Insert the document RF Final Site Configuration from the radio network plan following this section.
2G Flexi MultiRadio BTS SSD
4(22)
3. ANTENNA SYSTEM INSTALLATION REPORT 3.1
Antenna System Configuration Antenna Type Code
SECTOR 1
SECTOR 2
SECTOR 3
DBXLH-8585B-VTM
DBXLH-8585B-VTM
DBXLH-8585B-VTM
Number of Antennas
1
2
0 0 4 4
Set Direction Mechanical Tilt Electrical Tilt 900 Electrical Tilt 1800
54
Mounting Height Sector 1
0
° ° ° °
m. AGL
2
1
120 ° 0 ° 4 ° 4 ° 54 m. AGL
240 ° 0 ° 4 ° 4 54 m. AGL
Sector 1
Ant. B
-45
+45
+45
240
Sector 3
-45
+45
-45
Ant. A
Ant. A 120
+45
0
Sector 2
240
Sector 3
0
+45
-45
120
0
Sector 2
Ant. B
Ant. A +45
2G Flexi MultiRadio BTS SSD
+45
-45
0
-45
0
Ant. A
Ant. A
Antenna Support Structure
+45
0
-45
-45
Ant. B
2
0
Ant. A +45
1
-45
5(22)
3.2
Antenna Feeder Cable Configuration Sector 1
Item/Description
Sector 3
+45O Cable 2
-45O Cable 3
+45O Cable 4
-45O Cable 5
+45O Cable 6
n/a
n/a
n/a
n/a
n/a
n/a
Cable Label Feeder Cable Type:
1.
Sector 2
-45O Cable 1
(e.g. 1/2", 7/8”, 1-5/8")
2.
Installed Feeder Cable length:
n/a
n/a
n/a
n/a
n/a
n/a
3.
Number of Earth kits installed:
n/a
n/a
n/a
n/a
n/a
n/a
4.
Number of EMPs installed:
n/a
n/a
n/a
n/a
n/a
n/a
Internal Jumper Cable Lengths
5.
a.)*
BTS Feeder Cable
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
External Jumper Cable Lengths
6.
a.)* Feeder Cable Antenna b.)*
RF Mod Antenna
3m
n/a
n/a
n/a
n/a
n/a
c.)* RF Mod Feeder Cable
n/a
n/a
n/a
n/a
n/a
n/a
d.)* 2G SYS Mod RF Mod.
Fiber 75m.
Fiber 75m.
Fiber 75m.
Fiber 75m.
Fiber 75m.
Fiber 75m.
e.)* LTE SYS Mod RF Mod.
n/a.
n/a
n/a
n/a
n/a
n/a
* Complete row relevant to antenna configuration:
2G Flexi MultiRadio BTS SSD
6(22)
3.3
Antenna System Installation Checklist Description Antennas mounted according to Standard Procedures and Site Specific Documents Antenna height checked according to Final Site Configuration Antenna forward direction set and checked according to Final Site Configuration Mechanical tilting angle set and checked according to Final Site Configuration Electrical tilting angle set and checked according to Final Site Configuration Antenna mounting clamps & tilting kits checked, all screws tightened Feeder cables installed according to Site Specific Documents Feeder cables grounded at top of support structure close to the antenna Feeder cables grounded at bottom of tower/mast Feeder cables grounded at additional points (d > 80m) where applicable Feeder cables grounded at the entry point to BTS Feeder cables secured in position with cable hangers and clamps Feeder cables labelled correctly (at each end) External jumper cable connectors checked and tightened at both ends All external connectors checked for correct sealing All jumper cable connectors checked and tightened at both ends All jumper cables labelled correctly at both ends
Checke d
N/A
N/A N/A
Notes on Antenna System Installation
2G Flexi MultiRadio BTS SSD
7(22)
4. ANTENNA SYSTEM COMMISSIONING REPORT 4.1
Antenna System VSWR Measurement Results SECTOR 1
SECTOR 2
SECTOR 3
Cable Label: Sweeptests Measurement Results: VSWR for complete Antenna System (NSN/Netone):
n/a
n/a
n/a
n/a
n/a
n/a
RL for complete Antenna System (NSN/Netone):
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Checklist of Printed Sweeptests Results: n/a
Full Antenna Subsystem:
Copies of Antenna Test Result files are printed after this section. Note: Feeder less solution no feeder installed on site. 4.2
Antenna Measurement Equipment Model:
Serial Number:
Manufacturer:
Last Calibration Date:
N.B. Instrument calibration interval shall not exceed 12 month
2G Flexi MultiRadio BTS SSD
8(22)
4.3
Finishing Checklist Description All cables restored to normal position for BTS operation All cable connectors properly tightened All external connectors sealed and waterproof Black Plastic Cable Ties placed on all external sealed cable connections (to secure the PVC tape) Antenna system configuration table completed in Section 3.1 above Feeder inventory list completed in Section 3.2 above Paper copy of the antenna line test results included following each section All VSWR measurement results are within the defined test limits.
Installed 2G Flexi Multi Radio BTS Configuration: 4+4+4+4+4+4
Other: __________________
2+2+2 Feeder Site / Feeder less Site Configuration: Feeder Feeder less Installed LTE Flexi BTS Hardware Module/s: FSMF – SYSTEM MODULE FXEB – 1800 RF MODULE Installed 2G Flexi Multi Radio Hardware Module/s: ESMC – SYSTEM MODULE FXEB – 1800 RF MODULE FXDB – 900 RF MODULE FIQB – TRANSMISSION SUBMODULE FPFC – POWER DISTRIBUTION MODULE FPMA – POWER MODULE FPAA – AC/DC SUBMODULE FPBB – BATTERY Other: __________________ RF sharing on FXEB
2G Flexi MultiRadio BTS SSD
10(22)
BTS Equipment Installation Type and Location: BTS EQUIPMENT ()
BTS EQUIP’T INSTALLATION TYPE ()
BTS EQUIP’T INSTALLATION LOCATION ()
REMARKS
Shelter
LTE SYSTEM MODULE
Stack type
Outdoor
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
Shelter
2G SYSTEM MODULE
Stack type
Outdoor
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
Shelter
RF MODULE 1
Stack type
Outdoor
(Sector 1/2/3)
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
Shelter
RF MODULE 2
Stack type
Outdoor
(Sector 4/5/6)
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
Shelter
RF MODULE 3
Stack type
Outdoor
(LTE)
Wall Mounted
Tower
Pole Mounted
Rooftop
1800 Module (FXEB)
Shelter
POWER MODULE 1 (FPFC)
Stack type
Outdoor
Wall Mounted
Tower
Pole Mounted
Rooftop
FPFC feed 3 x RF modules
Shelter
POWER MODULE 2
Stack type
Outdoor
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
Shelter
POWER MODULE 3
2G Flexi MultiRadio BTS SSD
Stack type
Outdoor
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
11(22)
5.2
BTS Installation Checklist Description
Checked
Delivery is complete and undamaged
Minimum clearances are met
Adapter mechanics are installed (for wall and pole installation)
N/A
Plinth is installed according to the instructions
Plinth is grounded
Transmission sub-module is installed according to the instructions
Power supply cable is connected
Modules are installed according to the instructions
Modules are grounded to the plinth
Module back covers are installed
Cable entries are installed
Antenna cables are connected according to the configuration
Internal power cables are connected
Transmission cables are connected
Optical fibre cables are cleaned and connected
External alarm cable is connected Cables between the modules on the same plinth are routed via internal cable entries BTS External cables or cables between the modules on different plinths are routed via external cable entries Cables are tied properly
N/A
Cable connector seals are firmly in place
Unused connectors are covered with IP seals
BTS is switched on and all units are ready for commissioning
E1 Interface 4 Gb Ethernet – EIF 1 Fast Ethernet – EIF 2 Fast Ethernet – EIF 3
6.2
Transmission Installation Checklist
Description
Checked
Transmission Sub module installed properly
Transmission cables installed as per specifications
Transmission DDF installed as per specifications
Transmission cables connected to specified transmission DDF
Notes on Transmission Installation
2G Flexi MultiRadio BTS SSD
13(22)
7. BTS COMMISSIONING AND INTEGRATION REPORT 7.1
Site Commissioning Parameters ITEM
VALUE
BTS Name
CABS
BTS ID
911281
BTS IP Address
10.26.17.20
MME Name MME ID MME IP
7.2
NTP IP
10.26.8.84
Netmask
255.255.255.248
Frequency
1800 (1/1/1)
Tx Power
20W
BTS SW Release Version
LN4.0_ENB_1202_902_09
BTS Commissioning Report
Insert printed copy of BTS Commissioning Report following this section.
2G Flexi MultiRadio BTS SSD
14(22)
7.3
BTS Integration Test Handset Details MODEL
SERIAL NUMBER
PHONE NUMBER
SIM NUMBER
Voice Call (MOC Call) Success CELL
OK
NA
INITIALS / DATE
CELL 1
13 April 2015
CELL 2
13 April 2015
CELL 3
13 April 2015
COMMENTS
Voice Call (MTC Call) Success CELL
OK
NA
INITIALS / DATE
CELL 1
13 April 2015
CELL 2
13 April 2015
CELL 3
13 April 2015
COMMENTS
PS Call Success CELL
OK
NA
INITIALS / DATE
CELL 1
13 April 2015
CELL 2
13 April 2015
CELL 3
13 April 2015
2G Flexi MultiRadio BTS SSD
COMMENTS
15(22)
8. POWER SYSTEM INSTALLATION REPORT 8.1
BTS Power Supply Configuration Tap to Existing:
LTE System Module Circuit Breaker: 2G System Module Circuit Breaker: Input Voltage to System Module: RF Module Circuit Breaker: Input Voltage to RF Module:
-
60A 54.24 60A 54.24
Not Applicable Rectifier Equipment Implementation Power System 1 / Serial No. Power System 2 / Serial No. Power System 3 / Serial No. PC Serial No. Rectifier Module type Rectifier Serial No.
NOTE: Battery Open CCT shall be carried out in warehouse prior delivery of batteries to site. Battery Open Circuit Voltage below 12.30VDC should not be installed and are to be replaced!
GSM FLEXI MULTIRADIO BTS SITE PUNCH LIST NETONE – NOKIA SIEMENS NETWORKS SITE DATA Item
Data
Site ID
1144
Site Name
CABS
Installed by / Date
15 November 2014
Commissioned by / Date
15 November 2014
Integrated by / Date
13 April 2015
PUNCH LIST
Select the correct check number and point to check in Flexi MultiRadio BTS Implementation Check List. Type the description of point to check and your comments for failure description. When completed, type what was done. Check no.
FINAL ACCEPTANCE TESTING (FAT) NETONE – NOKIA SIEMENS NETWORKS Site Provisional Acceptance certificate for telecom implementation works
INDENT NUMBER:
SITE ADDRESS:
SITE ID:
1144
SITE NAME:
CABS
STAGE
COMPLETE (Initials/Signature)
GSM FLEXI MULTIRADIO BTS Site Installation GSM FLEXI MULTIRADIO BTS Site Commissioning GSM FLEXI MULTIRADIO BTS Site Integration GSM BTS Site Folder and Attached Documents Nokia Networks hereby states that the whole of supplies detailed above have been inspected, implemented, tested and unless otherwise stated conform to the specified requirements in the contract or order identified above.