11th International Scientific and Practical Coiled Tubing and Well Intervention Conference
Descripción: Petroleum
Descripción completa
Descripción: Equipo de Reacondicionamiento de Pozos
starts right from t
[ Coiled Tubing Unit ] Pengertian, Fungsi, List Komponen, dllFull description
good
Formula for coiled tubing hydraulics
Calculos Coiled tubing
Cementación secundaria y Usos de Coiled Tubing
Descripción: Manual para operaciones de Coiled Tubing, presenta de manera breve los fundamento de las operaciones con equipo de coiled tubing, historia y el equipamento basico usado en tales operaciones.
Measurement While Drilling • Started with existing 3-1/2" Directional/Gamma • Sonde design allowed OD reductions • Shortened collars • Software modified for CT operation • Incorporating Short Radius technology
CTD MWD Specifications CT MWD OD (in.) 3.25 / 2.875 Length (ft.) 25.5 Dir. Measure Pt. from end of MWD 5 Gamma Measure Pt. from end of MWD 14.5 Top Box Connection 2-7/8 Stub Acme Mod Bottom Connection 2-3/8 CS Hydril Box Flow Rate Range (gpm) 80-160 Pressure Drop (psi) 120 Max. Temperature (deg. C / deg. F) 140 / 284 Max. Working Pressure (psi) 15,000 Max. Dogleg Severity (0 / 100 ft.) 35 Power / Telemetry Turbine / Positive Toolface Update Time Max./Avg. (sec) 9 / 23 Real-time Gamma Update Max./Avg. (sec) 14 / 35 Recorded Gamma Update Max./Min. (sec) 10 / 95 Full Survey Time (sec) 190 Short Survey Time (sec) 118 Running Short Survey Update Time (min) 5.4
New Tools • Coiled Tubing Orienter – Required to orient bend – MWD must rotate in unison with bend – Operates on pressure drop • Equalizer Sub
Coiled Tubing Orienter Design • Driven by Pressure Drop below tool – No need for wireline (better hydraulics) – No need to cycle CT (less fatigue) • Indexes 20° every pump cycle • Piston + Helical Cam design with ratchet
Coiled Tubing Orienter
Internal Pressure
Annulus Pressure
Drive Piston
Pumps Off, Reset
Helical Return Cam Ratchet Spring Oil
Pumps On, Indexing
Port to Annulus
Balance Piston
Output Shaft
CTD Equalizer Sub
Orienter Specifications 3" OD Orienter
3-5/8" OD Orienter
7.5 ft
9.5 ft
Rotation/Cycle
20°
20°
Max Torque @ 600 psi ∆P
250 ft-lbs
400 ft-lbs
Max Torque @ 1000 psi ∆P
500 ft-lbs
800 ft-lbs
Max ∆P
1500 psi
1500 psi
Length
Directional Learning Curve • Drilling the Lateral – Must orient left/right - no rotation – “Meandering” increases drag – 1966 ft. lateral drilled – Only limited reach in 2 wells – Geologic factors
Well No. 9 Survey Plot Vertical Projection TVD (ft)
8600
8809.7 TVD at TD
11,628 -ft TD
8900 4000
4300
4600
4900
Vertical Section (ft) at N 2 deg 11 min W
5200
5500
Well No. 9 Survey Plot Horizontal Projection Latitude (ft) 4000
Thru-Tubing Sidetrack Cement Plug Kickoff 4-1/2" Tubing XN Nipple, milled to 3.8" ID 4-1/2" Tubing Tail @ 10,056 ft. KOP 10,140 ft. @ 33.5º INC 3-3/4" Open Hole 2-7/8" Liner
Laterals 1000 – 1966 ft.
7" / 9-5/8" Casing
Coiled Tubing Drilling Experience 40
B
Build Rate (º/100 ft.)
1650 30 515
B
675
579
198
B
20
B B
B
315
1966
B
1204
828
B
B
950
B B 983
1000
B
10
244 0 0
B
495 800 488 571 725 921
B B BB B
500
1000
1500
Horizontal Displacement (ft.)
2000
Lessons From Alaska IADC/SPE 35128 Excerpts • High Low-shear-rate viscosity improves cuttings transport – Solids kept below 1% – Backream: across doglegs and on short trips (every 50-100 ft.) – Drill rates in soft sands limited to 75 ft. / hr. to prevent buildup • Less aggressive PDC bits, non-mag motors • Depth control: use Gamma Ray to tie-in log to monitor • Economics: 40% savings in 1995 – Driving force: Thru-tubing applications with accessible targets
CTD Wells Through 1996 30
30
25
WELLS
20
15
10 5
5 3
1
1
1
O/S Holland
Mexico
UAE
0 Alaska
Long Beach
Other U.S.
CTD Statistics • 41 wells to date (12/96) • Over 36,000 ft. drilled / Over 25,000 ft. horizontal • Over 300 bit/mill runs • 1966 ft. – Longest horizontal section • 25 windows, 24 MR curves, 32 horizontals • 2 liner orientations – Longest 2100 ft. • 1 oriented acid job
Conclusions • Directional drilling capabilities have improved • New technology has been instrumental • Lateral Sections of 1966 ft. can be drilled • Build Sections of 38°/100 ft. can be drilled • Turns in 25°/100 ft. curve can be done • Global experience is expanding