.00
2
Pek. Pas bon bon keramik
5.40 M1 M1
15,000.00
81,000.00
3
Pek. Co C or lantai kerja 1 : 3 : 5, tebal 5 cm
0.60 M3 M3
960,720.00
576,432.00
4
Pek. Urugan pasir, tebal 5 cm
0.60 M3 M3
332,350.00
199,410.00
5
Pek. Urugan tanah dibawah lantai
2.25 M3 M3
344,350.00
774,787.50
6
Pek. Co C or rabat beton 1 : 3 : 5, tebal 5 cm
0.36 M3 M3
960,720.00
345,859.20 --------------------------------
F.
Sub Jumlah
3,804,121.10 2,261,698.40
PEKE PEKERJ RJAA AAN N KAP KAP / ATA ATAP P
1
Pek. Pas atap genteng metal
30.16 M2 M2
74,990.00
2
Pek. Pas parabung atap
3
Pek. Pas bola bola atap
5.80 M1 M1
72,530.00
420,674.00
62.40 M1 M1
44,980.00
2,806,752.00
4 5
Pek. Pa Pas rangka atap ( kasau + reng )
30.16 M2 M2
41,145.00
1,240,933.20
Pek. Pas gording, kayu 5/10 cm
0.17 M3 M3
3,161,500.00
537,455.00
6
Pek. Pas kuda kuda kayu 5/10 cm
0.11 M3 M3
3,818,000.00
419,980.00
7
Pek. Pas balok angin, kayu 5/7 cm
0.03 M3 M3
3,161,500.00
94,845.00
8
Pek. Pa Pas listplank papan 2 x 3/20 cm
32.40 M1 M1
39,480.00
1,279,152.00 --------------------------------
Sub Jumlah
9,061,489.60
A
B
C
D
E
G. PEKE PEKERJ RJAA AAN N PLAF PLAFON OND D 1
Pek. Pas rangka plafond ( kayu )
18.65 M2 M2
65,100.00
1,214,115.00
2
Pek. Pas plafond triplek
18.65 M2 M2
31,640.00
590,086.00
3
Pek. Pas list plafond
33.20 M2 M2
10,850.00
360,220.00 --------------------------------
H.
Sub Jumlah
2,164,421.00 270,000.00
PEKERJ PEKERJAA AAN N INSTA INSTALA LASI SI LISTR LISTRIK IK
1
Pek. Pas lampu XL 18 watt
6.00 Bh Bh
45,000.00
2
Pek. Pas stop kontak
1.00 Bh Bh
50,000.00
50,000.00
3
Pek. Pas saklar tiga
2.00 Bh Bh
60,000.00
120,000.00
4
Pek. Pas sikring khas ( 1 NCB )
1.00 Bh Bh
50,000.00
50,000.00
5
Pek. Pas instalasi listrik
10.00 Tt T tk
190,000.00
1,900,000.00 --------------------------------
I.
Sub Jumlah
2,390,000.00
PEKE PEKERJ RJA AAN SANI SANITA TASI SI
1
Pek. Pas kloset jongkok
2.00 Bh Bh
395,750.00
791,500.00
2
Pek. Pas bak air fiber
2.00 Bh Bh
396,800.00
793,600.00
3
Pek. Pas floordrain
2.00 Bh Bh
24,420.00
48,840.00
4
Pek. Pas kran air
3.00 Bh Bh
65,170.00
195,510.00
5
Pek. Pa P as kosen dan pintu fiber, lengkap
2.00 Bh Bh
300,000.00
600,000.00
6
Pek. Pas septicktank + peresapan
1.00 Un Unt
3,000,000.00
3,000,000.00
7
Pek. Pas pipa saluran air bersih, PVC 3/4 "
36.00 M1 M1
18,350.00
660,600.00
8
Pek. Pa P as pipa saluran air kotor, PVC 3 "
6.00 M1 M1
55,630.00
333,780.00
9
Pek. Pas pipa saluran limbah padat dari kloset, PVC 4 "
18.00 M1 M1
55,630.00
1,001,340.00 --------------------------------
J.
Sub Jumlah
7,425,170.00
PEKE PEKERJ RJAA AAN N PENGE PENGECA CATA TAN N
1
Pek. Cat air untuk dinding
71.16 M2 M2
10,470.00
745,045.20
2
Pek. Cat air untuk plafond
18.65 M2 M2
10,470.00
195,265.50
3
Pek. Cat minyak untuk listplank papan & cat list plafond
11.05 M2 M2
27,060.00
299,013.00 --------------------------------
Sub Jumlah
K. 1
1,239,323.70
PEKE PEKERJ RJAA AAN N LAIN LAIN LAI LAIN N
Pek. Pembersihan akhir
1.00 Ls Ls
138,000.00
138,000.00 --------------------------------
Sub Jumlah
138,000.00
REKAPITULASI - HPS KEGIATAN
:
PEKE PEKERJ RJAA AAN N
:
PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU PEMB PEMBAN ANGU GUNA NAN N MCK MCK UNTUK UNTUK PASA PASAR R PED PEDES ESAA AAN N DI DI KEC KEC.. MER MERBA BAU U 2 UNIT UNIT
LOKASI
:
KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI
TAHUN
:
2011
NO.
URAIAN KEGIATAN
A
JUMLAH HARGA
PEKERJAAN PENDAHULUAN
Rp.
500,000.00
B
PEKERJAAN TANAH DAN PONDASI
Rp.
11,005,950.60
C
PEKERJAAN STRUKT UR UR
Rp.
4,236,014.30
D
PEKERJAAN DINDING
Rp.
11,581,451.20
E
PEKERJAAN LANTAI
Rp.
3,804,121.10
F
PEKERJAAN KAP / ATAP
Rp.
9,061,489.60
G
PEKERJAAN PLAFOND
Rp.
2,164,421.00
H
PEKERJAAN INSTALASI LISTRIK
Rp.
2,390,000.00
I
PEKERJAAN SANITASI
Rp.
7,425,170.00
J
PEKERJAAN PENGECATAN
Rp.
1,239,323.70
K
PEKERJAAN LAIN LAIN
Rp.
138,000.00
53,545,941.50
TERB TERBIL ILAN ANG G
JUMLAH
Rp.
PPN 10%
Rp.
5,354,594.15
TOTAL
Rp.
58,900,535.65
DIBULATKAN
Rp.
58,900,000.00
: LIMA LIMA PUL PULUH UH DEL DELAP APAN AN JUT JUTA A SEMB SEMBIL ILAN AN RAT RATUS US RIB RIBU U RUPI RUPIAH AH.. Selatpanjang,
November 2011
Disetujui Oleh :
Dibuat Oleh :
PENGGUNA ANGGARAN
PEJABAT PELAKSANA TEKNIS KEGIATAN
DINAS PASAR, KEBERSIHAN DAN PERTAMANAN
( PPTK )
KAB. KEPULAUAN MERANTI
JONIZAR, SH, M.Si
Z A U J A R, S.Sos
NIP. 19611030 198510 1 001
NIP. 19601110 198503 198503 1 010
PEMERINTAH KABUPATEN KEPULAUAN MERANTI
DINAS PASAR, KEBERSIHAN KEBERSI HAN DAN PERTAMANAN JLN. TANJUNG HARAPAN - SELATPANJANG
HARGA PERKIRAAA PERKIRAAAN N SENDIRI ( HPS )
Kegiatan PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU
Pekerjaan : PEMBANGUNAN MCK UNTUK PASAR PEDESAAN DI KEC. MERBAU 2 UNIT
Lokasi : KECAMATAN MERBAU - KABUPATEN KABUPATEN KEPULAUAN MERANTI
HARGA PERKIRAAN SENDIRI ( HPS ) KEGI KEGIAT ATAN AN
: PENI PENING NGKA KATA TAN N PEM PEMBA BANG NGUN UNAN AN PASA PASAR R PED PEDES ESAA AAN N DI DI KECA KECAM MATAN ATAN MERBA ERBAU U
PEKE PEKERJ RJAA AAN N
: PEMB PEMBAN ANGUN GUNAN AN MCK MCK UNTU UNTUK K PAS PASAR AR PEDES PEDESAA AAN N DI DI KEC. KEC. MERB MERBAU AU 2 UNI UNIT T
LOKASI
: KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI
TAHUN
: 2011
NO
URAIAN PEKERJAAN
VOLUME
A
B
C
A.
HAR GA GA SAT UA UA N
JUMLAH HARGA
( Rp )
( Rp )
D
E
PEKE PEKERJ RJAA AAN N PENDA PENDAHUL HULUA UAN N
1
Pek. Pembersihan lokasi
1.00 Ls Ls
400,500.00
2
Pek. Pe Pengukuran dan pas. bowplank
1.00 Ls Ls
1,700,000.00
400,500.00 1,700,000.00 --------------------------------
Sub Jumlah
B.
2,100,500.00
PEKERJ PEKERJAA AAN N TANA TANAH H DAN DAN PONDAS PONDASII
1
Pek. Galian tanah pondasi
6.00 M3 M3
29,400.00
176,400.00
2
Pek. Pas cerocok kayu
96.00 Bt B tg
22,000.00
2,112,000.00
3
Pek. Urugan pasir, tebal 5 cm
0.60 M3 M3
332,350.00
199,410.00
4
Pek. Co C or lantai kerja 1 : 3 : 5, tebal 5 cm
0.60 M3 M3
960,720.00
576,432.00
5
Pek. Cor pondasi setempat
0.44 M3 M3
3,113,750.00
1,370,050.00
6
Pek. Cor sloof 12/20 cm
0.58 M3 M3
3,297,790.00
1,912,718.20
7
Pek. Pas pondasi 1 bata 1 : 4
9.60 M2 M2
431,290.00
4,140,384.00
8
Pek. Raben pondasi
19.20 M2 M2
32,970.00
633,024.00
9
Pek. Urugan kembali bekas galian ( tanah timbun )
2.44 M3 M3
344,350.00
840,214.00 --------------------------------
C.
Sub Jumlah
11,960,632.20
PEKE PEKERJ RJAA AAN N STRU STRUKT KTUR UR
1
Pek. Cor kolom 12/12 cm
0.35 M3 M3
4,727,650.00
1,654,677.50
2
Pek. Cor ring balok 15/15 cm
0.54 M3 M3
4,097,360.00
2,212,574.40
3
Pek. Cor ring balok 10/15 cm ( pagar selasar / teras )
0.09 M3 M3
4,097,360.00
368,762.40 --------------------------------
D.
Sub Jumlah
4,236,014.30
PEKE PEKERJ RJAA AAN N DINDI DINDING NG
1
Pek. Pas dinding 1/2 bata 1 : 4
35.58 M2 M2
213,140.00
7,583,521.20
2
Pek. Plesteran dinding 1 : 4
71.16 M2 M2
55,150.00
3,924,474.00
3
Pek. Pas dinding batu kerawang
6.08 M2 M2
102,780.00
624,902.40
4
Pek. Pa P as kosen dan pintu fiber, lengkap
2.00 Bh Bh
300,000.00
600,000.00 --------------------------------
E.
Sub Jumlah
12,732,897.60 1,826,632.40
PEKE PEKERJ RJAA AAN N LANT LANTAI AI
1
Pek. Pas lantai keramik 20/20 cm
10.82 M2 M2
168,820.00
2
Pek. Pas bon bon keramik
5.40 M1 M1
15,000.00
81,000.00
3
Pek. Co C or lantai kerja 1 : 3 : 5, tebal 5 cm
0.60 M3 M3
960,720.00
576,432.00
4
Pek. Urugan pasir, tebal 5 cm
0.60 M3 M3
332,350.00
199,410.00
5
Pek. Urugan tanah dibawah lantai
2.25 M3 M3
344,350.00
774,787.50
6
Pek. Co C or rabat beton 1 : 3 : 5, tebal 5 cm
0.36 M3 M3
960,720.00
345,859.20 --------------------------------
F.
Sub Jumlah
3,804,121.10 2,261,698.40
PEKE PEKERJ RJAA AAN N KAP KAP / ATA ATAP P
1
Pek. Pas atap genteng metal
30.16 M2 M2
74,990.00
2
Pek. Pas parabung atap
3
Pek. Pas bola bola atap
5.80 M1 M1
72,530.00
420,674.00
62.40 M1 M1
44,980.00
2,806,752.00
4 5
Pek. Pa Pas rangka atap ( kasau + reng )
30.16 M2 M2
41,145.00
1,240,933.20
Pek. Pas gording, kayu 5/10 cm
0.17 M3 M3
3,161,500.00
537,455.00
6
Pek. Pas kuda kuda kayu 5/10 cm
0.11 M3 M3
3,818,000.00
419,980.00
7
Pek. Pas balok angin, kayu 5/7 cm
0.03 M3 M3
3,161,500.00
94,845.00
8
Pek. Pa Pas listplank papan 2 x 3/20 cm
32.40 M1 M1
39,480.00
1,279,152.00 --------------------------------
Sub Jumlah
9,061,489.60
A
B
C
D
E
G. PEKE PEKERJ RJAA AAN N PLAF PLAFON OND D 1
Pek. Pas rangka plafond ( kayu )
18.65 M2 M2
65,100.00
1,214,115.00
2
Pek. Pas plafond triplek
18.65 M2 M2
31,640.00
590,086.00
3
Pek. Pas list plafond
33.20 M2 M2
10,850.00
360,220.00 --------------------------------
H.
Sub Jumlah
2,164,421.00 270,000.00
PEKERJ PEKERJAA AAN N INSTA INSTALA LASI SI LISTR LISTRIK IK
1
Pek. Pas lampu XL 18 watt
6.00 Bh Bh
45,000.00
2
Pek. Pas stop kontak
1.00 Bh Bh
50,000.00
50,000.00
3
Pek. Pas saklar tiga
2.00 Bh Bh
60,000.00
120,000.00
4
Pek. Pas sikring khas ( 1 NCB )
1.00 Bh Bh
50,000.00
50,000.00
5
Pek. Pas instalasi listrik
10.00 Tt T tk
190,000.00
1,900,000.00 --------------------------------
I.
Sub Jumlah
2,390,000.00
PEKE PEKERJ RJA AAN SANI SANITA TASI SI
1
Pek. Pas kloset jongkok
2.00 Bh Bh
395,750.00
791,500.00
2
Pek. Pas bak air fiber
2.00 Bh Bh
396,800.00
793,600.00
3
Pek. Pas floordrain
2.00 Bh Bh
24,420.00
48,840.00
4
Pek. Pas kran air
3.00 Bh Bh
65,170.00
195,510.00
5
Pek. Pa P as kosen dan pintu fiber, lengkap
2.00 Bh Bh
300,000.00
600,000.00
6
Pek. Pa Pas tangki air fiber, kap. 1000 lt
2.00 Bh Bh
950,000.00
1,900,000.00
7
Pek. Pas septicktank + peresapan
1.00 Un Unt
3,500,000.00
3,500,000.00
8
Pek. Pas pipa saluran air bersih, PVC 3/4 "
36.00 M1 M1
18,350.00
660,600.00
9
Pek. Pa P as pipa saluran air kotor, PVC 3 "
6.00 M1 M1
55,630.00
333,780.00
10
Pek. Pas pipa saluran limbah padat dari kloset, PVC 4 "
18.00 M1 M1
55,630.00
1,001,340.00
11
Pek. Sumur bor
1.00 Un Unt
3,000,000.00
3,000,000.00 --------------------------------
J.
Sub Jumlah
12,825,170.00
PEKE PEKERJ RJAA AAN N PENGE PENGECA CATA TAN N
1
Pek. Cat air untuk dinding
71.16 M2 M2
10,470.00
745,045.20
2
Pek. Cat air untuk plafond
18.65 M2 M2
10,470.00
195,265.50
3
Pek. Cat minyak untuk listplank papan & cat list plafond
11.05 M2 M2
27,060.00
299,013.00 --------------------------------
Sub Jumlah
K.
1,239,323.70
PEKE PEKERJ RJAA AAN N TOWE TOWER R BETO BETON N
1
Pek. Galian tanah pondasi
1.15 M3 M3
29,400.00
33,810.00
2
Pek. Pas cerocok kayu
36.00 Bt Btg
22,000.00
792,000.00
3
Pek. Urugan pasir, tebal 5 cm
0.07 M3 M3
332,350.00
23,264.50
4
Pek. Co C or lantai kerja 1 : 3 : 5, tebal 5 cm
0.07 M3 M3
960,720.00
67,250.40
5
Pek. Cor pondasi tapak
0.86 M3 M3
3,113,750.00
2,677,825.00
6
Pek. Cor tiang beton 20/20 cm
0.34 M3 M3
4,727,650.00
1,607,401.00
7
Pek. Cor balok skor 18/18 cm
0.17 M3 M3
4,285,350.00
728,509.50
8
Pek. Cor balok lantai 20/40 cm
0.34 M3 M3
4,285,350.00
1,457,019.00 2,118,680.00
9
Pek. Co C or plat lantai beton, tebal 12 cm
0.50 M3 M3
4,237,360.00
10
Pek. Urugan kembali bekas galian ( tanah timbun )
0.14 M3 M3
344,350.00
48,209.00 --------------------------------
L.
Sub Jumlah
9,553,968.40 3,360,000.00
PEKE PEKERJ RJAA AAN N LAI LAIN N LAI LAIN N
1
Pek. Pembuatan parit
2
Pek. Pembersihan akhir
14.00 M1 M1
240,000.00
1.00 Ls
1,000,000.00
2,500,000.00 --------------------------------
Sub Jumlah
5,860,000.00
REKAPITULASI - HPS KEGIATAN
:
PEKE PEKERJ RJAA AAN N
:
PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU PEMB PEMBAN ANGU GUNA NAN N MCK MCK UNTU UNTUK K PAS PASAR AR PEDE PEDESA SAAN AN DI KEC. KEC. MERB MERBAU AU 2 UNI UNIT T
LOKASI
:
KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI
TAHUN
:
2011
NO.
URAIAN KE KEGIATAN
A
JUMLAH HARGA
PEKERJAAN PENDAHULUAN
Rp.
2,100,500.00
B
PEKERJAAN TANAH DAN PONDASI
Rp.
11,960,632.20
C
PEKERJAAN ST RU RUKT UR UR
Rp.
4,236,014.30
D
PEKERJAAN DINDING
Rp.
12,732,897.60
E
PEKERJAAN LANTAI
Rp.
3,804,121.10
F
PEKERJAAN KAP / ATAP
Rp.
9,061,489.60
G
PEKERJAAN PLAFOND
Rp.
2,164,421.00
H
PEKERJAAN INSTALASI LISTRIK
Rp.
2,390,000.00
I
PEKERJAAN SANITASI
Rp.
12,825,170.00
J
PEKERJAAN PENGECATAN
Rp.
9,553,968.40
K
PEKERJAAN TOW ER BETON
Rp.
9,553,968.40
L
PEKERJAAN LAIN LAIN
Rp.
5,860,000.00
JUMLAH
Rp.
86,243,182.60
PPN 10%
Rp.
8,624,318.26
TERBILANG
TOTAL
Rp.
94,867,500.86
DIBULATKAN
Rp.
94,867,000.00
: SERATUS JUTA RUPIAH. Selatpanjang,
November 2011
Disetujui Oleh :
Dibuat Oleh :
PENGGUNA ANGGARAN
PEJABAT PELAKSANA TEKNIS KEGIATAN
DINAS PASAR, KEBERSIHAN DAN PERTAMANAN
( PPTK )
KAB. KEPULAUAN MERANTI
JONIZAR, SH, M.Si
Z A U J A R, S.Sos
NIP. 19611030 198510 1 001
NIP. 19601110 198503 1 010
DAFTAR HARGA SATUAN UPAH DAN BAHAN KEGIATAN
: PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU
PEKERJAAN
: PEMBANGUNAN MCK UNTUK PASAR PEDESAAN DI KEC. MERBAU 2 UNIT
LOKASI
: KECAMATAN MERBAU - KABUPATEN KEPULAUAN ME MERANTI
TAHUN
: 2011
NO.
JENIS BAHAN
SATUAN
HARGA SATUAN
KETERANGAN
1
2
3
4
5
I
T E N A G A K ER J A
1 2 3 4
MANDOR KEPALA TUKANG TUKANG PEKERJA
II
B A HA N
A
B AH AH A N P A S A N G A N
1 2 3 4 5 6 7 8 9 10 11 12 13 B
ORANG / HARI ORANG / HARI ORANG / HARI ORANG / HARI
PASIR URUG PASIR PASANG PASIR BETON / COR TANAH URUG / TIMBUN TANAH HITAM KERIKIL / KORAL BETON BATU KALI BATU BATA BATU KERAW ANG PORTLAND CEMENT / SEMEN PADANG TYPE I PORTLAND CEMENT W ARNA PAVING BLOK TEBAL 6 CM TIANG PANCANG BETON 20/20 CM
85,000.00 85,000.00 75,000.00 65,000.00
M3. M3. M3. M3. M3. M3. M3. BH. BH. KG. KG. BH. M'
260,000.00 290,000.00 290,000.00 270,000.00 180,000.00 400,000.00 400,000.00 1,500.00 2,300.00 1,500.00 2,500.00 2,500.00 120,000.00
M3. M3. M3. M3. M3. BT G . BT G . BT G . M3. M' M2. BH
5,800,000.00 2,200,000.00 2,300,000.00 2,300,000.00 2,000,000.00 14,000.00 19,000.00 10,000.00 2,000,000.00 110,000.00 450,000.00 350,000.00
KG. KG. M'
13,000.00 17,000.00 8,000.00
BH. BH. BH. BH. BH. BH. M2.
10,850.00 5,950.00 3,250.00 2,600.00 2,000.00 2,750.00 350,000.00
B A HA N K A YU
1 2 3 4 5 6 7 8 9 10 11 12 C
1 2 3 D
KAYU KELAS I (KULIM, TEMBUSU/ SEJENISNYA) KAYU MERANTI KAYU LAMBERZIRING (JELUTUNG) PAPAN/KAYU SURIAN KAYU KELAS III KAYU CEROCOK / KAYU MAHANG KAYU CEROCOK / KAYU UBAR KAYU DOLKEN DIA. 8 - 10 CM PANJANG 400 CM KAYU PERANCAH / BEKISTING DALAM PAPAN LISPLANK UKIR (LEBAH BERGAYUT) PAPAN SINGAP UKIR (GRC) SELEMBAYUNG UKIR ( GRC ) B A H A N B ES I
BESI BETON KAW AT IKAT BETON (BANDRAT) RANGKA PLAFOND METAL FURING B A H AN A N PE PE NU NU TU TU P L A N TA TA I D A N D IN IN DI DI N G
1 2 3 4 5 6 7
KERAMIK UKURAN 40X40 KERAMIK UKURAN 30X30 KERAMIK UKURAN 20X25 KERAMIK UKURAN 20X20 PLIN KERAMIK 10X30 PLIN KERAMIK 10X40 BATU ANDESIT HITAM 15X20 CM
1 2 3 4 5 6
SENG PLAT SENG GELOMBANG ATAP GENTENG METAL 0,25 MM PERABUNG GENTENG METAL BULAT BOLA - BOLA ATAP GENTENG PLASTIK GOT
E
CM CM CM CM CM CM
B A HA N A TA P
F
B A H AN A N L A NG NG IT IT - L A N GI GI T DA D A N L A P. P. DI DI N DI DI NG NG
1 2 3 4 5 6
PL PLYW OOD 4 MM PLYW OOD 9 MM GYPSUM 9 MM GRC BOARD 9 MM LIST PROFIL KAYU K1 LIST PROFIL GYPSUM h = 15 CM
Page 8
LBR. LBR. M2. LBR. LBR. M'
50,000.00 45,000.00 48,000.00 38,000.00 35,000.00 30,000.00
LBR. LBR. LBR. LBR. M' M'
57,000.00 120,000.00 115,000.00 120,000.00 6,000.00 25,000.00
NO.
JENIS BAHAN
SATUAN
HARGA SATUAN
KETERANGAN
1
2
3
4
5
G
1 2 3 4 5 6 7 8
B A H A N PIP A
STOPKRAN DIA. KRAN AIR DIA. KRAN AIR DIA. PIPA PVC AW PIPA PVC AW PIPA PVC AW PIPA PVC AW SEAL TAPE
3/4 1/2 3/4 1/2 3/4 3 4
" " " " " " "
H
B A HA HA N S A NI NI T A IR IR
1 2 3 4 5 6 7 8 9 10 11
KLOSET JONGKOK PORSELIN KLOSET DUDUK MONOBLOK WASTAFEL FLOOR DRAIN SETARA SUN EI BAK FIBERGLASS TANGKI FIBER, Kap. 1000 Ltr MESIN POMPA AIR MERK SANYO / NASIONAL KRAN AIR DIA. 3/4" , 1/2" SEAL TAPE PINTU FIBER + KOSEN FIBER, KOMPLIT STOP KRAN DIA. 3/4"
I
BH. BH. BH. M' M' M' M' BH.
45,000.00 55,000.00 55,000.00 6,000.00 7,000.00 16,000.00 25,000.00 30,000.00
BH. BH. BH. BH. BH. BH. UNIT BH. BH. BH. UNIT
180,000.00 1,450,000.00 1,250,000.00 15,000.00 160,000.00 950,000.00 1,000,000.00 30,000.00 3,500.00 300,000.00 35,000.00
KG. KG. KG. KG. KG. KG.
23,000.00 17,000.00 22,000.00 17,000.00 22,000.00 23,000.00
" " " "
M2. BH. BH. BH. BH. BH. BH. BH.
850,000.00 200,000.00 12,000.00 15,000.00 14,000.00 15,000.00 20,000.00 20,000.00
MM MM MM
M2. M2. M2.
85,000.00 125,000.00 135,000.00
B A H A N PA K U
1 2 3 4 5 6
PAKU ATAP GENTENG METAL PAKU KAYU PAKU SERI PAKU 2" - 5" PAKU GYPSUM PAKU SKRUP
1 2 3 4 5 6 7 8
PINTU BESI FOLDING GATE + KUNCI TANAM BIASA GRENDEL PINTU 4 ENGSEL PINTU 4 ENGSEL JENDELA 3 GRENDEL JENDELA 2 HAK ANGIN JENDELA HANDLE JENDELA
1 2 3
KACA BENING KACA BENING KACA BURAM
1 2 3 4 5 6 7 8
INSTALASI TITIK LAMPU (KABEL INSTALASI STANDAR PLN) STOP KONTAK PANEL BOX SAKLAR TIGA SAKLAR GANDA SAKLAR TUNGGAL LAMPU XL 18 W ATT BOX NCB KOMPLIT
J
B A H A N P IN IN TU TU D A N P EN EN GG G G A NT NT UN UN G / K U NC NC I
K
PEMASANGAN
B A HA N K A CA
L
3 5 5
B A H A N LI LIS T R IK
M
B AH A H A N F IN IS H I N G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
CAT MINYAK SETARA PLATON CAT TEMBOK SETARA PLATON CAT VERNISH CAT KAYU DASAR / MENI MINYAK CAT TH THINEER RE RESIDU DEMPUL PLAMIR RJ KERTAS PASIR / AMPLAS TEPUNG PENGISI NAT KERAMIK KUAS 3" MINYAK BEKISTING CAT IMPRA CAT VERNIS
Page 9
TTK. BH. BH. BH. BH. BH. BH. BH.
190,000.00 50,000.00 2,500,000.00 60,000.00 50,000.00 40,000.00 45,000.00 50,000.00
KG. KG. KG. KG. LTR. LTR. KG. KG. KG. LBR. KG. BH. LTR. KG. LTR.
34,000.00 7,500.00 55,000.00 25,000.00 21,000.00 21,000.00 8,000.00 9,000.00 10,000.00 3,500.00 12,000.00 12,000.00 4,000.00 35,000.00 34,000.00
NO.
JENIS BAHAN
SATUAN
HARGA SATUAN
KETERANGAN KETER ANGAN
1
2
3
4
5
N
1 2 3 4 5
B A J A R IN G A N
PROFIL C.85.40.7 PROFIL U.41.33.5 W TEKS 12-14 x 20 HW FS CLASS II CSP 10-16 x 16 HW FS CLASS II SG 10 MULTIPLATE
O
MOBILISASI
1 2 3
TR TRONTON CRANE HA HAMMER
Page 10
KG. KG. PC. PC. PC.
15,000.00 15,000.00 750.00 500.00 3,000.00
JAM JAM JAM
170,000.00 190,000.00 60,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN KEGIA EGIATA TAN N
: PENI PENING NGK KATA ATAN PEM PEMBANG BANGUN UNAN AN PAS PASAR PEDE PEDESA SAAN AN DI KECA KECAM MATAN TAN MERB ERBAU
PEKE PEKERJ RJAA AAN N
: PEM PEMBANG BANGUN UNAN AN MCK UNTU UNTUK K PASA PASAR R PEDE PEDESA SAAN AN DI KEC. KEC. MERBA ERBAU U 2 UNIT UNIT
LOKASI
: KECAMATAN MERBAU - KABUPATEN KEPULAUAN ME MERANTI
TAHUN
: 2011
#REF!
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
JUMLAH UPAH
BAHAN
5
6
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN 1 M'
PENGUKURAN DAN PEMASANGAN BOWPLANK
TENAGA
Pekerja
0.1000
OH OH
65,000.00
6,500.00
Tukang Kayu
0.1000
OH OH
75,000.00
7,500.00
Kepala Tukang
0.0100
OH OH
85,000.00
850.00
Mandor
0.0050
OH OH
85,000.00
425.00
Kayu 5/7
0.0120
M3 M3
2,200,000.00
Paku Biasa 2'-5'
0.0200
Kg Kg
17,000.00
340.00
Kayu Papan 3/20
0.0070
Kg Kg
2,300,000.00
16,100.00
BAHAN
SUB TOTAL
26,400.00
15,275.00
JUMLAH DIBULATKAN
1 M2
42,840.00 58,115.00 58,110.00
MEMBE MEMBERS RSIHK IHKAN AN LAPA LAPANG NGAN AN DAN DAN PERA PERALA LATA TAN N
TENAGA
Pekerja
0.1000
OH OH
65,000.00
Mandor
0.0500
OH OH
85,000.00
6,500.00 4,250.00
SUB TOTAL
10,750.00
-
JUMLAH
10,750.00
DIBULATKAN
10,750.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH 1 M3 M3
GALI GALIAN AN TANA TANAH H BIAS BIASA A SEDA SEDALA LAM M 1M
TENAGA
Pekerja Tukang Kepala Tukang Mandor
0.4000 0.0400
OH OH OH OH OH OH
65,000.00 85,000.00
26,000.00 3,400.00 29,400.00
SUB TOTAL JUMLAH DIBULATKAN
1 M3
29,400.00 29,400.00
URUGAN KEMBALI
TENAGA
Pekerja Mandor
0.1920 0.0190
OH OH OH OH
65,000.00 85,000.00
12,480.00 1,615.00 14,095.00
SUB TOTAL JUMLAH DIBULATKAN
1 M3
14,095.00 14,095.00
URUGAN PASIR
TENAGA
Pekerja Tukang Kepala Tukang Mandor
0.3000 0.0100
OH OH OH OH OH OH
65,000.00 85,000.00
Pasir urug
1.2000
M3 M3
260,000.00
19,500.00 850.00
BAHAN SUB TOTAL
JUMLAH DIBULATKAN
Page 11 of 22
20,350.00
312,000.00 312,000.00 332,350.00 332,350.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
1 M3
JUMLAH UPAH
BAHAN
5
6
URUGAN TANAH
TENAGA
Pekerja Tukang Kepala Tukang Mandor
0.3000 0.0100
OH OH OH OH OH OH
65,000.00 85,000.00
Tanah
1.2000
M3 M3
270,000.00
19,500.00 850.00
BAHAN SUB TOTAL
20,350.00
JUMLAH DIBULATKAN
1 M3 M3
324,000.00 324,000.00 344,350.00 344,350.00
URUG URUGA AN TA TANAH NAH HI HITAM/ TAM/H HUMU UMUS
TENAGA
Pekerja Tukang Kepala Tukang Mandor
0.3000 0.0100
OH OH OH OH OH OH
65,000.00 85,000.00
Tanah Hitam / Humus
1.2000
M3 M3
180,000.00
19,500.00 850.00
BAHAN SUB TOTAL
20,350.00
JUMLAH DIBULATKAN
216,000.00 216,000.00 236,350.00 236,350.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING 1 M2 M2
PASA PASANG NGAN AN BATA BATA MERA MERAH H TEB TEBAL AL 1 BAT BATA A (1: (1:4) 4)
TENAGA
Pekerja Tukang Kepala Tukang Mandor
0.6500 0.2000 0.0200 0.0300
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Batu Bata Semen Portland Pasir Pasang
202.0000 26.5500 0.0930
Bh Bh Kg Kg M3 M3
1,500.00 1,500.00 290,000.00
42,250.00 15,000.00 1,700.00 2,550.00
BAHAN
SUB TOTAL
61,500.00
JUMLAH DIBULATKAN
1 M2
303,000.00 39,825.00 26,970.00 369,795.00 431,295.00 431,290.00
PASA PASANG NGAN AN BATA BATA MERA MERAH H TEBA TEBAL L 1/2 1/2 BAT BATA A (1: (1:2) 2)
TENAGA
Pekerja Tukang Kepala Tukang Mandor
0.3200 0.1000 0.0100 0.0150
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Batu Bata Semen Portland Pasir Pasang
102.0000 18.9500 0.0380
Bh Bh Kg Kg M3 M3
1,500.00 1,500.00 290,000.00
20,800.00 7,500.00 850.00 1,275.00
BAHAN
SUB TOTAL
30,425.00
JUMLAH DIBULATKAN
1 M2
153,000.00 28,425.00 11,020.00 192,445.00 222,870.00 222,870.00
PASA PASANG NGAN AN BATA BATA MERA MERAH H TEBA TEBAL L 1/2 1/2 BAT BATA A (1: (1:4) 4)
TENAGA
Pekerja Tukang Kepala Tukang Mandor
0.3200 0.1000 0.0100 0.0150
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Batu Bata Semen Portland Pasir Pasang
102.0000 11.5000 0.0430
Bh Bh Kg Kg M3 M3
1,500.00 1,500.00 290,000.00
20,800.00 7,500.00 850.00 1,275.00
BAHAN
SUB TOTAL
JUMLAH DIBULATKAN
Page 12 of 22
30,425.00
153,000.00 17,250.00 12,470.00 182,720.00 213,145.00 213,140.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
1 M2
JUMLAH UPAH
BAHAN
5
6
PASA PASANG NGAN AN BATU BATU KERA KERAWA WANG NG (1:4) (1:4)
TENAGA
Pekerj a Tukang Kepala Tukang Mandor
0.3200 0.1000 0.0100 0.0150
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Batu Kerawang Semen Portland Pasir Pasang
25.0000 5.7500 0.0215
Bh Bh Kg Kg M3 M3
2,300.00 1,500.00 290,000.00
20,800.00 7,500.00 850.00 1,275.00
BAHAN
SUB TOTAL
30,425.00
JUMLAH DIBULATKAN
57,500.00 8,625.00 6,235.00 72,360.00 102,785.00 102,780.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN 1 M2 M2
PLES LESTER TERAN 1: 1:2, TEBA TEBAL L 20 20 MM MM
TENAGA
Pekerj a Tukang batu Kepala Tukang Mandor
0.2500 0.2000 0.0200 0.0125
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Semen Portland Pasir Pasang
14.2800 0.0230
Kg Kg M3 M3
1,500.00 290,000.00
16,250.00 15,000.00 1,700.00 1,062.50
BAHAN
SUB TOTAL
34,012.50
JUMLAH DIBULATKAN
1 M2 M2
21,420.00 6,670.00 28,090.00 62,102.50 62,100.00
PLES LESTER TERAN 1: 1:4, TEBA TEBAL L 20 20 MM MM
TENAGA
Pekerj a Tukang batu Kepala Tukang Mandor
0.2500 0.2000 0.0200 0.0125
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Semen Portland Pasir Pasang
8.6800 0.0280
Kg Kg M3 M3
1,500.00 290,000.00
16,250.00 15,000.00 1,700.00 1,062.50
BAHAN
SUB TOTAL
34,012.50
JUMLAH DIBULATKAN
1 M2
13,020.00 8,120.00 21,140.00 55,152.50 55,150.00
PLES PLESTE TERA RAN N MERA MERABE BEN N 1:3 1:3,, TEBA TEBAL L 30 MM
TENAGA
Pekerj a Tukang batu Kepala Tukang Mandor
0.1500 0.0700 0.0070 0.0080
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Semen Portland Pasir Pasang
7.0700 0.0210
Kg Kg M3 M3
1,500.00 290,000.00
9,750.00 5,250.00 595.00 680.00
BAHAN
SUB TOTAL
16,275.00
JUMLAH DIBULATKAN
1 M2 M2
10,605.00 6,090.00 16,695.00 32,970.00 32,970.00
PLES PLESTE TERA RAN N BET BETON ON 1:3, 1:3, TEBA TEBAL L 10 10 MM MM
TENAGA
Pekerj a Tukang batu Kepala Tukang Mandor
0.2000 0.2000 0.0180 0.0100
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Semen Portland Pasir Pasang
2.3400 0.0070
Kg Kg M3 M3
1,500.00 290,000.00
13,000.00 15,000.00 1,530.00 850.00
BAHAN
SUB TOTAL
JUMLAH DIBULATKAN
Page 13 of 22
30,380.00
3,510.00 2,030.00 5,540.00 35,920.00 35,920.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
JUMLAH UPAH
BAHAN
5
6
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP 1 M2 M2
PASA PASANG NG ATAP TAP GE GENTE NTENG META METAL L
TENAGA
Pekerja T ukang Kayu Kepala T ukang Mandor
0.2000 0.1000 0.0100 0.0010
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
1.0200 0.2000
M2 M2 Kg Kg
48,000.00 23,000.00
13,000.00 7,500.00 850.00 85.00
BAHAN
Atap Genteng metal Paku atap genteng metal SUB TOTAL
21,435.00
JUMLAH DIBULATKAN
1 M' M'
48,960.00 4,600.00 53,560.00 74,995.00 74,990.00
PASA PASANG NG PARABU RABUNG NG GENT GENTE ENG META METAL L
TENAGA
Pekerja T ukang Kayu Kepala T ukang Mandor
0.2500 0.1500 0.0150 0.0130
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Parabung genteng metal Paku biasa 2'-5'
1.1000 0.0500
Lb L br Kg Kg
38,000.00 17,000.00
16,250.00 11,250.00 1,275.00 1,105.00
BAHAN
SUB TOTAL
29,880.00
JUMLAH DIBULATKAN
1 M'
41,800.00 850.00 42,650.00 72,530.00 72,530.00
PASANG JURAI DALAM
TENAGA
Pekerja T ukang Kayu Kepala T ukang Mandor
0.2000 0.1500 0.0150 0.0130
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Seng Plat Plastik Got Paku biasa 2'-5'
0.2500 0.3000 0.0500
m2 m2 M' M' Kg Kg
50,000.00 30,000.00 17,000.00
13,000.00 11,250.00 1,275.00 1,105.00
BAHAN
SUB TOTAL
26,630.00
JUMLAH DIBULATKAN
1 M'
12,500.00 9,000.00 850.00 22,350.00 48,980.00 48,980.00
PASANG BOLA - BOLA ATAP
TENAGA
Pekerja T ukang Kayu Kepala T ukang Mandor
0.2000 0.1500 0.0150 0.0130
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Bola - Bola Genteng Paku biasa 2'-5'
0.5000 0.0500
Lb L br Kg Kg
35,000.00 17,000.00
13,000.00 11,250.00 1,275.00 1,105.00
BAHAN
SUB TOTAL
26,630.00
JUMLAH DIBULATKAN
1 M3 M3
17,500.00 850.00 18,350.00 44,980.00 44,980.00
PASA PASANG NG KUDA KUDA - KUD KUDA A KAY KAYU U KEL KELAS AS II
TENAGA
Pekerja T ukang kayu Kepala T ukang Mandor
4.0000 12.0000 1.2000 0.2000
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Kayu Kelas II Balok Paku Biasa 2" - 5"
1.1000 7.0000
M3 M3 Kg Kg
2,200,000.00 17,000.00
260,000.00 900,000.00 102,000.00 17,000.00
BAHAN
SUB TOTAL
JUMLAH DIBULATKAN
Page 14 of 22
1,279,000.00
2,420,000.00 119,000.00 2,539,000.00 3,818,000.00 3,818,000.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
1 M3
JUMLAH UPAH
BAHAN
5
6
PASA PASANG NG GORD GORDIN ING G KAY KAYU U KEL KELAS AS II
TENAGA
Pekerja Tukang kayu Kepala Tukang Mandor
2.0000 6.0000 0.6000 0.1000
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Kayu Kelas II Balok Paku Biasa 2" - 5"
1.1000 6.0000
M3 M3 Kg Kg
2,200,000.00 17,000.00
130,000.00 450,000.00 51,000.00 8,500.00
BAHAN
SUB TOTAL
639,500.00
JUMLAH DIBULATKAN
1 M2 M2
2,420,000.00 102,000.00 2,522,000.00 3,161,500.00 3,161,500.00
PASA PASANG NG RANGKA RANGKA ATAP ATAP (KASA (KASAU+R U+RENG ENG)) KAY KAYU U KELA KELAS S II II
TENAGA
Pekerja Tukang kayu Kepala Tukang Mandor
0.1000 0.1000 0.0100 0.0050
OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Kayu Kelas II Balok Paku Biasa 2" - 5"
0.0106 0.1500
M3 Kg
2,200,000.00 17,000.00
6,500.00 7,500.00 850.00 425.00
BAHAN
SUB TOTAL
15,275.00
JUMLAH DIBULATKAN
1 M' M'
23,320.00 2,550.00 25,870.00 41,145.00 41,145.00
PASANG LISP LISPLA LAN NG UKU UKURA RAN N 2 X3/ X3/20 20
TENAGA
Pekerja Tukang kayu Kepala Tukang Mandor
0.1000 0.1000 0.0100 0.0500
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Kayu / papan Meranti Paku biasa
0.0088 0.0600
M3 M3 Kg Kg
2,200,000.00 17,000.00
6,500.00 7,500.00 850.00 4,250.00
BAHAN
SUB TOTAL
19,100.00
JUMLAH DIBULATKAN
19,360.00 1,020.00 20,380.00 39,480.00 39,480.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT 1 M2
PASANG PLA PLAFON FOND TRI TRIPL PLE EK 4 MM MM
TENAGA
Pekerja Tukang Kayu Kepala Tukang Mandor
0.0250 0.0750 0.0075 0.0013
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Plywood 4 mm Paku biasa
0.4000 0.0500
Lb L br Kg Kg
57,000.00 17,000.00
1,625.00 5,625.00 637.50 110.50
BAHAN
SUB TOTAL
7,998.00
JUMLAH DIBULATKAN
1 M2 M2
22,800.00 850.00 23,650.00 31,648.00 31,640.00
PASA PASANG NG RANG RANGKA KA PLAF PLAFON OND D (RA (RANG NGKA KA KAYU KAYU))
TENAGA
Pekerja Tukang kayu Kepala Tukang Mandor
0.1500 0.2500 0.0250 0.0750
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Kayu Meranti Paku biasa
0.0120 0.1000
M3 M3 Kg Kg
2,200,000.00 17,000.00
9,750.00 18,750.00 2,125.00 6,375.00
BAHAN
SUB TOTAL
JUMLAH DIBULATKAN
Page 15 of 22
37,000.00
26,400.00 1,700.00 28,100.00 65,100.00 65,100.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
1 M'
JUMLAH UPAH
BAHAN
5
6
LIST PL PLAFOND PR PROFIL KA KAYU
TENAGA
Pekerj a Tukang Kayu Kepala Tukang Mandor
0.0500 0.0500 0.0050 0.0030
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
List Kayu Profil Paku biasa
0.5000 0.0100
Lb Lbr Kg Kg
6,000.00 17,000.00
3,250.00 3,750.00 425.00 255.00
BAHAN
SUB TOTAL
7,680.00
JUMLAH DIBULATKAN
3,000.00 170.00 3,170.00 10,850.00 10,850.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON 1 M3
M EM EM BU BUAT BETON 1 :3 :3:5
TENAGA
Pekerj a Tukang batu Kepala Tukang Mandor
1.6500 0.2500 0.0250 0.0800
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Semen Portland Pasir Beton Koral Beton
218.0000 0.5200 0.8700
Kg Kg M3 M3 M3 M3
1,500.00 290,000.00 400,000.00
107,250.00 18,750.00 2,125.00 6,800.00
BAHAN
SUB TOTAL
134,925.00
JUMLAH DIBULATKAN
1 M3 M3
327,000.00 150,800.00 348,000.00 825,800.00 960,725.00 960,720.00
MEMB MEMBUA UAT T BET BETON ON BERT BERTUL ULAN ANG G K 225 225 + BEKI BEKIST STIN ING G
TENAGA
Pekerj a Tukang Kayu Tukang batu Kepala Tukang Mandor
2.0000 0.1000 0.3500 0.0350 1.0000
OH OH OH OH OH OH OH OH OH OH
65,000.00 75,000.00 75,000.00 85,000.00 85,000.00
Kayu Meranti Paku Semen Portland Pasir Beton Koral Beton
0.1300 M3 M3 1.0000 Kg Kg 371.0000 Kg Kg 0.4986 M3 M3 0.7756 M3 M3
2,200,000.00 17,000.00 1,500.00 290,000.00 400,000.00
130,000.00 7,500.00 26,250.00 2,975.00 85,000.00
BAHAN
SUB TOTAL
251,725.00
JUMLAH DIBULATKAN
1 M3
286,000.00 17,000.00 556,500.00 144,585.71 310,222.22 1,314,307.94 1,566,032.94 1,566,032.00
MEMB MEMBUA UAT T BET BETON ON BERT BERTUL ULAN ANG G K 225 225
TENAGA
Pekerj a Tukang batu Kepala Tukang Mandor
1.6500 0.2750 0.0280 0.0830
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Semen Portland Pasir Beton Koral Beton
371.0000 0.4986 0.7756
Kg Kg M3 M3 M3 M3
1,500.00 290,000.00 400,000.00
107,250.00 20,625.00 2,380.00 7,055.00
BAHAN
SUB TOTAL
JUMLAH DIBULATKAN
Page 16 of 22
137,310.00
556,500.00 144,585.71 310,222.22 1,011,307.94 1,148,617.94 1,148,617.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
1 M3
JUMLAH UPAH
BAHAN
5
6
MEMBU MEMBUAT AT PON PONDA DASI SI /POER /POER BETO BETON N BERT BERTULA ULANG NG (90 (90 KG+BE KG+BEKIS KISTIN TING) G)
TENAGA
Pekerj a Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
3.9000 0.3500 1.0400 1.0500 0.2450 0.1650
OH OH OH OH OH OH OH OH OH OH OH OH
65,000.00 75,000.00 75,000.00 75,000.00 85,000.00 85,000.00
Kayu Paku Biasa Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Koral Beton
0.2000 1.5000 0.4000 90.0000 2.0000 371.0000 0.4986 0.7756
M3 Kg Kg Lt Ltr Kg Kg Kg Kg Kg Kg M3 M3 M3 M3
2,000,000.00 17,000.00 4,000.00 13,000.00 17,000.00 1,500.00 290,000.00 400,000.00
253,500.00 26,250.00 78,000.00 78,750.00 20,825.00 14,025.00
BAHAN
SUB TOTAL
471,350.00
JUMLAH DIBULATKAN
1 M3 M3
400,000.00 25,500.00 1,600.00 1,170,000.00 34,000.00 556,500.00 144,585.71 310,222.22 2,642,407.94 3,113,757.94 3,113,750.00
MEMBU MEMBUAT AT SLOOF SLOOF BETON BETON BERTU BERTULA LANG NG 90 KG+BE KG+BEKIS KISTIN TING) G)
TENAGA
Pekerj a Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
4.8500 0.3500 1.5600 1.4000 0.3310 0.1700
OH OH OH OH OH OH OH OH OH OH OH OH
65,000.00 75,000.00 75,000.00 75,000.00 85,000.00 85,000.00
Kayu Paku Biasa Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Koral Beton
0.2200 2.0000 0.6000 90.0000 2.0000 371.0000 0.4986 0.7756
M3 Kg Kg Lt Ltr Kg Kg Kg Kg Kg Kg M3 M3 M3 M3
2,000,000.00 17,000.00 4,000.00 13,000.00 17,000.00 1,500.00 290,000.00 400,000.00
315,250.00 26,250.00 117,000.00 105,000.00 28,135.00 14,450.00
BAHAN
SUB TOTAL
606,085.00
JUMLAH DIBULATKAN
1 M3 M3
440,000.00 34,000.00 2,400.00 1,170,000.00 34,000.00 556,500.00 144,585.71 310,222.22 2,691,707.94 3,297,792.94 3,297,790.00
MEMBU MEMBUAT AT KOLOM KOLOM BETO BETON N BER BERTU TULA LANG NG (90 KG+BE KG+BEKIS KISTIN TING) G)
TENAGA
Pekerj a Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
5.9600 0.3500 3.3000 2.1000 0.5700 0.2500
OH OH OH OH OH OH OH OH OH OH OH OH
65,000.00 75,000.00 75,000.00 75,000.00 85,000.00 85,000.00
Kayu Paku Biasa Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Koral Beton Kayu balok Plywood Dolken
0.4000 4.0000 2.0000 90.0000 2.5000 371.0000 0.4986 0.7756 0.1500 3.5000 24.0000
M3 Kg Kg Lt Ltr Kg Kg Kg Kg Kg Kg M3 M3 M3 M3 M3 Lb Lbr Bt Btg
2,000,000.00 17,000.00 4,000.00 13,000.00 17,000.00 1,500.00 290,000.00 400,000.00 2,000,000.00 57,000.00 10,000.00
387,400.00 26,250.00 247,500.00 157,500.00 48,450.00 21,250.00
BAHAN
SUB TOTAL
JUMLAH DIBULATKAN
Page 17 of 22
888,350.00
800,000.00 68,000.00 8,000.00 1,170,000.00 42,500.00 556,500.00 144,585.71 310,222.22 300,000.00 199,500.00 240,000.00 3,839,307.94 4,727,657.94 4,727,650.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
1 M3
JUMLAH UPAH
BAHAN
5
6
MEMBU MEMBUAT AT PLA PLAT T LANTA LANTAII BETON BETON BERT BERTULA ULANG NG (90 (90 KG+BE KG+BEKIS KISTIN TING) G)
TENAGA
Pekerj a Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
5.6000 0.3500 2.6400 1.0500 0.4000 0.1930
OH OH OH OH OH OH OH OH OH OH OH OH
65,000.00 75,000.00 75,000.00 75,000.00 85,000.00 85,000.00
Kayu Paku Biasa Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Koral Beton Kayu balok Plywood 4 mm Dolken
0.2400 3.2000 1.6000 90.0000 2.2500 371.0000 0.4986 0.7756 0.1500 2.8000 30.0000
M3 Kg Kg Lt Ltr Kg Kg Kg Kg Kg Kg M3 M3 M3 M3 M3 Lb Lbr Bt Btg
2,000,000.00 17,000.00 4,000.00 13,000.00 17,000.00 1,500.00 290,000.00 400,000.00 2,000,000.00 57,000.00 10,000.00
364,000.00 26,250.00 198,000.00 78,750.00 34,000.00 16,405.00
BAHAN
SUB TOTAL
717,405.00
JUMLAH DIBULATKAN
1 M3
480,000.00 54,400.00 6,400.00 1,170,000.00 38,250.00 556,500.00 144,585.71 310,222.22 300,000.00 159,600.00 300,000.00 3,519,957.94 4,237,362.94 4,237,360.00
MEMBU MEMBUAT AT RENG RENG BALOK BALOK BETON BETON BERTU BERTULA LANG NG (90 (90 KG+BE KG+BEKIS KISTIN TING) G)
TENAGA
Pekerj a Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
5.6000 0.3500 2.6400 1.0500 0.4000 0.1930
OH OH OH OH OH OH OH OH OH OH OH OH
65,000.00 75,000.00 75,000.00 75,000.00 85,000.00 85,000.00
Kayu Paku Biasa Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Koral Beton Kayu balok Plywood 4 mm Dolken
0.2500 3.2000 1.6000 90.0000 2.2500 371.0000 0.4986 0.7756 0.1400 2.8000 16.0000
M3 Kg Kg Lt Ltr Kg Kg Kg Kg Kg Kg M3 M3 M3 M3 M3 Lb Lbr Bt Btg
2,000,000.00 17,000.00 4,000.00 13,000.00 17,000.00 1,500.00 290,000.00 400,000.00 2,000,000.00 57,000.00 10,000.00
364,000.00 26,250.00 198,000.00 78,750.00 34,000.00 16,405.00
BAHAN
SUB TOTAL
717,405.00
JUMLAH DIBULATKAN
1 M3 M3
500,000.00 54,400.00 6,400.00 1,170,000.00 38,250.00 556,500.00 144,585.71 310,222.22 280,000.00 159,600.00 160,000.00 3,379,957.94 4,097,362.94 4,097,360.00
MEMBU MEMBUAT AT BALOK BALOK BETON BETON BERTU BERTULA LANG NG (90 (90 KG+BEK KG+BEKIST ISTING ING))
TENAGA
Pekerj a Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
5.6000 0.3500 2.6400 1.0500 0.4000 0.1930
OH OH OH OH OH OH OH OH OH OH OH OH
65,000.00 75,000.00 75,000.00 75,000.00 85,000.00 85,000.00
Kayu Paku Biasa Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Koral Beton Kayu balok Plywood 4 mm Dolken
0.3200 3.2000 1.6000 90.0000 2.2500 371.0000 0.5200 0.7800 0.1600 2.8000 16.0000
M3 Kg Kg Lt Ltr Kg Kg Kg Kg Kg Kg M3 M3 M3 M3 M3 Lb Lbr Bt Btg
2,000,000.00 17,000.00 4,000.00 13,000.00 17,000.00 1,500.00 290,000.00 400,000.00 2,000,000.00 57,000.00 10,000.00
364,000.00 26,250.00 198,000.00 78,750.00 34,000.00 16,405.00
BAHAN
SUB TOTAL
JUMLAH DIBULATKAN
Page 18 of 22
717,405.00
640,000.00 54,400.00 6,400.00 1,170,000.00 38,250.00 556,500.00 150,800.00 312,000.00 320,000.00 159,600.00 160,000.00 3,567,950.00 4,285,355.00 4,285,350.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
1 M1
JUMLAH UPAH
BAHAN
5
6
MEMBUA MEMBUAT T KOLOM KOLOM PRAK PRAKTIS TIS BETO BETON N BERTU BERTULA LANG NG ( 10 10 x 10 CM CM + BEKIS BEKISTIN TING) G)
TENAGA
Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
0.0600 0.0200 0.0200 0.0200 0.0060 0.0030
OH OH OH OH OH OH OH OH OH OH OH OH
65,000.00 75,000.00 75,000.00 75,000.00 85,000.00 85,000.00
Kayu Paku Biasa Besi beton polos Kawat beton Semen Portland Pasir Beton Koral Beton
0.0020 0.0100 3.0000 0.4500 4.0000 0.0060 0.0090
M3 M3 Kg Kg Kg Kg Kg Kg Kg Kg M3 M3 M3 M3
2,000,000.00 17,000.00 13,000.00 17,000.00 1,500.00 290,000.00 400,000.00
3,900.00 1,500.00 1,500.00 1,500.00 510.00 255.00
BAHAN
SUB TOTAL
9,165.00
JUMLAH DIBULATKAN
4,000.00 170.00 39,000.00 7,650.00 6,000.00 1,740.00 3,600.00 62,160.00 71,325.00 71,320.00
ANALISA BIAYA BIAYA KONSTRUKSI KONSTRUKSI PEKERJAAN LANTAI & DINDING DINDING 1 M2 M2
PASA PASANG NG LANT LANTA AI KER KERA AMIK MIK 20x 20x25 25
TENAGA
Pekerja Tukang Batu Kepala Tukang Mandor
0.6200 0.3500 0.0350 0.0300
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Keramik 20x25 cm Semen Portland Pasir Pasang Semen warna
20.0000 11.3800 0.0420 1.0000
Bh Bh Kg Kg M3 M3 Kg Kg
3,250.00 1,500.00 290,000.00 12,000.00
40,300.00 26,250.00 2,975.00 2,550.00
BAHAN
SUB TOTAL
72,075.00
JUMLAH DIBULATKAN
1 M2 M2
65,000.00 17,070.00 12,180.00 12,000.00 106,250.00 178,325.00 178,320.00
PASA PASANG NG LANT LANTA AI KER KERA AMIK MIK 20x 20x20 20
TENAGA
Pekerja Tukang Batu Kepala Tukang Mandor
0.6200 0.3500 0.0350 0.0300
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Keramik 20x20 cm Semen Portland Pasir Pasang Semen warna
25.0000 11.3800 0.0420 1.0000
Bh Bh Kg Kg M3 M3 Kg Kg
2,600.00 1,500.00 290,000.00 2,500.00
40,300.00 26,250.00 2,975.00 2,550.00
BAHAN
SUB TOTAL
72,075.00
JUMLAH DIBULATKAN
65,000.00 17,070.00 12,180.00 2,500.00 96,750.00 168,825.00 168,820.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI 1 SET SET
MEMAS MEMASAN ANG G 1 BUAH BUAH KLOS KLOSET ET JONG JONGKOK KOK STA STANDA NDART RT
TENAGA
Pekerja Tukang Batu Kepala Tukang Mandor
1.0000 1.5000 0.1500 0.1600
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Kloset Jongkok Semen Portland Pasir pasang
1.0000 6.0000 0.0100
Bh Bh Kg Kg M3 M3
180,000.00 1,500.00 290,000.00
65,000.00 112,500.00 12,750.00 13,600.00
BAHAN
SUB TOTAL
JUMLAH DIBULATKAN
Page 19 of 22
203,850.00
180,000.00 9,000.00 2,900.00 191,900.00 395,750.00 395,750.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
1 SET SET
JUMLAH UPAH
BAHAN
5
6
MEMAS MEMASAN ANG G 1 BUAH BUAH KLO KLOSET SET DUD DUDUK UK MON MONOBL OBLOK OK
TENAGA
Pekerj a Tukang Batu Kepala Tukang Mandor
3.3000 1.1000 0.0010 0.1600
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Kloset Duduk/monoblok Perlengkapan (6% dari harga kloset)
1.0000 1.0000
Bh Bh Ls Ls
1,450,000.00 87,000.00
214,500.00 82,500.00 85.00 13,600.00
BAHAN
SUB TOTAL
310,685.00
JUMLAH DIBULATKAN
1 SET SET
1,450,000.00 87,000.00 1,537,000.00 1,847,685.00 1,847,680.00
MEMA MEMASA SANG NG 1 BUA BUAH H WAS WASTA TAFE FEL L
TENAGA
Pekerj a Tukang Batu Kepala Tukang Mandor
1.2000 1.4500 0.1500 0.1000
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
W astafel Perlengkapan (12% dari harga W astafel) Semen Portland Pasir pasang
1.0000 1.0000 6.0000 0.0100
Bh Bh Ls Ls Kg Kg M3 M3
1,250,000.00 150,000.00 1,500.00 290,000.00
78,000.00 108,750.00 12,750.00 8,500.00
BAHAN
SUB TOTAL
208,000.00
JUMLAH DIBULATKAN
1 SET
1,250,000.00 150,000.00 9,000.00 2,900.00 1,411,900.00 1,619,900.00 1,619,900.00
MEMASAN MEMASANG G 1 BUAH BUAH BAK MANDI MANDI FIBERG FIBERGLAS LASS S KAPAS KAPASITA ITAS S 0.5 M3
TENAGA
Pekerj a Tukang Batu Kepala Tukang Mandor
1.2000 1.4500 0.1500 0.1000
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Bak fiberglass Per le lengk ap apan (18% dari har ga ga bak fiber gl glass )
1.0000 1.0000
Bh Bh Ls Ls
160,000.00 28,800.00
78,000.00 108,750.00 12,750.00 8,500.00
BAHAN
SUB TOTAL
208,000.00
JUMLAH DIBULATKAN
1 BH
160,000.00 28,800.00 188,800.00 396,800.00 396,800.00
MEMASAN MEMASANG G 1 BUAH BUAH BAK BAK KONTR KONTROL OL PAS.B PAS.BATU ATU BATA BATA (45 (45 x 45) TINGGI TINGGI 50 50 CM
TENAGA
Pekerj a Tukang Batu Kepala Tukang Mandor
1.4200 0.4730 0.0470 0.0710
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Batu bata Semen portland Pasir Pasang Batu Kerikil Besi Beton Pasir beton
250.0000 77.0000 0.1300 0.0200 2.6000 0.0900
Bh Bh Kg Kg M3 M3 M3 M3 Kg Kg M3 M3
1,500.00 1,500.00 290,000.00 400,000.00 13,000.00 290,000.00
92,300.00 35,475.00 3,995.00 6,035.00
BAHAN
SUB TOTAL
137,805.00
JUMLAH DIBULATKAN
1 M' M'
375,000.00 115,500.00 37,700.00 8,000.00 33,800.00 26,100.00 596,100.00 733,905.00 733,900.00
MEMA MEMASA SANG NG PIPA PIPA PVC PVC TYP TYPE E AW AW DIA DIA.. 1/2 1/2" "
TENAGA
Pekerj a Tukang Batu Kepala Tukang Mandor
0.0360 0.0600 0.0060 0.0018
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Pipa PVC Perlengkapan (35%)
1.2000 1.0000
M' M' Ls Ls
6,000.00 2,100.00
2,340.00 4,500.00 510.00 153.00
BAHAN
SUB TOTAL
JUMLAH DIBULATKAN
Page 20 of 22
7,503.00
7,200.00 2,100.00 9,300.00 16,803.00 16,800.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
1 M' M'
JUMLAH UPAH
BAHAN
5
6
MEMA MEMASA SANG NG PIPA PIPA PVC PVC TYP TYPE E AW AW DIA DIA.. 3/4 3/4" "
TENAGA
Pekerj a Tukang Batu Kepala Tukang Mandor
0.0360 0.0600 0.0060 0.0018
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Pipa PVC Perlengkapan (35%)
1.2000 1.0000
M' M' Ls Ls
7,000.00 2,450.00
2,340.00 4,500.00 510.00 153.00
BAHAN
SUB TOTAL
7,503.00
JUMLAH DIBULATKAN
1 M' M'
8,400.00 2,450.00 10,850.00 18,353.00 18,350.00
MEMA MEMASA SANG NG PIPA PIPA PVC PVC TYP TYPE E AW AW DIA DIA. 3" 3"
TENAGA
Pekerj a Tukang Batu Kepala Tukang Mandor
0.0810 0.1350 0.0135 0.0041
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Pipa PVC Perlengkapan (35%)
1.2000 1.0000
M' M' Ls Ls
25,000.00 8,750.00
5,265.00 10,125.00 1,147.50 348.50
BAHAN
SUB TOTAL
16,886.00
JUMLAH DIBULATKAN
1 M' M'
30,000.00 8,750.00 38,750.00 55,636.00 55,630.00
MEMA MEMASA SANG NG PIPA PIPA PVC PVC TYP TYPE E AW AW DIA DIA. 4" 4"
TENAGA
Pekerj a Tukang Batu Kepala Tukang Mandor
0.0810 0.1350 0.0135 0.0041
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Pipa PVC Perlengkapan (35%)
1.2000 1.0000
M' M' Ls Ls
25,000.00 8,750.00
5,265.00 10,125.00 1,147.50 348.50
BAHAN
SUB TOTAL
16,886.00
JUMLAH DIBULATKAN
1 BH BH
30,000.00 8,750.00 38,750.00 55,636.00 55,630.00
MEMA MEMASA SANG NG KRAN KRAN DIA. DIA. 1/2" 1/2" ATAU ATAU 3/4" 3/4"
TENAGA
Pekerj a Tukang Batu Kepala Tukang Mandor
0.0100 0.1000 0.0100 0.0050
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Kran air Seal Tape
1.0000 0.0250
Bh Bh Bh Bh
55,000.00 30,000.00
650.00 7,500.00 850.00 425.00
BAHAN
SUB TOTAL
9,425.00
JUMLAH DIBULATKAN
1 BH
55,000.00 750.00 55,750.00 65,175.00 65,170.00
MEMA MEMASA SAN NG FLOO LOOR DRAIN
TENAGA
Pekerj a Tukang Batu Kepala Tukang Mandor
0.0100 0.1000 0.0100 0.0050
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
floordrain
1.0000
Bh Bh
15,000.00
650.00 7,500.00 850.00 425.00
BAHAN SUB TOTAL
JUMLAH DIBULATKAN
Page 21 of 22
9,425.00
15,000.00 15,000.00 24,425.00 24,420.00
NO
URAIAN PEKERJAAN
VOLUME
HARGA SATUAN
1
2
3
4
JUMLAH UPAH
BAHAN
5
6
ANALISA BIAYA BIAYA KONSTRUKSI KONSTRUKSI PEKERJAAN PENGECATAN 1 M2
PENGECA PENGECATAN TAN BIDANG BIDANG KAYU KAYU BARU BARU (1 PLAMIR PLAMIR : 1 CAT DASAR DASAR : 2 CAT PENUTUP PENUTUP))
TENAGA
Pekerj a Tukang Cat Kepala Tukang Mandor
0.0700 0.0090 0.0060 0.0025
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Cat meni Plamir Cat dasar Cat penutup 2X
0.2000 0.1500 0.1700 0.2600
Kg Kg Kg Kg Kg Kg Kg Kg
25,000.00 10,000.00 34,000.00 34,000.00
4,550.00 675.00 510.00 212.50
BAHAN
SUB TOTAL
5,947.50
JUMLAH DIBULATKAN
1 M2
5,000.00 1,500.00 5,780.00 8,840.00 21,120.00 27,067.50 27,060.00
PENGECA PENGECATAN TAN BIDANG BIDANG TEMBOK TEMBOK BARU BARU BAG LUAR( LUAR(1 1 PLAMIR PLAMIR : 1 CAT CAT DASAR DASAR : 2 CAT CAT PENUTUP PENUTUP))
TENAGA
Pekerj a Tukang Cat Kepala Tukang Mandor
0.0200 0.0630 0.0063 0.0025
OH OH OH OH OH OH OH OH
65,000.00 75,000.00 85,000.00 85,000.00
Plamir Cat dasar Cat penutup 2X
0.1000 0.1000 0.2600
Kg Kg Kg Kg Kg Kg
10,000.00 7,500.00 7,500.00
1,300.00 4,725.00 535.50 212.50
BAHAN
SUB TOTAL
JUMLAH DIBULATKAN
Page 22 of 22
6,773.00
1,000.00 750.00 1,950.00 3,700.00 10,473.00 10,470.00