RINCIAN ANGGARAN BIAYA BIAYA PEKERJAAN : UNTUK SATU TITIK TOWER 45 MTR LOKASI HSS No
URAIAN
Volume
Harga Satuan
Jumlah
KETERANGAN
1
Pekerjaan TOWER Triangle 45 mtr
1
Ancak /Angker utk Pondasi Tower
1
bh
200,000
200,000 utk pekerjaan rangka beton & pondasi
2
Ancak/Angker utk Tarikan Suspender
3
bh
250,000
750,000 utk pekerjaan rangka beton & pondasi
3
Upah kerja cor beton dan besi beton dan Bahan
4
Ls
300,000
1,200,000 Utk. Pendukung Pekerjaan Beton dan Pondasi
4
Pabrikasi Tower besi Uk.19 mm x 10 mm
5 mtr
390,000
1,950,000 4 stage segi tiga Uk. 30x30 per stage 4 mtr
5
Pabrikasi Tower besi Uk.16 mm x 10 mm
40 mtr
350,000
14,000,000 6 stage segi tiga Uk. 30x30 cm per stage 4 mtr
7
Jasa pemasangan Instalasi tower
45 mtr
250,000
11,250,000 Kondisi terpasang
8
Kipas Caping dan segel caping
3 bh
150,000
9
Segel Ditiang Tower
450,000 Utk. Ikatan Jarum keras
33 Pcs
8,500
33 pcs
25,000
825,000 Pengencang Suspender
11 Kawat Slink Baja 6 mm
1 set
16,000,000
16,000,000 Kawat slink Baja 6mm
12 Bor File utk Tarikan suspender
3 bh
200,000
10 Jarum keras N0. 12
12 Segel/ klam Slink 6mm (kuku Macan) 13 Baut / nut uk.19 x 15 cm
2 1
198 pcs
3,000
33 pcs
17,500
280,500 utk pengcang slink di tioang tower
600,000 utk kedalaman Bor ± 1,5 meter & dicor dg pondasi tarikan 594,000 utk.Ikatan jarum keras 577,500 Baut mur
Sub Total 1
48,677,000
JASA INSTALASI PENANGKAR PETIR Kabel Grounding
55
mtr
70,000
3,850,000
kabel dari splitz ke bak kontrol
Tali grounding pembagi
50
mtr
30,000
1,500,000
pembagi dari bak kontrol ke stik rood grounding
2
Pipa splitz penangkal petir
1
pcs
150,000
150,000
3
Splitz penangkal petir
1
pcs
80,000
80,000
4
Stick rood grounding 16mm
3
Btg
1,200,000
3,600,000
5
Clamp
8
pcs
25,000
200,000
6
Scound
4
pcs
7,500
30,000
7
Isolator
1
pcs
20,000
20,000
8
Box Kontrol (beton)
1
unit
350,000
350,000
9
wisbar grounding
1
pcs
250,000
250,000
1
Ls
2,000,000
2,000,000
Sub Total 2
12,030,000
11 Jasa instalasi
stick tembaga 16mm X 4 mtr
central pembagi kabel ground
3
Instalasi Lampu tower
1
Kabel NYY 2x1,5mm
1
rol
1,500,000
1,500,000
2
MCB 2A+box
1
unit
350,000
350,000
3
Lampu OBL
1
unit
1,850,000
1,850,000
4
Photocell Switch control
1
unit
300,000
300,000
untuk otomatis lampu tower
5
Mounting lampu tower
1
unit
250,000
250,000
dudukan lampu tower dari pipa
6
Jasa instalasi lampu Tower
1
Ls
750,000
750,000
Sub Total 3
5,000,000
Kabel lampu tower stop kontak untuk lampu tower lampu tower
4 Biaya Transport 1
Biaya transport Akomodasi Team 4 orang 4hari
1
Ls
2,500,000
2,500,000 Transport Team
2
Biaya tranport angkutan tower dan matrial ke lokasi
1
ttk
2,000,000
2,000,000 sampai di Lokasi Pemasangan
Sub Total 4
4,500,000
GRAND TOTAL
70,207,000
Jumlah 1 + 2 + 3 + 4 =
Terbilang : Tujuh Puluh Juta Dua Ratus Tujuh Ribu Rupiah Garansi 1 Tahun utk tower, yang tidak di sebabkan oleh Force major Tersedianya Lahan yang Ideal di mana Tower akan di pasang Estimasi Waktu Pelaksanaan Pekerjaan Paling lama 20 hari Kerja harga tidak termasuk Pajak Cara Pembayaran : Dp. 50% 30% sebelum berangkat ke Lokasi pemasangan 20% setelah Pekerjaan selesai di kerjakan
Banjarmasin, 7 Junil 2015 hormat saya
Pembayaran via Transfer Ke Rek Bank BNI cab Sutoyo.s Banjarmasin No.Rek 0287713162 a/n Andry anwary yurdi Andry anwary yurdi