BBU3900 V300
Installation Guide
Issue: 16 Date: 2010-07-30
HUAWEI TECHNOLOGIES Co., Ltd.
Contents Installation Tools………………………………… 2 Installation Scenarios…………………………… 3 BBU Hardware…………………………………… 5 Installation Procedure…………………………… 6 Installing the BBU in the APM30……………… 7 Installing the BBU in the APM30H(Ver.A) …… 13 Installing the BBU in the 19-Inch Rack………… 15 Installing the BBU in the TMC…………………… 17 Installing the BBU in the PS4890 Cabinet…… 20 Installing the BBU in the RRU3004 Rack……… 23 Installing the IMB03 on the H-Shaped Stand… 27 Installing the RRU on the H-Shaped Stand … 28 Installing the BBU on the Wall………………… 29 Installing the BBU in the APM30H(Ver.B)…… 33 Installing the BBU in the TMC11H(Ver.B)…… 37 Installing the BBU in the APM30H(Ver.B, +24V) …………………………… 39 Installing the BBU in the OMB ………………… 41 BBU Hardware Installation Checklist………… 47 Powering On the BBU…………………………… 47 Appendix…………………………………………… 48 Obtaining the ESN ……………………………… 48 Change History…………………………………… 56
1
Copyright © Huawei Technologies Co., Ltd. 2010. All rights reserved.
Installation Tools
Measuring tape
Phillips screwdriver (M3-M6)
Flat-head screwdriver (M3-M6)
Adjustable wrench
Socket wrench
ESD wrist strap
Vacuum cleaner
Torque wrench
Marking pen
Level
Rubber Mallet
RJ-45 crimping tool
Multimeter
Power cable crimping tool
Cable cutter
2
Hammer drill
Wire stripper
ESD gloves
Installation Scenarios The GTMU in this document is based on the first type of GTMU.
In the APM30/APM30H(Ver.A)
In the PS4890
In the 19-inch rack
In the APM30H(Ver.B)
In the TMC
In the RRU3004 rack
3
Installation Scenarios
In the TMC11H(Ver.B)
In the APM30H (Ver.B, +24V)
On the wall
In the OMB
4
BBU Hardware 1. Exterior of the BBU
442
mm
86 mm (2U) 310 m
m
2. Configuration Principles of the BBU Boards
Board
Mandatory/ Optional
Full Configuration
Installation Slot
Remarks
GTMU
Mandatory
1
S5 and S6
Can be installed only in S5 and S6.
UPEU
Mandatory
2
S18 or S19
A single UPEU is preferentially configured in the S19 slot.
FAN
Mandatory
1
S16
Can be installed only in the S16 slot.
UTRP
Optional
1
S0 or S4
Preferentially installed in the slot4.
UELP
Optional
2
S0 or S4
A single UELP is preferentially configured in the S4 slot.
UFLP
Optional
2
S0 or S4
A single UELP is preferentially configured in the S4 slot.
USCU
Optional
1
S0 or S1
Preferentially installed in the S1 slot.
UEIU
Optional
1
S18
Preferentially installed in the S18 slot.
z The UELP and UFLP need to be optionally configured in the BBU or SLPU on site according to the field requirements. z UTRP is supported in V300R012 and later versions.
5
Installation Procedure
When the equipment is unpacked, it must be powered on in 24 hours. The maximum duration of the power-off state of the equipment is 24 hours during maintenance.
6
Installing the BBU in the APM30 a Installing the BBU Case 1. Install the mounting ears at both sides of the BBU reversely.
PDU
BBU M6 bolt
2. Slide the BBU case into the cabinet.
b
Installing the BBU Cables
Cable connections of the BBU External power supply External monitoring device External alarm device E1/T1 surge protection transfer cable E1/T1cable CPRI signal cable Alarm cable Monitoring signal cable
FE/GE surge protection transfer cable
Power cable
FE/GE cable
7
Installing the BBU in the APM30 b Installing the BBU Cables 1. Install BBU power cable. Connect the OT terminal of the power cable to the LOAD3 terminal of the PDU, and then fix the 3V3 connector of the power cable to the PWR port on the BBU.
LOAD3 NEG(-) RNT(+)
PWR
The OT terminals of the power cable is to be made on site.
2. Install the CPRI optical cable.
Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI5 ports on the GTMU, and connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU.
Optical module Puller
a. Insert the optical module into the CPRI0, CPRI1, CPRI2 CPRI3, CPRI4 or CPRI5 port, and then turn outwards the puller on the optical module.
Winding pipe
b. Insert one end of the CPRI optical cable into the optical module, and then lead the CPRI optical cable out of the cabinet along the right side of the cabinet. c. Wrap the fiber tail with the winding pipe.
The single-mode optical module is labeled "SM" and multi-mode optical module is labeled "MM".
The TX port on the BBU is connected to the RX port on the RRU. The RX port on the BBU is connected to the TX port on the RRU.
8
Installing the BBU in the APM30 b Installing the BBU Cables 3. Install the E1/T1 surge protection transfer cable. Fix the DB25 connector of the E1/T1 surge protection transfer cable to the INSIDE port on the UELP and the DB26 connector to the E1/T1 port on the GTMU. 4. Install the E1/T1 cable. 4.1. Cabling the E1/T1 cable. 4.2. Fix the DB26 connector of the E1/T1 cable to the OUTSIDE port on the UELP. 4.3. Strip the jacket off the E1/T1 cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer Shielding layer of the E1/T1 cable (25 mm)
4.4. Thread the E1/T1 cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the E1/T1 cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the ground bolt of the APM30.
Shielding layer of the E1/T1 cable
E1/T1cable
E1/T1 surge protection transfer cable
Grounding clip
Before soldering the connectors to the E1/T1 cable, ensure that both ends of the E1 cable are disconnected from any devices. In addition, all the connectors should be soldered to the cable.
9
Installing the BBU in the APM30 b Installing the BBU Cables 5. Install the FE/GE surge protection transfer cable (FE/GE transmission mode). Connect one end of the FE/GE surge protection transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the GTMU.
6. Install the FE/GE cable (FE/GE transmission mode). 6.1. Connect one end of the FE/GE cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet. (25 mm)
FE/GE surge protection transfer cable
FE/GE cable
6.2. Thread the FE/GE cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the FE/GE cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the ground bolt of the APM30.
Shielding layer of the FE/GE cable
7. Install the monitoring signal cable between the APMI and the BBU. 7.1. Fix the RJ45 connector at one end of the cable to the MON1 port on the UPEU. 7.2. Cut off the RJ45 connector at the other end of the cable on site, and then connect the four exposed wires to the RX+, RX-, TX+, and TX- ports on the APMI.
10
Installing the BBU in the APM30 b
Installing the BBU Cables
8. Install the EMUA monitoring signal cable. (The EMUA is configured if there are external dry contacts or analog detection is required.) Cut off the RJ45 connector of the EMUA monitoring signal cable, and then connect the four exposed wires to the RX+, RX-, TX+, and TX- ports on the APMI. Fix the DB9 connector to the corresponding port on the EMUA.
EMUA monitoring signal cable Pin on the RJ45 Connector
Pin of the DB9 Male Connector
Wire Color
Wire Type
Port on the APMI
X1.1
X2.3
White
Twisted pair
TX+
X1.2
X2.7
Orange
Twisted pair
TX-
X1.4
X2.2
Blue
Twisted pair
RX+
X1.5
X2.6
White
Twisted pair
RX-
11
Installing the BBU in the APM30 b
Installing the BBU Cables
9. Install the alarm cable.
Connect one end of the alarm cable to the EXT-ALM port on the UPEU and the other end to the corresponding alarm device.
12
Installing the BBU in the APM30H(Ver.A) a BBU Cable Connections The procedure for installing the BBU case in the APM30H is the same as that in the APM30. For details, see pages 7 to 12. The following figure shows the cable connections of the BBU. For details on how to install the monitoring signal cable between the HEUA and the BBU in the APM30H, see page 14.
No.
Cable
Installation Position One end is connected to...
The other end is connected to...
BBU power cable
LOAD3 terminal of the PDU
PWR port on the BBU
E1/T1 surge protection transfer cable
E1/T1 port on the GTMU
INSIDE port on the UELP
E1/T1 cable
OUTSIDE port on the UELP
External transmission device
Monitoring signal cable
COM IN port on the HEUA
MON1 port on the BBU
CPRI optical cable
CPRI port on the GTMU
CPRI port on the RRU
13
Installing the BBU in the APM30H(Ver.A) b
Installing the Monitoring Signal Cable Between the HEUA and the BBU
HEUA
COM IN MON1 UPEU on the BBU
14
Installing the BBU in the 19-Inch Rack a Space Requirements
When the BBU3900 is installed in the 19-inch cabinet, no space is required on the left and right of the BBU3900.
b
Installing the BBU Case
c Installing the DCDU-03B
15
Installing the BBU in the 19-Inch Rack d Installing the BBU Cables
No.
Cable
Installation Position One end is connected to...
The other end is connected to...
CPRI optical cable
CPRI port on the GTMU
CPRI port on the RRU
External power cable
BEG(-) and RTN(+) on the DCDU-03B
External power equipment
BBU power cable
PWR1 on the UPEU
LOAD6 on the DCDU-03B
16
Installing the BBU in the TMC a
Installing the DCDU-03B
Slide the DCDU-03B into the TMC. Then, tighten the four M6 screws.
b
Installing the BBU Case Slide the BBU into the TMC. Then, tighten the four M6 screws.
17
Installing the BBU in the TMC c
Installing the BBU Cables
DCDU-03B input power cable
z For details on how to install the TMC alarm cable, see page 19. z The DCDU-03B input power cable is connected to the external DC power supply system. z For cable connections of the BBU, see page 7.
18
Installing the BBU in the TMC c
Installing the BBU Cables
Procedure for installing the TMC alarm cable:
APMI panel
Door status sensor
a. Fix the RJ45 connector at one end of the alarm cable to the EXT_ALM1 port on the BBU. b. Connect the two bare terminals X1.4 (blue) and X1.5 (white) to the alarm wiring terminals of the door status sensor. c. Connect the two bare terminals X1.1 (white) and X1.2 (orange) to the OUT1+ and OUT1alarm wiring terminals on the APMI. d. Connect the two bare terminals X1.3 (white) and X1.6 (green) to the alarm wiring terminals of the DCDU.
The white and green bare wire terminals are not distinguished from different wiring terminals.
19
Installing the BBU in the PS4890 Cabinet a
Installing the DCDU-03B
1. Slide the DCDU-03B into the PS4890 cabinet. Then, tighten the four M6 screws.
2. Install the DCDU-03B input power cable. Connect one end of the power cable in blue to the DC output terminal LOAD2(-) on the power subrack and the other end to the DC input terminal NEG(-) on the DCDU-03B . Connect one end of the power cable in black to the DC output terminal RTN(+) on the power subrack and the other end to the DC input terminal RTN(+) on the DCDU-03B.
DC input terminal on the DCDU-03B
b
Installing the BBU Case
Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.
20
DC output terminal on the power subrack
Installing the BBU in the PS4890 Cabinet c Installing the BBU Cables Cable connections of the BBU
Connect the BBU power cable to the DC output terminal LOAD6 of the DCDU-03B.
CPRI optical cable
BBU power cable
Monitoring signal cable between the PMU and the BBU
E1/T1 cable
BBU alarm cable
In addition to the BBU cables installed in the APM30, a monitoring signal cable between the PMU and the BBU needs to be installed when the BBU is installed in the PS4890 cabinet. The monitoring signal cable between the APMI and the BBU is not required. For details on how to install the monitoring signal cable between the PMU and the BBU, see page 22.
21
Installing the BBU in the PS4890 Cabinet c Installing the BBU Cables Install the monitoring signal cable between the PMU and the BBU.
Connect one end of the cable to the MON port on the BBU and the other end to the RS232/RS422 port on the PMU.
Monitoring signal cable between the PMU and the BBU
RS232/RS422 port
22
Installing the BBU in the RRU3004 Rack a
b
Marking Anchor Points (Unit: mm)
Drilling Holes and Installing the Expansion Bolt Assembly
Bolt M10x60 Spring washer 12 Flat washer 12
Expansion tube
c Installing the H-shaped Stand a 1. Secure the stand.
2. Adjust the level of the stand.
3. Install the beam.
Pre-tightening
Tightening
The beam on the other side is installed in the same way.
23
Installing the BBU in the RRU3004 Rack d Removing the Washers a
e
Fitting the Tabs on One Side of the RRU3004 Rack into the Anchor Slots on the Stand
f a
g
Installing the Adapting Pieces
i
Installing the DCDU-03B (–48 V Input Power)
Fixing the Lower Part of the RRU3004 Rack
Tighten the screws
h Installing the BBU Case
Case 2
Installing the EPS30-4815AF (AC Input Power)
24
Installing the BBU in the RRU3004 Rack j
Installing the BBU Cables –48 V input power
DCDU
Cable
One End Is Connected to...
The Other End Is Connected to...
The end with the optical cable labels 2A and 2B is
The end with the optical cable labels 1A and
connected to CPRI ports 0 to 5 of the GTMU of the
1B is connected to the CPRI_W port of the
BBU.
cabling cavity of the RRU.
Ground cable for the subrack
Ground terminal of the RRU3004 rack
Ground bar of the stand
Power cable for the BBU
PWR port of the BBU
LOAD6 port of the DCDU
E1/T1 cable
E1/T1 port of the BBU
GEHUB or HUBBTS
Power cable for the DCDU
RTN (+) and NEG (-) terminals at the DC input end of External power supply system
CPRI optical cable
the DCDU External PGND cable
Ground bar of the stand
External ground busbar
Equipotential cable for the
Ground terminal of the RRU3004 rack
Ground terminal of the RRU3004 rack
Ground terminal of the RRU3004 rack
Ground terminal of the DCDU
subrack Ground cable for the DCDU
25
Installing the BBU in the RRU3004 Rack j
Installing the BBU Cables 220 V input power
4815
The mounting ears need to be installed in an inverse manner during the installation of the 4815.
Only two countersunk screws are required. Cable
One End Is Connected to... CPRI optical cable
The Other End Is Connected to...
The end with the optical cable labels 2A and The end with the optical cable labels 1A and 2B is connected to CPRI ports 0 to 5 of the
1B is connected to the CPRI_W port of the
GTMU of the BBU.
cabling cavity of the RRU.
PGND cable for the RRU3004 rack
Ground terminal of the RRU3004 rack
Ground bar of the stand
External PGND cable
Ground bar of the stand
External ground busbar
Equipotential cable for the rack
Ground terminal of the RRU3004 rack
Ground terminal of the RRU3004 rack
Power cable for the BBU
PWR port of the BBU
LOAD1 port of the 4815
4815 - BBU monitoring signal cable
MON1 port of the BBU
RS232/RS485 port of the 4815, close to the
E1/T1 cable
E1/T1 port of the BBU
GEHUB or HUBBTS
PGND cable for the 4815
Bolts for the mounting ears of the 4815
Ground terminal of the RRU3004 rack
Input power cable for the 4815
AC INPUT port of the 4815
Power supply equipment of the customer
232 side
26
Installing the IMB03 on the H-Shaped Stand a
b Installing the Bolts
Installing the Mounting Ears for the IMB03
Upper mounting hole for the IMB03
Insulation pad Fitting to the mounting hole M6x16
Beam Lower mounting hole for the IMB03
3 N•m
c a Installing the IMB03
d Securing the IMB03 M10x30
30 N•m
20 mm to 30 mm
For details about how to install the BBU and DCDU, see page 24.
27
Installing the RRU on the H-Shaped Stand a Preparing the Installation
b Installing the Main Bracket
Auxiliary Bracket Main bracket
Dual-nut bolt
Main bracket
Brackets for installing the RRU
When the expansion bolt assemblies are used to secure the H-shaped stand, only the bolt and spring washer are used, and the expansion tube and plastic tube are removed.
Only the main bracket is used for installing the RRU on the H-shaped stand, and the dual-nut bolt and auxiliary bracket are not used.
c a Installing the RRU
d Securing the RRU
For details about cable connections, see pages 25 and 26.
28
Installing the BBU on the Wall a Space Requirements A single BBU
BBU+DCDU-03B DCDU-03B BBU
0mm ≥ 10
The DCDU should be installed close to the BBU, but the distance between BBU and DCDU must be greater than 100 mm.
a b
Installing the Mounting Ears for Wall Installation
Mounting ears on the BBU case
Mounting ears for wall installation Use screws to join the mounting ears for wall installation and the mounting ears on the BBU case.
29
Installing the BBU on the Wall c a
Determining the Anchor Points on the Wall Place the BBU against the wall, and then use the marking pen to mark the anchor points.
Wall
BBU
a d
Installing the Expansion Bolts
e
Bolt M6×60 Nut Spring washer 6 Flat washer 6
Fixing the BBU Case on the Wall
Flat washer
Spring washer Expansion tube
30
Installing the BBU on the Wall f
Installing the DCDU-03B Case 2. Place the mounting ears for wall installation against the wall, and then use the marker to mark the holes of the mounting ears for wall installation.
1. Installing the mounting ears for the DCDU-03B.
Wall M6x12
2 N•m
3. Install the expansion bolt.
4. Install the DCDU-03 on the wall.
Bolt M6×60 Nut Spring washer 6 Flat washer 6 Expansion tube
31
Installing the BBU on the Wall g
Installing the BBU Cables
External ground bar
External power equipment
External ground bar
External transmission equipment
External monitoring equipment
SN
Cable
Installation Position One End Connected to...
The Other End Connected to...
RRU power cable
LOAD0 to LOAD5 on the DCDU-03
Power supply socket on the RRU
CPRI optical cable
CPRI port on the BBU
CPRI port on the RRU
E1/T1 cable
E1/T1 port on the GTMU
GEHUB or HUBBTS
Monitoring signal cable
MON/ALM port on the BBU
External monitoring equipment
BBU power cable
PWR port on the BBU
LOAD6 on the DCDU-03
DCDU power cable
DC input port on the DCDU-03
External power equipment
PGND cable
Ground bolt on the equipment
External ground bar
32
Installing the BBU in the APM30H(Ver.B) a Installing the BBU Case 2. Installing the SLPU Case Slide the SLPU box into the 1U space above the EPS in the cabinet, and then fasten the two M6 screws on the panel.
1. Installing the BBU Case Slide the BBU into the 2 U space close to the EPS along the guide rails, and then tighten the four M6 screws on the BBU panel. M6x16
EPS 01
2 N•m
BBU SLPU
M6 screws
b BBU Cable Connections
FE/GE cable
Monitoring signal cable
FE/GE surge protection transfer cable E1/T1 surge protection transfer cable CPRI optical cable
Alarm cable BBU power cable E1/T1 cable
33
Installing the BBU in the APM30H(Ver.B) c Installing the BBU Cables 1. Install power cable. Link the easy power receptacle (pressfit type) connector at one end to the LOAD1 terminal of the EPS01, and then link the 3V3 connector at the other end to the -48V port on the BBU. LOAD1
2. Install the CPRI optical cable. The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI5 on the GTMU of the BBU, the connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU. 2.1. Turn the puller on the optical module outwards, and then insert the optical module to the port CPRI 0 to CPRI5. 2.2. Remove the dustproof caps from the optical connectors.
Optical module Puller
Insert the optical connector at one end of the CPRI optical cable into the optical module. Lead the CPRI optical cable out of the cabinet along the left side of the cabinet. 2.3. Wrap the winding pipe at the fiber tails.
Winding pipe
z Connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU. z Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI5 ports on the GTMU.
34
Installing the BBU in the APM30H(Ver.B) c
Installing the BBU Cables
3. Install the E1/T1 surge protection transfer cable. Fix the DB25 connector of the E1/T1 surge protection transfer cable to the INSIDE port on the UELP and the DB26 connector to the E1/T1 port on the GTMU.
4. Install the E1/T1 cable. 4.1. Cabling the E1/T1 cable. 4.2. Fix the DB26 connector of the E1/T1 cable to the OUTSIDE port on the UELP.
E1/T1 cable
Before soldering the connectors to the E1/T1 cable, ensure that both ends of the E1 cable are disconnected from any devices. In addition, all the connectors should be soldered to the cable.
E1/T1 surge protection transfer cable
5. Install the FE/GE surge protection transfer cable (FE/GE transmission mode).
Connect one end of the FE/GE surge protection transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the GTMU.
6. Install the FE/GE cable (FE/GE transmission mode). 6.1. Connect one end of the FE/GE cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet.
FE/GE surge protection transfer cable
35
FE/GE cable
Installing the BBU in the APM30H(Ver.B) c Installing the BBU Cables 7. Install the monitoring signal cable between the CMUA and the BBU.
COM_IN
MON1
36
Installing the BBU in the TMC11H(Ver.B) a Installing the BBU Slide the SLPU into the TMC11H along the guide rails, and then tighten the two M6 screws on the SLPU panel.
Slide the BBU into the TMC11H along guide rails, and then tighten the four M6 screws on the BBU panel. M6x16
M6x16
DCDU 2 N•m
2 N•m
SLPU BBU
b Installing the BBU Cable Install the BBU power cable.
LOAD6
37
Installing the BBU in the TMC11H(Ver.B) b Installing the BBU Cable z The procedure for installing BBU cables (except the power cable) in the TMC11H cabinet is the same as that in the APM30H(Ver.B). For details, see the description on pages 33 to 36. z For details on the BBU cable connections, see BBU Cable Connections on pages 33.
Cable
Connector Type
Connects to
CPRI optical cable
DLC
The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI5 on the GTMU.
DLC
The connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU.
DB26 connector
OUTSIDE port on the UELP
The connector needs to be made on site according to the field requirements.
Port on the transmission device
DB26 connector
E1/T1 port on the GTMU
DB25 connector
INSIDE port on the UELP
RJ45 connector
FE0 port at the OUTSIDE side on the UFLP
RJ45 connector
Port on the transmission device
FE/GE surge protection transfer cable
RJ45 connector
FE0 port at the INSIDE side on the UFLP
RJ45 connector
FE0 port on the GTMU
Monitoring signal cable between the CMUA and the BBU
RJ45 connector
MON1 port on the BBU
RJ45 connector
COM_IN port on the CMUA
BBU power cable
3V3 connector
-48V port on the UPEU
OT terminal
LOAD6 port on the DCDU-03B
E1/T1 cable
E1/T1 surge protection transfer cable
FE/GE cable
38
Installing the BBU in the APM30H(Ver.B, +24V) a Installing the BBU Slide the SLPU to the APM30H (+24V) along guide rails, and then tighten the two M6 screws on the SLPU panel.
Slide the BBU to the APM30H (+24V) along guide rails, and then tighten the four M6 screws on the BBU panel. M6x16
M6x16
EPS48100D
2 N•m
2 N•m
BBU
b Installing BBU Cables Installing the monitoring signal cable for the PSU and the in-position signal cable for the PSU PRESENT ALM
EXT-ALM1
39
EXT-ALM0
Installing the BBU in the APM30H(Ver.B, +24V) b Installing BBU Cables z The procedure for installing BBU cables (except the power cable) in the APM30H(+24 V) cabinet is the same as that in the APM30H(Ver.B). For details, see the description on pages 33 to 36. z For details on the BBU cable connections, see BBU Cable Connections on pages 33.
Cable
Connector Type
Connects to
CPRI optical cable
DLC
The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI2 on the GTMU.
DLC
The connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU.
DB26 Connector
E1/T1 port on the GTMU
The connector needs to be made on site according to the field requirements.
Port on the transmission device
E1/T1 Surge Protection Transfer Cable
DB26 connector
E1/T1 port on the GTMU
DB25 connector
INSIDE port on the UELP
FE/GE cable
RJ45 connector
FE0 port on the GTMU
RJ45 connector
Port on the transmission device
FE/GE Surge Protection Transfer Cable
RJ45 connector
FE0 port at the INSIDE side on the UFLP
RJ45 connector
FE0 port on the GTMU
Monitoring signal cable between the CMUA and the BBU
RJ45 connector
MON1 port on the BBU
RJ45 connector
COM_IN port on the CMUA
Monitoring signal cable for the PSU
RJ-45
EXT-ALM0 port on the UPEU
RJ-45
ALM port on the EPS48100D
In-position signal cable for the PSU
RJ-45
EXT-ALM1 port on the UPEU
Cord end terminal
PRESENT port on the EPS48100D
BBU power cable
3V3
-48V port on the UPEU
OT
LOAD6 port on the DCDU-03B
E1/T1 cable
40
Installing the BBU in the OMB a Installing the Brackets on the Metal Pole and Mounting Plate 1. Install the brackets on the metal pole. Use a level to adjust the level of the brackets to ensure that the front and back brackets are on the same plane. M10x110 Flat washer Spring washer Bolt
255-306 kgf·cm
2. Install the mounting plate. M10x40
255-306 kgf·cm
Flat Spring Bolt washer washer
Mounting plate
41
Installing the BBU in the OMB b Installing the OMB Slide the BBU case into the OMB gently. Then, tighten the four M6 screws.
Ensure that the fan is on the bottom when installing the BBU.
c Installing the BBU Cables The procedures for installing the PGND cable, E1/T1 cable or FE/GE cable, and optical cable in the DC OMB and in the AC OMB are the same: z PGND cable z E1/T1 cable or FE/GE cable z Optical cable The following description takes the installation in the DC OMB as an example.
1. Install the PGND cable for OMB.
Ground bar
42
Installing the BBU in the OMB c Installing the BBU Cables 2. Install the input power cable for the DC OMB.
RNT (+) NEG(-)
3. Install the input power cable for the AC OMB.
L
N
PE
43
Installing the BBU in the OMB c Installing the BBU Cables 4. Install the BBU power cable for the DC OMB.
5. Install the BBU power cable for the AC OMB. DC INPUT
PWR
LOAD1
44
LOAD6
Installing the BBU in the OMB c Installing the BBU Cables 6. Install the E1/T1 cable (E1/T1 transmission mode).
E1/T1
OUTSIDE
INSIDE
b
PGND
Shielding layer (25 mm)
Shielding layer
45
Installing the BBU in the OMB c Installing the BBU Cables 7. Install the FE/GE cable (FE/GE transmission mode). c
a
a c b
b
8. Install the CPRI optical cable. Connect the longer end of the optical cable to CPRI0, CPRI1, CPRI2, CPRI3,CPRI4 or CPRI5 on the GTMU. Then, connect the other end to the RRU.
1. Insert the optical module into the CPRI0, CPRI1, CPRI2, CPRI3, CPRI4 or CPRI5 port. 2. Turn outwards the puller on the optical module.
Optical module
Puller
3. Remove the dustproof caps from the optical connectors. 4. Insert the optical connector at one end of the CPRI optical cable into the optical module. Lead the CPRI optical cable out of the cabinet along the left side of the cabinet.
46
BBU Hardware Installation Checklist SN
Item
1
All self-made PGND cables are copper-based with the proper wire diameters. No breaking device such as switch and fuse is allowed for the electric connection of the grounding system. No short circuit is allowed. Each terminal on the ground bar can be connected with only one wiring terminal of the PGND cable.
2
The redundant part of the power cable or PGND cable is stripped off rather than coiled.
3
The terminals at both ends of the power cable or PGND cable are securely soldered or crimped.
4
The bare wires and the terminal handles at the wiring terminals are coated with heat-shrinkable tubes.
5
The flat washer and the spring washer are well mounted on all OT terminals.
6
All cables are connected securely and reliably. Pay special attention to the cable connections at the bottom of the cabinet.
7
The cables are neatly and tightly bound. The cable ties are evenly spaced and face the same direction.
8
The power cable, PGND cable, feeder, optical cable and the E1/T1/FE/GE signal cable are bound separately with a spacing of larger than 3 cm.
9
The cable layout facilitates maintenance and future capacity expansion, and the bending radius of the cables meet the requirements.
10
All the labels at both ends of the cables are legible.
11
The extra length of each indoor cable tie is cut, and the cut surface is smooth without sharp edges. An extra length of 3 mm to 5 mm is reserved for each outdoor cable tie.
12
The idle connectors of the cables are properly protected.
Powering On the BBU
47
Obtaining the ESN Record the Electronic Serial Number (ESN) shown on the label attached to the mounting ear of the BBU, and report the ESN to the engineer for the commissioning of the base station.
ESN
Appendix a Setting the DIP Switches Remove the GTMU and UELP from the BBU.
Wear an ESD wrist strap during the operations on the boards to prevent damage to the boards.
The UELP is optional. Please check the settings of the DIP switches according to the field conditions.
48
Appendix a Setting the DIP Switches Set the DIP switches of the BBU. Settings of the DIP switches on the UELP 75-ohm E1 Mode
Other Modes
Settings of the DIP switches on the GTMU T1 Mode
75-ohm E1 Mode
120-ohm E1 Mode
All the DIP bits of S2 on the GTMU are set to OFF by default in all modes. When four 75-ohm E1/T1 links are faulty, all the DIP bits of S2 should be set to ON so that the faults are rectified.
49
Appendix a Setting the DIP Switches Settings of S4 and S5 on the GTMU DIP Switch
Setting of DIP Bit
S4
Description
1
2
3
4
ON
ON
ON
ON
The E1 link can be bypassed.
OFF
OFF
OFF
OFF
The E1 link cannot be bypassed.
Miscellaneous
DIP Switch
S5
Not available
Setting of DIP Bit
Description
1
2
3
4
ON
ON
ON
ON
The E1 link can be bypassed.
OFF
ON
ON
OFF
The E1 link of the Level 1 cascaded BTS can be bypassed.
ON
OFF
ON
OFF
The E1 link of the Level 2 cascaded BTS can be bypassed.
OFF
OFF
ON
OFF
The E1 link of the Level 3 cascaded BTS can be bypassed.
Reinstall the GTMU and the UELP.
50
Appendix a Setting the DIP Switches No.
Function
Operation
1 to 5
Defining the communication address of
(1) Switches 1 to 5 correspond to bits 0 to 4. ON:1; OFF: 0
the PMU
For example: to set the address of PMU to 3, set switches 3 to 5 as OFF. (2) Default setting before delivery: 1 (BIT0), ON 2 (BIT1), ON 3 (BIT2), OFF 4 (BIT3), OFF 5 (BIT4), OFF 6
Selecting baud rate for communicating
Set as ON, indicating that the baud
with the BTS
rate is 9600. (If it is set as OFF, the baud rate is 19200.)
7 and 8
Reserved and not defined
Set as OFF
Set the DIP switches of the PMU.
51
Appendix b Pin Assignment for the BBU Signal Cables 75-ohm E1 cable Pin of the DB26 Male Connector
Wire Type
Coaxial Series No.
Label
X1.1
Tip
1
RX1+
X1.2
Ring
X1.3
Tip
X1.4
Ring
X1.5
Tip
X1.6
Ring
X1.7
Tip
X1.8
Ring
X1.19
Tip
X1.20
Ring
X1.21
Tip
X1.22
Ring
X1.23
Tip
X1.24
Ring
X1.25
Tip
X1.26
Ring
52
RX13
RX2+ RX2-
5
RX3+ RX3-
7
RX4+ RX4-
2
TX1+ TX1-
4
TX2+ TX2-
6
TX3+ TX3-
8
TX4+ TX4-
Appendix b Pin Assignment for the BBU Signal Cables 120-ohm E1 cable Pin of the DB26 Male Connector
Wire Color
X1.1
Blue
Wire Type
Label RX1+
Twisted pair X1.2
White
RX1-
X1.3
Orange
RX2+
X1.4
White
X1.5
Green
X1.6
White
X1.7
Brown
Twisted pair
RX2RX3+
Twisted pair RX3RX4+ Twisted pair X1.8
White
RX4-
X1.19
Grey
TX1+
X1.20
White
X1.21
Blue
Twisted pair TX1TX2+ Twisted pair X1.22
Red
TX2-
X1.23
Orange
TX3+
X1.24
Red
TX3-
X1.25
Green
TX4+
X1.26
Red
Twisted pair
Twisted pair
53
TX4-
Appendix b Pin Assignment for the BBU Signal Cables Monitoring signal cable between the APMI and the BBU Pin of the RJ45 Connector
Wire Color
Pins of X2, X3, X4, and X5
Wire Type
Port on the APMI
X1.1
White
X2
Twisted pair
TX+
X1.2
Orange
X3
Twisted pair
TX-
X1.4
Blue
X4
Twisted pair
RX+
X1.5
White
X5
Twisted pair
RX-
EMUA monitoring signal cable Pin on the RJ45 Connector
Pin of the DB9 Male Connector
Wire Color
Wire Type
Port on the APMI
X1.1
X2.3
White
Twisted pair
TX+
X1.2
X2.7
Orange
Twisted pair
TX-
X1.4
X2.2
Blue
Twisted pair
RX+
X1.5
X2.6
White
Twisted pair
RX-
54
Appendix b Pin Assignment for the BBU Signal Cables BBU alarm cable Pin of the RJ45 Connector
Pin of the RJ45 Connector
Wire Color
Wire Type
X1.1
X2.1
White/orange
Twisted pair
X1.2
X2.2
Orange
X1.3
X2.3
White/green
X1.6
X2.6
Green
X1.5
X2.5
White/blue
X1.4
X2.4
Blue
X1.7
X2.7
White/brown
X1.8
X2.8
Brown
55
Twisted pair
Twisted pair
Twisted pair
Change History This describes the changes in the BBU3900 Installation Guide. 16 (2010-07-30) This is the sixteenth commercial release. Compared with issue 15 (2010-06-30) of V300R008&R009, this issue excludes the safety information. 15 (2010-06-30) This is the fifteenth commercial release. Compared with issue 14 (2010-04-10) of V300R008&R009, this issue incorporates the description about installing the IMB03 on the H-Shaped stand. 14 (2010-04-10) This is the fourteen commercial release. Compared with issue 13 (2010-03-15) of V300R008&R009, the UTRP is added. 13 (2010-03-15) This is the thirteenth commercial release. Compared with issue 12 (2010-01-30) of V300R008&R009, the procedure for obtaining the ESN is added. 12 (2010-01-30) This is the twelfth commercial release. Compared with issue 11 (2009-12-30) of V300R008&R009, the configuration principles of the UFLP is modified. 11 (2009-12-30) This is the eleventh commercial release. Compared with issue 10 (2009-11-10) of V300R008&R009, the installation scenarios of OMB are added. 10 (2009-11-10) This is the tenth commercial release. Compared with issue 09 (2009-07-15) of V300R008&R009, the installation scenarios of APM30H(Ver.B), TMC11H(Ver.B) and APM30H(Ver.B, +24V) are added. 09 (2009-07-15) This is the ninth commercial release. Compared with issue 08 (2009-04-20) of V300R008, no contents are added or deleted. 56
HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base Bantian Longgang Shenzhen 518129 People’s Republic of China www.huawei.com