900 Inspection and Testing Abstract This section covers both shop inspection of new equipment and inspection of existing units during maintenance turnarounds. The section on shop inspection covers information on shop testing and inspection to verify that new units are built to specification and with good workmanship. Heat exchanger failures cause many plant shutdowns and slowdowns. The cost of these failures is high due to lost production and replacement of the exchangers. Inspection’s responsibilities are to: (1) inspect existing exchangers when they are taken out of service to determine extent of repairs and remaining life; (2) verify that repairs are completed to the tolerances specified; and (3) maintain accurate long term records that facilitate accurate forecasting. This section covers inspection and testing requirements for new and existing shell and tube and air cooled heat exchangers. The type of damage found in exchangers is discussed, along with the primary inspection and testing techniques used to determine the condition of an exchanger. Detailed shutdown inspection checklists are included. Acceptable dimensional tolerances are discussed, and guidance on Safety Instruction Sheets (SIS) for shell and tube exchangers and air cooled heat exchangers is provided.
Chevron Corporation
Contents
Page
910
Shop Inspection of New Exchangers
900-3
911
General Comments
912
Degree of Inspection
913
Shop Inspection of Shell and Tube Exchangers
914
Shop Inspection of Air Cooled Heat Exchangers
915
Inspection Tasks
920
Inspection of Existing Shell and Tube Exchangers and Air Cooled Exchangers 900-9
921
The Inspection, Engineering, Operation, and Maintenance Team
922
Inspection Sequence
923
Double Pipe Exchangers
900-1
December 1989
900 Inspection and Testing
December 1989
Heat Exchanger and Cooling Tower Manual
924
Inspection of State Registered Unfired Steam Generators
930
Types of Damage Found In Exchangers
900-11
940
Inspection and Testing Techniques
900-12
941
Inspection Techniques
942
Pressure Testing Techniques
943
Safety
950
Dimensional Tolerances
900-14
960
Safety Instruction Sheets
900-15
970
Maintenance Inspection Checklists
900-17
900-2
Chevron Corporation
Heat Exchanger and Cooling Tower Manual
900 Inspection and Testing
910 Shop Inspection of New Exchangers 911 General Comments Shop inspection is warranted for virtually all heat exchangers except “off-the-shelf” lube oil coolers. Inspection at the fabrication plant is normally done by the Quality Assurance (QA) section of Purchasing, or by an inspector contracted by Purchasing QA to inspect the exchanger. The purpose of shop inspection is to provide assurance that the equipment meets specification and order requirements, displays good workmanship, and is free of significant damage or defects. ASME Code uses the term “Authorized Inspector” to describe the inspector who works for a state, municipality, or insurance company and must be used by the fabricator to inspect the exchanger and sign the Manufacturer’s Data Report. The Authorized Inspector is not the same shop inspector that Chevron uses. The Authorized Inspector’s responsibility is to verify that the exchanger is designed and fabricated in accordance with ASME Code, but he has no interest in and does not check such things as: 1.
Dimensions or orientations (except for diameter and thickness).
2.
Presence of all required nozzles, baffles, or impingement plates; plumbness/squareness of nozzles.
3.
Limitations or restrictions in Company specifications on materials or welding processes.
4.
Special construction details in Company specifications that exceed ASME Code requirements.
5.
Inspection or testing requirements in Company specifications that exceed ASME Code minimums.
912 Degree of Inspection Figures 900-1 and 900-2 show the degrees of inspection for shell and tube heat exchangers and for air cooled exchangers, respectively. The degrees of inspection ranging from one or two inspection visits to resident inspection. The visits themselves are listed in chronological sequence. Degrees of inspection are listed generally in accordance with the importance of the visit. Purchasing QA usually establishes the visits required based on the specifics of an order, but the job engineer can always participate in this decision. Figures 900-1 and 900-2 define the basic purpose for each visit but do not list all of the tasks that the Company inspector is required to complete during these visits (see Section 915).
Chevron Corporation
900-3
December 1989
900 Inspection and Testing
Fig. 900-1
Heat Exchanger and Cooling Tower Manual
Degrees of Inspection for Shell and Tube Heat Exchangers
Visit Notes: A. This visit is required for any parts of exchanger that are required to be PWHT’D. This does not apply to stress relief of tube bends. B. This visit is made prior to any hydrostatic test and after PWHT if any. For exchangers with fixed tubesheets, internal inspection of the shell prior to attachment of closing tubesheet is required. C. This visit is required for all stacked exchangers with interconnecting nozzles. D. This visit is required for Degree 9, 10, and 11 inspection if finish paint is shop applied. General Notes: 1. Add supplementary visits A, C, and D as applicable. 2. Visits for purposes other than listed may be warranted and added (for example, to witness penetrant test of sealwelded tubes/tubesheets). 3. This matrix does not include all of the inspection tasks that an inspector completes during the required plant visits shown. A list of detailed inspection tasks can be several pages long. This list is normally part of the inspection plan for a particular exchanger. Inspection plans are usually prepared by Purchasing QA. 4. Each visit is not necessarily a full 8-hour day. 5. Problems with quality, specification compliance, or vendor cooperation/scheduling could increase the number of visits beyond the number shown.
December 1989
900-4
Chevron Corporation
Heat Exchanger and Cooling Tower Manual
Fig. 900-2
900 Inspection and Testing
Degrees of Inspection for Air Cooled Exchangers
Visit Notes: A. Outside face of tubesheet must be painted prior to tubing bundle if painting outside face is important; not normally done. B. Test erection and shop run are normally required. This visit can usually be included with visit for final inspection. General Notes: 1. Add supplementary visits A and B as applicable. 2. Visits for purposes other than listed may be warranted and added. 3. This matrix does not include all of the inspection tasks that an inspector completes during the required plant visits that are shown. A list of detailed inspection tasks can be several pages long. This list is normally part of the inspection plan for a particular exchanger. Inspection plans are usually prepared by Purchasing QA. 4. Each visit is not necessarily a full 8-hour day. 5. Problems with quality, specification compliance, or vendor cooperation/scheduling could increase the number of visits beyond the number shown.
Chevron Corporation
900-5
December 1989
900 Inspection and Testing
Heat Exchanger and Cooling Tower Manual
913 Shop Inspection of Shell and Tube Exchangers Figure 900-1 identifies the different degrees of inspection for shell and tube exchangers. Figure 900-3 summarizes when to use the various degrees. Degree 4 is about the minimum for any shell and tube exchanger in hydrocarbon or critical service. Degree 10 is appropriate where any of the following apply. • • • • • •
The exchanger has a fabrication time over 6 weeks. The exchanger is very large (over 4 feet diameter). The exchanger wall thickness is over 1-1/4 inch. The exchanger has a high pressure rating (flanges 600 pounds or more). The exchanger is fabricated from low alloy or high alloy steels. The exchanger has substantial cladding or weld overlay.
Degree 11 (resident inspection) is rarely applied to heat exchangers but could be considered during fabrication of heavy wall shells or channels (over about 4 inches thick). Visits for purposes in addition to those listed can be added to cover any special concerns.
914 Shop Inspection of Air Cooled Heat Exchangers Figure 900-2 identifies the degree of inspection for air cooled heat exchangers. Degree 5 is about the minimum for any air cooled exchanger in hydrocarbon or critical service. Factors similar to those listed in Section 913 above are used to decide when more inspection visits are warranted; consult Purchasing QA for additional guidance.
915 Inspection Tasks Figures 900-1 and 900-2 do not list all of the tasks the Company inspector is required to complete during the plant visits. These tasks are normally listed in an inspection plan prepared by Purchasing QA. The tasks listed in the inspection plan can be several pages long. Some of the principal tasks are:
December 1989
1.
Verification that welding procedures and welders are qualified per ASME Code.
2.
Review of material test reports for principal exchanger parts and verification that exchanger parts are traceable to material test reports.
3.
Verification that welding procedures and preheat requirements are being followed.
4.
Visual inspection of all welds for flaws, contour, size, and reinforcement.
5.
Reading all radiographs (“x-rays”) and witnessing other nondestructive examination, if required.
6.
Complete dimensional and orientation check against Company reviewed vendor drawings.
900-6
Chevron Corporation
Heat Exchanger and Cooling Tower Manual
Fig. 900-3
900 Inspection and Testing
Application of the Degrees of Inspection for Shell and Tube Exchangers (1 of 2) GUIDELINES FOR CHOOSING THE APPROPRIATE DEGREE OF INSPECTION FOR SHELL AND TUBE HEAT EXCHANGERS (NOTE THAT THESE ARE GUIDELINES ONLY)
Degree 1 when: 1. No Company specification applies, and 2. Exchanger: a. is small and simple (under 18 inch diameter), and b. is carbon steel (tubes can be another material), and c. has low pressure rating (under 250 psig), and d. is not in flammable or hazardous services. Degree 2 when: 1. No Company specification applies, and 2. Exchanger: a. is of moderate size (18 inch to 30 inch diameter), and b. is carbon steel (tubes can be another material), and c. has low pressure rating (under 250 psig). OR 3. Only one low dollar value hair-pin type exchanger is on a purchase order (an attempt is made to accomplish Degree 2 inspection in one visit to include inspecting parts, witnessing assembly, and witnessing hydrostatic tests). Degree 3 when: 1. Company specifications and/or standard drawings apply, and 2. Exchanger: a. is small and simple (under 18 inch diameter), and b. is carbon steel (tubes can be another material), and c. has low pressure rating (under 250 psig), and d. is in relatively noncritical service (choose at least Degree 4 for critical services).
Note “Critical Service” is difficult to define; judgment is required; factors to consider are type of service (contents of exchanger), consequences of failure with regard to the process, consequences of failure with regard to personnel and surrounding facilities. Degree 4 (this is the normal minimum for exchangers in hydrocarbon service) when: 1. Company specifications and/or standard drawings apply, and 2. Exchanger: a. is of moderate size (18 inch to 30 inch diameter), and b. is carbon steel (tubes can be another material), and c. has moderate pressure rating (150 pound or 300 pound flanges), and d. is in relatively critical service.
Chevron Corporation
900-7
December 1989
900 Inspection and Testing
Fig. 900-3
Heat Exchanger and Cooling Tower Manual
Application of the Degrees of Inspection for Shell and Tube Exchangers (2 of 2)
Degree 5 when: 1. Company specifications and/or standard drawings apply, and 2. Exchanger: a. is of large size (over 30 inch diameter), and b. is carbon steel (tubes can be another material), and c. has moderate pressure rating (150 pound or 300 pound flanges), and d. is in relatively critical service Degree 6 when: 1. Company specifications and/or standard drawings apply, and 2. Exchanger: a. is of large size (over 30 inch diameter), and b. is carbon steel (tubes can be another material), and c. has shell thickness 3/4 inch or more, and d. has moderate pressure rating (150 pound or 300 pound flanges), and e. is in relatively critical service. Degree 7 (same as Degree 6 but when diameter, thickness of tubesheet, or tubesheet material warrants a visit for tubesheet/baffle inspection before installing tubes; this visit should always be made for tubesheets that are clad, weld overlayed, or will have tube/tubesheet welds, and can be considered for all moderate size and large size process exchangers.) Degree 8 (same as Degree 7 but when surface preparation required for painting is “near-white” or “White Metal.”) Degree 9 (same as Degree 7 but when surface preparation required for painting is “near-white” or “White Metal” and inspection of dry primer is judged to be warranted.) Degree 10 when: 1. Exchanger: a. fabrication time is over 6 weeks, or b. is very large (over 4 feet diameter), or c. has wall thickness over 1-1/4 inch, or d. has a high pressure rating (flanges 600 pound or more), or e. is fabricated from low alloy or high alloy steels. f. is fabricated from clad or weld overlayed material. Degree 11 (Resident inspection is rarely applied to heat exchangers but could be considered during fabrication of heavy wall shells or channels; heavy wall means over 4 inches thick.)
December 1989
900-8
Chevron Corporation
Heat Exchanger and Cooling Tower Manual
900 Inspection and Testing
7.
Verification that all nozzles are present, and that they are correct size, rating, and material.
8.
Verification that bundle has all required baffles and support plates, and that baffle and tubesheet holes have been deburred; verification that tubes have been properly expanded into tubesheet holes.
9.
Review of Manufacturer’s Data Report to verify all entries are correct.
920 Inspection of Existing Shell and Tube Exchangers and Air Cooled Exchangers 921 The Inspection, Engineering, Operation, and Maintenance Team While much of the standard maintenance work on exchangers is initiated by inspection, the major decisions must be made with input from inspection, engineering, operations and maintenance. These decisions include: • • • • •
Retubing or rebundling Plugging tubes Nozzle replacement Major shell repairs or replacement Gasket surface repairs
The above organizations also must work together to establish the objectives of exchanger repairs well in advance of the shutdown. These objectives include: •
Exchanger or bundle design life
•
Time between internal inspections (for some cases, this is determined by state regulations; i.e., waste heat boilers)
•
Degree of internal or external leakage which is acceptable over the life of the bundle
•
Degree of cleaning required (often dictated by process economics)
Section 1000 contains a Heat Exchanger Bundle Repair Worksheet for helping the engineer coordinate the decision making process.
922 Inspection Sequence Inspection of existing exchangers and air coolers involves the following steps:
Chevron Corporation
1.
Set objectives as discussed above.
2.
Examine inspection and maintenance records to note any trends and make initial recommendations.
900-9
December 1989
900 Inspection and Testing
Heat Exchanger and Cooling Tower Manual
3.
Perform preshutdown inspection to note leaks and any areas which must be inspected in more detail when the unit is shut down.
4.
Determine need for bleeder tests prior to opening.
5.
Inspect and photograph shell and bundle after exchanger has been opened but before cleaning to look for patterns and types of fouling and evidence of plugged tubes.
6.
Inspect shell and bundle after cleaning and make recommendations for repairs.
7.
Inspect repairs and witness testing.
8.
Record gagings and repairs in the inspection file to anticipate what to expect in the future.
9.
Process paperwork for any code repairs or operating permits for state registered equipment.
Section 970 contains a detailed inspection checklist for exchangers and air coolers.
923 Double Pipe Exchangers Double pipe or “hairpin” exchangers can be one pipe or several pipes inside another pipe. In either type of exchanger the corrosion is usually found in the area of the inlet nozzle and at the return bend. All these units are usually small enough in diameter to radiograph. Radiography can reveal the inner and outer pipe wall thickness, tube-wall thickness, and any fouling problem, without taking the unit out of service. Most repair work can therefore be planned before the plant is actually shut down. In one double pipe exchanger, called a “chiller,” the stock in the inner pipe is scraped using a scroll, and corrosion is usually found externally because of low temperature conditions. The scrolls may also break or become disconnected.
924 Inspection of State Registered Unfired Steam Generators Like fired boilers, unfired steam generators require periodic inspection and state certification by qualified boiler inspectors. Generally, unfired steam generators are of tubular heat exchanger design. Consequently, inspection and repair follow the same general pattern as that used for process heat exchangers.
December 1989
1.
The tube bundles are removed, cleaned, and inspected externally and internally.
2.
The shells and flash drums are internally inspected and ultrasonically gaged.
3.
The gage glasses, pressure gages and alarms are cleaned and serviced. The safety valves are removed, cleaned, tested and reset.
4.
Hydrostatic tests, when applied, should include the flash drum, if any, and all interconnected piping and appurtenances.
900-10
Chevron Corporation
Heat Exchanger and Cooling Tower Manual
900 Inspection and Testing
The work copies of the inspection report and operating permit sheet are completed and processed as required by the local inspection organization.
930 Types of Damage Found In Exchangers The various types of damage found in exchangers are discussed below. Refer to the Corrosion Prevention Manual for more information. End impingement—where high velocity stock enters the tube and erodes the end. This can involve the tubesheet as well. Galvanic corrosion—occurs when the tube material and tubesheet material are apart on the galvanic scale, often with salt water as the electrolyte; e.g., for a Monel tubesheet with titanium tubes, the Monel tubesheet will corrode. Lodgement attack—occurs when an obstruction in the tube increases velocities at that point and erodes the tube. External corrosion—wall thinning on the outside of the tube. Internal corrosion—wall thinning on the inside of the tube. Dezincification—usually occurs on the I.D. of Admiralty brass tubes in saltwater service operating above 120°F or when an inhibited grade of Admiralty was not used. Denickelification—usually occurs on the I.D. of copper-nickel tubes in saltwater service which have operated well above their normal tube-wall temperature. CO2 attack—occurs in condensing steam service and is common at the floating tubesheet end of the tube O.D. on vertical reboilers. Stress corrosion cracking—usually occurs at a stressed point of tubes, such as at the U-bends. Can occur on any metal. Chlorides with stainless steels or NH3 with brass are examples where this can be a problem. Mechanical deformation—caused by improper sling placement when handling the bundle, for example. Vibration wear—occurs when the area between the tube and transverse baffle is too great or when the baffle spacing is too great, allowing the tube to vibrate in the hole. Seal weld cracking—cracks in the tube-to-tubesheet seal weld. (Usually detected during a hydrotest.) Roll leaks—when the tube-to-tubesheet roll joint leaks. (Usually detected during a hydrotest.) Thermal shock—usually occurs during an operation upset. Improper starting up or shutting down of equipment or loss of cooling water can cause shock. This commonly causes roll leaks.
Chevron Corporation
900-11
December 1989
900 Inspection and Testing
Heat Exchanger and Cooling Tower Manual
External impingement—usually occurs on the tube O.D. in the area of the shell inlet nozzle. Can be remedied by installing an impingement device on the bundle, usually impingement rods or tubes. Necking down—occurs on the tube O.D. at the transverse baffle. It is caused by too large an area between the tube O.D. and the transverse baffle, allowing bypassing. Usually the baffle will erode as well as the tube, requiring replacement at the next retubing.
940 Inspection and Testing Techniques This section discusses the primary inspection and testing techniques used to determine the condition of an exchanger before, during, and after repairs. It does not include visual inspection, which is very important.
941 Inspection Techniques •
Ultrasonic (UT) gaging can be used to determine remaining wall thickness of the shell as well as defects in the wall.
•
Micrometer measurements are used to determine tube wall thickness, depth of pitting, and metal loss on body flanges or tubesheets.
•
Radiography can be used to check wall thickness and fouling in tubes. Radiography can be used on large bundles by sliding the film under the outer row of tubes. On large U-tube bundles the U-bends can be radiographed for wall thickness and fouling. On bundles with tubes 2-inch O.D. and larger, tube wall thickness and O.D. fouling can be identified using radiography by sliding a narrow film cassette in one tube and the source in another tube. Place the film in Tube A as shown in Figure 900-4. Put the source in Tube D. The two walls projected on the film will be the inside walls of Tubes B and C. Any fouling between Tubes B and C will show on the film. Several films can be shot with one exposure, depending on the tube layout and space available.
Fig. 900-4
December 1989
Film Layout for X-Raying Bundles with Tube 2 inches and Larger
900-12
Chevron Corporation
Heat Exchanger and Cooling Tower Manual
900 Inspection and Testing
•
Eddy current testing is an effective inspection tool for determining tube wall thickness. It is very useful for determining the tube wall in the center of tube bundles when specimen tubes are unattainable, such as in U-tube bundles. Ferrous as well as nonferrous tubes can be inspected; however, the tubes must be clean, and specimen tubes to confirm eddy current results are advisable before major repairs.
•
Specimen tubes are tubes which have been removed from various locations throughout the bundle to determine the extent of corrosion in the bundle. Choosing the proper location of the specimen tubes is critical in developing an accurate profile of the corrosion. Often, eddy current is used to determine the worst areas of corrosion before pulling specimen tubes.
•
Boroscopes connected to a TV can be used to visually inspect the tube interior. This technique will not measure wall thickness or pitting depth but can be a good visual tool for determining tube condition.
942 Pressure Testing Techniques In general, exchangers out of service for repairs are pressure tested before the repairs to determine where work is required and after repairs to determine if the exchanger meets code requirements.
Test Pressures The code hydrostatic test pressures are calculated using the code under which the exchanger was built (usually ASME). The exchanger fabricator generally supplies these pressures. The exchanger should be tested to full code test pressure after any repair work affecting the strength of the vessel.
Minimum Pressurizing Temperature (MPT) The temperature of the pressurizing fluid must be above the MPT as discussed in Section 820 of this manual and in the Pressure Vessel Manual.
Tube Side Tests Pressuring the tubes permits inspection of the channel cover gasket, channel, channel-to-tubesheet gasket, tubesheets, floating head gasket, floating head, and the tubes. Leaks can be identified by leakage at the joints; however, individual tube leaks are not identifiable because the tubesheets are inaccessible.
Shell Side Tests Pressuring the shell side tests the shell, shell-to-tubesheet gasket, channel-totubesheet gasket, tubesheets, and tubes. If the channel has a removable cover this test allows individual leaking tubes to be plugged off because the tubesheet is accessible. Roll leaks also can be individually identified and repaired. U-tube bundles are easily tested with the shell enclosed. Floating head bundles require the use of a test ring to observe the floating tubesheet during the shell test. Figure 900-5 is a schematic of a test ring.
Chevron Corporation
900-13
December 1989
900 Inspection and Testing
Fig. 900-5
Heat Exchanger and Cooling Tower Manual
Test Ring - Floating Tubesheet (Courtesy of TEMA)
Leakage Tests Tests for leakage can be conducted at the operating pressure for repairs not affecting the vessel “strength,” such as plugging tubes.
Bleeder Tests Shell and tube bleeder tests can be applied quickly; however, they will indicate only that the unit is leaking. The type of leak will be unknown. When the shell or tubes are pressured, inspect for leaks at the channel or shell drains.
Testing Medium The testing medium should be oil or water. Gas tests are more sensitive, but are extremely dangerous. Such tests over 15 psig require the approval of local management.
943 Safety The inspector must remember that pressure tests involve certain hazards. In addition to gaskets blowing out, previously driven plugs can blow out as well. While witnessing pressure tests, the inspector should stand to one side. Unauthorized personnel should not be in the vicinity of the exchanger on test. The test pump must have a safety valve set at the test pressure, and a gage with a range of roughly double the test pressure (i.e., if test pressure is 150 psi, gage range should be 0 to 300 psi).
950 Dimensional Tolerances Dimensional tolerances for standard shell and tube exchangers are tabulated in Section 2 of the Standards of Tubular Exchanger Manufactures Association (TEMA).
December 1989
900-14
Chevron Corporation
Heat Exchanger and Cooling Tower Manual
900 Inspection and Testing
Copies of TEMA Tables F-1 and F-2 are included for your quick reference. (See Figures 900-6 and 900-7.) Dimensional tolerances for air cooled exchangers are covered by API Standard 661, also included in this manual.
960 Safety Instruction Sheets Safety Instruction Sheets (SISs) are used by several organizations as a singlesource summary document for important data on operating equipment. These data are important to operations, technical groups, inspection and maintenance, and they include: •
Safe operating limits (temperatures, pressures, rotational speeds, etc.)
•
Particular precautions for safe operation
•
Specified routine tests required for safe operation
•
References necessary to operate and/or maintain the equipment
•
Inspection/technical data (minimum thickness, corrosion allowances, test pressures, relief valve settings, minimum pressurizing temperatures, etc.)
SI sheets should be completed for (1) new exchangers and (2) existing exchangers that have been altered in any way that affects the SI sheet content. This includes: material changes, derating, minimum thickness changes. SI sheets are routinely filled out by a project engineer and countersigned by an operating representative. They become permanent records in the inspection groups and in the equipment manuals for the plants. Many technical groups also maintain compiled copies. Some organizations are now shifting this information to a centralized information database, PEIS (Plant Equipment Information System). Regardless of the format, the SI sheet is a good checklist of important information to have readily available. A significant problem with SI sheets has been getting them accurately and completely filled in prior to startup. One reason for this is that vendors are not always as responsive during the latter stages of a project, after the equipment has been purchased and installed. If you are committed to having SI sheets, you should consider methods to motivate vendors to complete them (or provide data) after all design and operating data are confirmed. Instructions for completing the following SI sheets are included in the Safety Instruction Sheet Section: • •
Chevron Corporation
EXH-EF-787 Shell and Tube and Double Pipe Heat Exchangers SI Sheet EXH-EF-788 Air Cooled Heat Exchangers SI Sheet
900-15
December 1989
900 Inspection and Testing
Fig. 900-6
Heat Exchanger and Cooling Tower Manual
Standard Tolerances for External Dimensions, Nozzle and Support Locations of Heat Exchanger (Courtesy of TEMA)
December 1989
900-16
Chevron Corporation
Heat Exchanger and Cooling Tower Manual
Fig. 900-7
900 Inspection and Testing
Standard Clearances and Tolerances for Tubesheets, Partitions, Covers, and Flanges (Courtesy of TEMA)
970 Maintenance Inspection Checklists Attached are inspection checklists for the following: • •
Shell and Tube Exchangers (Figure 900-8) Air Cooled Exchangers (Figure 900-9)
This information was excerpted from the CUSA Manufacturing Inspection Manual.
Chevron Corporation
900-17
December 1989
900 Inspection and Testing
Fig. 900-8
Heat Exchanger and Cooling Tower Manual
Inspection Checklist—Shell and Tube Exchangers (1 of 3)
Date:
____________________
Exchanger:
____________________
Service:
Tube side
__________________
Shell side
__________________ Initial:
_______
Preshutdown Inspection: Discuss and agree on the “shutdown objectives with Operations, Engineering, and Maintenance.”
_______
Records Check: Review records and become familiar with corrosion history. Prepare a sketch indicating type and location of previous corrosion.
_______
External Visual Inspection: Inspect exchanger supports for proper bearing and anchoring.
_______
Look for corrosion on the shell where it is in contact with the concrete fireproofing.
_______
Check slide plates or slotted bolt holes for freedom of movement at the exchanger supports.
_______
Inspect support leg fireproofing for cracks and spalling and corrosion underneath.
_______
Inspect the anchor bolts for necking down at the baseplate.
_______
Where exchangers are saddled into a concrete support, inspect the shell for external corrosion.
_______
Inspect the insulation and retainers. Corrosion often occurs where moisture penetrates the insulation and the shell is not hot enough to dry it out. Insulated exchangers which operate below ambient temperature are susceptible to this type of corrosion. Representative sections, or even all of the insulation, should be removed to permit a complete external inspection and ultrasonic gaging.
_______
Inspect all small piping for leaks and external corrosion, including vents, drains, relief valves, plugs, and other small screwed fittings.
_______
Look for gasket leaks on the inlet and outlet piping flanges and at the channel or shell cover flanges. Evidence of leaks can be seen as deposits on the ground or platform under the unit.
_______
Check the packing gland on the bottom leg of the reboilers for leaks.
_______
Check gaskets and gasket surfaces for evidence of leakage.
_______
If the unit is a water cooler or condenser, note the water outlet temperature either by dial thermometer or by feel. Excessively high water temperature (above 120°F for salt water) indicates possible fouling and probable high corrosion rates in the tubes.
_______
Ultrasonic Inspection: Take ultrasonic gage measurements at locations where internal corrosion is suspected. A sufficient number of measurements should be taken to provide reasonable assurance of the exchanger’s integrity. It is important to recognize that external gage points can reflect general corrosion rates, but that actual remaining wall thickness is probably lower.
December 1989
900-18
_______
Chevron Corporation
Heat Exchanger and Cooling Tower Manual
Fig. 900-8
900 Inspection and Testing
Inspection Checklist—Shell and Tube Exchangers (2 of 3)
Shutdown Inspection: Shell and Covers: Verify exchanger is properly cleaned for inspection. Cleaning can be done by water-washing, chemical cleaning, or by sandblasting. The amount of cleaning required depends on the severity of the corrosion and fouling in the unit.
_______
Internally inspect shells 20 inches or greater in diameter. Look for evidence of corrosion, noting particularly the nozzle, flange and shell welds, and the locations where the transverse baffles contact the shell.
_______
Take ultrasonic (UT) gage measurements in corroded areas and at representative locations on the shell cover and channel section to establish an accurate picture of the corrosion patterns. UT the shell at the inlet and outlet nozzles.
_______
Prior to cleaning, check gasket surfaces for evidence of leakage.
_______
After buffing, inspect gasket surfaces and flanges for evidence of corrosion or mechanical damage. Severely corroded gasket surfaces can require weld buildup and machining. Lightly damaged gasket surfaces can be repaired by machining or drawfiling.
_______
Inspect the baffles in channel sections for warpage, distortion, corrosion, or evidence of bypassing.
_______
Ensure that baffle stay rods are not cracked or broken.
_______
Inspect lifting lugs on channel sections and covers for mechanical damage or corrosion to ensure they are safe for continued use.
_______
Hammer-test or UT gage all small piping on the channel, shell, or shell cover and inspect all threaded fittings as necessary. On high pressure, or stainless steel piping, radiography should be used instead of hammer-testing.
_______
For services other than water, verify that all piping connections, including small piping, are welded up to the first root value. Eliminate connections less than 3/4 inch in size.
_______
Inspect longitudinal grooves or guides in the shell for the horizontal baffle in the bundle.
_______
Inspect alloy lining for cracked attachment welds and pinhole leaks. Have leaking or bulged lining removed for inspection under the lining.
_______
If channel cover staybolts are used, observe the bolt holes behind the lining. Graphitization frequently enlarges the holes and results in leaks. Repairs can be made by using oversize gaskets under the nuts.
_______
Inspect floating head bolts for evidence of corrosion, breakage or overstressing.
_______
Inspect split rings for warpage which can cause leaks at the floating head gasket.
_______
Bundles: A summary of the various types of bundle wear is included in Section 930 of the Heat Exchanger and Cooling Tower Manual.
_______
Before Cleaning: Record plugging and fouling conditions.
_______
Record clean washed areas indicative of high velocity and subsequent corrosion.
_______
Chevron Corporation
900-19
December 1989
900 Inspection and Testing
Fig. 900-8
Heat Exchanger and Cooling Tower Manual
Inspection Checklist—Shell and Tube Exchangers (3 of 3)
Walk around the unclean bundle, take pictures, gather samples of fouling products and scale for analysis if necessary. Look for distortion, leaks, and any unusual condition. Much of this evidence is washed away when the bundle is cleaned.
_______
After Cleaning: Gage O.D. of accessible tubes with calipers.
_______
Use a mirror to visually inspect the full length of the outside of as many tubes as possible. Have the bundle rotated if necessary.
_______
Look for localized corrosion near the shell inlet nozzle in areas of impingement.
_______
Use a boroscope or a mirror and reflected light to visually inspect tube I.D.
_______
Look at tube ends for corrosion and thinning using a tube I.D. gage.
_______
Consider eddy current inspection for tube wall thickness.
_______
Pull specimen tubes in strategic areas if necessary. Split the tube and check the entire length for remaining wall thickness. The eddy current inspection may give you an idea of where to pull specimen tubes.
_______
Inspect the front and backsides of tubesheets for corrosion.
_______
Verify that all gasket surfaces are clean and free of defects and corrosion that could affect the tightness of the gasketed joint.
_______
Check the tubesheet baffle gasket surfaces for bypassing. Bypassing can corrode both the tubesheet gasket surface and the baffles.
_______
Check tubesheets with seal welded tubes for warpage which can cause excessive baffle bypassing.
_______
Inspect the tubesheet which is to be reused as a bundle to ensure that it is retubed. Look for the tube hole enlargement using a “go/no-go” gage. Look for pieces of thimbles left in the tubesheet serrations. Check for cracked ligaments. Note the history of the bundle. If roll leaks have been a problem, the ligaments are probably spongy, unable to hold a tight roll, and the tubesheet should be replaced.
_______
Inspect the segmental cross baffles for hole enlargement by moving the tubes and observing excess movement.
_______
Look for general thinning of all carcass components.
_______
Inspect the carcass for possible reuse when the bundle is retubed. Ensure that the frame will last the life of the bundle, especially when the tube material is being upgraded.
_______
December 1989
900-20
Chevron Corporation
Heat Exchanger and Cooling Tower Manual
Fig. 900-9 Date:
900 Inspection and Testing
Inspection Checklist—Air Cooled Exchangers _____________________
Equipment #: _____________________ Service:
_____________________ Initial
_______
Tubes: Inspect fin condition and fouling.
_______
Have header plugs removed and measure tube I.D. with an I.D. gage.
_______
Consider eddy current inspection to determine tube wall thickness.
_______
Pull specimen tubes if the eddy current inspection indicates it is warranted.
_______
Header boxes and tubesheet: Inspect the header box and tubesheet for wall thickness.
_______
Check the plugs for impingement on the outlet sides.
_______
Check the plug and header hole threads for corrosion and galling.
_______
Fan, driver, and housing: Inspect the fan for cracking or distress.
_______
Check the guards to ensure they are intact, for personnel protection.
_______
Check the light gage steel housing for general condition.
_______
Chevron Corporation
900-21
December 1989