This study contains brief description of the Akkas gas field in the west dessert of Iraq, as well as some suggestions to develop it.
Guideline to develop small fields in Malaysia
Marginal Field Development Concepts for Western Offshore
Deskripsi lengkap
A project report on training and development and training modules of five companies.Full description
economics
General review about wastewater treatmentFull description
laporan praktek industri UPIDeskripsi lengkap
Full description
Laporan KP (kerja praktek)Full description
karya ilmiah populer
Project Development
economics
PT CENTRAL INDONESIA OFFSHORE ENERGY RENCANA PENGEMBANGAN LAPANGAN GRANADA
Peralatan yang akan digunakan: 1. Surface Equipment: Pemboran sumur infil dengan kedalaman akhir 4500 ft akan menggunakan Rig dengan kekuatan 1500 HP dengan pipa bor (Drill Pipe) 4 ½ “. Blow Out Preventer yang akan digunakan adalah type Annular Preventer dengan working
pressure sebesar 2000 psi, Pipe Preventer dengan working pressure sebesar 3000 psi, Blind Preventer dengan working pressure sebesar 3000 psi, Choke Manifold dengan working pressure sebesar 3000 psi, dan dengan well head
yang memiliki working pressure 3000 psi. Tangki lumpur dilengkapi “degasser” untuk membuang gas apabila lumpur terkontaminasi oleh gas serta satu set “Solid Control Removal”.
2. Downhole Equipment: Pemboran sumur di lapangan Granada ini tepatnya pada sumur infil CIO-1 adalah pemboran sumur lurus atau vertikal, dengan penggunaan down hole equipment yang standard, antara lain adalah DP 4-½ “ , 5” dan DC 6”, 8”, dengan Stabillizer 12-¼ “ , 8-½ “.
5.1.5
Lumpur Pemboran
Ada 4 jenis lumpur yang digunakan untuk setiap sumur drilling CIO-1. Keempat jenis lumpur tersebut digunakan sesuai dengan kedalamannya