ANALISA SATUAN PEKERJAAN BOW Propinsi Kabupaten Kecamatan No
Uraian Pekerjaan
Satuan
Faktor Penggali
H OK
0.07
H OK
0.02
Harga Sat. (Rp)
Jumlah (Rp)
Total (Rp)
Keterangan
I Peke Pekerj rjaa aan n Tana Tanah h 1
Pembersiahan Lapangan/ 10 M2 Upah : Pekerja Mandor
2 Pemasangan Bowplank / 10 M' Bahan: Papan Meranti Paku 2"
Ton
0.05
Kg
2.00
H OK H OK
2.00 0.30
H OK
0.03
H OK
0.75
H OK
0.03
Satuan
Faktor Penggali
M3 M3
0.82 0.54
Zak
6.80
H OK H OK
3.60 1.20
H OK
0.18
Bahan Besi Besi Beton Kawat Beton
Kg
110.00
Kg
2.00
Upah Besi: Pekerja Tukang Mandor
H OK H OK
9.00 9.00
H OK
3.00
Upah : Pekerja Tukang Mandor 3
Galian tanah Biasa/M3 Upah: Pekerja Mandor
No
Uraian Pekerjaan
Swadaya
Harga Sat. (Rp)
Jumlah (Rp)
Total (Rp)
Keterangan
II Pekerj Pekerjaan aan Beton Beton Bertul Bertulang ang 1
Beton Bertulang 1:2:3 /M3 Bahan: Kerikil 3/4 " Pasir Semen Upah : Pekerja Tukang Mandor
Harga bahan disesuaikan (Harga dilokasi Kegiatan)
-
Cetakan Beton Bahan : Kayu Bekisting Paku Upah : Pekerja Tukang Mandor
Ton
0.29
Kg
4.00
H OK H OK
0.50 0.60
H OK
0.01
Harga bahan disesuaikan (Harga dilokasi Kegiatan)
-
Bongkar Bekisting Pekerja
H OK
2.00
-
No
Uraian Pekerjaan
Satuan
Faktor Penggali
Harga Sat. (Rp)
Jumlah (Rp)
Total (Rp)
Keterangan
Pekerjaan Plesteran 1
Pekerjaan Pleseran 1:4 /M2 Bahan : Semen Pasir
Zak
0.13
M3
0.08
Harga bahan disesuaikan
dengan RAB desa (Harga dilokasi Kegiatan)
Upah : Pekerja Tukang Mandor
HOK HOK
0.40 0.15
HOK
0.02 -
No
Uraian Pekerjaan
Satuan
Faktor Penggali
Ton
1.10
HOK HOK
5.00 15.00
HOK
0.25
Ton
1.10
Harga Sat. (Rp)
Jumlah (Rp)
Total (Rp)
Keterangan
IV Pekerjaan Kayu 1
Pekerjaan Gel Jembatan Kayu/Ton Bahan: Kayu Kapur Upah : Pekerja Tukang Mandor
2 Pekerjaan Lantai Jembatan Kayu /Ton Bahan : Kayu Kapur
Harga bahan disesuaikan
dengan RAB desa (Harga dilokasi Kegiatan)
Upah : Pekerja Tukang Mandor
HOK HOK
4.00 6.00
HOK
0.2 -
No
Uraian Pekerjaan
Satuan
Faktor Penggali
Kg Bh
2.75 0.1
Ls
1.00
Harga Sat. (Rp)
Jumlah (Rp)
Total (Rp)
Keterangan
V Peker aan Cat 1
Pekerjaan Cat Minyak/ 10 M2 Bahan Cat Minyak Kuas Cat Alat Bantu
Harga bahan disesuaikan
dengan RAB desa Upah: Pekerja Mandor
(Harga dilokasi Kegiatan) HOK HOK
0.67 0.03 -
RENCANA ANGGARAN BIAYA PRASARANA Propinsi : Kabupaten : Kecamatan : Desa :
No RAB Program Jenis Kegiatan Ukuran/Dimensi
Uraian 1. BAHAN 1. Besi UNP 100mm x 6 m 2. Besi UNP 65mm x 6 m 3. Besi BBT 15,4 x 10 4. Besi BBT 16 x 12 5. Kawat beton 1 rol 6. Tiang Pilon 8 " SCH 40 7. Papan mal 8. Semen 9. Paku 10.Kunci 11.Besi BT 18mm P=10 m 12.Paku 13.Besi L 60x60x6 P = 6m 14.Vesi L 70x70x7 P = 6m 15.Pasir 16.Batu 17.Reng dan gelagar 18.Paku 19.Besi O 16mm P = 12 m 20.Besi O 12mm P=12 m 21.Semen 22.Batu 23.Paku 24.Besi plat t=6 mm 25.Semen 26.Besi O 12 mm P = 12 m 27.Besi UNP 28.Besi pipa putih 29.Besi L 30.Cat 31.Timer 32.Paku 33.Kayu 34.Spendrat 35.Baut 1/2x2 " 36.Kawat pengikat 37.Besi L 12x10mm 38.Baut 1/2x1,5 " 39.Baut 1/2x5" 40.Baut 3/8x2" 41.Baut 5/16x3" 42.Baut 3/8x2" 43.Reng 9 mm 44.Klem 1,5 " 45.Klem O 16 mm 46.Spendrat 12 mm 47.Sling 1 1/4 " 48.Sling 16 mm 49.Spendrat 16 mm 50.Baut 1/2x2" 51.Paku 52.Klem penggantung hanger 53.Sling 14 mm 54.Spendrat besar 55.Klem O 14 mm
Total 22 21 10 160 25 5 7.5 100 6 1 22 6 6 6 96 59.5 1 13 107 25 150 27 4 276 150 5 4 4 20 10 5 15 2.5 6 250 3 4 130 75 300 100 800 1,000 16 18 12 260 243 6 250 10.5 98 100 8 30
Volume Dari Swadaya -
Dari Dana 22 21 10 160 25 5 7.5 100 6 1 22 6 6 6 96 59.5 1 13 107 25 150 27 4 276 150 5 4 4 20 10 5 15 2.5 6 250 3 4 130 75 300 100 800 1,000 16 18 12 260 243 6 250 10.5 98 100 8 30
Satuan
Btg Btg Btg Btg Kg Btg m3 sak Kg Ls Btg Kg Btg Btg m3 m3 Ls Kg Btg Btg sak m3 Kg m3 sak Btg Btg Btg Btg Kg Btl kg m3 bh bh Kg Btg bh bh bh bh bh bh bh bh bh m' m' bh bh kg bh m' bh bh
01 : Jembatan Gantung 80 m x 1,85 m
Harga Satuan
Jumlah Total
Rp
Rp 5,856,400 4,326,000 1,875,000 16,160,000 190,000 18,280,000 3,750,000 4,500,000 48,000 4,500 5,120,000 60,000 4,530,500 1,878,000 4,320,000 4,165,000 50,000 150,000 12,305,000 1,675,000 6,450,000 1,960,000 82,000 1,656,000 7,200,000 375,000 1,060,000 2,200,000 3,100,000 350,000 24,000 135,000 1,500,000 222,000 500,000 36,000 208,000 325,000 412,500 360,000 130,000 1,200,000 750,000 768,000 360,000 210,000 26,000,000 7,776,000 285,000 687,500 185,000 5,439,000 2,500,000 360,000 360,000
56.Gomok sling 57.Baut 12 mm 58.Klem slin 1 1/4 " 59.Plat strip tebal & ring 60.Klem sling utama 61.Kayu gelagar dan tiang 62.Cat 63.Papan lantai kayu kls I
15 63 24 1 4 1 1 3
3
15 63 24 1 4 1 1 -
kg bh bh ls bh ls kg m3
200,000 189,000 480,000 82,000 1,000,000 400,000 131,600 2,850,000
Sub Total 1 2.ALAT 1. Mobilisasi 2. Ongkos langsir semen 3. Skop 4. Kakak tua 5. Ember cor 6. Terpal 7. Ongkos 8. Langsir besi 9. Mata gergaji 10.Kikir 11.Batu asah 12.Slang 13.Kapak 14.Terpal 15.Buku panjang 16.Gergaji stanlex 17.Mobilisasi besi 18.Angkung 19.Langsir besi 20.Mobilisasi besi 21.Mobilisasi besi 22.Carter pompong 23.Langsir semen/besi 24.Kuas 25.Rental mesin 26.Mobilisasi besi 27.Bongkar muat 28.Prasasti
3 2 4 3
5 1 1 20 1 11 1 10 2
3 4
169,742,000 -
3 2 4 3
2,700,000 300,000 75,000 20,000 16,000 10,000 9,000 20,000 10,000 8,000 9,000 14,000 25,000 44,000 5,000 100,000 300,000 271,500 375,000 350,000 300,000 550,000 650,000 60,000 160,000 800,000 850,000 300,000 8,331,500
ls ls bh bh bh m' ls ls bh bh bh m' bh m' ls unit ls ls ls hari ls bh hari ls ls ls
5 1 1 20 1 11 1 10 2
3 4
Sub Total 2 3.UPAH 1. Pekerja 2. Tukang 3. Mandor
419.43 618 56
-
419.43 618 56
HOK HOK HOK
14,680,000 30,900,000 3,640,000
Dari PPK Total Biaya
49,220,000 227,293,500 2,850,000
Sub Total 3 Sumber Dana Tgl. Disetujui Oleh PjOK
( FERISMAN A.S.SOS)
Di Buat Oleh Ketua TPK
(M U L A D I )
FK/FT
DEWI ANDAYANI, ST
Program Pengembangan Kecamatan
REKAPITULASI ANGGARAN BIAYA P Propinsi Kabupaten
No
Uraian
Kegiatan : Jembatan Gantung Ukuran : 80 m x 1,85 m Jumlah : 1 unit No.RAB : 01 PPK
I
BAHAN
Kegiatan Bobot Ukuran % Jumlah No.RAB
Swadaya
Bobot %
PPK
166,892,000
2,850,000
74.36
8,331,500
0
3.71
49,220,000
0
21.93
Swadaya
tidak dirinci II
PERALATAN tidak dirinci
III UPAH tidak dirinci Jumlah
224,443,500
95
IV Operasional UPK 2 %
4,725,126
2
V Operasional TPK 3 %
7,087,689
3
Jumlah Total
236,256,316
100
Jumlah Biaya Upah
49,220,000
Jumlah HOK Kontruksi
1093.43
FK/FT
DEWI ANDAYANI, ST
2
Hok
Hok
PjOk
F E R I S M A N, S.SOS
ASARANA
Kegiatan Ukuran Jumlah No.RAB PPK
Bobot %
Bobot %
Jumlah Total
Swadaya
PPK
Swadaya
166,892,000
2,850,000
70.64
8,331,500
0
3.53
49,220,000
0
20.83
224,443,500
2,850,000
95.00
4,725,126
2
7,087,689
3
236,256,316
100
49,220,000
22
Hok
1093.43 Tgl Ketua TPK
MULADI
Hok