Progress By St.John G.Ervine Professor Henry Corrie Mrs. MeldonFull description
23Full description
Daily Strength for Daily Needs by Mary Wilder Tileston Both beginners and "veterans" at praying will delight in using Daily Strength for Daily Needs, a collection of brief inspirational passage...
EPC progress calculation
Descrição: tests
english language tests
In any processor the major units are Control Unit, ALU and Memory read write. Among these units the performance of any processor majorly depends on the time taken by the ALU to perform the s…Full description
10th grade ESL testsDescrição completa
progressFull description
nFull description
RecordFull description
routine
Descrição completa
Daily Duas
usefulFull description
Nyumba Ya Akiba-Cement Plant 3000 TPD Daily Progress Report
Da D ate:
9-Dec-15
a) Major Activities Done Activities Description
Area 131131- Limest Limestone one Clay Clay Mix Stor Storage age
Column Columnss Concre Concrete te (26 (26 done) done)
b) Potential issues Issue Consequences Excavation of Switch Yard yet not started due to shortage/limited earth Completion of Civil Works in Switch Yard will be moving machines delayed
Grid Station
Embeded Parts of Cable Trenches e.g Angle for Grating
Embeded Part required till Dec 08,2015
Anchor Bolts of Foundations in Switch Yard
Completion of Civil Works will be delayed
481-Clinker Storage Shaft (Clinker Tower) Super structure design details above +327 still awaited from Loya associates
Civil
Could be resulted in delay of slip forming startup
461-Coal Mill Building Hold due to Mechanical Works CCR Building
Civil Works of Coal Mill Will be delayed
Architectural Drawings awaited from Loya associates
Demand of architectural and Plumbing Items and subsequent. Procurement to be delayed
391-Coal Mill Substation Wo rk rk ca ca n n ot ot be be st st ar ar te te d due to to er er ec ec titi on on of of Pr Pr e He at ate r Supervisor Accommodation
C om om pl ple ti ti on on of of Ci Ci vi vi l Wo rk rk s i s de la la ye ye d. d.
Completed from local resources, while remaining 30 rooms finishing delayed to non arrival of material booked from Dubai
Completion of remaining remaining 30 rooms of Supervisor Accommodation could be delayed
Tools for OK Mill foundation bolts tightening missing in FLS shipment package
Delay in final leveling of OK foundation bolts. FLS raised the inquiry to locate the missing tools.
Mechanical
Manpower required to M/s Mughal Engineering
Material Sand Crush Cement Diesel Oxygen Cylinder DA Cylinder Fon Gas Cylinder
Current Stock 12983.59 15280.07 59053 28905 149 64 26
Unit ton ton ton liter Nos. Nos. Nos.
Delay in erection of additive and limestone area
NYA Locals Expats LCL
Total
Manpower Contractor 43 Alghazi 6 INDEC 11 Cambridge Al Farooq T NI SCS EMI FLS LOYA 60