DAFTAR ANALISA HARGA SATUAN PROGRAM
: WAJIB BELAJAR PENDIDIKAN DASAR 9 TAHUN
KEGIATAN
: LANJUTAN PEMBANGUNAN RKB SDN 003 KECAMATAN SEBULU
LOKASI
: KECAMATAN SEBULU
TAHUN
: 2014
A. PEKERJAAN PEKERJAAN PERSIAPAN, PERSIAPAN, PASIR PASIR DAN TANAH KODE ANALISA A.1
HARGA INDEK
SAT.
URAIAN
HARGA
SATUAN
BAHAN
UPAH
HARGA
( Rp. )
( Rp. )
( Rp. )
( Rp. )
1 M1 MENGUKUR MENGUKUR DAN MEMASANG MEMASANG BOUWPLANK BOUWPLANK
0,012
M3
Kayu Meranti 5/7 Cm
3.100.000,00
37.200,00
0,007
M3
Kayu Papan 3/20 Cm
3.200.000,00
22.400,00
0,020
Kg
Paku Biasa
2.100,00
42,00
0,100
OH
Tukang
110.000,00
11.000,00
0,010
OH
Kepala Tukang Kayu
115.000,00
1.150,00
0,100
OH
Pekerja
80.000,00
8.000,00
0,005
OH
Mandor
125.000,00
625,00
A.2
M3
Tanah Urugan
90.000,00
80.417,00
108.000,00
0,500
OH
Pekerja
80.000,00
40.000,00
0,050
OH
Mandor
125.000,00
6.250,00 108.000,00
46.250,00
154.250,00
1 M3 URUGAN PASIR
1,200
M3
Pasir Urugan
130.000,00
156.000,00
0,300
OH
Pekerja
80.000,00
24.000,00
0,010
OH
Mandor
125.000,00
1.250,00 156.000,00
25.250,00
181.250,00
1 M3 URUGAN T ANAH KEMBALI BEKAS GALIAN
0,250
OH
Pekerja
80.000,00
20.000,00
0,008
OH
Mandor
125.000,00
1.037,50
A.5
20.775,00
1,200
A.4
59.642,00
1 M3 URUGAN TANAH BAWAH LANTAI LANTAI DENGAN PEMADATAN PEMADATAN
A.3
JUMLAH
21.037,50
21.037,50
1 M3 GALIAN TANAH BIASA
0,750
OH
Pekerja
80.000,00
60.000,00
0,025
OH
Mandor
125.000,00
3.125,00
63.125,00
63.125,00
B. PEKERJAAN PONDASI KODE ANALISA B.1
HARGA INDEK
SAT.
URAIAN
HARGA
SATUAN
BAHAN
UPAH
HARGA
( Rp. )
( Rp. )
( Rp. )
( Rp. )
1 TITIK TONGKAT ULIN UK. 10/10 CM - 200CM
0,020
M3
Balok Ulin 10/10 cm
4.500.000,00
90.000,00
0,145 0,015 0,300
OH OH OH
Tukang Kepala Tukang Pekerja
110.000,00 115.000,00 80.000,00
15.950,00 1.667,50 24.000,00
0,015
OH
Mandor
125.000,00
1.875,00
B.2
90.000,00
43.492,50
133.492,50
1 M3 PASANGAN BATU GUNUNG 1 : 4
1,100
M3
Batu Gunung
400.000,00
440.000,00
163,000
Kg
Semen Pc
1.300,00
211.900,00
0,520 0,600 0,060
M3 OH OH
Pasir Pasangan (Tgr) Tukang Kepala Tukang
230.000,00 110.000,00 115.000,00
119.600,00
1,500
OH
Pekerja
80.000,00
120.000,00
0,075
OH
Mandor
125.000,00
9.375,00
66.000,00 6.900,00
B.3
JUMLAH
771.500,00
202.275,00
973.775,00
1 M3 PASANGAN PONDASI BATU KOSONG / AANSTAMPING
1,200
M3
Batu Gunung
400.000,00
480.000,00
0,432
M3
Pasir Pasangan (Tgr)
230.000,00
99.360,00
0,390
OH
Tukang
110.000,00
42.900,00
0,039 0,780
OH OH
Kepala Tukang Pekerja
115.000,00 80.000,00
4.485,00 62.400,00
0,039
OH
Mandor
125.000,00
4.875,00
579.360,00
114.660,00
694.020,00
C. PEKERJAAN PASANGAN + PLESTERAN KODE ANALISA C.1
HARGA INDEK
SAT.
URAIAN
HARGA
SATUAN
BAHAN
UPAH
HARGA
( Rp. )
( Rp. )
( Rp. )
( Rp. )
1 M2 PASANGAN BATU BATA CAMP. 1 PC : 4 PS
50,000 Buah Batu Bata/ Batu Merah
1.300,00
65.000,00
11,500
Kg
Semen Pc
1.300,00
14.950,00
0,043
M3
Pasir Pasangan
230.000,00
9.890,00
0,100
OH
Tukang
110.000,00
11.000,00
0,010
OH
Kepala Tukang
115.000,00
1.150,00
0,320
OH
Pekerja
80.000,00
25.600,00
0,015
OH
Mandor
125.000,00
1.875,00
C.2
89.840,00
39.625,00
129.465,00
1 M2 PASANGAN ROLAG BATA CAMP. 1 PC : 4 PS
100,000 Buah Batu Bata/ Batu Merah
1.300,00
130.000,00
26,550
Kg
Semen Pc
1.300,00
34.515,00
0,093
M3
Pasir Pasangan
230.000,00
21.390,00
0,200
OH
Tukang
110.000,00
22.000,00
0,020
OH
Kepala Tukang
115.000,00
2.300,00
0,650
OH
Pekerja
80.000,00
52.000,00
0,030
OH
Mandor
125.000,00
3.750,00
C.3
JUMLAH
185.905,00
80.050,00
265.955,00
1 M2 PASANGAN BATU BATA CAMP. 1 PC : 2 PS
50,000 Buah Batu Bata/ Batu Merah
1.300,00
65.000,00
18,950
Kg
Semen Pc
1.300,00
24.635,00
0,038
M3
Pasir Pasangan
230.000,00
8.740,00
0,100
OH
Tukang
110.000,00
11.000,00
0,010
OH
Kepala Tukang
115.000,00
1.150,00
0,320
OH
Pekerja
80.000,00
25.600,00
0,015
OH
Mandor
125.000,00
1.875,00
98.375,00
39.625,00
138.000,00
C.4
1 M2 PLESTERAN DINDING 1 PC : 4 PS t=20mm
8,320
Kg
Semen Pc
1.300,00
10.816,00
0,032
M3
Pasir Pasangan
230.000,00
7.360,00
0,200
OH
Tukang
110.000,00
22.000,00
0,020
OH
Kepala Tukang
115.000,00
2.300,00
0,260
OH
Pekerja
80.000,00
20.800,00
0,013
OH
Mandor
125.000,00
1.625,00
C.5
46.725,00
13,632
Kg
Semen Pc
1.300,00
17.721,60
0,027
M3
Pasir Pasangan
230.000,00
6.210,00
0,200
OH
Tukang
110.000,00
22.000,00
0,020
OH
Kepala Tukang
115.000,00
2.300,00
0,260
OH
Pekerja
80.000,00
20.800,00
0,013
OH
Mandor
125.000,00
1.625,00
64.901,00
23.931,60
46.725,00
70.656,60
1 M2 ACIAN
3,250
Kg
Semen Pc
1.300,00
4.225,00
0,100
OH
Tukang
110.000,00
11.000,00
0,010
OH
Kepala Tukang
115.000,00
1.150,00
0,150
OH
Pekerja
80.000,00
12.000,00
0,008
OH
Mandor
125.000,00
1.000,00
C.7
1 M2 PLESTERAN DINDING 1 PC : 2 PS , t=20mm
C.6
18.176,00
4.225,00
25.150,00
29.375,00
1 M2 PASANGAN KERAMIK LANTAI 40/40 CM
1,000
M2
Keramik 40/40
75.000,00
75.000,00
10,000
Kg
Semen Pc
1.300,00
13.000,00
0,045
M3
Pasir Pasangan
230.000,00
10.350,00
0,125
OH
Tukang
110.000,00
13.750,00
0,013
OH
Kepala Tukang
115.000,00
1.495,00
0,260
OH
Pekerja
80.000,00
20.800,00
0,013
OH
Mandor
125.000,00
1.625,00
98.350,00
37.670,00
136.020,00
C.8
1 M2 PASANGAN LANTAI KERAMIK WC 20/20 CM
1,000
M2
Keramik 20/20 Cm
75.000,00
75.000,00
10,040
Kg
Semen Pc
1.300,00
13.052,00
0,045
M3
Pasir Pasangan
230.000,00
10.350,00
0,130
OH
Tukang
110.000,00
14.300,00
0,013
OH
Kepala Tukang
115.000,00
1.495,00
0,270
OH
Pekerja
80.000,00
21.600,00
0,014
OH
Mandor
125.000,00
1.750,00
C.9
39.145,00
1,000
M2
Keramik 20/25 Cm
75.000,00
75.000,00
9,300
Kg
Semen Pc
1.300,00
12.090,00
0,018
M3
Pasir Pasangan
230.000,00
4.140,00
1,940
Kg
Semen warna
20.000,00
38.800,00
0,180
OH
Tukang
110.000,00
19.800,00
0,018
OH
Kepala Tukang
115.000,00
2.070,00
0,370
OH
Pekerja
80.000,00
29.600,00
0,037
OH
Mandor
125.000,00
4.625,00
137.547,00
130.030,00
56.095,00
186.125,00
1 M1 PASANGAN SALURAN AIR HUJAN
1,000
m2
Pas. Batu bata
129.465,00
129.465,00
1,000
m2
Plasteran
64.901,00
64.901,00
0,010
M3
Cor Rabat
1.129.885,00
11.298,85
0,030
OH
Tukang
110.000,00
3.300,00
0,003
OH
Kepala Tukang
115.000,00
345,00
0,150
OH
Pekerja
80.000,00
12.000,00
0,015
OH
Mandor
125.000,00
1.875,00
C.11
1 M2 PASANGAN DINDING WC/KM KERAMIK 25/20 CM
C.10
98.402,00
205.664,85
17.520,00
223.184,85
1 M2 PASANGAN BATU ALAM
1,000
M2
Batu alam
350.000,00
350.000,00
9,300
Kg
Semen Pc
1.300,00
12.090,00
0,018
M3
Pasir Pasangan
230.000,00
4.140,00
0,180
OH
Tukang
110.000,00
19.800,00
0,018
OH
Kepala Tukang
115.000,00
2.070,00
0,370
OH
Pekerja
80.000,00
29.600,00
0,037
OH
Mandor
125.000,00
4.625,00
366.230,00
56.095,00
422.325,00
D. PEKERJAAN BETON KODE ANALISA D.1
HARGA INDEK
SAT.
URAIAN
HARGA
SATUAN
BAHAN
UPAH
HARGA
( Rp. )
( Rp. )
( Rp. )
( Rp. )
1 M3 BETON CAMPURAN 1 : 3 : 5 UNTUK PEKERJAAN COR LANTAI KERJA
1,012
M3
Batu Split 1-2
400.000,00
404.800,00
276,000
Kg
Semen
1.300,00
358.800,00
0,828
M3
Pasir Cor
230.000,00
190.440,00
0,275
HO
Tukang
110.000,00
30.250,00
0,028
HO
Kepala Tukang
115.000,00
3.220,00
1,650
HO
Pekerja
80.000,00
132.000,00
0,083
HO
Mandor
125.000,00
10.375,00
D.2
954.040,00
175.845,00
1.129.885,00
1 M3 BETON CAMPURAN 1 : 2 : 3
1,047
M3
Batu Split 1-2
400.000,00
418.800,00
371,000
Kg
Semen
1.300,00
482.300,00
0,698
M3
Pasir Cor
230.000,00
160.540,00
0,275
HO
Tukang
110.000,00
30.250,00
0,028
HO
Kepala Tukang
115.000,00
3.220,00
1,650
HO
Pekerja
80.000,00
132.000,00
0,083
HO
Mandor
125.000,00
10.375,00
D.3
JUMLAH
1.061.640,00
175.845,00
1.237.485,00
1 M2 PASANG BEKISTING UNTUK FOOT PLAT
0,020
M3
Papan Begisting (Meranti)
3.200.000,00
64.000,00
0,011
M3
Balok Begisting (Meranti)
3.100.000,00
34.720,00
0,245
Kg
Paku Biasa
19.000,00
4.655,00
0,100
Lt
Minyak Bekisting
5.000,00
500,00
0,195
OH
Tukang
110.000,00
21.450,00
0,020
OH
Kepala Tukang
115.000,00
2.242,50
0,390
OH
Pekerja
80.000,00
31.200,00
0,020
OH
Mandor
125.000,00
2.437,50
103.875,00
57.330,00
161.205,00
D.4
1 M2 PASANG BEKISTING UNTUK SLOOF
0,035
Lbr
Plywood 9mm
135.000,00
4.687,50
0,024
M3
Balok Begisting (Meranti)
3.100.000,00
75.020,00
0,300
Kg
Paku Biasa
19.000,00
5.700,00
0,100
Lt
Minyak Bekisting
5.000,00
500,00
0,260
OH
Tukang
110.000,00
28.600,00
0,026
OH
Kepala Tukang
115.000,00
2.990,00
0,520
OH
Pekerja
80.000,00
41.600,00
0,026
OH
Mandor
125.000,00
3.250,00
D.5
76.440,00
162.347,50
1 M2 PASANG BEKISTING UNTUK KOLOM
0,400
Kg
Paku Biasa
19.000,00
7.600,00
0,200
Lt
Minyak Bekisting
5.000,00
1.000,00
0,018
M3
Balok kayu Kls II
3.200.000,00
57.600,00
0,350
Lbr
Plywood Tebal 9 mm
135.000,00
47.250,00
2,000
Btg
Dolken Kayu Galam
10.000,00
20.000,00
0,330
OH
Tukang
110.000,00
36.300,00
0,033
OH
Kepala Tukang
115.000,00
3.795,00
0,660
OH
Pekerja
80.000,00
52.800,00
0,033
OH
Mandor
125.000,00
4.125,00
D.6
85.907,50
133.450,00
97.020,00
230.470,00
1 M2 PASANG BEKISTING UNTUK BALOK
0,040
M3
Kayu Begisting (Meranti)
3.100.000,00
124.000,00
0,400
Kg
Paku Biasa
19.000,00
7.600,00
0,200
Lt
Minyak Bekisting
5.000,00
1.000,00
0,350
Lbr
Plywood Tebal 9 mm
135.000,00
47.250,00
2,000
Btg
Dolken Kayu Galam
10.000,00
20.000,00
0,330
OH
Tukang
110.000,00
36.300,00
0,033
OH
Kepala Tukang
115.000,00
3.795,00
0,660
OH
Pekerja
80.000,00
52.800,00
0,033
OH
Mandor
125.000,00
4.125,00
199.850,00
97.020,00
296.870,00
D.7
1 M2 PASANG BEKISTING UNTUK LISTPLANK
0,040
M3
Kayu Begisting (Meranti)
3.100.000,00
124.000,00
0,600
Kg
Paku Biasa
19.000,00
11.400,00
0,200
Lt
Minyak Bekisting
5.000,00
1.000,00
0,350
Lbr
Plywood Tebal 9 mm
135.000,00
47.250,00
1,500
Btg
Dolken Kayu Galam
10.000,00
15.000,00
0,195
OH
Tukang
110.000,00
21.450,00
0,020
OH
Kepala Tukang
115.000,00
2.242,50
0,390
OH
Pekerja
80.000,00
31.200,00
0,020
OH
Mandor
125.000,00
2.437,50
D.8
57.330,00
0,400
Kg
Paku Biasa
19.000,00
7.600,00
0,200
Lt
Minyak Bekisting
5.000,00
1.000,00
0,056
M3
Balok kayu Kls II
3.200.000,00
179.200,00
0,350
Lbr
Plywood Tebal 9 mm
135.000,00
47.250,00
10,000
Btg
Dolken Kayu Galam
10.000,00
100.000,00
0,330
OH
Tukang
110.000,00
36.300,00
0,033
OH
Kepala Tukang
115.000,00
3.795,00
0,320
OH
Pekerja
80.000,00
25.600,00
0,033
OH
Mandor
125.000,00
4.125,00 335.050,00
69.820,00
404.870,00
10 KG PEMBESIAN DENGAN BESI POLOS
10,500
Kg
Besi Tulangan
13.000,00
136.500,00
0,150 0,070 0,0070
Kg OH OH
Kawat Bindrat Tukang Kepala Tukang
17.000,00 110.000,00 115.000,00
2.550,00
0,070
OH
Pekerja
80.000,00
5.600,00
0,004
OH
Mandor
125.000,00
500,00
7.700,00 805,00
139.050,00
14.605,00
Untuk 1 Kg Pembesian D.10
255.980,00
1 M2 PASANG BEKISTING UNTUK LANTAI
D.9
198.650,00
153.655,00 15.365,50
1 M3 BETON BERTULANG PEKERJAAN PLAT LANTAI T=10 CM
1,000
M3
Cor Beton Struktur 1 : 2 : 3
1.237.485,00
1.237.485,00
112,000
Kg
Besi Beton (D.7)
15.365,50
1.720.936,00
10,000
M2
Pekerjaan Begisting (D.8)
404.870,00
4.048.700,00
7.007.121,00
7.007.121,00
D.11
1 M3 BETON BERTULANG PEKERJAAN SLOOF 15/20 CM 1,000
M3
Cor Beton Struktur 1 : 2 : 3
1.237.485,00
1.237.485,00
174,160
Kg
Besi Beton (D.7)
15.365,50
2.676.055,48
13,333
M2
Pekerjaan Begisting (D.4)
162.347,50
2.164.633,29
D.12
1,000
M3
Cor Beton Struktur 1 : 2 : 3
1.237.485,00
1.237.485,00
219,320
Kg
Besi Beton (D.7)
15.365,50
3.369.961,46
20,000
M2
Pekerjaan Begisting (D.5)
230.470,00
4.609.400,00
1,000
M3
Cor Beton Struktur 1 : 2 : 3
1.237.485,00
1.237.485,00
139,976
Kg
Besi Beton (D.7)
15.365,50
2.150.801,23
18,000
M2
Pekerjaan Begisting (D.5)
230.470,00
4.148.460,00 7.536.746,23
1,000
M3
Cor Beton Struktur 1 : 2 : 3
1.129.885,00
1.129.885,00
150,791
Kg
Besi Beton (D.7)
15.365,50
2.316.980,82
26,667
M2
Pekerjaan Begisting (D.5)
230.470,00
6.145.866,67
7.536.746,23
9.592.732,48
9.592.732,48
1 M3 BETON BERTULANG PEKERJAAN KOLOM TERAS 15/50CM
1,000
M3
Cor Beton Struktur 1 : 2 : 3
1.237.485,00
1.237.485,00
134,437
Kg
Besi Beton (D.7)
15.365,50
2.065.696,85
17,333
M2
Pekerjaan Begisting (D.5)
230.470,00
3.994.813,33
D.16
9.216.846,46
1 M3 BETON BERTULANG PEKERJAAN KOLOMS PRAKTIS 15/15 CM
D.15
9.216.846,46
1 M3 BETON BERTULANG PEKERJAAN KOLOM 20/25CM
D.14
6.078.173,77
1 M3 BETON BERTULANG PEKERJAAN KOLOM WC 20/20 CM
D.13
6.078.173,77
7.297.995,18
7.297.995,18
1 M3 BETON BERTULANG PEKERJAAN RING BALK 15/20 CM
1,000 156,693
M3 Kg
Cor Beton Struktur 1 : 2 : 3 Besi Beton (D.7)
1.237.485,00 15.365,50
1.237.485,00 2.407.671,41
16,667
M2
Pekerjaan Begisting (D.6)
296.870,00
4.947.833,33
8.592.989,75
8.592.989,75
D.17
1 M3 BETON BERTULANG PEKERJAAN BALOK 15/30 CM
1,000 177,013
M3 Kg
Cor Beton Struktur 1 : 2 : 3 Besi Beton (D.7)
1.237.485,00 15.365,50
1.237.485,00 2.719.898,37
13,333
M2
Pekerjaan Begisting (D.6)
296.870,00
3.958.266,67
D.18
7.915.650,04
7.915.650,04
1 M3 BETON BERTULANG CANOPY TERAS 10X30X2
1,000
M3
Cor Beton Struktur 1 : 2 : 3
1.237.485,00
1.237.485,00
118,267
Kg
Besi Beton (D.7)
15.365,50
1.817.226,47
16,667
M2
Pekerjaan Begisting (D.7)
255.980,00
4.266.333,33
7.321.044,80
7.321.044,80
E. PEKERJAAN KUDA - KUDA DAN ATAP KODE ANALISA E.1
HARGA INDEK
SAT.
URAIAN
HARGA
SATUAN
BAHAN
UPAH
HARGA
( Rp. )
( Rp. )
( Rp. )
( Rp. )
1 M2 RANGKA BAJA RINGAN 1,200
Btg
Btg Rangka Baja ringan C75
100.000,00
120.000,00
0,950
Btg
Btg Rangka Baja ringan AAA 40X30
55.000,00
52.250,00
18,000
bh
bh Baut sekrub
300,00
5.400,00
1,000
Ls
Tools (Cutting well and Drill electric Pwr)
9.000,00
9.000,00
0,320
OH
Pekerja
80.000,00
25.600,00
0,158
OH
Tukang Baja Ringan
110.000,00
17.380,00
0,016
OH
Kep Tukang
115.000,00
1.817,00
0,016
OH
Mandor
125.000,00
1.975,00
E.2
46.772,00
1,620
Bh
Genteng Metal
38.000,00
61.560,00
0,200
Kg
Paku Genteng
25.000,00
5.000,00
0,100
OH
Tukang
110.000,00
11.000,00
0,010
OH
Kepala Tukang
115.000,00
1.150,00
0,200
OH
Pekerja
80.000,00
16.000,00
0,001
OH
Mandor
125.000,00
125,00
233.422,00
66.560,00
28.275,00
94.835,00
1 M1 MEMASANG BUBUNGAN ATAP (MODEL U)
1,100
Bh
Bubungan Model U
40.000,00
44.000,00
0,050
Kg
Paku Genteng
25.000,00
1.250,00
0,150
OH
Tukang
110.000,00
16.500,00
0,015
OH
Kepala Tukang
115.000,00
1.725,00
0,250
OH
Pekerja
80.000,00
20.000,00
0,013
OH
Mandor
125.000,00
1.625,00
E.4
186.650,00
1 M2 MEMASANG ATAP GENTENG METAL
E.3
JUMLAH
45.250,00
39.850,00
85.100,00
1 M1 PAPAN LISTPLANK KAYU ULIN
0,0108
M3
Papan Ulin
5.500.000,00
59.400,00
0,100
Kg
Paku Biasa
19.000,00
1.900,00
0,200
OH
Tukang
110.000,00
22.000,00
0,025
OH
Kepala Tukang
115.000,00
2.875,00
0,100
OH
Pekerja
80.000,00
8.000,00
0,005
OH
Mandor
125.000,00
625,00
61.300,00
33.500,00
94.800,00
F. PEKERJAAN RANGKA DAN PENUTUP PLAFOND KODE ANALISA F.1
HARGA INDEK
SAT.
URAIAN
HARGA
SATUAN
BAHAN
UPAH
HARGA
( Rp. )
( Rp. )
( Rp. )
( Rp. )
1 M2 PENGGANTUNG DAN RANGKA PLAFOND
4,580
M1
Besi Kotak 2x4
13.000,00
59.540,00
0,200
Kg
Baut sekrup
300,00
60,00
0,250
OH
Tukang
110.000,00
27.500,00
0,025
OH
Kepala Tukang
115.000,00
2.875,00
0,150
OH
Pekerja
80.000,00
12.000,00
0,075
OH
Mandor
125.000,00
9.375,00
F.2
59.600,00
51.750,00
111.350,00
1 M2 PLAFOND GRC BOARD
0,375
Lbr
GRC BOARD Tebal 4 mm
65.000,00
24.375,00
0,030
Kg
Paku Plywood
19.000,00
570,00
0,100
OH
Tukang
110.000,00
11.000,00
0,010
OH
Kepala Tukang
115.000,00
1.150,00
0,070
OH
Pekerja
80.000,00
5.600,00
0,004
OH
Mandor
125.000,00
500,00
F.3
JUMLAH
24.945,00
18.250,00
43.195,00
1 M1 LIST PLAFOND Kayu profil
1,050
M1
List kayu profil
9.000,00
9.450,00
0,010
Kg
Paku biasa
19.000,00
190,00
0,050
OH
Tukang
110.000,00
5.500,00
0,002
OH
Kepala Tukang
115.000,00
230,00
0,050
OH
Pekerja
80.000,00
4.000,00
0,003
OH
Mandor
125.000,00
375,00
9.640,00
10.105,00
19.745,00
G. PEKERJAAN KUSEN DAN PENGGANTUNG KODE ANALISA G.1
HARGA INDEK
SAT.
URAIAN
HARGA
SATUAN
BAHAN
UPAH
HARGA
( Rp. )
( Rp. )
( Rp. )
( Rp. )
1 M3 MENGERJAKAN KUSEN PINTU DAN JENDELA
1,200
M3
Kayu Bengkirai Kosen
5.500.000,00
6.600.000,00
20,000
OH
Tukang
110.000,00
2.200.000,00
2,000
OH
Kepala Tukang
115.000,00
230.000,00
6,000
OH
Pekerja
80.000,00
480.000,00
0,300
OH
Mandor
125.000,00
37.500,00
G.1.1
6.600.000,00
M3
Kosen Pintu Jendela
9.547.500,00
9.547.500,00
62.058,75
0,060
OH
Tukang
110.000,00
6.600,00
0,010
OH
Kepala Tukang
115.000,00
1.150,00
0,120
OH
Pekerja
80.000,00
9.600,00
0,001
OH
Mandor
125.000,00
125,00 62.058,75
17.475,00
79.533,75
1 M2 PASANG PINTU PANEL KAYU BENGKIRAI
0,040
M3
Kayu Bengkirai
5.500.000,00
220.000,00
2,500
OH
Tukang
110.000,00
275.000,00
0,250
OH
Kepala Tukang
115.000,00
28.750,00
1,000
OH
Pekerja
80.000,00
80.000,00
0,050
OH
Mandor
125.000,00
6.250,00 220.000,00
G.2.1
1 Buah Pintu Panel Double Bengkirai
G.2.2
1 Buah Pintu Panel Tunggal Bengkirai
390.000,00
610.000,00 1.921.500,00 960.750,00
1 M2 PASANG PINTU PANEL ULIN
0,040
M3
Kayu Ulin
4.000.000,00
160.000,00
2,500
OH
Tukang
110.000,00
275.000,00
0,250 1,000
OH OH
Kepala Tukang Pekerja
115.000,00 80.000,00
28.750,00 80.000,00
0,050
OH
Mandor
125.000,00
6.250,00
G.3.1
2.947.500,00
0,0065
G.3
1 M1 PEKERJAAN DAN PEMASANGAN KUSEN PINTU DAN JENDELA
G.2
JUMLAH
1 Buah Pintu Panel Ulin
160.000,00
390.000,00
550.000,00 808.500,00
G.4
1 M2 PASANG DAUN JENDELA KACA
0,035
M3
Kayu Bengkirai
5.500.000,00
192.500,00
2,000 0,200
OH OH
Tukang Kepala Tukang
110.000,00 115.000,00
220.000,00 23.000,00
0,800
OH
Pekerja
80.000,00
64.000,00
0,040
OH
Mandor
125.000,00
5.000,00
192.500,00
312.000,00
504.500,00
G.5.1
1 Buah Daun Jendela Type 1 uk. 40 x 65
131.170,00
G.5.2
1 Buah Daun Jendela Type 2 uk. 40 x 75
151.350,00
G.5.3
1 Buah Daun Jendela Type 3 uk.80 x 65
262.340,00
G.5.4
1 Buah Daun Jendela Type 4 uk. 65 x 100
327.925,00
G.5.5
1 Buah Daun Jendela Type 5 uk. 65 x 150
491.887,50
G.5.6
1 Buah Daun Jendela Type 6 uk. 60 x 100
302.700,00
G.5
1 M2 PASANG JALUSI KAYU MERANTI MERAH
0,021
M3
Kayu Meranti Merah
3.200.000,00
66.560,00
0,052
Kg
Paku Biasa
19.000,00
988,00
0,693
OH
Tukang
110.000,00
76.230,00
0,069
OH
Kepala Tukang
115.000,00
7.935,00
0,173
OH
Pekerja
80.000,00
13.840,00
0,009
OH
Mandor
125.000,00
1.125,00
G.6
99.130,00
166.678,00
1 BH PASANG KUNCI TANAM/BIASA
1,000
Bh
Kunci Tanam
225.000,00
225.000,00
0,500
OH
Tukang
110.000,00
55.000,00
0,010
OH
Kepala Tukang
115.000,00
1.150,00
0,010
OH
Pekerja
80.000,00
800,00
0,005
OH
Mandor
125.000,00
625,00
G.7
67.548,00
225.000,00
57.575,00
282.575,00
1 BH PASANG ENGSEL JENDELA KUPU-KUPU
1,000
Bh
Engsel Jendela
35.000,00
35.000,00
0,100
OH
Tukang
110.000,00
11.000,00
0,010
OH
Kepala Tukang
115.000,00
1.150,00
0,010
OH
Pekerja
80.000,00
800,00
0,001
OH
Mandor
125.000,00
62,50
35.000,00
13.012,50
48.012,50
G.8
1 BH PASANG ENGSEL PINTU
1,000
Bh
Engsel Pintu
45.000,00
45.000,00
0,150
OH
Tukang
110.000,00
16.500,00
0,015
OH
Kepala Tukang
115.000,00
1.725,00
0,015
OH
Pekerja
80.000,00
1.200,00
0,001
OH
Mandor
125.000,00
93,75
G.9
Bh
Hak Angin
25.000,00
64.518,75
25.000,00
0,150
OH
Tukang
110.000,00
16.500,00
0,015
OH
Kepala Tukang
115.000,00
1.725,00
0,015
OH
Pekerja
80.000,00
1.200,00
0,001
OH
Mandor
125.000,00
93,75 25.000,00
19.518,75
44.518,75
1 BH PASANG HANDLE
1,000
Bh
Handle
25.000,00
25.000,00
0,150
OH
Tukang
110.000,00
16.500,00
0,015
OH
Kepala Tukang
115.000,00
1.725,00
0,015
OH
Pekerja
80.000,00
1.200,00
0,001
OH
Mandor
125.000,00
93,75 25.000,00
19.518,75
44.518,75
1 BH GRENDEL
1,000
Bh
Grendel
25.000,00
25.000,00
0,150
OH
Tukang
110.000,00
16.500,00
0,015
OH
Kepala Tukang
115.000,00
1.725,00
0,015
OH
Pekerja
80.000,00
1.200,00
0,001
OH
Mandor
125.000,00
93,75
G.12
19.518,75
1,000
G.11
1 BH PASANG HAK ANGIN
G.10
45.000,00
25.000,00
19.518,75
44.518,75
1 M2 PASANG KACA BENING TEBAL 5 MM
1,100
M2
Kaca
125.000,00
137.500,00
0,150
OH
Tukang
110.000,00
16.500,00
0,015
OH
Kepala Tukang
115.000,00
1.725,00
0,015
OH
Pekerja
80.000,00
1.200,00
0,001
OH
Mandor
125.000,00
93,75
137.500,00
19.518,75
157.018,75
I. PEKERJAAN CAT-CATAN KODE ANALISA I.1
INDEK
URAIAN
HARGA
SAT.
HARGA
SATUAN
BAHAN
UPAH
HARGA
( Rp. )
( Rp. )
( Rp. )
( Rp. )
1 M2 PENGECETAN TEMBOK BAGIAN DALAM DAN PLAFON EX. MOWILEX ATAU SETARA
0,100
Kg
Plamir
35.000,00
3.500,00
0,260
Kg
Cat Penutup setara mowilex min 3 layer
60.000,00
15.600,00
0,063
OH
Tukang Cat
110.000,00
6.930,00
0,006
OH
Kepala Tukang Cat
115.000,00
724,50
0,020
OH
Pekerja
80.000,00
1.600,00
0,003
OH
Mandor
125.000,00
375,00
I.2
19.100,00
9.629,50
28.729,50
1 M2 PENGECETAN TEMBOK BAGIAN LUAR EX. MOWILEX ATAU SETARA
0,100
Kg
Plamir
35.000,00
3.500,00
0,260
Kg
Cat Penutup setara mowilex min 3 layer
85.000,00
22.100,00
0,063
OH
Tukang Cat
110.000,00
6.930,00
0,006
OH
Kepala Tukang Cat
115.000,00
724,50
0,020
OH
Pekerja
80.000,00
1.600,00
0,003
OH
Mandor
125.000,00
375,00
I.3
JUMLAH
25.600,00
9.629,50
35.229,50
1 M2 PENGECETAN KAYU DENGAN CAT KILAP
0,150
Kg
Plamir
35.000,00
5.250,00
0,350
Kg
Cat Penutup
50.000,00
17.500,00
0,070
OH
Tukang Cat
110.000,00
7.700,00
0,105
OH
Kepala Tukang Cat
115.000,00
12.075,00
0,040
OH
Pekerja
80.000,00
3.200,00
0,003
OH
Mandor
125.000,00
375,00
22.750,00
23.350,00
46.100,00