DAFTAR HARGA SEWA PERALATAN KABUPATEN JEPARA TAHUN 2015 NO.
PERALATAN
SATUAN
HARGA SEWA ALAT (Rp)
1
Dump Truck
3 ton
Jam
71,500
2
Truk Tanki Air
Jam
82,500
3
Truk Bak Terbuka
hr
250,000
4
Bulldozer
Jam
236,500
5
Motor Grader
Jam
236,500
6
Wheel Loader
Jam
192,500
7
Excavator
Jam
275,000
8
Handle Crane 2 T
hr
210,000
9
Trailler
Jam
225,000
10
Mesin Gilas 3 roda 6 - 10 ton
Jam
44,000
11
Mesin Gilas Roda Karet 8 - 10 ton
Jam
57,700
12
Vibratory Roller
Jam
170,500
13
Vibro roller 1 ton
Jam
30,200
14
Water Pump
Jam
20,000
15
Asphalt Sprayer
Jam
50,000
16
Pick Up
Jam
50,000
17
Asphalt Finisher
Jam
550,000
18
Concrete Vibrator
Jam
50,000
19
Compressor
Jam
125,000
20
Concrete Mixer
Jam
75,000
21
Stamper
Jam
40,000
22
Genset
Jam
180,000
23
Alat Pengecat Marka
Jam
80,000
24
Molen
hr
250,000
Jepara, Februari 2015
KET.
KEPALA DINAS CIPTA KARYA TATA RUANG DAN KEBERSIHAN KABUPATEN JEPARA
Ir. ASHAR EKANTO NIP. 19620921 199503 1 001
DAFTAR UPAH TENAGA KERJA KABUPATEN JEPARA TAHUN 2015 NO.
JENIS
BAHAN
SATUAN
HARGA SATUAN (Rp)
1 Pekerja
Hr
60,000
2 Mandor
Hr
80,000
3 Tukang listrik
Hr
75,000
4 Tukang kayu
Hr
75,000
5 Kep. tk. kayu
Hr
80,000
6 Tukang batu
Hr
75,000
7 Kep. tk. batu
Hr
80,000
8 Tukang besi
Hr
75,000
9 Kep. tk. besi
Hr
80,000
10 T u k a n g c a t
Hr
75,000
11 K e p . t k . c a t
Hr
80,000
12 T u k a n g p l i t u r
Hr
75,000
13 T u k a n g g a l i
Hr
75,000
14 Tukang aspal
Hr
75,000
15 Operator terlatih
Hr
70,000
16 Operator semi terlatih
Hr
60,000
17 Buruh tak terlatih
Hr
40,000
18 Buruh semi terlatih
Hr
55,000
19 Buruh terlatih
Hr
60,000
20 M a n d o r P i p a
Hr
70,000
21 T k . P i p a
Hr
60,000
22 P e k e r j a . P i p a
Hr
50,000
23 T k . l e i d e n g
Hr
70,000
24 Site manager
Hr
75,000
25 Geologist
Hr
60,000
26 Administrasi
Hr
50,000
27 Logistik
Hr
50,000
28 Operator pemboran
Hr
50,000
29 Mekanik
Hr
60,000
30 C r e w
Hr
50,000
31 Buruh lokal
Hr
40,000
32 P e n j a g a m a l a m
Hr
40,000
33 Pengemudi
Hr
40,000
KET.
Jepara, Februari 2015
KEPALA DINAS CIPTA KARYA TATA RUANG DAN KEBERSIHAN KABUPATEN JEPARA
Ir. ASHAR EKANTO NIP. 19620921 199503 1 001
DAFTAR HARGA SATUAN BAHAN BANGUNAN KABUPATEN JEPARA TAHUN 2015
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN
KETERANGAN
(Rp)
I. B A H A N
DASAR
Harga belum termasuk PPN 10%
1 BATU KALI
2 KERIKIL
Pecah
15/20
m3
143,000
Pecah
5/7
m3
191,900
Pecah
3/5
m3
191,900
m3
82,500
Timbun/Sirtu
3 BATU BATA 4 PASIR
5 TANAH 6 KAPUR
Beton/Ciping
0,5/1
m3
189,400
Beton
,1/2
m3
217,100
Beton
,2/3
m3
215,900
Abu batu
m3
172,700
Kudus
bh
760
Kalipucang/Clering
bh
530
Urug
m3
82,000
Pasang lokal
m3
142,800
Beton/Muntilan
m3
270,300
Padas
m3
56,500
Liat/tanah merah
m3
41,700
Pasang
m3
402,800
Semen Merah
m3
172,500
Semen PC
kg
1,410
Semen Putih
kg
2,120
Semen warna
kg
11,790
Genteng Beton Warna standard
bh
6,000
Kerpus Beton Warna Standard
bh
13,500
Jatiwangi kecil tak berwarna
bh
3,000
Jatiwangi besar tak berwarna
bh
6,000
Genteng Pres Lokal
bh
1,200
Nok kerpus Jatiwangi
bh
13,500
Nok kerpus Lokal
bh
5,000
bh
72,000
7 PORTLAND CEMENT
II. B A H A N
PE N U T U P ATAP
1 GENTENG BETON
2 GENTENG TANAH LIAT
3 ASBES GELOMBANG BESAR . 200 cm X 102 cm X 5 mm
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN (Rp)
. 225 cm X 102 cm X 5 mm
bh
78,000
. 250 cm X 102 cm X 5 mm
bh
87,000
. 200 cm X 102 cm X 6 mm
bh
85,000
. 225 cm X 102 cm X 6 mm
bh
93,000
. 250 cm X 102 cm X 6 mm
bh
100,000
. 150 cm X 105 cm X 4 mm
bh
45,000
. 180 cm X 105 cm X 4 mm
bh
52,000
. 210 cm X 105 cm X 4 mm
bh
62,000
. 240 cm X 105 cm X 4 mm
bh
70,000
. 270 cm X 105 cm X 4 mm
bh
80,000
. 300 cm X 105 cm X 4 mm
bh
88,000
. Kerpus Genteng
bh
30,000
. Stel Besar
bh
60,000
. 100cm X 100 cm X 4 mm
bh
25,700
Fiber Glass Plat
bh
29,800
Fiber Glass Gelombang
bh
35,800
BJLS 0,18 lebar 55 cm
m'
31,300
BJLS 0,28 lebar 55 cm
m'
72,500
BJLS 0,20 panjang 180 cm
lbr
80,000
1 JATI
m3
16,875,000
2 KAMPER
m3
8,116,300
3 KRUING
m3
6,582,500
4 MERANTI
m3
4,500,000
5 HUTAN
m3
2,750,000
6 BENGKIRAI
m3
8,648,600
Kayu cetakan/Randu
m3
897,700
Kayu bakar
m3
160,000
Bambu
bt
13,500
Asbes Gelombang Kecil
NOK
Jabes nok
4 ASBES PLAT
5 FIBRE GLASS (JABES)
6 SENG PLAT
7 SENG GELOMBANG
III . B A H A N K A Y U
7 DOLKEN
IV . BAHAN PENUTUP DINDING / LANTAI 1 UBIN (TEGEL BIASA)
KETERANGAN
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN (Rp)
PC polos PC warna Teraso 2 KERAMIK
30 X 30 cm
bh
2,900
20 X 20 cm
bh
1,500
30 X 30 cm
bh
3,000
20 X 20 cm
bh
1,900
30 X 30 cm
bh
3,800
40 X 40 cm warna
bh
8,300
40 X 40 cm putih
bh
7,800
30 X 30 cm warna
bh
4,100
30 X 30 cm putih
bh
3,800
20 X 20 cm
bh
2,000 2,500
3 Parquet Jati
m2
210,000
4 Batu Paras/alam
m2
105,000
5 Batu Tempel Hitam
m2
105,000
bh
32,800
6 GRANITO
40 x 40 cm
KETERANGAN
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN (Rp)
V . BAHAN C E TAK 1 BUIS BETON Ø 20 cm - 100 cm
bh
53,000
Ø 30 cm - 100 cm
bh
79,000
Ø 60 cm - 100 cm
bh
169,100
Ø 80 cm - 100 cm
bh
248,000
Ø 100 cm - 100 cm
bh
340,000
U 15 cm - 100 cm
bh
36,500
U 20 cm - 100 cm
bh
46,200
U 30 cm - 100 cm
bh
58,700 225,000
2 LUBANG ANGIN (ROSTER) Roster Tanah Merah
bh
3,300
Roster Beton
bh
9,500
Roster Kayu
bh
17,700
besi beton polos/Ulir
kg
9,180
besi beton prestress
kg
16,000
2 BESI PLAT
Besi Strip
kg
20,200
3 BESI PROFIL
Besi Profil
kg
16,100
Kawat Bronjong/wiremesh
kg
17,000
m'
35,800
kg
15,300
- Kawat Kasa
m2
18,300
- Saringan pasir
m2
15,000
- Kawat bronjong
kg
17,000
Pipa PVC DN 20 ( ½" ) AW
m'
5,100
Pipa PVC DN 25 ( ¾" ) AW
m'
6,600
Pipa PVC DN 32 ( 1" ) AW
m'
8,500
Pipa PVC DN 40 ( 1½" ) AW
m'
10,000
Pipa PVC DN 63 ( 2" ) AW
m'
17,000
Pipa PVC DN 90 ( 3" ) AW
m'
32,300
VI . B A H A N B E S I 1 BESI BETON
4 JARING - JARING BAJA 5 BESI SIKU
L L 50 X 50 X 5
6 KAWAT - Ikat beton/bendrat
VII . B A H A N P I P A 1 Pipa PVC AW
KETERANGAN
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN (Rp)
Pipa PVC DN 110 ( 4" ) AW
m'
50,800
Pipa PVC DN 160 ( 6" ) AW
m'
93,500
Pipa PVC DN 200 ( 8" ) AW
m'
151,500
Pipa PVC DN 250 ( 10" ) AW
m'
287,500
KETERANGAN
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN (Rp)
VIII . B A H A N L A N G I T - L A N G I T 1 List Kayu Profil
m'
15,000
lbr
64,300
X 4 mm
lbr
72,200
. 120 X 240
X 3 mm
lbr
47,500
. 120 X 240
X 4 mm
lbr
55,000
. 120 X 240
X 6 mm
lbr
69,700
X 9 mm
lbr
102,000
lbr
58,000
Menie
kg
29,000
Dempul plamur
kg
28,700
Ambril/amplas
lbr
13,100
Cat dasar
kg
33,000
cat kayu
kg
51,700
Kuas
bh
11,500
Sirlak
ons
20,000
Spiritus
ltr
11,600
Vernish
ltr
40,000
Kalkarium
kg
5,500
Kapur sirih
kg
5,200
Plamur
kg
17,500
Undercoat/cat dasar
kg
45,000
Cat Tembok Decolite
kg
18,000
Mowilex Dalam Ruangan
kg
52,600
Mowilex Luar Ruangan
kg
80,000
Menie
kg
29,000
Cat besi
kg
57,600
Minyak cat/Afduner
ltr
18,000
Residu (teer/aspal)
drum
68,000
2 SOFT BOARD-uk:
4'X 8'
Gypsum tebal 9 mm 3 PLY WOOD Teak wood . 90 X 210 Tripleks
Multipleks . 120 X 240 Formika ukuran pintu
IX . B A H A N F I N I S H I N G 1 KAYU
2 TEMBOK
3 BESI
KETERANGAN
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN (Rp)
Fibre glass (tanki air) kapasitas 550 liter.
bh
780,000
kapasitas 1100 liter.
bh
1,350,000
Lem Aica Aibon
kg
35,000
3 mm
m2
71,200
5 mm
m2
85,000
8 mm
m3
140,000
Stop kontak Broco
bh
15,200
Saklar tunggal Broco
bh
14,200
Saklar ganda Broco
bh
17,000
X . BAHAN KACA 1 POLOS
XI . BAHAN INSTALASI LISTRIK
XII . ALAT - ALAT PENGUNCI & PENGGANTUNG 1 KUNCI TANAM Biasa
2 X slag
bh
60,800
Kamar mandi
1 X slag
bh
36,600
Engsel Angin
bh
19,800
Engsel Jendela
bh
14,100
Engsel Pintu kuningan
bh
20,500
Espagnoled -
bh
32,000
Grendel biasa
bh
8,900
Kait Angin
bh
5,500
Door Stop
bh
35,000
Door Closer
bh
93,300
1 KLOSET DUDUK
bh
1,192,800
2 KLOSET JONGKOK
bh
134,700
3 WASTAFEL GANTUNG BULAT
bh
292,700
4 TEMPAT SABUN TANAM
bh
36,100
5 URINOIR
bh
367,500
6 BAK MANDI FIBER
bh
280,000
7 BAK CUCI PIRING STAINLES
bh
176,100
bh
36,000
2 ENGSEL DAN GERENDEL
XIII . BAHAN SANITAIR
8
LAIN - LAIN Kran Air
KETERANGAN
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN (Rp)
Seal tape
bh
2,300
Floor drain
bh
23,100
Water drain
bh
60,000
1 PAKU - ukuran 1" s/d 5"
kg
12,800
2 PAKU - sekrup
kg
13,000
3 PAKU - sekrup fizzer
bh
1,600
4 PAKU - sumbat / kait
kg
25,000
5 MUR BAUT (kuda-kuda)
kg
16,000
6 ANGKUR BAUT
bh
14,000
7 LEM KAYU
bh
12,800
8 Tali Ijuk
kg
23,600
XIV . ALAT PENGIKAT KAYU
KETERANGAN
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN
KETERANGAN
(Rp)
X V . PAVING BLOCK 1 Blok pafing tebal 6 cm lokal
m2
55,300
2 Blok pafing tebal 8 cm lokal
m2
75,000
3 Blok pafing warna tebal 6 cm lokal
m2
51,000
4 Blok pafing warna tebal 8 cm lokal
m2
57,500
5 Blok pafing blok tebal 6 cm K.225
m2
60,000
6 Blok pafing blok tebal 8 cm K.300
m2
94,000
7 Blok pafing blok tebal 8 cm K.400
m2
108,000
8 KANSTEEN
m'
13,500
9 BATACO
bh
3,700
10 Glass blox
bh
20,600
1 Rel Pintu dorong
bh
183,000
2 Naco per Daun
bh
11,000
3 Rolling door Besi
m2
350,000
4 Rolling door Almunium
m2
415,000
5 Awning Almunium
m2
190,000
6 Profil Alumunium
m'
103,200
7 Alumunium strip
m'
34,300
8 Besi Hollow 40x40x2
m'
11,300
kg
13,500
m2
230,000
Pagar BRC 90 A2
/lb
178,000
Pagar BRC 120 A2
/lb
220,000
Minyak Beton & bekisting
ltr
10,000
Pintu Lipat Besi
m2
434,000
Sealent
tube
22,500
Soda api
kg
20,000
Sabun
kg
15,000
Air
ltr
20
Kuas
bh
11,500
Premium
ltr
6,600
Minyak Tanah
ltr
13,500
Vynil 30x30 cm
bh
6,500
XVI. L A I N - L A I N
9 ASPAL. Aspal Ex Pertamina 10 K A C A Cermin tebal 5 mm 11 PAGAR BRC. 12 LAIN-LAIN
XVII. INSTALASI AIR BERSIH PERDESAAN/PERKOTAAN 1
" Pipa PVC "SII, S 10
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN (Rp)
2
3
4
5
6
7
8
Diameter nominal 1/2"
m'
3,400
Diameter nominal 3/4"
m'
5,000
Diameter nominal 1"
m'
8,450
Diameter nominal 1 1/2"
m'
19,100
Diameter nominal 2"
m'
24,350
Diameter nominal 3"
m'
50,900
Diameter nominal 4"
m'
73,900
Diameter nominal 1/2"
m'
19,900
Diameter nominal 3/4"
m'
26,000
Diameter nominal 1"
m'
40,000
Diameter nominal 1 1/2"
m'
60,100
Diameter nominal 2"
m'
80,100
Diameter nominal 3"
m'
130,200
Diameter nominal 4"
m'
190,300
Diameter nominal 6"
m'
310,500
Diameter nominal OD 40mm
m'
20,400
Diameter nominal OD 50mm
m'
31,650
Diameter nominal OD 63mm
m'
50,050
Diameter nominal OD 75mm
m'
69,900
Diameter nominal OD 90mm
m'
101,300
Diameter nominal 3/4"
Bh
35,100
Diameter nominal 1"
Bh
58,500
Diameter nominal 1 1/2"
Bh
101,600
Diameter nominal 2"
Bh
171,900
Diameter nominal 3"
Bh
445,400
Diameter nominal 4"
Bh
570,400
Diameter nominal 6"
Bh
1,015,100
Diameter nominal 160 x 110 mm
Bh
164,200
Diameter nominal 110 x 90 mm
Bh
76,200
Diameter nominal 63 x 50 mm
Bh
26,050
Diameter nominal 50 x 40 mm
Bh
10,850
Diameter nominal 40 x 25 mm
Bh
8,150
Diameter nominal 25 x 20 mm
Bh
3,050
Bh
179,100
" Pipa PVC "SII, S 12.5
" Pipa Galvanis " medium
" Pipa HDPE " SDR 11(PN16)
" Stop valve "
" Gate valve "
" Reduser " SC/SC
" Tee all socket " PVC Diameter nominal 100 x 100 mm
KETERANGAN
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN (Rp)
9
10
11
12
13
14
15
Diameter nominal 75 x 75 mm
Bh
110,800
Diameter nominal 50 x 50 mm
Bh
18,050
Diameter nominal 40 x 40 mm
Bh
10,500
Diameter nominal 25 x 25 mm
Bh
3,850
Diameter nominal 75 mm RRJ
Bh
36,500
Diameter nominal 50 mm RRJ
Bh
27,000
Diameter nominal 40 mm
Bh
5,400
Diameter nominal 25 mm
Bh
3,400
Diameter nominal 20 mm
Bh
2,100
Diameter nominal 2"
Bh
10,400
Diameter nominal 1 1/2"
Bh
8,300
Diameter nominal 1"
Bh
5,400
Diameter nominal 3/4"
Bh
3,100
Diameter nominal 3" x 3/4"
Bh
23,400
Diameter nominal 2" x 3/4"
Bh
15,600
Diameter nominal 1 1/2" x 3/4"
Bh
12,400
Diameter nominal 1" x 3/4"
Bh
12,400
Diameter nominal 50 mm
Bh
23,550
Diameter nominal 40 mm
Bh
13,400
Diameter nominal 25 mm
Bh
8,700
Diameter nominal 20 mm
Bh
8,050
Diameter nominal 50 mm
Bh
143,200
Diameter nominal 63 mm
Bh
179,400
Diameter nominal 110 mm
Bh
448,400
Diameter nominal 160 mm
Bh
691,200
Diameter nominal 50 mm
Bh
47,850
Diameter nominal 40 mm
Bh
35,750
Diameter nominal 25 mm
Bh
20,050
Diameter nominal 20 mm
Bh
15,900
Diameter nominal 100 mm
Bh
24,300
Diameter nominal 75 mm
Bh
14,200
Diameter nominal 50 mm
Bh
12,250
Diameter nominal 40 mm
Bh
8,050
Diameter nominal 25 mm
Bh
4,050
" Bend all socket " PVC
" Bend all socket " GI
" Clamp sadle " GI
" Valve socket " PVC
" Flange socket " PVC
" Faucet socket " PVC
" D o f " PVC
KETERANGAN
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN (Rp)
Diameter nominal 20 mm 16
17
18
19
20
Bh
3,050
Diameter nominal 3"
Bh
1,218,500
Diameter nominal 2"
Bh
927,800
Diameter nominal 1"
Bh
345,300
Diameter nominal 1/2"
Bh
108,100
Diameter nominal 3"
Bh
473,300
Diameter nominal 4"
Bh
609,300
Diameter nominal 6"
Bh
1,048,800
Diameter nominal 3"
Bh
89,700
Diameter nominal 4"
Bh
124,100
Diameter nominal 6"
Bh
199,900
Diameter nominal 1"
Bh
115,100
Diameter nominal 3/4"
Bh
108,100
Diameter nominal 3"
Bh
25,200
Diameter nominal 4"
Bh
30,600
Doble neple GI dia 3/4"
Bh
1,800
Tee all socket GI dia 3/4"
Bh
4,600
Valve socket GI dia 3/4"
Bh
2,600
Kran stainless steel
Bh
18,600
Verlop ring 1 " x 3/4"
Bh
8,300
Sock GIP dia 1"
Bh
3,300
Sock GIP dia 3/4"
Bh
2,600
Tee faucet dia 20 mm PVC
Bh
5,400
Bend faucet dia 20 mm PVC
Bh
3,400
Submersible pump 5.5 KW/1 Phase
Unit
29,508,000
Submersible pump 11 KW/3 Phase
Unit
53,655,900
Panel submersible pump 5.5 KW
Unit
2,864,600
Panel submersible pump 11 KW
Unit
4,688,400
Submersible pump 2.2 KW/1 Phase
Unit
22,325,600
Panel submersible pump 2.2 KW
Unit
2,232,600
Bend all sock GIP diameter 3"
Bh
21,400
Tee all sock GIP diameter 3"
Bh
17,900
Pasang tangga bahan pipa GIP dn 1"
Bh
198,500
Tutup man hole & tutup pengaman lengkap 3 mm
Unit
297,700
Speed Kran DN 20 mm
Bh
18,600
" Water meter "
" Chek valve "
" Bend all flange " CI - 45'
" Air valve " CI
" Stred boox "
21 "Accessories"
KETERANGAN
NO.
J E N I S
B A H A N
SATUAN
HARGA BAHAN
KETERANGAN
(Rp) Gate Valev DN 50 mm
Bh
168,700
Flends diameter 150 mm
Bh
99,200
Pelurus / Centering tiap 30 mm
set
36,000
Reduser DN 100 x 150 mm
set
509,300
Filter Grevel
m3
180,000
Grouting
m
480,300
Tangki fiberglas kapasitas 1 m3
m'
3,959,100
Tangki fiberglas kapasitas 2 m3
m'
4,688,400
Solar
ltr
6,400
Olie
ltr
33,600
Bentonite
kg
11,400
Veet/grease
kg
33,100
Gravel pack
m3
173,900
Kawat las
btg
900
Pipa jambang diameter 8" ( GI)
m'
578,400
Pipa jambang diameter 6" (GI)
m'
323,200
Pipa buta diamter 6" ( GI )
m'
310,000
Pipa buta diamter 4" (GI )
m'
283,500
Pipa saringan stainless steel diameter 6"
m'
1,719,900
Pipa saringan stainless steel diameter 4"
m'
1,181,300
22 "Pembuatan Sumur Produksi"
Jepara, Februari 2015 KEPALA DINAS CIPTA KARYA TATA RUANG DAN KEBERSIHAN KABUPATEN JEPARA
Ir. ASHAR EKANTO NIP. 19620921 199503 1 001
DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSI KABUPATEN JEPARA TA. 2015
SWAKELOLA (Ket : Harga belum termasuk PPN 10%)
URAIAN PEKERJAAN
NO.
I
HARGA SATUAN PEKERJAAN PERSIAPAN
1
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
2 3
SAT
KODE
HARGA SATUAN (Rp)
A. 2.2.1 m'
A.2.2.1.2
386,130.42
Pengukuran dan Pemasangan Bouwplank
m'
A.2.2.1.4
55,595.90
Membersihkan Lapangan dan Perataan
m2
A.2.2.1.9
10,250.00
4
Bongkaran Beton Bertulang
m3
A.2.2.1.13
874,653.00
5
Bongkaran Dinding Tembok Bata Merah
m3
A.2.2.1.14
437,326.50
6
Bongkaran 1 m3 Pasangan Batu
m3
A.2.2.1.17
128,945.00
7
Pembuatan Steger/Perancah dari Bambu tebas tebang berupa memotong dan membersihkan lokasi dari tanaman diameter < 15cm
m2
A.2.2.1.18
101,039.38
m2
A.2.2.1.19
5,365.88
8
II
HARGA SATUAN PEKERJAAN TANAH
A.2.3.1
1
Menggali Tanah Biasa Sedalam 1 m
m3
A.2.3.1.1
48,175.00
2
Menggali Tanah Biasa Sedalam 2 m
m3
A.2.3.1.2
59,040.00
3
Menggali Tanah Biasa Sedalam 3 m
m3
A.2.3.1.3
70,069.00
4
Menggali Tanah Keras Sedalam 1 m
m3
A.2.3.1.4
64,124.00
5
Menggali Tanah Cadas Sedalam 1 m
m3
A.2.3.1.5
97,170.00
6
Menggali Tanah Lumpur Sedalam 1 m
m3
A.2.3.1.6
77,490.00
7
Mengerjakan Striping Tebing Setinggi 1 m
m2
A.2.3.1.7
3,485.00
8
MembuangTanah sejauh 30 m'
m3
A.2.3.1.8
21,115.00
9
Pengurugan Kembali
m3
A.2.3.1.9
11,616.67
10
Pemadatan Tanah (per 20 cm)
m3
A.2.3.1.10
34,850.00
11
Urugan Pasir hurug
m3
A.2.3.1.11
120,130.00
12
Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan
m2
A.2.3.1.13
155,595.00
13
Mengurug Sirtu Padat
m3
A.2.3.1.14
118,900.00
15
Urugan tanah biasa dan dipadatkan (SNI)
m3
A.2.3.1.15
81,347.08
16
Urugan tanah padas dan dipadatkan (SNI)
m3
A.2.3.1.16
99,551.08
17
Pemasangan trucuk bambu Ø 10 cm panjang 6 m (SNI)
ttk
A.2.3.1.17
23,476.73
III
HARGA SATUAN PEKERJAAN PONDASI
1
Pemasangan Pondasi Batu Belah 1SP : 3 PP lokal
m3
A.3.2.1.1
701,026.20
2
Pemasangan Pondasi Batu Belah 1SP : 3 PP muntilan
m3
A.3.2.1.1.1
764,409.64
3
Pemasangan Pondasi Batu Belah 1SP : 4 PP lokal
m3
A.3.2.1.2
649,784.40
4
Pemasangan Pondasi Batu Belah 1SP : 4 PP muntilan
m3
A.3.2.1.2.1
717,741.90
5
Pemasangan Pondasi Batu Belah 1SP : 5 PP lokal
m3
A.3.2.1.3
614,275.53
6
Pemasangan Pondasi Batu Belah 1SP : 5 PP muntilan
m3
A.3.2.1.3.1
685,369.53
7
Pemasangan Pondasi Batu Belah 1SP : 6 PP lokal
m3
A.3.2.1.4
589,304.07
8
Pemasangan Pondasi Batu Belah 1SP : 6 PP muntilan
m3
A.3.2.1.4.1
662,619.76
A.3.2.1.
URAIAN PEKERJAAN
NO.
SAT
KODE
HARGA SATUAN (Rp)
9
Pemasangan Pondasi Batu Belah 1SP : 8 PP lokal
m3
A.3.2.1.5
555,094.08
10
Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan
m3
A.3.2.1.5.1
631,415.58
11
Pemasang Batu Kosong/Anstamping
m3
A.3.2.1.9
296,546.85
12
Pasang Pondasi Sumuran diameter 100 cm
m3
A.3.2.1.11
723,480.67
17
Pasang Pondasi Rolag Trashraam Bata Merah 1 Pc : 3 Ps (SNI)
m3
A.3.2.1.12
1,011,325.48
18
Pasang suling-suling
m'
A.3.2.1.13
7,212.93
URAIAN PEKERJAAN
NO. IV
SAT
HARGA SATUAN PEKERJAAN PASANGAN DINDING
KODE
HARGA SATUAN (Rp)
A.4.4.1
Dinding dengan bata merah kudus 1
Pemasangan Dinding Bata Merah Kudus Tebal 1 Bata Camp. 1SP : 3PP Muntilan
m2
A.4.4.1.2
238,268.22
2
Pemasangan Dinding Bata Merah Kudus Tebal 1 Bata Camp. 1SP : 4PP Muntilan
m2
A.4.4.1.3
229,572.74
3
Pemasangan Dinding Bata Merah Kudus Tebal 1 Bata Camp. 1SP : 5PP Muntilan
m2
A.4.4.1.4
225,779.42
4
Pemasangan Dinding Bata Merah Kudus Tebal 1 Bata Camp. 1SP : 6PP Muntilan
m2
A.4.4.1.5
225,973.14
5
Pemasangan Dinding Bata Merah Kudus Tebal 1/2 Bata Camp. 1SP : 3PP Muntilan
m2
A.4.4.1.8
114,568.04
6
Pemasangan Dinding Bata Merah Kudus Tebal 1/2 Bata Camp. 1SP : 4PP Muntilan
m2
A.4.4.1.9
111,251.35
7
Pemasangan Dinding Bata Merah Kudus Tebal 1/2 Bata Camp. 1SP : 5PP Muntilan
m2
A.4.4.1.10
109,175.11
8
Pemasangan Dinding Bata Merah Kudus Tebal 1/2 Bata Camp. 1SP : 6PP Muntilan
m2
A.4.4.1.11
108,317.80
9
Pemasangan Dinding Bata Merah Kudus Tebal 1/2 Bata Camp. 1SP : 8PP Muntilan
m2
A.4.4.1.12
105,964.50
10
Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP Muntilan
m2
A.4.4.1.23
155,257.26
11
Pemasangan Dinding Bata Merah Kudus Tebal 1 Bata Camp. 1SP : 3PP Lokal
m2
A.4.4.1.2.1
226,375.66
12
Pemasangan Dinding Bata Merah Kudus Tebal 1 Bata Camp. 1SP : 4PP Lokal
m2
A.4.4.1.3.1
217,418.80
13
Pemasangan Dinding Bata Merah Kudus Tebal 1 Bata Camp. 1SP : 5PP Lokal
m2
A.4.4.1.4.1
212,449.29
14
Pemasangan Dinding Bata Merah Kudus Tebal 1 Bata Camp. 1SP : 6PP Lokal
m2
A.4.4.1.5.1
210,029.27
15
Pemasangan Dinding Bata Merah Kudus Tebal 1/2 Bata Camp. 1SP : 3PP Lokal
m2
A.4.4.1.8.1
109,340.54
16
Pemasangan Dinding Bata Merah Kudus Tebal 1/2 Bata Camp. 1SP : 4PP Lokal
m2
A.4.4.1.9.1
105,631.79
17
Pemasangan Dinding Bata Merah Kudus Tebal 1/2 Bata Camp. 1SP : 5PP Lokal
m2
A.4.4.1.10.1
103,294.17
18
Pemasangan Dinding Bata Merah Kudus Tebal 1/2 Bata Camp. 1SP : 6PP Lokal
m2
A.4.4.1.11.1
101,914.11
19
Pemasangan Dinding Bata Merah Kudus Tebal 1/2 Bata Camp. 1SP : 8PP Lokal
m2
A.4.4.1.12.1
99,430.13
Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP Lokal
m2
A.4.4.1.23.1
150,683.20
20
Dinding dengan bata merah Kalipucang 21
Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 3PP Muntilan
m2
A.4.4.1.2.2
210,695.72
22
Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 4PP Muntilan
m2
A.4.4.1.3.2
202,000.24
23
Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 5PP Muntilan
m2
A.4.4.1.4.2
229,372.60
24
Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 6PP Muntilan
m2
A.4.4.1.5.2
198,400.64
25
Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 3PP Muntilan
m2
A.4.4.1.8.2
100,781.79
26
Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 4PP Muntilan
m2
A.4.4.1.9.2
97,465.10
27
Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 5PP Muntilan
m2
A.4.4.1.10.2
95,388.86
28
Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 6PP Muntilan
m2
A.4.4.1.11.2
94,531.55
29
Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 8PP Muntilan
m2
A.4.4.1.12.2
92,178.25
30
Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 3PP Lokal
m2
A.4.4.1.3.3
198,803.16
31
Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 4PP Lokal
m2
A.4.4.1.3.3
189,846.30
32
Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 5PP Lokal
m2
A.4.4.1.4.3
216,367.60
33
Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 6PP Lokal
m2
A.4.4.1.5.3
182,456.77
34
Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 3PP Lokal
m2
A.4.4.1.8.3
95,554.29
35
Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 4PP Lokal
m2
A.4.4.1.9.3
91,845.54
36
Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 5PP Lokal
m2
A.4.4.1.10.3
89,507.92
37
Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 6PP Lokal
m2
A.4.4.1.11.3
88,127.86
38
Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 8PP Lokal
m2
A.4.4.1.12.3
85,643.88
URAIAN PEKERJAAN
NO.
SAT
KODE
HARGA SATUAN (Rp)
V
HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2
1
Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm Pasir Muntilan
m2
A.4.4.2.3
50,051.84
2
Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm Pasir Lokal
m2
A.4.4.2.3.1
47,046.02
3
Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm Pasir Muntilan
m2
A.4.4.2.4
48,108.99
4
Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm Pasir Lokal
m2
A.4.4.2.4.1
44,972.49
5
Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm Pasir Muntilan
m2
A.4.4.2.5
47,136.92
6
Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm Pasir Lokal
m2
A.4.4.2.5.1
43,739.05
7
Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm Pasir Muntilan
m2
A.4.4.2.6
46,304.03
8
Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm Pasir Lokal
m2
A.4.4.2.6.1
42,775.46
9
Pemasangan Plesteran 1 Pc : 7 Pp Tebal 15 mm Pasir Muntilan
m2
A.4.4.2.7
45,887.36
10
Pemasangan Plesteran 1 Pc : 7 Pp Tebal 15 mm Pasir Lokal
m2
A.4.4.2.7.1
42,228.11
11
Pemasangan Plesteran 1 Pc : 8 Pp Tebal 15 mm Pasir Muntilan
m2
A.4.4.2.8
45,470.70
12
Pemasangan Plesteran 1 Pc : 8 Pp Tebal 15 mm Pasir Lokal
m2
A.4.4.2.8.1
41,680.76
13
Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm Pasir Muntilan
m2
A.4.4.2.19
30,998.30
14
Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm Pasir Lokal
m2
A.4.4.2.19.1
27,600.42
15
Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm Pasir Muntilan
m2
A.4.4.2.20
43,602.37
16
Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm Pasir Lokal
m2
A.4.4.2.20.1
41,903.44
17
Pemasangan Plesteran Ciprat 1Pc : 2 Pp Muntilan
m2
A.4.4.2.23
36,093.33
18
Pemasangan Plesteran Ciprat 1Pc : 2 Pp Lokal
m2
A.4.4.2.23.1
35,309.20
19
Pemasangan Finishing Siar Pasangan Dinding Bata Merah
m2
A.4.4.2.24
20,794.46
20
Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp Muntilan
m2
A.4.4.2.26
44,928.83
21
Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp Lokal
m2
A.4.4.2.26.1
43,360.58
22
Pemasangan Acian
m2
A.4.4.2.27
26,324.56
VI
HARGA SATUAN PEKERJAAN
1
Pembuatan & Pemasangan 1 m3 Kosen Pintu & Jendela Kayu bengkirai
m3
A.4.6.1.1
12,026,591.50
2
Pembuatan & Pemasangan 1 m3 Kosen Pintu & Jendela Kayu Kamfer
m3
A.4.6.1.2
11,937,519.00
3
Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Jati
m2
A.4.6.1.5
1,013,356.00
4
Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Kamfer
m2
A.4.6.1.5.1
654,249.30
5
Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Jati
m2
A.4.6.1.6
675,721.00
6
Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu kamfer
m2
A.4.6.1.6.1
460,256.98
7
Pembuatan&Pemasangan 1 m2 Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kamfer
m2
A.4.6.1.8
513,516.29
8
Pembuatan&Pemasangan 1 m2 Pintu Plywood rangkap, rangka expose kayu Kamfer
m2
A.4.6.1.9
550,590.31
9
Pembuatan & Pemasangan 1 m2 Jalusi mati Kosen Kayu Bengkirai
m2
A.4.6.1.10
772,681.90
10
Pembuatan & Pemasangan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Bengkirai
m2
A.4.6.1.11
556,614.98
K A Y U
A.4.6.1
11
Pembuatan&Pemasangan 1 m2 Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu kamfer
m2
A.4.6.1.12
585,895.64
12
Pembuatan&Memasang 1 m3 Konstruksi Kuda-kuda Konvensional Kayu bengkirai
m3
A.4.6.1.13
11,418,643.50
13
Pembuatan&Memasang 1 m3 Konstruksi Kuda-kuda Konvensional Kayu Kruing
m3
A.4.6.1.13.1
9,089,115.75
14
Pemasangan 1 m3 konstruksi Gording, Kayu bengkirai
m3
A.4.6.1.15
12,250,759.00
15
Pemasangan konstruksi 1 m3 Gording, Kayu Kruing
m3
A.4.6.1.15.1
9,921,231.25
16
Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu bengkirai
m2
A.4.6.1.16
174,368.24
17
Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu bengkirai
m2
A.4.6.1.17
206,281.58
18
Pemasangan 1 m2 Rangka Langit-langit (50x1,00) m, kayu Kruing
m2
A.4.6.1.19
147,426.26
19
Pemasangan 1 m2 Rangka Langit-langit (60x60) cm, kayu Kruing
m2
A.4.6.1.20
151,899.62
URAIAN PEKERJAAN
NO.
SAT
KODE
HARGA SATUAN (Rp)
20
Pemasangan 1 m' Listplank Uk. (3x20)cm Kayu Bengkirai
m'
A.4.6.1.21
120,627.00
21
Pemasangan 1 m' Listplank Uk. (3x30)cm Kayu Bengkirai
m'
A.4.6.1.22
121,743.97
22
Pemasangan 1 m2 Rangka Dinding Pemisah (60x120) cm Kayu Kruing
m2
A.4.6.1.23
239,050.50
23
Pemasangan 1 m2 Dinding Pemisah Teakwood Rangkap Rangka Kayu Kruing
m2
A.4.6.1.24
310,042.00
24
Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap Rangka Kayu Kruing
m2
A.4.6.1.25
314,972.25
25
Pemasangan 1 m2 Dinding Lambriziring dari Papan Kayu Jati
m2
A.4.6.1.26
316,883.88
26
Pasang Kasau & Reng Kayu Bengkirai (SNI)
m2
A.4.6.1.29
123,413.28
27
Pasang Kasau & Reng Kayu Kruing (SNI)
m2
A.4.6.1.30
98,000.25
28
Pasang Papan sirip (SNI)
m'
A.4.6.1.31
53,148.81
URAIAN PEKERJAAN
NO.
VII HARGA SATUAN PEKERJAAN
SAT
BETON
KODE
HARGA SATUAN (Rp)
A.4.1.1
1
Membuat Beton mutu f'c=7,4 Mpa (K100)
m3
A.4.1.1.1
828,835.57
2
Membuat Beton mutu f'c=9,8 Mpa (K125)
m3
A.4.1.1.2
864,765.01
3
Membuat Beton mutu f'c=12,2 Mpa (K150)
m3
A.4.1.1.3
893,086.33
4
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K100)
m3
A.4.1.1.4
777,315.63
5
Membuat Beton mutu f'c=14,5 MPa (K175)
m3
A.4.1.1.5
926,357.14
6
Membuat Beton mutu f'c=16,9 MPa (K200)
m3
A.4.1.1.6
958,522.44
7
Membuat Beton mutu f'c=19,3 MPa (K225)
m3
A.4.1.1.7
982,074.33
8
Membuat Beton mutu f'c=21,7 MPa (K250)
m3
A.4.1.1.8
998,363.80
9
Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275)
m3
A.4.1.1.9
1,026,445.10
10
Membuat Beton mutu f'c=26,4 MPa (K300)
m3
A.4.1.1.10
1,035,148.54
11
Pembesian dg Besi Polos atau Besi Ulir
1 kg
A.4.1.1.17
11,174.04
12
Jaring Kawat baja/Wire Mesh
1 kg
A.4.1.1.19
18,222.45
13
Memasang Bekisting untuk Pondasi
m2
A.4.1.1.20
97,998.20
14
Memasang Bekisting untuk Sloof
m2
A.4.1.1.21
102,598.91
15
Memasang Bekisting untuk Kolom
m2
A.4.1.1.22
193,544.09
16
Memasang Bekisting untuk Balok
m2
A.4.1.1.23
196,304.52
17
Memasang Bekisting untuk Lantai
m2
A.4.1.1.24
248,894.09
18
Memasang Bekisting untuk Tangga
m2
A.4.1.1.26
183,830.16
19
Membuat Kolom Penguat Beton Bertulang/kolom praktis (11 x 11) cm
m'
A.4.1.1.35
57,253.22
20
Membuat Ring Balok Beton Bertulang (10 x 15) cm
m'
A.4.1.1.36
79,369.13
21
1 m² bekisting untuk permukaan beton biasa dengan kayu randu tebal 2 cm
m2
A.4.1.1.37
81,148.64
VIII HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2
1
Pemasangan Atap Genteng Jatiwangi Kecil
m2
A.4.5.2.1
93,136.63
2
Pemasangan Atap Genteng Kodok / lokal
m2
A.4.5.2.2
47,052.63
3
Pemasangan Atap Genteng Jatiwangi Super / Besar
m2
A.4.5.2.3
127,002.63
4
Pemasangan Genteng Bubung jatiwangi kecil
m'
A.4.5.2.4
127,212.34
5
Pemasangan Genteng Bubung Kodok / lokal
m'
A.4.5.2.5
83,649.84
6
Pemasangan Genteng Bubung Jatiwangi Besar
m'
A.4.5.2.6
113,374.84
7
Pemasangan Atap Asbes Gelombang (2,25x0,92 m) x 5 mm
m2
A.4.5.2.9
66,732.63
8
Pemasangan Atap Asbes Gelombang (2,00x0,92 m) x 5 mm
m2
A.4.5.2.10
62,494.25
9
Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 mm
m2
A.4.5.2.12
49,784.25
10
Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 4 mm
m2
A.4.5.2.15
50,624.75
11
Pemasangan 1 m’ bubung Asbes
m'
A.4.5.2.22
99,809.38
12
Pemasangan Atap Genteng Beton
m2
A.4.5.2.30
89,671.10
13
Pemasangan Nok Genteng Beton
m'
A.4.5.2.34
124,719.54
14
Pemasangan Atap Seng Gelombang
m2
A.4.5.2.38
70,889.00
15
Pemasangan Atap Nok Seng
m'
A.4.5.2.39
40,797.05
IX
HARGA SATUAN PEKERJAAN LANGIT-LANGIT
1
Pemasangan Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm
m2
A.4.5.1.1
37,236.20
2
Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm
m2
A.4.5.1.5
36,601.73
A.4.5.1
URAIAN PEKERJAAN
NO.
SAT
KODE
HARGA SATUAN (Rp)
3
Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm
m2
A.4.5.1.6
380,124.33
4
Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm
m2
A.4.5.1.7
36,269.83
5
List Langit-Langit Kayu Profil
m1
A.4.5.1.10
23,849.70
URAIAN PEKERJAAN
NO.
SAT
KODE
HARGA SATUAN (Rp)
X
HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1
1
Memasang Closet Duduk / Mono Blok
Unit
A.5.1.1.1
1,597,429.70
2
Memasang Closet Jongkok Porselen
Unit
A.5.1.1.2
350,435.20
3
Memasang Urinoir
Unit
A.5.1.1.4
650,503.95
4
Memasang Wastafel
Unit
A.5.1.1.5
448,321.68
5
Pemasangan Bak Fibreglass vol.1 m3
Unit
A.5.1.1.7
929,777.50
6
Memasang Bak Mandi Batu Bata Vol. 0,30 m3
Unit
A.5.1.1.8
1,260,934.50
7
Pemasangan Bak Cuci Piring Stainless stell
buah
A.5.1.1.12
270,600.00
8
Pemasangan Floor Drain
buah
A.5.1.1.14
33,210.00
9
Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm
bh
A.5.1.1.15
347,162.38
10
Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm
bh
A.5.1.1.16
526,088.43
11
Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm
bh
A.5.1.1.17
661,113.62
12
Pemasangan Pipa Galvanis Ø ½"
m'
A.5.1.1.18
44,807.88
13
Pemasangan Kran Ø ½" atau Ø ¾"
bh
A.5.1.1.19
72,013.94
14
Pemasangan Pipa Galvanis Ø ¾"
m'
A.5.1.1.20
54,499.25
15
Pemasangan Pipa Galvanis Ø 1"
m'
A.5.1.1.21
76,741.75
16
Pemasangan Pipa Galvanis Ø 1½ "
m'
A.5.1.1.22
117,849.38
17
Pemasangan Pipa Galvanis Ø 3"
m'
A.5.1.1.23
234,914.63
18
Pemasangan Pipa Galvanis Ø 4"
m'
A.5.1.1.24
330,398.50
19
Pemasangan Pipa PVC tipe AW Ø ½"
m'
A.5.1.1.25
15,585.13
20
Pemasangan Pipa PVC tipe AW Ø ¾"
m'
A.5.1.1.26
17,968.25
21
Pemasangan Pipa PVC tipe AW Ø 1"
m'
A.5.1.1.27
20,986.88
22
Pemasangan Pipa PVC tipe AW Ø 1½"
m'
A.5.1.1.28
27,111.25
23
Pemasangan Pipa PVC tipe AW Ø 2"
m'
A.5.1.1.29
38,232.50
24
Pemasangan Pipa PVC tipe AW Ø 3"
m'
A.5.1.1.31
68,111.25
25
Pemasangan Pipa PVC tipe AW Ø 4"
m'
A.5.1.1.32
97,503.13
26
Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm
m'
A.5.1.1.33
310,920.63
27
Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm
m'
A.5.1.1.34
172,483.31
28
Pemasangan Pipa Beton Ø 20 cm
m'
A.5.1.1.35
106,550.80
29
Pemasangan Pipa Beton Ø 100 cm
m'
A.5.1.1.36
645,731.35
XI
HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
1
Pemasangan Besi Profil
Kg
A.4.2.1.1
29,801.88
2
Pemasangan Rangka Kuda-kuda Baja IWF
kg
A.4.2.1.2
28,018.38
3
Pemasangan Pintu Rolling Door Besi
m2
A.4.2.1.7
535,132.00
4
Pemasangan Pintu Lipat (Folding Door)
m2
A.4.2.1.8
511,147.00
5
Pemasangan Rolling Door Allumunium
m2
A.4.2.1.10
576,050.00
6
Pemasangan Kusen Pintu Allumunium
m'
A.4.2.1.11
127,496.68
7
Pemasangan Pintu Allumunium Strip Lebar 8 cm
m2
A.4.2.1.12
991,534.78
8
Pemasangan Pintu Kaca Rangka Allumunium
m2
A.4.2.1.13
876,631.25
9
Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm
m'
A.4.2.1.18
150,917.93
10
Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm
m'
A.4.2.1.19
79,573.83
11
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
m2
A.4.2.1.21
213,189.75
A.4.2.1
URAIAN PEKERJAAN
NO.
SAT
XII HARGA SATUAN PEKERJAAN KUNCI dan KACA
KODE
HARGA SATUAN (Rp)
A.4.6.2
1
Pemasangan Kunci Tanam Biasa
Buah
A.4.6.2.2
105,882.50
2
Pemasangan Kunci Kamar Mandi
Buah
A.4.6.2.3
80,565.00
3
Pemasangan Kunci Selinder
Buah
A.4.6.2.4
105,370.00
4
Pemasangan Engsel Pintu
Buah
A.4.6.2.5
34,761.85
5
Pemasangan Engsel Jendela Kupu-kupu
Buah
A.4.6.2.6
23,616.00
6
Pemasangan Engsel Angin
Buah
A.4.6.2.7
43,501.00
7
Pemasangan Kait Angin
Buah
A.4.6.2.9
19,977.25
8
Pasang Door Closer
Buah
A.4.6.2.10
141,450.00
9
Pemasangan Kunci Selot
Buah
A.4.6.2.11
27,449.50
10
Pemasangan Door Stop
Buah
A.4.6.2.13
45,038.50
11
Pemasangan Rel Pintu Dorong
Buah
A.4.6.2.14
242,556.00
12
Pemasangan Kaca tebal 3 mm
m2
A.4.6.2.16
94,023.25
13
Pemasangan Kaca tebal 5 mm
m2
A.4.6.2.17
109,582.75
14
Pemasangan Kaca Cermin tebal 5 mm
m2
A.4.6.2.18
273,070.25
XIII HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING
A.4.4.3
1
Pemasangan lantai Ubin PC Abu-abu Uk. 30 x 30 cm
m2
A.4.4.3.2
83,439.10
2
Pemasangan lantai Ubin PC Abu-abu Uk. 20 x 20 cm
m2
A.4.4.3.3
91,640.13
3
Pemasangan lantai Ubin PC Warna Uk. 30 x 30 cm
m2
A.4.4.3.5
103,782.28
4
Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm
m2
A.4.4.3.6
122,082.42
5
Pemasangan lantai Ubin Granito Uk. 40 x 40 cm
m2
A.4.4.3.9
286,477.25
6
Pemasangan Lantai Keramik 30 x 30 cm warna
m2
A.4.4.3.35
164,746.20
7
Pemasangan Lantai Keramik 30 x 30 cm putih
m2
A.4.4.3.35.1
161,096.18
8
Pemasangan Lantai Keramik 40 x 40 cm warna
m2
A.4.4.3.35.2
119,981.38
9
Pemasangan Lantai Keramik 40 x 40 cm putih
m2
A.4.4.3.35.3
116,583.50
10
Pemasangan Lantai Keramik 20 x 20 cm
m2
A.4.4.3.36
171,215.80
11
Pemasangan Lantai Parquet Jati
m2
A.4.4.3.46
323,233.75
12
Pemasangan Dinding Keramik 10x20 cm,
m2
A.4.4.3.53
200,957.30
11
Pemasangan Dinding Keramik 20x20 cm,
m2
A.4.4.3.54
191,168.65
14
Pemasangan Dinding Batu Paras / Batu Tempel Hitam
m2
A.4.4.3.58
216,188.39
15
Pemasangan Plint Kayu Klas II Ukuran 2x10 cm
m'
A.4.4.3.63
38,988.44
14
Pasang blok pafing tebal 6 cm K.125 (SNI)
m2
A.4.4.3.64
103,629.04
15
Blok paving tebal 6 cm dengan paving mutu K 225 (SNI)
m2
A.4.4.3.65
108,446.54
16
Blok paving tebal 8 cm dengan paving mutu K 300 (SNI)
m2
A.4.4.3.66
143,296.54
17
Blok paving warna tebal 6 cm K.125 (SNI)
m2
A.4.4.3.67
99,221.54
18
Blok paving warna tebal 8 cm K.125 (SNI)
m2
A.4.4.3.68
105,884.04
19
pasang saluran U-20 cm (SNI)
m'
A.4.4.3.69
263,054.21
20
pasang saluran U-30 cm (SNI)
m'
A.4.4.3.70
275,866.71
URAIAN PEKERJAAN
NO.
SAT
XIV HARGA SATUAN PEKERJAAN PENGECATAN
KODE
HARGA SATUAN (Rp)
A.4.7.1
1
Pengikisan / pengerokan Permukaan Cat Tembok Lama
m2
A.4.7.1.1
10,496.00
2
Pencucian Bidang Permukaan Tembok yang Pernah dicat
m2
A.4.7.1.2
10,239.75
3
Pengerokan Karat Cat Lama permukaan Baja dg cara manual
m2
A.4.7.1.3
10,649.75
4
Pengecatan Bidang Kayu Baru 2x cat
m2
A.4.7.1.4
38,977.68
5
Pengecatan Bidang Kayu Baru 3x cat
m2
A.4.7.1.5
50,963.00
6
Pelaburan Bidang Kayu dg Teak Oil
m2
A.4.7.1.6
28,213.13
7
Pelaburan Bidang Kayu dg Politur
m2
A.4.7.1.7
42,983.58
8
Pelaburan Bidang Kayu dg Cat Residu & Ter
m2
A.4.7.1.8
7,861.75
9
Pelaburan Bidang Kayu dg Vernis
m2
A.4.7.1.9
32,661.63
10
Pengecat Tembok Baru dengan Decolite
m2
A.4.7.1.10
18,038.98
11
Pengecat Tembok Baru dengan Mowilex dalam ruangan
m2
A.4.7.1.10.1
27,259.88
12
Pengecat Tembok Baru dengan Mowilex luar ruangan
m2
A.4.7.1.10.2
34,561.98
13
Pengecatan Tembok Lama dengan Decolite
m2
A.4.7.1.11
14,397.15
14
Pengecatan Tembok Lama dengan Mowilex dalam ruangan
m2
A.4.7.1.11.1
20,780.85
15
Pengecatan Tembok Lama dengan Mowilex luar ruangan
m2
A.4.7.1.11.2
25,836.15
16
Pengecatan Permukaan Baja dg Meni Besi
m2
A.4.7.1.16
21,781.25
17
Pengecatan 1 m2 permukaan Besi 3x (SNI)
m2
A.4.7.1.22
33,136.20
18
Pengecatan 1 m2 permukaan Trotoir 3x (SNI)
m2
A.4.7.1.23
40,029.33
XV HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
A.8.4.1
1
Pemasangan 1 m pipa PVC Ø 50 mm (2")
m'
A.8.4.1.1
32,205.50
2
Pemasangan 1 m pipa PVC Ø 25 mm (1")
m'
A.8.4.1.1.1
14,650.30
3
Pemasangan 1 m pipa PVC Ø 40 mm (1½")
m'
A.8.4.1.1.2
26,165.45
4
Pemasangan 1 m pipa PVC Ø 75 mm (3")
m'
A.8.4.1.2
60,526.25
5
Pemasangan 1 m pipa PVC Ø 90 mm (4")
m'
A.8.4.1.3
85,177.50
6
Pemasangan 1 m pipa HDPE OD 63 mm
m'
A.8.4.1.17
54,355.75
7
Pemasangan 1 m pipa HDPE OD 75 mm
m'
A.8.4.1.17.1
75,007.45
8
Pemasangan 1 m pipa HDPE OD 90 mm
m'
A.8.4.1.17.2
107,399.50
9
Biaya 1 m' pemasangan pipa PVC Ø 25 mm (galian 0,25m x 0,3m + Bahan)
m'
A.8.4.1.80
20,425.83
10
Biaya 1 m' pemasangan pipa PVC Ø 40 mm (galian 0,25m x 0,4m + Bahan)
m'
A.8.4.1.81
33,929.49
11
Biaya 1 m' pemasangan pipa PVC Ø 50 mm (galian 0,25m x 0,5m + Bahan)
m'
A.8.4.1.82
41,958.03
12
Biaya 1 m' pemasangan pipa PVC Ø 75 mm (galian 0,25m x 0,6m + Bahan)
m'
A.8.4.1.83
72,172.30
13
Biaya 1 m' pemasangan pipa PVC Ø 100 mm (galian 0,30m x 1,00m + Bahan)
m'
A.8.4.1.84
108,232.14
14
Biaya 1 m' pemasangan pipa HDPE OD 63 mm (galian 0,25m x 0,5m + Bahan)
m'
A.8.4.1.85
64,108.28
15
Biaya 1 m' pemasangan pipa HDPE OD 75 mm (galian 0,25m x 0,6m + Bahan)
m'
A.8.4.1.86
86,653.50
16
Biaya 1 m' pemasangan pipa HDPE OD 90 mm (galian 0,25m x 0,70m + Bahan)
m'
A.8.4.1.87
120,986.56
XVI HARGA SATUAN PEKERJAAN PENGETESAN PIPA
A.8.4.5
1
Pengetesan 1 m pipa Ø 50 mm
m'
A.8.4.5.1
979.08
2
Pengetesan 1 m pipa Ø 75 mm
m'
A.8.4.5.2
1,020.08
3
Pengetesan 1 m pipa Ø 100 mm
m'
A.8.4.5.3
1,102.08
4
Pengetesan 1 m pipa Ø 150 mm
m'
A.8.4.5.4
1,307.08
5
Pengetesan 1 m pipa Ø 200 mm
m'
A.8.4.5.5
1,573.58
NO.
URAIAN PEKERJAAN
SAT
KODE
HARGA SATUAN (Rp)
Jepara, Februari 2015
KEPALA DINAS CIPTA KARYA TATA RUANG DAN KEBERSIHAN KABUPATEN JEPARA
Ir. ASHAR EKANTO NIP. 19620921 199503 1 001
ANALISA BIAYA PEKERJAAN LAPIS PENETRASI MAKADAM (LAPEN) 5 CM ( MENGGUNAKAN BURUH )
PROPINSI : JAWA TENGAH
KODE KABUPATEN : 33 JEPARA
URAIAN : 1. Semprotkan aspal tack coat 0,8 liter/m2 2. Hamparkan agregat pokok 3-5 25 m2/m3 dan padatkan 3. Haparkan split 2-3 45 m2/m3 dan padatkan 4. Semprotkan aspal (2,5 kg/m2) 5. Hamparkan agregat pengunci split 1-2 90 m2/m3 & padatkan 6. Semprotkan aspal 1,5 kg/m2 dan gilas 7. Taburkan pasir rata-rata 400m2 per m3
Jumlah Orang
Mandor Operator terlatih Sopir Buruh tak terlatih Buruh terlatih ( Tenaga Aspal )
Alat bantu Material batu pecah : -Batu pecah 3-5 cm - Batu pecah 2-3 cm - Batu pecah 1-2 cm - Batu ciping 0,5 cm - Abu batu Aspal Minyak bakar
P E R A L A T A N
Jumlah
0.04 0.02 0.01 0.01 0.00 4.48 0.32
PERALATAN
Mesin gilas 3 roda 6 - 10 ton Sprayer aspal 200 L Flatbed truck 3,5 T /115 HP
Hari
2.00 2.00 1.00 66.00 2.00
MATERIAL
M A T E R I A L
DISIAPKAN OLEH : CIPTAKARYA
Kode
3 3 3 3 3
Volume Satuan
Jumlah Hari-Org 6.00 6.00 3.00 198.00 6.00
Kode
Upah (Rp./Org/Hari) 80,000.00 70,000.00 40,000.00 40,000.00 60,000.00
:
1,400.00
Biaya (Rp.)
Sub Total (Rp.)
480,000.00 420,000.00 120,000.00 7,920,000.00 360,000.00
Harga Satuan (Rp.)
9,300,000.00 Sub Total (Rp.)
Biaya (Rp.)
3.10
Set
465,000.00
1,441,500.00
56.00 31.00 15.50 7.13 3.50 6,270.00 450.00
m3 m3 m3 m3 m3 kg liter
191,900.00 215,900.00 217,100.00 189,400.00 172,700.00 13,500.00 13,500.00
10,746,400.00 6,692,900.00 3,365,050.00 1,350,422.00 604,450.00 84,645,000.00 6,075,000.00
Jumlah Alat
Hari Kerja
1.00 1.00 1.00
Kode
3 3 3
Jam Kerja 15.00 15.00 15.00
Harga (Rp./jam) 44,000.00 50,000.00 71,500.00
TOTAL Overhead TOTAL BIAYA VOLUME/ QUANTITY
TANGGAL: Jepara, Februari 2015
ANGGAPAN / ASUMSI : 1. Menggunakan tenaga buruh 2. Harga material ( agregat dan aspal) adalah harga di lokasi proyek 3. Volume aspal cair untuk tack coat/prime coat 0,8 liter/m2 4. Tebal lapisan penetrasi 5 cm 5. Agregat dikirim ke lokasi oleh leveransir
PEKERJA
P E K E R J A
KODE: 20
KODE K 618
SATUAN:
m2
HARGA SATUAN Rp.
114,920,722.00 Sub Total (Rp.)
Biaya (Rp.) 660,000.00 750,000.00 1,072,500.00
Rp. 2.5%
2,482,500.00 126,703,222.00 3,167,580.55 129,870,802.55
92,764.86 Per m2
ANALISA BIAYA PEKERJAAN MEMBUAT CAMPURAN, MENGHAMPAR DAN PEMADATAN LATASIR 2 CM ( MENGGUNAKAN BURUH )
PROPINSI : JAWA TENGAH
KODE KABUPATEN : 33 JEPARA
URAIAN : 1. Supplier mengirim material sampai ke bin spreader 2. Material dihampar dengan mesin spreader, dipadatkan dengan mesin gilas roda baja
PEKERJA
P E K E R J A
Mandor Operator terlatih Buruh tak terlatih Buruh semi terlatih
Jumlah
3.4285 0.0172 0.0039 0.2514 0.5575
PERALATAN
P E R A L A T A N
Hari
1.00 1.00 25.00 10.00
Aspal untuk campuran Pasir beton Abu batu (filler) Aspal untuk prime coat Minyak bakar
Roller 3 Wheled 8-10 T 51 HP Aspal Sprayer Towed 350 L 7 HP
DISIAPKAN OLEH : CIPTAKARYA
3 3 3 3
L 061 L 085 L 092 L 091
Volume Satuan
Kode
kg m3 m3 kg Ltr
M061 M041 M027 M061 M065
Hari Kerja
Kode
1,371.40 6.86 1.57 100.57 223.00
Jumlah Alat
Kode
1.00 1.00
1 E 080 1 E 154
Jumlah Hari-Org 3.00 3.00 75.00 30.00
Upah (Rp./Org/Hari) 80,000.00 70,000.00 40,000.00 55,000.00
:
400.00
SATUAN:
m2
Biaya (Rp.)
13,500.00 270,300.00 172,700.00 13,500.00 13,500.00
Jam Kerja 5.00 5.00
5,100,000.00 Sub Total (Rp.)
Biaya (Rp.)
18,513,900.00 1,854,258.00 271,139.00 1,357,695.00 3,010,500.00
Harga (Rp./jam)
25,007,492.00 Sub Total (Rp.)
Biaya (Rp.)
44,000.00 50,000.00
HARGA SATUAN Rp.
Sub Total (Rp.)
240,000.00 210,000.00 3,000,000.00 1,650,000.00
Harga Satuan (Rp.)
TOTAL Overhead TOTAL BIAYA VOLUME/ QUANTITY
TANGGAL: Jepara, Februari 2015
ANGGAPAN / ASUMSI : 1. Menggunakan tenaga buruh 400 m2/hari 2. Pasir aspal dikirim oleh levelansier ketempat pekerjaan 3. Rata - rata tebal lapisan padat 2 cm
Jumlah Orang
MATERIAL
M A T E R I A L
KODE: 20
KODE K 621.a
220,000.00 250,000.00
Rp. 2.5%
470,000.00 30,577,492.00 764,437.30 31,341,929.30
78,354.82 Per m2
Mandor Operator terlatih Sopir Buruh tak terlatih Buruh terlatih ( Tenaga Aspal ) Alat bantu Material batu pecah : -Batu pecah 3-5 cm - Batu pecah 2-3 cm - Batu pecah 1-2 cm - Batu ciping 0,5 cm - Abu batu Aspal Minyak bakar Mesin gilas 3 roda 6 - 10 ton Sprayer aspal 200 L Flatbed truck 3,5 T /115 HP Mandor Operator terlatih Buruh tak terlatih Buruh semi terlatih Aspal untuk campuran Pasir beton Abu batu (filler) Aspal untuk prime coat Minyak bakar 0 Roller 3 Wheled 8-10 T 51 HP Aspal Sprayer Towed 350 L 7 H
1.19571429 1.19571429 0.59785714 39.4585714 1.20 0.62 0.00 11.16 6.18 3.09 1.42 0.70 1249.52 89.68 2.99 2.99 2.99 6.98 6.98 174.38 19.93 3188.505 15.9495 3.65025 233.82525 518.475 11.63 11.63
80000 95657.1429 70000 83700 40000 23914.2857 40000 1578342.86 60,000 71,743 465,000 287,270 191,900 2,141,604 215,900 1,333,799 217,100 670,606 189,400 269,120 172,700 120,458 13,500 16,868,539 13,500 1,210,661 44,000 131,529 50,000 149,464 71,500 213,734 - 25,250,142 80000 558,000 70000 488,250 40000 6,975,000 55000 1,096,071 13500 43,044,818 270300 4,311,150 172700 630,398 13500 3,156,641 13500 6,999,413 44000 511,500 50000 581,250 93,602,632
Mandor Operator terlatih Sopir Buruh tak terlatih Buruh terlatih ( Tenaga Aspal ) Buruh semi terlatih Alat bantu -Batu pecah 3-5 cm - Batu pecah 2-3 cm - Batu pecah 1-2 cm - Batu ciping 0,5 cm - Abu batu Aspal Minyak bakar Pasir beton Mesin gilas 3 roda 6 - 10 ton mobilisasi
8.17 8.17 0.597857 213.83 1.20 19.93 0.62 11.16 6.18 3.09 1.42 4.35 4671.85 608.15 15.95
80,000 70,000 40,000 40,000 60,000 55,000 465,000 191,900 215,900 217,100 189,400 172,700 13,500 13,500 270,300
653,657 571,950 23,914 8,553,343 71,743 1,096,071 287,270 2,141,604 1,333,799 670,606 269,120 750,856 63,069,998 8,210,073 2,549,605 1,587,477 750,000
92,591,087
945000 259050 759850 0.4290322581
RENCANA ANGGARAN BIAYA KEGIATAN
: PEMELIHARAAN PRASARANA FISIK
PEKERJAAN LOKASI
: REHABILITASI JALAN ASPAL : RT 01 RW 01
TAHUN ANGGARAN
: 2015
VOLUME
: 200 x 2,75 = 550 m2
DESA SLAGI KECAMATAN PAKIS AJI KABUPATEN JEPARA
NO
URAIAN PEKERJAAN
VOLUME
ANALISA
HARGA SATUAN JUMLAH HARGA Rp
Rp
Rp
A
PEKERJAAN PERSIAPAN
1
Pekerjaan Pembersihan
B I
PEKERJAAN REHAB PEKERJAAN PENGASPALAN
1
LAPIS PENETRASI MAKADAM (LAPEN) 5 CM
279
m2
K 618
92,764.86
25,881,395.65
2
MEMBUAT CAMPURAN, MENGHAMPAR DAN PEMADATAN LATASIR 2 CM
930
m2
K 621.a
78,354.82
72,869,985.62
1
LS
420,000.00
JUMLAH
420,000.00 420,000.00
98,751,381.27 99,171,381.27 9,917,138.13
TOTAL PPN 10 % JUMLAH TOTAL TERBILANG
Enam Puluh Tujuh Juta Lima Ratus Ribu Rupiah
Jepara,
MENYETUJUI :
2015
KETUA BPD SLAGI
PETINGGI SLAGI
MASTUR SUHARTOYO
DAMAM Konsultan
RETNO KUSUMAWATI, ST
109,088,519.40
109,080,000.00
DIBULATKAN
DAFTAR ANALISIS HARGA SATUAN PEKERJAAN (AHSP) KABUPATEN JEPARA TAHUN 2015 SWAKELOLA
URAIAN PEKERJAAN
No.
AHSP
I
A. 2.2.1
HARGA SATUAN PEKERJAAN PERSIAPAN
1
A.2.2.1.2
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
A
KODE SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
TENAGA Pekerja
L.01
OH
0.2
60,000.00
12,000.00
Tukang Kayu
L.02
OH
0.4
75,000.00
30,000.00
Kepala Tukang
L.03
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.02
80,000.00
1,600.00 45,200.00
B
BAHAN Bambu
Btg
1.25
13,500.00
16,875.00
Portalnd Semen
Kg
2.5
1,410.00
3,525.00
Seng Gelombang 3" - 5"
Lbr
1.2
80,000.00
96,000.00
Pasir Beton
m3
0.005
270,300.00
1,351.50
Koral Beton
m3
0.009
215,900.00
1,943.10
Kayu 5/7X4m Kayu Hutan
m3
0.072
2,750,000.00
198,000.00
Paku Biasa 2" - 5"
Kg
0.06
12,800.00
768.00
Meni Besi
Kg
0.45
29,000.00
13,050.00 331,512.60
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
376,712.60 2.5%
9,417.82 386,130.42
Overhead & Profit 2
A.2.2.1.4 A
Pengukuran dan Pemasangan Bouwplank Tenaga Pekerja
L.01
OH
0.1
60,000.00
6,000.00
Tukang Kayu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
Mandor
L.04
800.00
OH
0.005
80,000.00
400.00 14,700.00
B
Bahan Kayu 5/7x 4m Kayu Hutan
m3
0.012
2,750,000.00
Paku Biasa 2" - 5"
Kg
0.02
12,800.00
33,000.00 256.00
Kayu Papan 3/20 randu
m3
0.007
897,700.00
6,283.90 39,539.90
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.2.1.9 A
54,239.90 2.5%
Membersihkan Lapangan dan Perataan Tenaga
1,356.00 55,595.90
No.
AHSP
URAIAN PEKERJAAN
KODE SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pekerja
L.01
OH
0.1
60,000.00
6,000.00
Mandor
L.04
OH
0.05
80,000.00
4,000.00 10,000.00
B
Bahan
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
10,000.00 2.5%
250.00 10,250.00
No.
4
AHSP
A.2.2.1.13 A
URAIAN PEKERJAAN
KODE SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Bongkaran Beton Bertulang Tenaga Pekerja
L.01
OH
13.334
60,000.00
800,040.00
Mandor
L.04
OH
0.666
80,000.00
53,280.00 853,320.00
5
B
Bahan
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.2.1.14 A
853,320.00 2.5%
21,333.00 874,653.00
Bongkaran Dinding Tembok Bata Merah Tenaga Pekerja
L.01
OH
6.667
60,000.00
400,020.00
Mandor
L.04
OH
0.333
80,000.00
26,640.00 426,660.00
6
B
Bahan
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.2.1.17 A
AHSP-SDA
426,660.00 2.5%
10,666.50 437,326.50
Bongkaran 1 m3 Pasangan Batu Tenaga Pekerja
L.01
OH
1.850
60,000.00
Mandor
L.04
OH
0.185
80,000.00
111,000.00 14,800.00 125,800.00
7
B
Bahan
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.2.1.18 A
AHSP-SDA
125,800.00 2.5%
3,145.00 128,945.00
Pembuatan Steger/Perancah dari Bambu Tenaga Pekerja
L.01
OH
0.33
60,000.00
19,800.00
Tukang Kayu
L.02
Kepala Tukang
L.03
OH
0.66
75,000.00
49,500.00
OH
0.066
80,000.00
Mandor
L.04
5,280.00
OH
0.0330
80,000.00
2,640.00 77,220.00
B
Bahan Bambu diameter 6 - 8 / 600 cm
Btg
1.250
13,500.00
Paku 5 - 7 cm
Kg
0.350
12,800.00
16,875.00 4,480.00 21,355.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
98,575.00 2.5%
2,464.38 101,039.38
No.
8
AHSP
A.2.2.1.19 A
AHSP-SDA
URAIAN PEKERJAAN
KODE SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
1m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan diameter < 15cm Tenaga Pekerja
L.01
OH
0.0750
60,000.00
4,500.00
Mandor
L.04
OH
0.0075
80,000.00
600.00 5,100.00
B
Bahan Minyak tanah
ltr
0.010
13,500.00
135.00 135.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
5,235.00 2.5%
130.88 5,365.88
No.
URAIAN PEKERJAAN
AHSP
II
A.2.3.1
1
A.2.3.1.1 A
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
HARGA SATUAN PEKERJAAN TANAH Menggali Tanah Biasa Sedalam 1 m TENAGA Pekerja
L.01
OH
0.7500
60,000.00
Mandor
L.04
OH
0.0250
80,000.00
45,000.00 2,000.00 47,000.00
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
47,000.00 2.5%
1,175.00 48,175.00
Overhead & Profit
2
A.2.3.1.2 A
Menggali Tanah Biasa Sedalam 2 m TENAGA Pekerja
L.01
OH
0.9000
60,000.00
Mandor
L.04
OH
0.0450
80,000.00
54,000.00 3,600.00 57,600.00
3
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.3 A
57,600.00 2.5%
1,440.00 59,040.00
Menggali Tanah Biasa Sedalam 3 m TENAGA Pekerja
L.01
OH
1.0500
60,000.00
Mandor
L.04
OH
0.0670
80,000.00
63,000.00 5,360.00 68,360.00
4
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.4 A
68,360.00 2.5%
1,709.00 70,069.00
Menggali Tanah Keras Sedalam 1 m TENAGA Pekerja
L.01
OH
1.0000
60,000.00
Mandor
L.04
OH
0.0320
80,000.00
60,000.00 2,560.00 62,560.00
5
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.5 A
62,560.00 2.5%
1,564.00 64,124.00
Menggali Tanah Cadas Sedalam 1 m TENAGA Pekerja
L.01
OH
1.5000
60,000.00
90,000.00
No.
URAIAN PEKERJAAN
AHSP Mandor
KODE
SAT.
KOEF
L.04
OH
0.0600
HARGA SATUAN Rp 80,000.00
JUMLAH HARGA Rp 4,800.00 94,800.00
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
94,800.00 2.5%
2,370.00 97,170.00
No.
AHSP
6
A.2.3.1.6 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Menggali Tanah Lumpur Sedalam 1 m TENAGA Pekerja
L.01
OH
1.2000
60,000.00
Mandor
L.04
OH
0.0450
80,000.00
72,000.00 3,600.00 75,600.00
7
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.7 A
75,600.00 2.5%
1,890.00 77,490.00
Mengerjakan Striping Tebing Setinggi 1 m TENAGA Pekerja
L.01
OH
0.0500
60,000.00
Mandor
L.04
OH
0.0050
80,000.00
3,000.00 400.00 3,400.00
8
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.8
MembuangTanah sejauh 30 m'
A
3,400.00 2.5%
85.00 3,485.00
TENAGA Pekerja
L.01
OH
0.3300
60,000.00
Mandor
L.04
OH
0.0100
80,000.00
19,800.00 800.00 20,600.00
9
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.9
20,600.00 2.5%
515.00 21,115.00
Pengurugan Kembali Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
A
TENAGA Pekerja
L.01
OH
0.5000
60,000.00
Mandor
L.04
OH
0.0500
80,000.00
30,000.00 4,000.00 34,000.00
10
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.10
Pemadatan Tanah (per 20 cm)
A
34,000.00 2.5%
850.00 11,616.67
TENAGA Pekerja
L.01
OH
0.5000
60,000.00
Mandor
L.04
OH
0.0500
80,000.00
30,000.00 4,000.00 34,000.00
No.
URAIAN PEKERJAAN
AHSP B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
34,000.00 2.5%
850.00 34,850.00
No.
AHSP
11
A.2.3.1.11 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Urugan Pasir TENAGA Pekerja
L.01
OH
0.3000
60,000.00
Mandor
L.04
OH
0.0100
80,000.00
18,000.00 800.00 18,800.00
B
BAHAN Pasir Urug
m3
1.2000
82,000.00
98,400.00 98,400.00
12
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.13 A
117,200.00 2.5%
2,930.00 120,130.00
Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan TENAGA Pekerja
L.01
OH
0.1500
60,000.00
9,000.00
Mandor
L.04
OH
0.0150
80,000.00
1,200.00 10,200.00
B
BAHAN Ijuk
kg
6.0000
23,600.00
141,600.00 141,600.00
13
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.14 A
151,800.00 2.5%
3,795.00 155,595.00
Mengurug Sirtu Padat TENAGA Pekerja
L.01
OH
0.2500
60,000.00
15,000.00
Mandor
L.04
OH
0.0250
80,000.00
2,000.00 17,000.00
B
BAHAN Sirtu
m3
1.2000
82,500.00
99,000.00 99,000.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
14
A.2.3.1.15
SNI
A
116,000.00 2.5%
2,900.00 118,900.00
Urugan tanah biasa dan dipadatkan TENAGA Pekerja
L.01
OH
0.0714
60,000.00
4,284.00
Mandor
L.04
OH
0.0178
80,000.00
1,424.00 5,708.00
B
BAHAN Tanah biasa
m3
1.2000
41,700.00
50,040.00 50,040.00
C
PERALATAN whell loader
jam
0.0178
192,500.00
3,426.50
No.
URAIAN PEKERJAAN
AHSP
HARGA SATUAN Rp
JUMLAH HARGA
SAT.
KOEF
dump truck
jam
0.2289
71,500.00
16,366.35
motor grader
jam
0.0061
236,500.00
1,442.65
vibro roller
jam
0.0100
30,200.00
302.00
water tangker
jam
0.0070
82,500.00
577.50
ls
1.0000
1,500.00
1,500.00
alat bantu
KODE
Rp
23,615.00 D
Jumlah A + B + C
E
Overhead
79,363.00
F
Harga Satuan Pekerjaan (D+E)
2.5%
1,984.08 81,347.08
No.
URAIAN PEKERJAAN
AHSP
15
A.2.3.1.16
SNI
A
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Urugan tanah padas dan dipadatkan PERALATAN Pekerja
L.01
OH
0.0714
60,000.00
4,284.00
Mandor
L.04
OH
0.0178
80,000.00
1,424.00 5,708.00
B
BAHAN Tanah padas
m3
1.2000
56,500.00
67,800.00 67,800.00
C
PERALATAN whell loader
jam
0.0178
dump truck
jam
motor grader
jam
vibro roller water tangker alat bantu
192,500.00
3,426.50
0.2289
71,500.00
16,366.35
0.0061
236,500.00
1,442.65
jam
0.0100
30,200.00
302.00
jam
0.0070
82,500.00
577.50
ls
1.0000
1,500.00
1,500.00 23,615.00
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
16
A.2.3.1.17
SNI
A
97,123.00 2.5%
2,428.08 99,551.08
Pemasangan trucuk bambu Ø 10 cm panjang 6 m PERALATAN Pekerja
L.01
OH
0.1250
60,000.00
7,500.00
Mandor
L.04
OH
0.0125
80,000.00
1,000.00 8,500.00
B
BAHAN Bambu
btg
1.0000
13,500.00
13,500.00
alat pancang
jam
0.1000
9,000.00
900.00
alat bantu
jam
0.0165
250.00
4.13 14,404.13
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
22,904.13 2.5%
572.60 23,476.73
No.
AHSP
III
A.3.2.1.
HARGA SATUAN PEKERJAAN PONDASI
1
A.3.2.1.1
Pemasangan Pondasi Batu Belah 1SP : 3 PP Lokal
A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
TENAGA Pekerja
L.01
OH
1.5
60,000.00
90,000.00
Tukang Batu
L.02
OH
0.750
75,000.00
56,250.00
Kepala Tukang
L.03
OH
0.075
80,000.00
6,000.00
Mandor
L.04
OH
0.075
80,000.00
6,000.00 158,250.00
B
BAHAN Batu Belah 15/20
m3
1.2
143,000.00
171,600.00
Portland Sement
Kg
202
1,410.00
284,820.00
Pasir Pasang
m3
0.485
142,800.00
69,258.00 525,678.00
2
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
683,928.00 2.5%
17,098.20 701,026.20
A.3.2.1.1.1 Pemasangan Pondasi Batu Belah 1SP : 3 PP Muntilan A
TENAGA Pekerja
L.01
OH
1.5
60,000.00
90,000.00
Tukang Batu
L.02
OH
0.750
75,000.00
56,250.00
Kepala Tukang
L.03
OH
0.075
80,000.00
6,000.00
Mandor
L.04
OH
0.075
80,000.00
6,000.00 158,250.00
B
BAHAN Batu Belah 15/20
m3
1.2
143,000.00
171,600.00
Portland Sement
Kg
202
1,410.00
284,820.00
Pasir muntilan
m3
0.485
270,300.00
131,095.50 587,515.50
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
745,765.50 2.5%
18,644.14 764,409.64
Overhead & Profit 3
A.3.2.1.2 A
Pemasangan Pondasi Batu Belah 1SP : 4 PP lokal TENAGA Pekerja
L.01
OH
1.5
60,000.00
90,000.00
Tukang Batu
L.02
OH
0.750
75,000.00
56,250.00
Kepala Tukang
L.03
OH
0.075
80,000.00
6,000.00
Mandor
L.04
OH
0.075
80,000.00
6,000.00 158,250.00
B
BAHAN Batu Belah 15/20
m3
1.2
143,000.00
171,600.00
Portland Sement
Kg
163
1,410.00
229,830.00
Pasir Pasang
m3
0.52
142,800.00
74,256.00 475,686.00
C
PERALATAN
D
Jumlah A + B + C
633,936.00
No.
AHSP
URAIAN PEKERJAAN
E
Overhead
2.5%
F
Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 15,848.40 649,784.40
No. 4
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
A.3.2.1.2.1 Pemasangan Pondasi Batu Belah 1SP : 4 PP Muntilan A
TENAGA Pekerja
L.01
OH
1.5
60,000.00
90,000.00
Tukang Batu
L.02
OH
0.750
75,000.00
56,250.00
Kepala Tukang
L.03
OH
0.075
80,000.00
6,000.00
Mandor
L.04
OH
0.075
80,000.00
6,000.00 158,250.00
B
BAHAN Batu Belah 15/20
m3
1.2
143,000.00
171,600.00
Portland Sement
Kg
163
1,410.00
229,830.00
Pasir Muntilan
m3
0.52
270,300.00
140,556.00 541,986.00
5
C
PERALATAN
D
Jumlah A + B + C
700,236.00
E F
Overhead 2.5% Harga Satuan Pekerjaan (D+E)
17,505.90 717,741.90
A.3.2.1.3 A
Pemasangan Pondasi Batu Belah 1SP : 5 PP lokal TENAGA Pekerja
L.01
OH
1.5
60,000.00
90,000.00
Tukang Batu
L.02
OH
0.750
75,000.00
56,250.00
Kepala Tukang
L.03
OH
0.075
80,000.00
6,000.00
Mandor
L.04
OH
0.075
80,000.00
6,000.00 158,250.00
B
BAHAN Batu Belah 15/20
m3
1.2
143,000.00
171,600.00
Portland Sement
Kg
136
1,410.00
191,760.00
Pasir Pasang
m3
0.544
142,800.00
77,683.20 441,043.20
6
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
599,293.20 2.5%
14,982.33 614,275.53
A.3.2.1.3.1 Pemasangan Pondasi Batu Belah 1SP : 5 PP muntilan A
TENAGA Pekerja
L.01
OH
1.5
60,000.00
90,000.00
Tukang Batu
L.02
OH
0.750
75,000.00
56,250.00
Kepala Tukang
L.03
OH
0.075
80,000.00
6,000.00
Mandor
L.04
OH
0.075
80,000.00
6,000.00 158,250.00
B
BAHAN Batu Belah 15/20
m3
1.2
143,000.00
171,600.00
Portland Sement
Kg
136
1,410.00
191,760.00
Pasir muntilan
m3
0.544
270,300.00
147,043.20 510,403.20
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
668,653.20 2.5%
16,716.33
No.
AHSP F
URAIAN PEKERJAAN Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 685,369.53
No.
AHSP
URAIAN PEKERJAAN
7
A.3.2.1.4
Pemasangan Pondasi Batu Belah 1SP : 6 PP lokal
A
KODE
SAT.
HARGA SATUAN Rp
KOEF
JUMLAH HARGA Rp
TENAGA Pekerja
L.01
OH
1.5
60,000.00
90,000.00
Tukang Batu
L.02
OH
0.750
75,000.00
56,250.00
Kepala Tukang
L.03
OH
0.075
80,000.00
6,000.00
Mandor
L.04
OH
0.075
80,000.00
6,000.00 158,250.00
B
BAHAN Batu Belah 15/20
m3
1.2
143,000.00
171,600.00 164,970.00
Portland Sement
Kg
117
1,410.00
Pasir Pasang
m3
0.561
142,800.00
80,110.80 416,680.80
8
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
574,930.80 2.5%
14,373.27 589,304.07
A.3.2.1.4.1 Pemasangan Pondasi Batu Belah 1SP : 6 PP muntilan A
TENAGA Pekerja
L.01
OH
1.5
60,000.00
90,000.00
Tukang Batu
L.02
OH
0.750
75,000.00
56,250.00
Kepala Tukang
L.03
OH
0.075
80,000.00
6,000.00
Mandor
L.04
OH
0.075
80,000.00
6,000.00 158,250.00
B
BAHAN Batu Belah 15/20
m3
1.2
143,000.00
171,600.00
Portland Sement
Kg
117
1,410.00
164,970.00
Pasir Muntilan
m3
0.561
270,300.00
151,638.30 488,208.30
9
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.3.2.1.5 A
646,458.30 2.5%
16,161.46 662,619.76
Pemasangan Pondasi Batu Belah 1SP : 8 PP lokal Tenaga Pekerja
L.01
OH
1.5
60,000.00
90,000.00
Tukang Batu
L.02
OH
0.750
75,000.00
56,250.00
Kepala Tukang
L.03
OH
0.075
80,000.00
6,000.00
Mandor
L.04
OH
0.075
80,000.00
6,000.00 158,250.00
B
Bahan Batu Belah 15/20
m3
1.2
143,000.00
171,600.00
Portland Sement
Kg
91
1,410.00
128,310.00
Pasir Pasang
m3
0.584
142,800.00
83,395.20 383,305.20
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
541,555.20 2.5%
13,538.88
No.
AHSP F
URAIAN PEKERJAAN Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 555,094.08
No. 10
AHSP
URAIAN PEKERJAAN
KODE
SAT.
HARGA SATUAN Rp
KOEF
JUMLAH HARGA Rp
A.3.2.1.5.1 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan A
Tenaga Pekerja
L.01
OH
1.5
60,000.00
90,000.00
Tukang Batu
L.02
OH
0.750
75,000.00
56,250.00
Kepala Tukang
L.03
OH
0.075
80,000.00
6,000.00
Mandor
L.04
OH
0.075
80,000.00
6,000.00 158,250.00
B
Bahan Batu Belah 15/20
m3
1.2
143,000.00
171,600.00
Portland Sement
Kg
91
1,410.00
128,310.00
Pasir muntilan
m3
0.584
270,300.00
157,855.20 457,765.20
11
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.3.2.1.9 A
616,015.20 2.5%
15,400.38 631,415.58
Pemasang Batu Kosong/Anstamping Tenaga Pekerja
L.01
OH
0.78
60,000.00
46,800.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.39
75,000.00
29,250.00
OH
0.039
80,000.00
3,120.00
Mandor
L.04
OH
0.039
80,000.00
3,120.00 82,290.00
B
Bahan Batu Belah 15/20
m3
1.2
143,000.00
Pasir Urug
m3
0.432
82,000.00
171,600.00 35,424.00 207,024.00
12
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
289,314.00 2.5%
7,232.85 296,546.85
A.3.2.1.11 Pasang Pondasi Sumuran diameter 100 cm A
Tenaga Pekerja
L.01
OH
2.40
60,000.00
144,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.8
75,000.00
60,000.00
OH
0.08
80,000.00
6,400.00
Mandor
L.04
OH
0.119
80,000.00
9,520.00 219,920.00
B
Bahan Batu Belah 15/20 cm
m3
0.45
60,000.00
27,000.00
Portland Semen
Kg
194
1,410.00
273,540.00
Pasir Beton
m3
0.312
270,300.00
84,333.60
Koral Beton
m3
0.468
215,900.00
101,041.20 485,914.80
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
705,834.80 2.5%
17,645.87
No.
AHSP F
URAIAN PEKERJAAN Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 723,480.67
No.
13 SNI
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
A.3.2.1.12 Pasang Pondasi Rolag Trashraam Bata Merah 1 Pc : 3 Ps A
Tenaga Pekerja
L.01
OH
4.50
60,000.00
270,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
1.5
75,000.00
112,500.00
OH
0.15
80,000.00
12,000.00
Mandor
L.04
OH
0.225
80,000.00
18,000.00 412,500.00
B
Bahan bata merah
m3
500.00
530.00
265,000.00
semen / PC
Kg
156
1,410.00
219,960.00
pasir beton
m3
0.330
270,300.00
89,199.00 574,159.00
14 SDA
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
986,659.00 2.5%
24,666.48 1,011,325.48
A.3.2.1.13 Pasang suling-suling A
Tenaga Pekerja
L.01
OH
0.018
60,000.00
1,080.00
Mandor
L.04
OH
0.002
80,000.00
160.00 1,240.00
B
Bahan Pipa PVC 2"
m'
0.341
17,000.00
5,797.00 5,797.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
7,037.00 2.5%
175.93 7,212.93
No.
AHSP
IV
A.4.4.1 1
A.4.4.1.2 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
HARGA SATUAN PEKERJAAN PASANGAN DINDING Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
OH
0.2
75,000.00
15,000.00
Kepala Tukang Batu
L.03
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
140
760.00
106,400.00
Portland Semen (PC)
Kg
32.95
1,410.00
46,459.50
Pasir Muntilan
m3
0.091
270,300.00
24,597.30 177,456.80
2
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.1.3 A
232,456.80 2.5%
5,811.42 238,268.22
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
OH
0.2
75,000.00
15,000.00
Kepala Tukang Batu
L.03
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
140
760.00
106,400.00 37,435.50
Portland Semen (PC)
Kg
26.55
1,410.00
Pasir Muntilan
m3
0.093
270,300.00
25,137.90 168,973.40
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.1.4 A
223,973.40 5,599.34
2.5%
229,572.74
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
OH
0.2
75,000.00
15,000.00
Kepala Tukang Batu
L.03
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
140
760.00
106,400.00
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Portland Semen (PC)
Kg
22.2
1,410.00
31,302.00
Pasir Muntilan
m3
0.102
270,300.00
27,570.60 165,272.60
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
220,272.60 2.5%
5,506.82 225,779.42
No. 4
URAIAN PEKERJAAN
AHSP A.4.4.1.5 A
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
OH
0.2
75,000.00
15,000.00
Kepala Tukang Batu
L.03
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
140
760.00
106,400.00
Portland Semen (PC)
Kg
18.5
1,410.00
26,085.00
Pasir Muntilan
m3
0.122
270,300.00
32,976.60 165,461.60
5
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.1.8 A
220,461.60 5,511.54
2.5%
225,973.14
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
OH
0.1
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah 5 x 11 x 22
Buah
70
760.00
53,200.00
Portland Semen
Kg
14.37
1,410.00
20,261.70
Pasir Muntilan
m3
0.04
270,300.00
10,812.00 84,273.70
6
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.1.9 A
111,773.70 2,794.34
2.5%
114,568.04
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
OH
0.1
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah 5 x 11 x 22 Portland Semen
Buah Kg
70
760.00
53,200.00
11.50
1,410.00
16,215.00
No.
URAIAN PEKERJAAN
AHSP
Pasir Muntilan
KODE
SAT. m3
KOEF 0.043
HARGA SATUAN 270,300.00
JUMLAH HARGA 11,622.90 81,037.90
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
108,537.90 2.5%
2,713.45 111,251.35
No. 7
URAIAN PEKERJAAN
AHSP A.4.4.1.10 A
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah 5 x 11 x 22
Buah
70
760.00
53,200.00
Portland Semen
Kg
9.68
1,410.00
13,648.80
Pasir Muntilan
m3
0.045
270,300.00
12,163.50 79,012.30
8
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.1.11 A
106,512.30 2,662.81
2.5%
109,175.11
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah 5 x 11 x 22
Buah
70
760.00
53,200.00
Portland Semen
Kg
8.32
1,410.00
11,731.20
Pasir Muntilan
m3
0.049
270,300.00
13,244.70 78,175.90
9
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.1.12 A
105,675.90 2,641.90
2.5%
108,317.80
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah 5 x 11 x 22
Buah
70
760.00
53,200.00
Portland Semen
Kg
6.50
1,410.00
9,165.00
Pasir Muntilan
m3
0.05
270,300.00
13,515.00
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA 75,880.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
103,380.00 2.5%
2,584.50 105,964.50
No. 10
URAIAN PEKERJAAN
AHSP A.4.4.1.23 A
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP Tenaga Pekerja
L.01
OH
Tukang Batu
L.02
0.30
60,000.00
18,000.00
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Terawang / Roster
Buah
30
3,300.00
99,000.00
Portland Semen
kg
11
1,410.00
15,510.00
Pasir Muntilan
m3
0.035
270,300.00
9,460.50 123,970.50
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
151,470.50 3,786.76
2.5%
155,257.26
11 A.4.4.1.2.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
Kepala Tukang Batu
L.03
OH
0.2
75,000.00
15,000.00
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
140
760.00
106,400.00
Portland Semen (PC)
Kg
32.95
1,410.00
46,459.50
Pasir Pasang lokal
m3
0.091
142,800.00
12,994.80 165,854.30
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
220,854.30 5,521.36
2.5%
226,375.66
12 A.4.4.1.3.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
Kepala Tukang Batu
L.03
OH
0.2
75,000.00
15,000.00
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
140
760.00
106,400.00
Portland Semen (PC)
Kg
26.55
1,410.00
37,435.50
Pasir Pasang lokal
m3
0.093
142,800.00
13,280.40
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA 157,115.90
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
212,115.90 2.5%
5,302.90 217,418.80
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
13 A.4.4.1.4.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
Kepala Tukang Batu
L.03
OH
0.2
75,000.00
15,000.00
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
140
760.00
106,400.00
Portland Semen (PC)
Kg
22.2
1,410.00
31,302.00
Pasir Pasang lokal
m3
0.102
142,800.00
14,565.60 152,267.60
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
207,267.60 5,181.69
2.5%
212,449.29
14 A.4.4.1.5.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
Kepala Tukang Batu
L.03
OH
0.2
75,000.00
15,000.00
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
140
760.00
106,400.00
Portland Semen (PC)
Kg
18.5
1,410.00
26,085.00
Pasir Pasang lokal
m3
0.122
142,800.00
17,421.60 149,906.60
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
204,906.60 5,122.67
2.5%
210,029.27
15 A.4.4.1.8.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah 5 x 11 x 22
Buah
70
760.00
53,200.00
Portland Semen
Kg
14.37
1,410.00
20,261.70
Pasir Pasang lokal
m3
0.04
142,800.00
5,712.00
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA 79,173.70
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
106,673.70 2.5%
2,666.84 109,340.54
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
16 A.4.4.1.9.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah 5 x 11 x 22
Buah
70
760.00
53,200.00
Portland Semen
Kg
11.50
1,410.00
16,215.00
Pasir Pasang lokal
m3
0.043
142,800.00
6,140.40 75,555.40
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
103,055.40 2,576.39
2.5%
105,631.79
17 A.4.4.1.10.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah 5 x 11 x 22
Buah
70
760.00
53,200.00
Portland Semen
Kg
9.68
1,410.00
13,648.80
Pasir Pasang lokal
m3
0.045
142,800.00
6,426.00 73,274.80
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
100,774.80 2,519.37
2.5%
103,294.17
18 A.4.4.1.11.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah 5 x 11 x 22
Buah
70
760.00
53,200.00
Portland Semen
Kg
8.32
1,410.00
11,731.20
Pasir Pasang lokal
m3
0.049
142,800.00
6,997.20
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA 71,928.40
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
99,428.40 2.5%
2,485.71 101,914.11
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
19 A.4.4.1.12.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah 5 x 11 x 22
Buah
70
760.00
53,200.00
Portland Semen
Kg
6.50
1,410.00
9,165.00
Pasir Pasang lokal
m3
0.05
142,800.00
7,140.00 69,505.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
97,005.00 2,425.13
2.5%
99,430.13
20 A.4.4.1.23.1 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Terawang / Roster
Buah
30
3,300.00
99,000.00
Portland Semen
kg
11
1,410.00
15,510.00
Pasir Pasang lokal
m3
0.035
142,800.00
4,998.00 119,508.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
147,008.00 3,675.20
2.5%
150,683.20
21 A.4.4.1.2.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 3PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
Kepala Tukang Batu
L.03
OH
0.2
75,000.00
15,000.00
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
150
530.00
79,500.00
Portland Semen (PC)
Kg
32.95
1,410.00
46,459.50
Pasir Muntilan
m3
0.091
270,300.00
24,597.30
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA 150,556.80
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
205,556.80 2.5%
5,138.92 210,695.72
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
22 A.4.4.1.3.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 4PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
Kepala Tukang Batu
L.03
OH
0.2
75,000.00
15,000.00
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
150
530.00
79,500.00
Portland Semen (PC)
Kg
26.55
1,410.00
37,435.50
Pasir Muntilan
m3
0.093
270,300.00
25,137.90 142,073.40
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
197,073.40 4,926.84
2.5%
202,000.24
23 A.4.4.1.4.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 5PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
Kepala Tukang Batu
L.03
OH
0.2
75,000.00
15,000.00
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
150
530.00
79,500.00
Portland Semen (PC)
Kg
22.2
1,410.00
31,302.00
Pasir Muntilan
m3
0.102
270,300.00
27,570.60 138,372.60
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
193,372.60 4,834.32
2.5%
229,372.60
24 A.4.4.1.5.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 6PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
Kepala Tukang Batu
L.03
OH
0.2
75,000.00
15,000.00
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
150
530.00
79,500.00
Portland Semen (PC)
Kg
18.5
1,410.00
26,085.00
Pasir Muntilan
m3
0.122
270,300.00
32,976.60
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA 138,561.60
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
193,561.60 2.5%
4,839.04 198,400.64
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
25 A.4.4.1.8.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 3PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah
Buah
75
530.00
39,750.00
Portland Semen
Kg
14.37
1,410.00
20,261.70
Pasir Muntilan
m3
0.04
270,300.00
10,812.00 70,823.70
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
98,323.70 2,458.09
2.5%
100,781.79
26 A.4.4.1.9.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 4PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah
Buah
75
530.00
39,750.00
Portland Semen
Kg
11.50
1,410.00
16,215.00
Pasir Muntilan
m3
0.043
270,300.00
11,622.90 67,587.90
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
95,087.90 2,377.20
2.5%
97,465.10
27 A.4.4.1.10.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 5PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
Kepala Tukang
L.03
OH
0.1
75,000.00
7,500.00
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah
Buah
75
530.00
39,750.00
Portland Semen
Kg
9.68
1,410.00
13,648.80
Pasir Muntilan
m3
0.045
270,300.00
12,163.50
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA 65,562.30
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
93,062.30 2.5%
2,326.56 95,388.86
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
28 A.4.4.1.11.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 6PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
OH
0.1
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah
Buah
75
530.00
39,750.00
Portland Semen
Kg
8.32
1,410.00
11,731.20
Pasir Muntilan
m3
0.049
270,300.00
13,244.70 64,725.90
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
92,225.90 2,305.65
2.5%
94,531.55
29 A.4.4.1.12.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 8PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
OH
0.1
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah
Buah
75
530.00
39,750.00
Portland Semen
Kg
6.50
1,410.00
9,165.00
Pasir Muntilan
m3
0.05
270,300.00
13,515.00 62,430.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
89,930.00 2,248.25
2.5%
92,178.25
30 A.4.4.1.2.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 3PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
OH
0.2
75,000.00
15,000.00
Kepala Tukang Batu
L.03
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah Portland Semen (PC)
Buah Kg
150
530.00
79,500.00
32.95
1,410.00
46,459.50
No.
URAIAN PEKERJAAN
AHSP
Pasir Pasang Lokal
KODE
SAT. m3
KOEF 0.091
HARGA SATUAN 142,800.00
JUMLAH HARGA 12,994.80 138,954.30
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
193,954.30 2.5%
4,848.86 198,803.16
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
31 A.4.4.1.3.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 4PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
OH
0.2
75,000.00
15,000.00
Kepala Tukang Batu
L.03
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
150
530.00
79,500.00 37,435.50
Portland Semen (PC)
Kg
26.55
1,410.00
Pasir Pasang Lokal
m3
0.093
142,800.00
13,280.40 130,215.90
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
185,215.90 4,630.40
2.5%
189,846.30
32 A.4.4.1.4.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 5PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
OH
0.2
75,000.00
15,000.00
Kepala Tukang Batu
L.03
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah
Buah
150
530.00
79,500.00
Portland Semen (PC)
Kg
22.2
1,410.00
31,302.00
Pasir Pasang Lokal
m3
0.102
142,800.00
14,565.60 125,367.60
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
180,367.60 4,509.19
2.5%
216,367.60
33 A.4.4.1.5.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 6PP A
Tenaga Pekerja
L.01
OH
0.6
60,000.00
36,000.00
Tukang Batu
L.02
OH
0.2
75,000.00
15,000.00
Kepala Tukang Batu
L.03
OH
0.02
80,000.00
1,600.00
Mandor
L.04
OH
0.03
80,000.00
2,400.00 55,000.00
B
Bahan Bata Merah Portland Semen (PC)
Buah
150
530.00
79,500.00
Kg
18.5
1,410.00
26,085.00
No.
URAIAN PEKERJAAN
AHSP
Pasir Pasang Lokal
KODE
SAT. m3
KOEF 0.122
HARGA SATUAN 142,800.00
JUMLAH HARGA 17,421.60 123,006.60
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
178,006.60 2.5%
4,450.17 182,456.77
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
34 A.4.4.1.8.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 3PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
OH
0.1
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah
Buah
75
530.00
39,750.00 20,261.70
Portland Semen
Kg
14.37
1,410.00
Pasir Pasang Lokal
m3
0.04
142,800.00
5,712.00 65,723.70
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
93,223.70 2,330.59
2.5%
95,554.29
35 A.4.4.1.9.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 4PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
OH
0.1
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah
Buah
75
530.00
39,750.00
Portland Semen
Kg
11.50
1,410.00
16,215.00
Pasir Pasang Lokal
m3
0.043
142,800.00
6,140.40 62,105.40
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
89,605.40 2,240.14
2.5%
91,845.54
36 A.4.4.1.10.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 5PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
OH
0.1
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah Portland Semen
Buah Kg
75
530.00
39,750.00
9.68
1,410.00
13,648.80
No.
URAIAN PEKERJAAN
AHSP
Pasir Pasang Lokal
KODE
SAT. m3
KOEF 0.045
HARGA SATUAN 142,800.00
JUMLAH HARGA 6,426.00 59,824.80
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
87,324.80 2.5%
2,183.12 89,507.92
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
HARGA SATUAN
KOEF
JUMLAH HARGA
37 A.4.4.1.11.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 6PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
OH
0.1
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah
Buah
75
530.00
39,750.00 11,731.20
Portland Semen
Kg
8.32
1,410.00
Pasir Pasang Lokal
m3
0.049
142,800.00
6,997.20 58,478.40
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
85,978.40 2,149.46
2.5%
88,127.86
38 A.4.4.1.12.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 8PP A
Tenaga Pekerja
L.01
OH
0.30
60,000.00
18,000.00
Tukang Batu
L.02
OH
0.1
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.01
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,500.00
B
Bahan Bata Merah
Buah
75
530.00
39,750.00
Portland Semen
Kg
6.50
1,410.00
9,165.00
Pasir Pasang Lokal
m3
0.05
142,800.00
7,140.00 56,055.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
83,555.00 2.5%
2,088.88 85,643.88
No.
AHSP
V
A.4.4.2 A.4.4.2.3 A
1
B
C D E F
URAIAN PEKERJAAN
KODE
C D E F 3
A.4.4.2.4 A
B
C D E F
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
HARGA SATUAN PEKERJAAN PLESTERAN Pemasangan Plesteran 1 Pc : 3 Pp muntilan Tebal 15 mm Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
Bahan Portland Semen Pasir Muntilan
Kg m3
7.7760 0.0230
1,410.00 270,300.00
10,964.16 6,216.90 17,181.06
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
2 A.4.4.2.3.1 Pemasangan Plesteran 1 Pc : 3 Pp lokal Tebal 15 mm A Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04 B
SAT.
Bahan Portland Semen Pasir lokal
48,831.06 1,220.78 50,051.84
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
Kg m3
7.7760 0.0230
1,410.00 142,800.00
10,964.16 3,284.40 14,248.56
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
45,898.56 1,147.46 47,046.02
Pemasangan Plesteran 1 Pc : 4 Pp muntilan Tebal 15 mm Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
Bahan Portland Semen Pasir Muntilan
Kg m3
6.2400 0.0240
1,410.00 270,300.00
8,798.40 6,487.20 15,285.60
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
4 A.4.4.2.4.1 Pemasangan Plesteran 1 Pc : 4 Pp lokal Tebal 15 mm A Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04
46,935.60 1,173.39 48,108.99
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
No.
AHSP B
C D E F
URAIAN PEKERJAAN Bahan Portland Semen Pasir lokal PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
KODE
SAT.
Kg m3
KOEF
6.2400 0.0240
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
1,410.00 142,800.00
8,798.40 3,427.20 12,225.60 43,875.60 1,096.89 44,972.49
No. 5
URAIAN PEKERJAAN
AHSP A.4.4.2.5 A
B
C D E F
KODE
C D E F 7
A.4.4.2.6 A
B
C D E F
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
Bahan Portland Semen Pasir Muntilan
Kg m3
5.1840 0.0260
1,410.00 270,300.00
7,309.44 7,027.80 14,337.24
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
Bahan Portland Semen Pasir lokal
45,987.24 1,149.68 47,136.92
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
Kg m3
5.1840 0.0260
1,410.00 142,800.00
7,309.44 3,712.80 11,022.24
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
42,672.24 1,066.81 43,739.05
Pemasangan Plesteran 1 Pc : 6 Pp Muntilan Tebal 15 mm Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
Bahan Portland Semen Pasir Muntilan
Kg m3
4.4160 0.0270
1,410.00 270,300.00
6,226.56 7,298.10 13,524.66
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
8 A.4.4.2.6.1 Pemasangan Plesteran 1 Pc : 6 Pp lokal Tebal 15 mm A Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04 B
KOEF
Pemasangan Plesteran 1 Pc : 5 Pp muntilan Tebal 15 mm Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04
6 A.4.4.2.5.1 Pemasangan Plesteran 1 Pc : 5 Pp lokal Tebal 15 mm A Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04 B
SAT.
Bahan
45,174.66 1,129.37 46,304.03
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
No.
AHSP
URAIAN PEKERJAAN Portland Semen Pasir lokal
C D E F
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
KODE
SAT. Kg m3
KOEF 4.4160 0.0270
HARGA SATUAN Rp 1,410.00 142,800.00
JUMLAH HARGA Rp 6,226.56 3,855.60 10,082.16 41,732.16 1,043.30 42,775.46
No. 9
URAIAN PEKERJAAN
AHSP A.4.4.2.7 A
B
C D E F
KODE
C D E F 11
A.4.4.2.8 A
B
C D E F
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
Bahan Portland Semen Pasir Muntilan
Kg m3
3.9360 0.0280
1,410.00 270,300.00
5,549.76 7,568.40 13,118.16
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
Bahan Portland Semen Pasir lokal
44,768.16 1,119.20 45,887.36
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
Kg m3
3.9360 0.0280
1,410.00 142,800.00
5,549.76 3,998.40 9,548.16
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
41,198.16 1,029.95 42,228.11
Pemasangan Plesteran 1 Pc : 8 Pp muntilan Tebal 15 mm Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
Bahan Portland Semen Pasir Muntilan
Kg m3
3.4560 0.0290
1,410.00 270,300.00
4,872.96 7,838.70 12,711.66
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
12 A.4.4.2.8.1 Pemasangan Plesteran 1 Pc : 8 Pp lokal Tebal 15 mm A Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04 B
KOEF
Pemasangan Plesteran 1 Pc : 7 Pp muntilan Tebal 15 mm Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04
10 A.4.4.2.7.1 Pemasangan Plesteran 1 Pc : 7 Pp lokal Tebal 15 mm A Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04 B
SAT.
Bahan
44,361.66 1,109.04 45,470.70
OH OH OH OH
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
No.
AHSP
URAIAN PEKERJAAN Portland Semen Pasir lokal
C D E F
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
KODE
SAT. Kg m3
KOEF 3.4560 0.0290
HARGA SATUAN Rp 1,410.00 142,800.00
JUMLAH HARGA Rp 4,872.96 4,141.20 9,014.16 40,664.16 1,016.60 41,680.76
No.
URAIAN PEKERJAAN
AHSP
13 A.4.4.2.19 A
B
C D E F
KODE
C D E F 15 A.4.4.2.20 A
B
C D E F
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
OH OH OH OH
0.1500 0.0750 0.0080 0.0080
60,000.00 75,000.00 80,000.00 80,000.00
9,000.00 5,625.00 640.00 640.00 15,905.00
Bahan Portland Semen Pasir Muntilan
Kg m3
5.1840 0.0260
1,410.00 270,300.00
7,309.44 7,027.80 14,337.24
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
Bahan Portland Semen Pasir lokal
30,242.24 756.06 30,998.30
OH OH OH OH
0.1500 0.0750 0.0080 0.0080
60,000.00 75,000.00 80,000.00 80,000.00
9,000.00 5,625.00 640.00 640.00 15,905.00
Kg m3
5.1840 0.0260
1,410.00 142,800.00
7,309.44 3,712.80 11,022.24
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
26,927.24 673.18 27,600.42
Pemasangan Plesteran Skoning 1 Pc : 2Pp muntilan Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04
OH OH OH OH
0.0800 0.4000 0.0400 0.0040
60,000.00 75,000.00 80,000.00 80,000.00
4,800.00 30,000.00 3,200.00 320.00 38,320.00
Bahan Portland Semen Pasir Muntilan
Kg m3
0.5000 0.0130
1,410.00 270,300.00
705.00 3,513.90 4,218.90
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
16 A.4.4.2.20.1 Pemasangan Plesteran Skoning 1 Pc : 2Pp lokal A Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04 B
KOEF
Pemasangan Berapen 1 Pc : 5Pp muntilan Tebal 15 mm Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04
14 A.4.4.2.19.1 Pemasangan Berapen 1 Pc : 5Pp lokal Tebal 15 mm A Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04 B
SAT.
Bahan
42,538.90 1,063.47 43,602.37
OH OH OH OH
0.0800 0.4000 0.0400 0.0040
60,000.00 75,000.00 80,000.00 80,000.00
4,800.00 30,000.00 3,200.00 320.00 38,320.00
No.
AHSP
URAIAN PEKERJAAN Portland Semen Pasir lokal
C D E F
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
KODE
SAT. Kg m3
KOEF 0.5000 0.0130
HARGA SATUAN Rp 1,410.00 142,800.00
JUMLAH HARGA Rp 705.00 1,856.40 2,561.40 40,881.40 1,022.04 41,903.44
No.
URAIAN PEKERJAAN
AHSP
17 A.4.4.2.23 A
B
C D E F
C D E F 19 A.4.4.2.24 A
B
C D E F 20 A.4.4.2.26 A
B
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pemasangan Plesteran Ciprat 1Pc : 2 Pp Muntilan Tenaga Pekerja L.01 Tukang batu L.02 Kepala Tukang L.03 Mandor L.04
OH OH OH OH
0.3000 0.1000 0.0100 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 7,500.00 800.00 1,200.00 27,500.00
Bahan Portland Semen Pasir Muntilan
Kg m3
4.3200 0.0060
1,410.00 270,300.00
6,091.20 1,621.80 7,713.00
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
18 A.4.4.2.23.1 Pemasangan Plesteran Ciprat 1Pc : 2 Pp Lokal A Tenaga Pekerja Tukang batu Kepala Tukang Mandor B
KODE
Bahan Portland Semen Pasir Lokal
35,213.00 880.33 36,093.33
L.01 L.02 L.03 L.04
OH OH OH OH
0.3000 0.1000 0.0100 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 7,500.00 800.00 1,200.00 27,500.00
Kg m3
4.3200 0.0060
1,410.00 142,800.00
6,091.20 856.80 6,948.00
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
34,448.00 861.20 35,309.20
Pemasangan Finishing Siar Pasangan Dinding Bata Merah (=20 m') Tenaga Pekerja OH L.01 Tukang batu L.02 OH Kepala Tukang OH L.03 Mandor L.04 OH
0.1500 0.0750 0.0080 0.0080
60,000.00 75,000.00 80,000.00 80,000.00
9,000.00 5,625.00 640.00 640.00 15,905.00
Bahan Portland Semen
3.1080
1,410.00
4,382.28 4,382.28
Kg
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
20,287.28 507.18 20,794.46
Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2PP Muntilan Tenaga Pekerja L.01 OH Tukang batu OH L.02 Kepala Tukang L.03 OH Mandor OH L.04
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
Bahan Pc
6.3400
1,410.00
8,939.40
Kg
No.
AHSP
URAIAN PEKERJAAN PP Muntilan
C D E F
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
KODE
SAT. m3
KOEF 0.0120
HARGA SATUAN Rp 270,300.00
JUMLAH HARGA Rp 3,243.60 12,183.00 43,833.00 1,095.83 44,928.83
No.
URAIAN PEKERJAAN
AHSP
KODE
SAT.
21 A.4.4.2.26.1 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2PP Lokal A Tenaga Pekerja L.01 OH Tukang batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B
C D E F 22 A.4.4.2.27 A
B
C D E F
Bahan Pc PP Lokal
Kg m3
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
0.3000 0.1500 0.0150 0.0150
60,000.00 75,000.00 80,000.00 80,000.00
18,000.00 11,250.00 1,200.00 1,200.00 31,650.00
6.3400 0.0120
1,410.00 142,800.00
8,939.40 1,713.60 10,653.00
PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E) Pemasangan Acian Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen PERALATAN Jumlah A + B + C 2.5% Overhead Harga Satuan Pekerjaan (D+E)
42,303.00 1,057.58 43,360.58
L.01 L.02 L.03 L.04
OH OH OH OH
0.2000 0.1000 0.0100 0.0100
60,000.00 75,000.00 80,000.00 80,000.00
12,000.00 7,500.00 800.00 800.00 21,100.00
Kg
3.2500
1,410.00
4,582.50 4,582.50 25,682.50 642.06 26,324.56
No.
AHSP
VI
A.4.6.1
1
A.4.6.1.1 A
URAIAN PEKERJAAN HARGA SATUAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
K A Y U
Pembuatan & Pemasangan 1 m3 Kosen Pintu & Jendela Kayu Bengkirai Tenaga Pekerja
L.01
OH
7.0000
60,000.00
420,000.00
Tukang Kayu
L.02
OH
21.0000
75,000.00
1,575,000.00
Kepala Tukang
L.03
OH
2.1000
80,000.00
168,000.00
Mandor
L.04
OH
0.3500
80,000.00
28,000.00 2,191,000.00
B
Bahan
B
Kayu Klas I (bengkirai)
m3
1.1000
8,648,600.00
9,513,460.00
Paku Biasa 2" - 5 "
kg
1.2500
12,800.00
16,000.00
Lem Kayu
kg
1.0000
12,800.00
12,800.00 9,542,260.00
2
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.2 A
11,733,260.00 2.5%
293,331.50 12,026,591.50
Pembuatan & Pemasangan 1 m3 Kosen Pintu & Jendela Kayu kamfer Tenaga Pekerja
L.01
OH
6.0000
60,000.00
360,000.00
Tukang Kayu
L.02
OH
18.0000
75,000.00
1,350,000.00
Kepala Tukang
L.03
OH
1.8000
80,000.00
144,000.00
Mandor
L.04
OH
0.3000
80,000.00
24,000.00 1,878,000.00
B
Bahan Kayu Klas II (kamfer)
m3
1.2000
8,116,300.00
9,739,560.00
Paku Biasa 2" - 5 "
kg
1.2500
12,800.00
16,000.00
Lem Kayu
kg
1.0000
12,800.00
12,800.00 9,768,360.00
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.5 A
11,646,360.00 2.5%
291,159.00 11,937,519.00
Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Jati Tenaga Pekerja
L.01
OH
1.0000
60,000.00
60,000.00
Tukang Kayu
L.02
OH
3.0000
75,000.00
225,000.00
Kepala Tukang
L.03
OH
0.3000
80,000.00
24,000.00
Mandor
L.04
OH
0.0500
80,000.00
4,000.00 313,000.00
B
Bahan Kayu jati
m3
0.0400
16,875,000.00
Lem Kayu
kg
0.0500
12,800.00
675,000.00 640.00 675,640.00
C
PERALATAN
D
Jumlah A + B + C
988,640.00
No.
AHSP
URAIAN PEKERJAAN
E
Overhead
2.5%
F
Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp 24,716.00 1,013,356.00
No. 4
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
A.4.6.1.5.1 Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Kamfer A
Tenaga Pekerja
L.01
OH
1.0000
60,000.00
60,000.00
Tukang Kayu
L.02
OH
3.0000
75,000.00
225,000.00
Kepala Tukang
L.03
OH
0.3000
80,000.00
24,000.00
Mandor
L.04
OH
0.0500
80,000.00
4,000.00 313,000.00
B
Bahan Kayu kamfer
m3
0.0400
8,116,300.00
324,652.00
Lem Kayu
kg
0.0500
12,800.00
640.00 325,292.00
5
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.6 A
638,292.00 2.5%
15,957.30 654,249.30
Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Jati Tenaga Pekerja
L.01
OH
0.8000
60,000.00
48,000.00
Tukang Kayu
L.02
OH
2.4000
75,000.00
180,000.00
Kepala Tukang
L.03
OH
0.2400
80,000.00
19,200.00
Mandor
L.04
OH
0.0400
80,000.00
3,200.00 250,400.00
B
Bahan Kayu jati, papan
m3
0.0240
16,875,000.00
405,000.00
Lem Kayu
kg
0.3000
12,800.00
3,840.00 408,840.00
6
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
659,240.00 2.5%
16,481.00 675,721.00
A.4.6.1.6.1 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu kamfer A
Tenaga Pekerja
L.01
OH
0.8000
60,000.00
48,000.00
Tukang Kayu
L.02
OH
2.4000
75,000.00
180,000.00
Kepala Tukang
L.03
OH
0.2400
80,000.00
19,200.00
Mandor
L.04
OH
0.0400
80,000.00
3,200.00 250,400.00
B
Bahan Kayu kamfer
m3
0.0240
8,116,300.00
194,791.20
Lem Kayu
kg
0.3000
12,800.00
3,840.00 198,631.20
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
449,031.20 2.5%
11,225.78 460,256.98
No.
AHSP
7
A.4.6.1.8 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pembuatan&Pemasangan 1 m2 Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm) Tenaga Pekerja
L.01
OH
0.7000
60,000.00
42,000.00
Tukang Kayu
L.02
OH
2.1000
75,000.00
157,500.00
Kepala Tukang
L.03
OH
0.2100
80,000.00
16,800.00
Mandor
L.04
OH
0.0350
80,000.00
2,800.00 219,100.00
B
Bahan Kayu Klas II (Kamfer)
m3
0.0250
8,116,300.00
202,907.50
Paku Biasa 1/2" - 1"
Kg
0.0300
12,800.00
384.00
Lem Kayu
Ltr
0.5000
12,800.00
6,400.00
Plywood tebal 4 mm uk.90x220cm
Lbr
1.0000
72,200.00
72,200.00 281,891.50
8
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.9 A
500,991.50 2.5%
12,524.79 513,516.29
Pembuatan&Pemasangan 1 m2 Pintu Plywood rangkap, rangka expose kayu klas I atau II Tenaga Pekerja
L.01
OH
0.8000
60,000.00
48,000.00
Tukang Kayu
L.02
OH
2.4000
75,000.00
180,000.00
Kepala Tukang
L.03
OH
0.2400
80,000.00
19,200.00
Mandor
L.04
OH
0.0400
80,000.00
3,200.00 250,400.00
B
Bahan Kayu Klas II (Kamfer)
m3
0.0256
8,116,300.00
207,777.28
Paku Biasa 1/2" - 1"
Kg
0.0300
12,800.00
384.00
Lem Kayu
Ltr
0.5000
12,800.00
6,400.00
Plywood tebal 4 mm uk.90x220cm
Lbr
1.0000
72,200.00
72,200.00 286,761.28
9
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.10 A
537,161.28 2.5%
13,429.03 550,590.31
Pembuatan & Pemasangan 1 m2 Jalusi mati Kosen Kayu Klas I atau II Tenaga Pekerja
L.01
OH
0.6700
60,000.00
40,200.00
Tukang Kayu
L.02
OH
2.0000
75,000.00
150,000.00
Kepala Tukang
L.03
OH
0.2000
80,000.00
16,000.00
Mandor
L.04
OH
0.3350
80,000.00
26,800.00 233,000.00
B
Bahan Kayu Klas I Bengkirai)
m3
0.0600
8,648,600.00
Paku Biasa 1/2" - 1"
Kg
0.1500
12,800.00
518,916.00 1,920.00 520,836.00
C
PERALATAN
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA Rp 753,836.00
2.5%
18,845.90 772,681.90
No.
10
AHSP
A.4.6.1.11 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pembuatan & Pemasangan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I Tenaga Pekerja
L.01
OH
0.8000
60,000.00
48,000.00
Tukang Kayu
L.02
OH
2.4000
75,000.00
180,000.00
Kepala Tukang
L.03
OH
0.2400
80,000.00
19,200.00
Mandor
L.04
OH
0.0400
80,000.00
3,200.00 250,400.00
B
Bahan Kayu Klas I (Bengkirai)
m3
0.0250
8,648,600.00
216,215.00
Paku Biasa 1/2" - 1"
Kg
0.0300
12,800.00
384.00
Lem Kayu
kg
0.3000
12,800.00
3,840.00
Teakwood (90 x 220) cm x 4 mm
Lbr
1.0000
72,200.00
72,200.00 292,639.00
11
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.12 A
543,039.00 2.5%
13,575.98 556,614.98
Pembuatan&Pemasangan 1 m2 Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II Tenaga Pekerja
L.01
OH
0.8500
60,000.00
51,000.00
Tukang Kayu
L.02
OH
2.5500
75,000.00
191,250.00
Kepala Tukang
L.03
OH
0.2550
80,000.00
20,400.00
Mandor
L.04
OH
0.0430
80,000.00
3,440.00 266,090.00
B
Bahan Kayu Klas II (Kamfer)
m3
0.0250
8,116,300.00
202,907.50
Paku Biasa 1/2" - 1"
Kg
0.0300
12,800.00
384.00
Lem Kayu
kg
0.0800
12,800.00
1,024.00
Teakwood (90 x 220) cm x 4 mm
Lbr
1.0000
72,200.00
72,200.00
Formika
Lbr
0.5000
58,000.00
29,000.00 305,515.50
12
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.13 A
571,605.50 2.5%
14,290.14 585,895.64
Pembuatan&Memasang 1 m3 Konstruksi Kuda-kuda Konvensional Kayu Bengkirai Tenaga Pekerja
L.01
OH
4.0000
60,000.00
240,000.00
Tukang Kayu
L.02
OH
12.0000
75,000.00
900,000.00
Kepala Tukang
L.03
OH
1.2000
80,000.00
96,000.00
Mandor
L.04
OH
0.2000
80,000.00
16,000.00 1,252,000.00
B
Bahan Kayu Bengkirai
m3
1.1000
8,648,600.00
9,513,460.00
Besi Strip
Kg
15.0000
20,200.00
303,000.00
No.
AHSP
URAIAN PEKERJAAN Paku Biasa 2" - 5"
KODE
SAT. Kg
KOEF 5.6000
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
12,800.00
71,680.00 9,888,140.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
11,140,140.00 2.5%
278,503.50 11,418,643.50
No.
13
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
A.4.6.1.13.1 Pembuatan&Memasang 1 m3 Konstruksi Kuda-kuda Konvensional Kayu Kruing A
Tenaga Pekerja
L.01
OH
4.0000
60,000.00
240,000.00
Tukang Kayu
L.02
OH
12.0000
75,000.00
900,000.00
Kepala Tukang
L.03
OH
1.2000
80,000.00
96,000.00
Mandor
L.04
OH
0.2000
80,000.00
16,000.00 1,252,000.00
B
Bahan Kayu Kruing
m3
1.1000
6,582,500.00
7,240,750.00
Besi Strip
Kg
15.0000
20,200.00
303,000.00
Paku Biasa 2" - 5"
Kg
5.6000
12,800.00
71,680.00 7,615,430.00
14
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.15 A
8,867,430.00 2.5%
221,685.75 9,089,115.75
Pemasangan konstruksi 1 m3 Gording, Kayu bengkirai Tenaga Pekerja
L.01
OH
6.7000
60,000.00
402,000.00
Tukang Kayu
L.02
OH
20.1000
75,000.00
1,507,500.00
Kepala Tukang
L.03
OH
2.0100
80,000.00
160,800.00
Mandor
L.04
OH
0.3350
80,000.00
26,800.00 2,097,100.00
B
Bahan Kayu Klas I (Bengkirai)
m3
1.1000
8,648,600.00
9,513,460.00
Besi Strip
Kg
15.0000
20,200.00
303,000.00
Paku Biasa 2" - 5"
Kg
3.0000
12,800.00
38,400.00 9,854,860.00
15
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
11,951,960.00 2.5%
298,799.00 12,250,759.00
A.4.6.1.15.1 Pemasangan konstruksi 1 m3 Gording, Kayu Kruing A
Tenaga Pekerja
L.01
OH
6.7000
60,000.00
402,000.00
Tukang Kayu
L.02
OH
20.1000
75,000.00
1,507,500.00
Kepala Tukang
L.03
OH
2.0100
80,000.00
160,800.00
Mandor
L.04
OH
0.3350
80,000.00
26,800.00 2,097,100.00
B
Bahan Kayu Klas Kruing
m3
1.1000
6,582,500.00
7,240,750.00
Besi Strip
Kg
15.0000
20,200.00
303,000.00
Paku Biasa 2" - 5"
Kg
3.0000
12,800.00
38,400.00 7,582,150.00
C
PERALATAN
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA Rp 9,679,250.00
2.5%
241,981.25 9,921,231.25
No.
AHSP
16
A.4.6.1.16 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu Klas II Tenaga Pekerja
L.01
OH
0.1000
60,000.00
6,000.00
Tukang Kayu
L.02
OH
0.1000
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.0100
80,000.00
800.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 14,700.00
B
Bahan Kayu Klas II (Bengkirai), Kaso-kaso (5x7) cm
m3
0.0140
8,648,600.00
121,080.40
Reng (2x3) cm bengkirai
m3
0.0036
8,648,600.00
31,134.96
Paku Biasa 2" - 5"
Kg
0.2500
12,800.00
3,200.00 155,415.36
17
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.17 A
170,115.36 2.5%
4,252.88 174,368.24
Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu Klas II Tenaga Pekerja
L.01
OH
0.1000
60,000.00
6,000.00
Tukang Kayu
L.02
OH
0.1000
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.0100
80,000.00
800.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 14,700.00
B
Bahan Kayu Klas II (Bengkirai), Kaso-kaso (5x7) cm
m3
0.0140
8,648,600.00
121,080.40
Reng (2x3) cm bengkirai
m3
0.0072
8,648,600.00
62,269.92
Paku Biasa 2" - 5"
Kg
0.2500
12,800.00
3,200.00 186,550.32
18
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.19 A
201,250.32 2.5%
5,031.26 206,281.58
Pemasangan 1 m2 Rangka Langit-langit (50x1,00) m, kayu Klas II atau III Tenaga Pekerja
L.01
OH
0.1500
60,000.00
9,000.00
Tukang Kayu
L.02
OH
0.3000
75,000.00
22,500.00
Kepala Tukang
L.03
OH
0.0300
80,000.00
2,400.00
Mandor
L.04
OH
0.0750
80,000.00
6,000.00 39,900.00
B
Bahan Kayu Klas II (Kruing)
m3
0.0154
6,582,500.00
101,370.50
Paku Biasa 2" - 5"
Kg
0.2000
12,800.00
2,560.00 103,930.50
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
143,830.50 2.5%
3,595.76
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
F
Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA Rp 147,426.26
No.
19
AHSP
A.4.6.1.20 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pemasangan 1 m2 Rangka Langit-langit (60x60) cm, kayu Klas II atau III Tenaga Pekerja
L.01
OH
0.2000
60,000.00
12,000.00
Tukang Kayu
L.02
OH
0.3000
75,000.00
22,500.00
Kepala Tukang
L.03
OH
0.0300
80,000.00
2,400.00
Mandor
L.04
OH
0.0100
80,000.00
800.00 37,700.00
B
Bahan Kayu Klas II (Kruing)
m3
0.0163
6,582,500.00
Paku Biasa 2" - 5"
Kg
0.2500
12,800.00
107,294.75 3,200.00 110,494.75
20
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.21 A
148,194.75 2.5%
3,704.87 151,899.62
Pemasangan 1 m' Listplank Uk. (3x20)cm Kayu klas I atau II Tenaga Pekerja
L.01
OH
0.1000
60,000.00
6,000.00
Tukang Kayu
L.02
OH
0.2000
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.0200
80,000.00
1,600.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 23,000.00
B
Bahan Kayu klas I Bengkirai)
m3
0.0108
8,648,600.00
Paku Biasa 2" - 5"
Kg
0.1000
12,800.00
93,404.88 1,280.00 94,684.88
21
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.22 A
117,684.88 2.5%
2,942.12 120,627.00
Pemasangan 1 m' Listplank Uk. (3x30)cm Kayu klas I atau klas II Tenaga Pekerja
L.01
OH
0.1000
60,000.00
6,000.00
Tukang Kayu
L.02
OH
0.2000
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.0200
80,000.00
1,600.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 23,000.00
B
Bahan Kayu klas I Bengkirai)
m3
0.0110
8,648,600.00
Paku Biasa 2" - 5"
Kg
0.0500
12,800.00
95,134.60 640.00 95,774.60
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
118,774.60 2.5%
2,969.37 121,743.97
No.
22
AHSP
A.4.6.1.23 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pemasangan 1 m2 Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III Tenaga Pekerja
L.01
OH
0.1500
60,000.00
9,000.00
Tukang Kayu
L.02
OH
0.4500
75,000.00
33,750.00
Kepala Tukang
L.03
OH
0.0450
80,000.00
3,600.00
Mandor
L.04
OH
0.0080
80,000.00
640.00 46,990.00
B
Bahan Kayu klas II (Kruing)
m3
0.0280
6,582,500.00
Paku Biasa 2" - 5"
Kg
0.1500
12,800.00
184,310.00 1,920.00 186,230.00
23
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.24 A
233,220.00 2.5%
5,830.50 239,050.50
Pemasangan 1 m2 Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II Tenaga Pekerja
L.01
OH
0.1500
60,000.00
9,000.00
Tukang Kayu
L.02
OH
0.4500
75,000.00
33,750.00
Kepala Tukang
L.03
OH
0.0450
80,000.00
3,600.00
Mandor
L.04
OH
0.0080
80,000.00
640.00 46,990.00
B
Bahan Kayu klas II (Kruing)
m3
0.0280
6,582,500.00
184,310.00
Paku Biasa 2" - 5"
Kg
0.1500
12,800.00
1,920.00
Teakwood 120 x 240 cm tebal 4mm
Lbr
0.8600
72,200.00
62,092.00
Lem
Ltr
0.5600
12,800.00
7,168.00 255,490.00
24
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.25 A
302,480.00 2.5%
7,562.00 310,042.00
Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap Rangka Kayu Klas II Tenaga Pekerja
L.01
OH
0.0200
60,000.00
1,200.00
Tukang Kayu
L.02
OH
0.6000
75,000.00
45,000.00
Kepala Tukang
L.03
OH
0.0600
80,000.00
4,800.00
Mandor
L.04
OH
0.0100
80,000.00
800.00 51,800.00
B
Bahan Kayu klas II (Kruing)
m3
0.0280
6,582,500.00
184,310.00
Paku Biasa 2" - 5"
Kg
0.1500
12,800.00
1,920.00
Plywood 120 x 240 cm tebal 4mm
Lbr
0.8600
72,200.00
62,092.00
Lem
Ltr
0.5600
12,800.00
7,168.00 255,490.00
No.
AHSP
URAIAN PEKERJAAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp 307,290.00
2.5%
7,682.25 314,972.25
No.
25
AHSP
A.4.6.1.26 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pemasangan 1 m2 Dinding Lambriziring dari Papan klas I Tenaga Pekerja
L.01
OH
0.6000
60,000.00
36,000.00
Tukang Kayu
L.02
OH
1.8000
75,000.00
135,000.00
Kepala Tukang
L.03
OH
0.1800
80,000.00
14,400.00
Mandor
L.04
OH
0.0300
80,000.00
2,400.00 187,800.00
B
Bahan Kayu klas I (Jati)
m3
0.0070
16,875,000.00
118,125.00
Paku Biasa 2" - 5"
Kg
0.1000
12,800.00
1,280.00
Paku Sekrup 3,5"
Kg
0.1500
13,000.00
1,950.00 121,355.00
26
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.29 A
SNI
309,155.00 2.5%
7,728.88 316,883.88
Pasang Kasau & Reng Kayu Bengkirai Tenaga Pekerja
L.01
OH
0.1000
60,000.00
6,000.00
Tukang Kayu
L.02
OH
0.1000
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.0100
80,000.00
800.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 14,700.00
B
Bahan Kayu Bengkirai
m3
0.0120
8,648,600.00
103,783.20
Paku Biasa 2" - 5"
Kg
0.1500
12,800.00
1,920.00 105,703.20
27
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.1.30 A
SNI
120,403.20 2.5%
3,010.08 123,413.28
Pasang Kasau & Reng Kayu Kruing Tenaga Pekerja
L.01
OH
0.1000
60,000.00
6,000.00
Tukang Kayu
L.02
OH
0.1000
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.0100
80,000.00
800.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 14,700.00
B
Bahan Kayu Kruing
m3
0.0120
6,582,500.00
78,990.00
Paku Biasa 2" - 5"
Kg
0.1500
12,800.00
1,920.00 80,910.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
95,610.00 2.5%
2,390.25
No.
AHSP F
URAIAN PEKERJAAN Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp 98,000.25
No.
AHSP
28
A.4.6.1.31 A
SNI
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pasang Papan sirip Tenaga Pekerja
L.01
OH
0.1000
60,000.00
6,000.00
Tukang Kayu
L.02
OH
0.1000
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.0100
80,000.00
800.00
Mandor
L.04
OH
0.0500
80,000.00
4,000.00 18,300.00
B
Bahan Kayu Kruing
m3
0.0050
6,582,500.00
32,912.50
Paku Biasa 2" - 5"
Kg
0.0500
12,800.00
640.00 33,552.50
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
51,852.50 2.5%
1,296.31 53,148.81
No.
AHSP
VII
A.4.1.1
1
A.4.1.1.1 A
URAIAN PEKERJAAN
HARGA SATUAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
BETON
Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 Tenaga Pekerja
L.01
OH
1.650
60,000.00
99,000.00
Tukang Batu
L.02
OH
0.275
75,000.00
20,625.00
Kepala Tukang
L.03
OH
0.028
80,000.00
2,240.00
Mandor
L.04
OH
0.083
80,000.00
6,640.00 128,505.00
B
Bahan Portland Semen
Kg
247.000
1,410.00
348,270.00
Pasir Beton
Kg
869.000
193.07
167,779.07
Kerikil (maksimum 30 mm)
Kg
999.000
159.93
159,766.00
Air
ltr
215.000
20.00
4,300.00 680,115.07
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
808,620.07 2.5%
A.4.1.1.2 A
828,835.57 12.5%
Overhead & Profit 2
20,215.50
Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 Tenaga Pekerja
L.01
OH
1.650
60,000.00
99,000.00
Tukang Batu
L.02
OH
0.275
75,000.00
20,625.00
Kepala Tukang
L.03
OH
0.028
80,000.00
2,240.00
Mandor
L.04
OH
0.083
80,000.00
6,640.00 128,505.00
B
Bahan Portland Semen
Kg
276.000
1,410.00
389,160.00
Pasir Beton
kg
828.000
193.07
159,863.14
Kerikil (maksimum 30 mm)
kg
1012.000
159.93
161,845.04
Air
ltr
215.000
20.00
4,300.00 715,168.18
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.3 A
843,673.18 2.5%
21,091.83 864,765.01
Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 Tenaga Pekerja
L.01
OH
1.650
60,000.00
99,000.00
Tukang Batu
L.02
OH
0.275
75,000.00
20,625.00
Kepala Tukang
L.03
OH
0.028
80,000.00
2,240.00
Mandor
L.04
OH
0.083
80,000.00
6,640.00 128,505.00
B
Bahan Portland Semen
Kg
299.000
1,410.00
421,590.00
Pasir Beton
kg
799.000
193.07
154,264.07
Kerikil (maksimum 30 mm)
kg
1017.000
159.93
162,644.67
Air
ltr
215.000
20.00
4,300.00 742,798.74
C
PERALATAN
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
2.5%
JUMLAH HARGA Rp 871,303.74 21,782.59 893,086.33
No.
AHSP
4
A.4.1.1.4 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, Tenaga
HARGA SATUAN Rp w/c = 0,87
JUMLAH HARGA Rp
Pekerja
L.01
OH
1.200
60,000.00
72,000.00
Tukang Batu
L.02
OH
0.200
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.020
80,000.00
1,600.00
Mandor
L.04
OH
0.060
80,000.00
4,800.00 93,400.00
B
Bahan Portland Semen
Kg
230.000
1,410.00
324,300.00
Pasir Beton Kerikil (maksimum 30 mm)
Kg
893.000
193.07
172,412.79
Kg
1027.000
159.93
Air
164,243.93
ltr
200.000
20.00
4,000.00 664,956.71
5
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.5 A
758,356.71 2.5%
18,958.92 777,315.63
Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 Tenaga Pekerja
L.01
OH
1.650
60,000.00
99,000.00
Tukang Batu
L.02
OH
0.275
75,000.00
20,625.00
Kepala Tukang
L.03
OH
0.028
80,000.00
2,240.00
Mandor
L.04
OH
0.083
80,000.00
6,640.00 128,505.00
B
Bahan Portland Semen
Kg
326.000
1,410.00
459,660.00
Pasir Beton
Kg
760.000
193.07
146,734.29
Kerikil (maksimum 30 mm)
Kg
1029.000
159.93
164,563.78
Air
ltr
215.000
20.00
4,300.00 775,258.06
6
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.6 A
903,763.06 2.5%
22,594.08 926,357.14
Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 Tenaga Pekerja
L.01
OH
1.650
60,000.00
99,000.00
Tukang Batu
L.02
OH
0.275
75,000.00
20,625.00
Kepala Tukang
L.03
OH
0.028
80,000.00
2,240.00
Mandor
L.04
OH
0.083
80,000.00
6,640.00 128,505.00
B
Bahan Portland Semen
Kg
352.000
1,410.00
496,320.00
Pasir Beton
Kg
731.000
193.07
141,135.21
Kerikil (maksimum 30 mm)
Kg
1031.000
159.93
164,883.63
Air
ltr
215.000
20.00
4,300.00 806,638.84
C
PERALATAN
D
Jumlah A + B + C
935,143.84
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
E
Overhead
2.5%
F
Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA Rp 23,378.60 958,522.44
No.
AHSP
7
A.4.1.1.7 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 Tenaga Pekerja
L.01
OH
1.650
60,000.00
99,000.00
Tukang Batu
L.02
OH
0.275
75,000.00
20,625.00
Kepala Tukang
L.03
OH
0.028
80,000.00
2,240.00
Mandor
L.04
OH
0.083
80,000.00
6,640.00 128,505.00
B
Bahan Portland Semen
Kg
371.000
1,410.00
523,110.00
Pasir Beton
Kg
698.000
193.07
134,763.86
Kerikil (maksimum 30 mm)
Kg
1047.000
159.93
167,442.44
Air
ltr
215.000
20.00
4,300.00 829,616.30
8
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.8 A
958,121.30 2.5%
23,953.03 982,074.33
Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 Tenaga Pekerja
L.01
OH
1.650
60,000.00
99,000.00
Tukang Batu
L.02
OH
0.275
75,000.00
20,625.00
Kepala Tukang
L.03
OH
0.028
80,000.00
2,240.00
Mandor
L.04
OH
0.083
80,000.00
6,640.00 128,505.00
B
Bahan Portland Semen
Kg
384.000
1,410.00
541,440.00
Pasir Beton
Kg
692.000
193.07
133,605.43
Kerikil (maksimum 30 mm)
Kg
1039.000
159.93
166,163.04
Air
ltr
215.000
20.00
4,300.00 845,508.47
9
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.9 A
974,013.47 2.5%
24,350.34 998,363.80
Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 Tenaga Pekerja
L.01
OH
1.650
60,000.00
99,000.00
Tukang Batu
L.02
OH
0.275
75,000.00
20,625.00
Kepala Tukang
L.03
OH
0.028
80,000.00
2,240.00
Mandor
L.04
OH
0.083
80,000.00
6,640.00 128,505.00
B
Bahan Portland Semen
Kg
406.000
1,410.00
572,460.00
Pasir Beton Kerikil (maksimum 30 mm)
kg
684.000
193.07
132,060.86
kg
1026.000
159.93
Air
164,084.00
ltr
215.000
20.00
4,300.00 872,904.86
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
1,001,409.86 2.5%
25,035.25
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
F
Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA Rp 1,026,445.10
No.
AHSP
10
A.4.1.1.10 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 Tenaga Pekerja
L.01
OH
1.650
60,000.00
99,000.00
Tukang Batu
L.02
OH
0.275
75,000.00
20,625.00
Kepala Tukang
L.03
OH
0.028
80,000.00
2,240.00
Mandor
L.04
OH
0.083
80,000.00
6,640.00 128,505.00
B
Bahan Portland Semen
Kg
413.000
1,410.00
582,330.00
Pasir Beton Kerikil (maksimum 30 mm)
Kg
681.000
193.07
131,481.64
Kg
1021.000
159.93
Air
163,284.37
ltr
215.000
20.00
4,300.00 881,396.01
11
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.17 A
1,009,901.01 2.5%
25,247.53 1,035,148.54
Pembesian 10 kg dg Besi Polos atau Besi Ulir Tenaga Pekerja
L.01
OH
0.070
60,000.00
4,200.00
Tukang Besi
L.02
OH
0.070
75,000.00
5,250.00
Kepala Tukang
L.03
OH
0.007
80,000.00
560.00
Mandor
L.04
OH
0.004
80,000.00
320.00 10,330.00
B
Bahan Besi Beton (polos/ulir)
Kg
10.500
9,180.00
96,390.00
Kawat Beton
Kg
0.150
15,300.00
2,295.00 98,685.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
109,015.00 2.5%
2,725.38 111,740.38
Jadi untuk pembesian 1 kg dibagi 10 12
A.4.1.1.19 A
11,174.04
Jaring Kawat baja/Wire Mesh / 10 kg Tenaga Pekerja
L.01
OH
0.025
60,000.00
1,500.00
Tukang Besi
L.02
OH
0.025
75,000.00
1,875.00
Kepala Tukang
L.03
OH
0.002
80,000.00
160.00
Mandor
L.04
OH
0.001
80,000.00
80.00 3,615.00
B
Bahan Jaring Kawat Baja dilas/wiremesh
Kg
10.200
17,000.00
Kawat Beton
Kg
0.050
15,300.00
173,400.00 765.00 174,165.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
177,780.00 2.5%
Jadi untuk pembesian 1 kg dibagi 10
4,444.50 182,224.50 18,222.45
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
No.
AHSP
13
A.4.1.1.20 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Memasang Bekisting untuk Pondasi Tenaga Pekerja
L.01
OH
0.520
60,000.00
31,200.00
Tukang Kayu
L.02
OH
0.260
75,000.00
19,500.00
Kepala Tukang
L.03
OH
0.026
80,000.00
2,080.00
Mandor
L.04
OH
0.026
80,000.00
2,080.00 54,860.00
B
Bahan Kayu Klas III (Randu)
m3
0.040
897,700.00
35,908.00
Paku Biasa 2" - 5"
Kg
0.300
12,800.00
3,840.00
Minyak Bekisting
Ltr
0.100
10,000.00
1,000.00 40,748.00
14
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.21 A
95,608.00 2.5%
2,390.20 97,998.20
Memasang Bekisting untuk Sloof Tenaga Pekerja
L.01
OH
0.520
60,000.00
31,200.00
Tukang Kayu
L.02
OH
0.260
75,000.00
19,500.00
Kepala Tukang
L.03
OH
0.026
80,000.00
2,080.00
Mandor
L.04
OH
0.026
80,000.00
2,080.00 54,860.00
B
Bahan Kayu Klas III (Randu)
m3
0.045
897,700.00
40,396.50
Paku Biasa 2" - 5"
Kg
0.300
12,800.00
3,840.00
Minyak Bekisting
Ltr
0.100
10,000.00
1,000.00 45,236.50
15
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.22 A
100,096.50 2.5%
2,502.41 102,598.91
Memasang Bekisting untuk Kolom Tenaga Pekerja
L.01
OH
0.660
60,000.00
39,600.00
Tukang Kayu
L.02
OH
0.330
75,000.00
24,750.00
Kepala Tukang
L.03
OH
0.033
80,000.00
2,640.00
Mandor
L.04
OH
0.033
80,000.00
2,640.00 69,630.00
B
Bahan Kayu Klas III (Randu)
m3
0.040
897,700.00
35,908.00
Paku Biasa 2" - 5"
Kg
0.400
12,800.00
5,120.00
Minyak Bekisting
Ltr
0.200
10,000.00
2,000.00
Balok Kayu
m3
0.015
897,700.00
13,465.50
Plywood tebal 9mm
Lbr
0.350
102,000.00
35,700.00
Bambu
Btg
2.000
13,500.00
27,000.00 119,193.50
C
PERALATAN
D
Jumlah A + B + C
188,823.50
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
E
Overhead
2.5%
F
Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA Rp 4,720.59 193,544.09
No.
AHSP
16
A.4.1.1.23 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Memasang Bekisting untuk Balok Tenaga Pekerja
L.01
OH
0.660
60,000.00
39,600.00
Tukang Kayu
L.02
OH
0.330
75,000.00
24,750.00
Kepala Tukang
L.03
OH
0.033
80,000.00
2,640.00
Mandor
L.04
OH
0.033
80,000.00
2,640.00 69,630.00
B
Bahan Kayu Klas III (Randu)
m3
0.040
897,700.00
35,908.00
Paku Biasa 2" - 5"
Kg
0.400
12,800.00
5,120.00
Minyak Bekisting
Ltr
0.200
10,000.00
2,000.00
Balok Kayu
m3
0.018
897,700.00
16,158.60
Plywood tebal 9mm
Lbr
0.350
102,000.00
35,700.00
Bambu
Btg
2.000
13,500.00
27,000.00 121,886.60
17
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.24 A
191,516.60 2.5%
4,787.92 196,304.52
Memasang Bekisting untuk Lantai Tenaga Pekerja
L.01
OH
0.660
60,000.00
39,600.00
Tukang Kayu
L.02
OH
0.330
75,000.00
24,750.00
Kepala Tukang
L.03
OH
0.033
80,000.00
2,640.00
Mandor
L.04
OH
0.033
80,000.00
2,640.00 69,630.00
B
Bahan Kayu Klas III (Randu)
m3
0.040
897,700.00
35,908.00
Paku Biasa 2" - 5"
Kg
0.400
12,800.00
5,120.00
Minyak Bekisting
Ltr
0.200
10,000.00
2,000.00
Balok Kayu
m3
0.015
897,700.00
13,465.50
Plywood tebal 9mm
Lbr
0.350
102,000.00
35,700.00
Bambu
Btg
6.000
13,500.00
81,000.00 173,193.50
18
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.26 A
242,823.50 2.5%
6,070.59 248,894.09
Memasang Bekisting untuk Tangga Tenaga Pekerja
L.01
OH
0.660
60,000.00
39,600.00
Tukang Kayu
L.02
OH
0.330
75,000.00
24,750.00
Kepala Tukang
L.03
OH
0.033
80,000.00
2,640.00
Mandor
L.04
OH
0.033
80,000.00
2,640.00 69,630.00
B
Bahan Kayu Klas III (Randu)
m3
0.030
897,700.00
26,931.00
Paku Biasa 2" - 5"
Kg
0.400
12,800.00
5,120.00
Minyak Bekisting
Ltr
0.150
10,000.00
1,500.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Balok Kayu
m3
0.015
Rp 897,700.00
Rp 13,465.50
Plywood tebal 9mm
Lbr
0.350
102,000.00
35,700.00
Bambu
Btg
2.000
13,500.00
27,000.00 109,716.50
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
179,346.50 2.5%
4,483.66 183,830.16
No.
AHSP
19
A.4.1.1.35 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Membuat Kolom Praktis Beton Bertulang (11 x 11) cm Tenaga Pekerja
L.01
OH
0.180
60,000.00
10,800.00
Tukang batu
L.02
OH
0.020
75,000.00
1,500.00
Tukang Kayu
L.02
OH
0.020
75,000.00
1,500.00
Tukang Besi
L.02
OH
0.020
75,000.00
1,500.00
Kepala Tukang
L.03
OH
0.006
80,000.00
480.00
Mandor
L.04
OH
0.009
80,000.00
720.00 16,500.00
B
Bahan Kayu Klas III (Randu)
m3
0.002
897,700.00
Paku Biasa 2" - 5"
Kg
0.010
12,800.00
1,795.40 128.00
Besi Beton Polos
Kg
3.000
9,180.00
27,540.00
Kawat Beton
Kg
0.045
15,300.00
688.50
Portland Semen
Kg
4.000
1,410.00
5,640.00
Pasir Beton
m3
0.006
270,300.00
1,621.80
Kerikil Beton
m3
0.009
215,900.00
1,943.10 39,356.80
20
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.36 A
55,856.80 2.5%
1,396.42 57,253.22
Membuat Ring Balok Beton Bertulang (10 x 15) cm Tenaga Pekerja
L.01
OH
0.297
60,000.00
17,820.00
Tukang batu
L.02
OH
0.033
75,000.00
2,475.00
Tukang Kayu
L.02
OH
0.033
75,000.00
2,475.00
Tukang Besi
L.02
OH
0.033
75,000.00
2,475.00
Kepala Tukang
L.03
OH
0.010
80,000.00
800.00
Mandor
L.04
OH
0.015
80,000.00
1,200.00 27,245.00
B
C D E F 21
A.4.1.1.37 A
B
Bahan Kayu Klas III (Randu) Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton
m3 Kg Kg Kg Kg m3 m3
0.003 0.020 3.600 0.050 5.500 0.009 0.015
897,700.00 12,800.00 9,180.00 15,300.00 1,410.00 270,300.00 215,900.00
PERALATAN Jumlah A + B + C Overhead 2.5% Harga Satuan Pekerjaan (D+E)
77,433.30 1,935.83 79,369.13
1 m² bekisting untuk permukaan beton biasa dengan kayu randu tebal 2 cm Tenaga Pekerja L.01 OH 0.200 Tukang Kayu L.02 OH 0.500 Kepala Tukang L.03 OH 0.050 Mandor L.04 OH 0.010 Bahan kayu randu tebal 2 cm Paku Biasa 2" - 5"
2,693.10 256.00 33,048.00 765.00 7,755.00 2,432.70 3,238.50 50,188.30
m3 Kg
0.022 0.400
60,000.00 75,000.00 80,000.00 80,000.00
12,000.00 37,500.00 4,000.00 800.00 54,300.00
897,700.00 12,800.00
19,749.40 5,120.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
C D E F
PERALATAN Jumlah A + B + C Overhead 2.5% Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA Rp 24,869.40 79,169.40 1,979.24 81,148.64
No.
AHSP
VIII
A.4.5.2
1
A.4.5.2.1 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
HARGA SATUAN PEKERJAAN PENUTUP ATAP Pemasangan Atap Genteng Plentong Kecil Tenaga Pekerja
L.01
OH
0.1500
60,000.00
9,000.00
Tukang Kayu
L.02
OH
0.0750
75,000.00
5,625.00
Kepala Tukang
L.03
OH
0.0075
80,000.00
600.00
Mandor
L.04
OH
0.0080
80,000.00
640.00 15,865.00
B
Bahan Genteng Plentong
Buah
25.0000
3,000.00
75,000.00 75,000.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
90,865.00 2,271.63
2.5%
93,136.63
Overhead & Profit
2
A.4.5.2.2 A
Pemasangan Atap Genteng Kodok / Glasur Tenaga Pekerja
L.01
OH
0.1500
60,000.00
9,000.00
Tukang Kayu
L.02
OH
0.0750
75,000.00
5,625.00
Kepala Tukang
L.03
OH
0.0080
80,000.00
640.00
Mandor
L.04
OH
0.0080
80,000.00
640.00 15,905.00
B
Bahan Genteng Kodok / Glasur
Buah
25.0000
1,200.00
30,000.00 30,000.00
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.5.2.3 A
45,905.00 1,147.63
2.5%
47,052.63
Pemasangan Atap Genteng Plentong Super / Besar Tenaga Pekerja
L.01
OH
0.1500
60,000.00
9,000.00
Tukang Kayu
L.02
OH
0.0750
75,000.00
5,625.00
Kepala Tukang
L.03
OH
0.0080
80,000.00
640.00
Mandor
L.04
OH
0.0080
80,000.00
640.00 15,905.00
B
Bahan Genteng Plentong Super / Besar
Buah
18.0000
6,000.00
108,000.00 108,000.00
No.
AHSP
URAIAN PEKERJAAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
123,905.00 2.5%
3,097.63 127,002.63
No.
4
AHSP
A.4.5.2.4 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pemasangan Genteng Bubung Plentong Tenaga Pekerja
L.01
OH
0.4000
60,000.00
24,000.00
Tukang Kayu
L.02
OH
0.2000
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.0200
80,000.00
1,600.00
Mandor
L.04
OH
0.0020
80,000.00
160.00 40,760.00
B
Bahan Genteng Bubung Plentong
Buah
5.0000
13,500.00
67,500.00
Portland Semen
Kg
8.0000
1,410.00
11,280.00
Pasir Pasang
m3
0.0320
142,800.00
4,569.60 83,349.60
5
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.5.2.5 A
124,109.60 3,102.74
2.5%
127,212.34
Pemasangan Genteng Bubung Kodok / Glasur Tenaga Pekerja
L.01
OH
0.4000
60,000.00
24,000.00
Tukang Kayu
L.02
OH
0.2000
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.0200
80,000.00
1,600.00
Mandor
L.04
OH
0.0020
80,000.00
160.00 40,760.00
B
Bahan Genteng Bubung Kodok / Glasur
Buah
5.0000
5,000.00
25,000.00
Portland Semen
Kg
8.0000
1,410.00
11,280.00
Pasir Pasang
m3
0.0320
142,800.00
4,569.60 40,849.60
6
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.5.2.6 A
81,609.60 2,040.24
2.5%
83,649.84
Pemasangan Genteng Bubung Plentong Besar Tenaga Pekerja
L.01
OH
0.4000
60,000.00
24,000.00
Tukang Kayu
L.02
OH
0.2000
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.0200
80,000.00
1,600.00
Mandor
L.04
OH
0.0020
80,000.00
160.00 40,760.00
B
Bahan
No.
AHSP
URAIAN PEKERJAAN
Genteng Bubung Plentong Besar
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
13,500.00
54,000.00
Buah
4.0000
Portland Semen
Kg
8.0000
1,410.00
11,280.00
Pasir Pasang
m3
0.0320
142,800.00
4,569.60 69,849.60
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
110,609.60 2.5%
2,765.24 113,374.84
No.
7
AHSP
A.4.5.2.9 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Pemasangan Atap Asbes Gelombang (2,25x0,92 m) x 5 mm Tenaga Pekerja
L.01
OH
0.1400
60,000.00
8,400.00
Tukang Kayu
L.02
OH
0.0750
75,000.00
5,625.00
Kepala Tukang
L.03
OH
0.0080
80,000.00
640.00
Mandor
L.04
OH
0.0080
80,000.00
640.00 15,305.00
B
Bahan Asbes Gelombang
Lbr
0.6000
78,000.00
46,800.00
Paku Pancing 60 x 230
Kg
0.1200
25,000.00
3,000.00 49,800.00
8
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
65,105.00 1,627.63
2.5%
66,732.63
A.4.5.2.10 Pemasangan Atap Asbes Gelombang (2,00x0,92 m) x 5 mm A
Tenaga Pekerja
L.01
OH
0.1400
60,000.00
8,400.00
Tukang Kayu
L.02
OH
0.0700
75,000.00
5,250.00
Kepala Tukang
L.03
OH
0.0070
80,000.00
560.00
Mandor
L.04
OH
0.0070
80,000.00
560.00 14,770.00
B
Bahan Asbes Gelombang
Lbr
0.6000
72,000.00
43,200.00
Paku Pancing 60 x 230
Kg
0.1200
25,000.00
3,000.00 46,200.00
9
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
60,970.00 1,524.25
2.5%
62,494.25
A.4.5.2.12 Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 mm A
Tenaga Pekerja
L.01
OH
0.1400
60,000.00
8,400.00
Tukang Kayu
L.02
OH
0.0700
75,000.00
5,250.00
Kepala Tukang
L.03
OH
0.0070
80,000.00
560.00
Mandor
L.04
OH
0.0070
80,000.00
560.00 14,770.00
B
Bahan Asbes Gelombang
Lbr
0.3500
88,000.00
30,800.00
No.
AHSP
URAIAN PEKERJAAN
Paku Pancing 60 x 230
KODE
SAT.
Kg
KOEF
0.1200
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
25,000.00
3,000.00 33,800.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
48,570.00 2.5%
1,214.25 49,784.25
No.
10
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
A.4.5.2.15 Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 4 mm A
Tenaga Pekerja
L.01
OH
0.1400
60,000.00
8,400.00
Tukang Kayu
L.02
OH
0.0700
75,000.00
5,250.00
Kepala Tukang
L.03
OH
0.0070
80,000.00
560.00
Mandor
L.04
OH
0.0070
80,000.00
560.00 14,770.00
B
Bahan Asbes Gelombang
Lbr
0.5100
62,000.00
31,620.00
Paku Pancing 60 x 230
Kg
0.1200
25,000.00
3,000.00 34,620.00
11
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
49,390.00 1,234.75
2.5%
50,624.75
A.4.5.2.22 Pemasangan 1 m’ bubung stel gelombang 0,92m A
Tenaga Pekerja
L.01
OH
0.0840
60,000.00
5,040.00
Tukang Kayu
L.02
OH
0.1250
75,000.00
9,375.00
Kepala Tukang
L.03
OH
0.0130
80,000.00
1,040.00
Mandor
L.04
OH
0.0040
80,000.00
320.00 15,775.00
B
Bahan Bubung stel gelombang Paku skrup 3,5”
Lbr
2.4000
30,000.00
72,000.00
bj
6.0000
1,600.00
9,600.00 81,600.00
12
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
97,375.00 2,434.38
2.5%
99,809.38
A.4.5.2.30 Pemasangan Atap Genteng Beton A
Tenaga Pekerja
L.01
OH
0.2000
60,000.00
12,000.00
Tukang Kayu
L.02
OH
0.1000
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.0100
80,000.00
800.00
Mandor
L.04
OH
0.0100
80,000.00
800.00 21,100.00
B
Bahan Genteng Beton Standrad
Lbr
11.0000
6,000.00
66,000.00
No.
AHSP
URAIAN PEKERJAAN
Paku Biasa 2" - 5"
KODE
SAT.
Kg
KOEF
0.0300
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
12,800.00
384.00 66,384.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
87,484.00 2.5%
2,187.10 89,671.10
No.
13
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
A.4.5.2.34 Pemasangan Nok Genteng Beton A
Tenaga Pekerja
L.01
OH
0.4000
60,000.00
24,000.00
Tukang Kayu
L.02
OH
0.2000
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.0200
80,000.00
1,600.00
Mandor
L.04
OH
0.0200
80,000.00
1,600.00 42,200.00
B
Bahan Nok Genteng Beton
Buah
3.5000
13,500.00
47,250.00
Paku Biasa 2" - 5"
Kg
0.0500
12,800.00
640.00
Portland Semen
Kg
10.8000
1,410.00
15,228.00
Pasir Pasang
m3
0.0320
142,800.00
4,569.60
Semen Warna
Kg
1.0000
11,790.00
11,790.00 79,477.60
14
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
121,677.60 3,041.94
2.5%
124,719.54
A.4.5.2.38 Pemasangan Atap Seng Gelombang A
Tenaga Pekerja
L.01
OH
0.1200
60,000.00
7,200.00
Tukang Kayu
L.02
OH
0.0600
75,000.00
4,500.00
Kepala Tukang
L.03
OH
0.0060
80,000.00
480.00
Mandor
L.04
OH
0.0060
80,000.00
480.00 12,660.00
B
Bahan Seng Gelombang 3" x 6" BJLS 28
Lbr
0.7000
80,000.00
56,000.00
Paku Pancing
Kg
0.0200
25,000.00
500.00 56,500.00
15
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
69,160.00 1,729.00
2.5%
70,889.00
A.4.5.2.39 Pemasangan Atap Nok Seng A
Tenaga Pekerja
L.01
OH
0.1500
60,000.00
9,000.00
Tukang Kayu
L.02
OH
0.0700
75,000.00
5,250.00
Kepala Tukang
L.03
OH
0.0070
80,000.00
560.00
Mandor
L.04
OH
0.0060
80,000.00
480.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp 15,290.00
B
Bahan Seng Plaat 3" x 6" BJLS 28
Lbr
0.3000
80,000.00
24,000.00
Paku Biasa 1/2" - 1"
Kg
0.0400
12,800.00
512.00 24,512.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
39,802.00 2.5%
995.05 40,797.05
No.
IX
AHSP
A.4.5.1 1
A.4.5.1.1 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
HARGA SATUAN PEKERJAAN LANGIT-LANGIT Pemasangan Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm Tenaga Pekerja
L.01
OH
0.030
60,000.00
1,800.00
Tukang Kayu
L.02
OH
0.070
75,000.00
5,250.00
Kepala Tukang
L.03
OH
0.007
80,000.00
560.00
Mandor
L.04
OH
0.004
80,000.00
320.00 7,930.00
B
Bahan Plat Asbes
Lbr
1.100
25,700.00
28,270.00
Paku
Kg
0.010
12,800.00
128.00 28,398.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
36,328.00 908.20
2.5%
37,236.20
Overhead & Profit (contoh 15%) 2
A.4.5.1.5 A
Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm Tenaga Pekerja
L.01
OH
0.100
60,000.00
6,000.00
Tukang Kayu
L.02
OH
0.100
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.010
80,000.00
800.00
Mandor
L.04
OH
0.005
80,000.00
400.00 14,700.00
B
Bahan Tripleks (4 mm)
Lbr
0.375
55,000.00
20,625.00
Paku Tripleks
Kg
0.030
12,800.00
384.00 21,009.00
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.5.1.6 A
35,709.00 892.73
2.5%
36,601.73
Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm Tenaga Pekerja
L.01
OH
0.800
60,000.00
48,000.00
Tukang Kayu
L.02
OH
0.800
75,000.00
60,000.00
Kepala Tukang
L.03
OH
0.080
80,000.00
6,400.00
Mandor
L.04
OH
0.040
80,000.00
3,200.00 117,600.00
No.
AHSP B
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Bahan Kayu Jati,Papan
m3
0.015
16,875,000.00
253,125.00
Paku
Kg
0.010
12,800.00
128.00 253,253.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
370,853.00 2.5%
9,271.33 380,124.33
No.
4
AHSP
A.4.5.1.7 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm Tenaga Pekerja
L.01
OH
0.100
60,000.00
6,000.00
Tukang Kayu
L.02
OH
0.050
75,000.00
3,750.00
Kepala Tukang
L.03
OH
0.005
80,000.00
400.00
Mandor
L.04
OH
0.005
80,000.00
400.00 10,550.00
B
Bahan Gypsum Board
Lbr
0.364
64,300.00
23,405.20
Paku Sekrup
Kg
0.110
13,000.00
1,430.00 24,835.20
5
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.5.1.10
List Langit-Langit Kayu Profil
A
35,385.20 884.63
2.5%
36,269.83
Tenaga Pekerja
L.01
OH
0.050
60,000.00
3,000.00
Tukang Kayu
L.02
OH
0.050
75,000.00
3,750.00
Kepala Tukang
L.03
OH
0.005
80,000.00
400.00
Mandor
L.04
OH
0.003
80,000.00
240.00 7,390.00
B
Bahan List Kayu Profil
m1
1.050
15,000.00
15,750.00
Paku
Kg
0.010
12,800.00
128.00 15,878.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
23,268.00 2.5%
581.70 23,849.70
No.
X
AHSP
A.5.1.1 1
A.5.1.1.1 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG Memasang Closet Duduk / Mono Blok Tenaga Pekerja
L.01
OH
3.3000
60,000.00
198,000.00
Tukang Batu
L.02
OH
1.1000
75,000.00
82,500.00
Kepala Tukang
L.03
OH
0.0100
80,000.00
800.00
Mandor
L.04
OH
0.1600
80,000.00
12,800.00 294,100.00
B
Bahan Kloset Duduk / Monoblok
Buah
Kelengkapan 6% dari harga Kloset
1.0000
1,192,800.00
1,192,800.00
0.0600
1,192,800.00
71,568.00 1,264,368.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
1,558,468.00 2.5%
38,961.70 1,597,429.70
Overhead & Profit (contoh 15%) 2
A.5.1.1.2 A
Memasang Closet Jongkok Porselen Tenaga Pekerja
L.01
OH
1.0000
60,000.00
60,000.00
Tukang Batu
L.02
OH
1.5000
75,000.00
112,500.00
Kepala Tukang
L.03
OH
0.1500
80,000.00
12,000.00
Mandor
L.04
OH
0.1600
80,000.00
12,800.00 197,300.00
B
Bahan Kloset Jongkok
Buah
1.0000
134,700.00
134,700.00
Portland Semen
Kg
6.0000
1,410.00
8,460.00
Pasir Pasang
m3
0.0100
142,800.00
1,428.00 144,588.00
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.4 A
341,888.00 2.5%
8,547.20 350,435.20
Memasang Urinoir Tenaga Pekerja
L.01
OH
1.0000
60,000.00
60,000.00
Tukang Batu
L.02
OH
1.0000
75,000.00
75,000.00
Kepala Tukang
L.03
OH
0.1000
80,000.00
8,000.00
Mandor
L.04
OH
0.0500
80,000.00
4,000.00 147,000.00
B
Bahan Urinoir
Buah
1.0000
367,500.00
367,500.00
Perlengkapan 30% Harga Urinoir
Ls
0.3000
367,500.00
110,250.00
Portland Semen
Kg
6.0000
1,410.00
8,460.00
Pasir Pasang
m3
0.0100
142,800.00
1,428.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 487,638.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
634,638.00 2.5%
15,865.95 650,503.95
No.
AHSP
A.5.1.1.5
4
A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Memasang Wastafel Tenaga Pekerja
L.01
OH
1.2000
60,000.00
72,000.00
Tukang Batu
L.02
OH
0.1450
75,000.00
10,875.00
Kepala Tukang
L.03
OH
0.1500
80,000.00
12,000.00
Mandor
L.04
OH
0.0600
80,000.00
4,800.00 99,675.00
B
Bahan Wastafel
Buah
1.0000
292,700.00
292,700.00
Perlengkapan 12% Harga Wastafel
Ls
0.1200
292,700.00
35,124.00
Portland Semen
Kg
6.0000
1,410.00
8,460.00
Pasir Pasang
m3
0.0100
142,800.00
1,428.00 337,712.00
5
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.7 A
437,387.00 2.5%
10,934.68 448,321.68
Pemasangan Bak Fibreglass vol.1 m3 Tenaga Pekerja
L.01
OH
3.0000
60,000.00
180,000.00
Tukang Batu
L.02
OH
4.5000
75,000.00
337,500.00
Kepala Tukang
L.03
OH
0.0500
80,000.00
4,000.00
Mandor
L.04
OH
0.9000
80,000.00
72,000.00 593,500.00
B
Bahan Bak Fibreglass Perlengkapan 12% Bak Fibreglass
Buah
1.0000
280,000.00
280,000.00
Ls
0.1200
280,000.00
33,600.00 313,600.00
6
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.8 A
907,100.00 2.5%
22,677.50 929,777.50
Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Tenaga Pekerja
L.01
OH
6.0000
60,000.00
360,000.00
Tukang Batu
L.02
OH
3.0000
75,000.00
225,000.00
Kepala Tukang
L.03
OH
0.3000
80,000.00
24,000.00
Mandor
L.04
OH
0.0300
80,000.00
2,400.00 611,400.00
B
Bahan Batu Bata
bh
150.00
Portland Semen
Kg
Pasir Pasang
m3 buah
Keramik 20 x 20
760.00
114,000.00
120.00
1,410.00
169,200.00
0.3000
142,800.00
42,840.00
111.00
2,000.00
222,000.00
No.
AHSP
URAIAN PEKERJAAN Semen Nat
KODE
SAT. Kg
KOEF 6.0000
HARGA SATUAN Rp 11,790.00
JUMLAH HARGA Rp 70,740.00 618,780.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
1,230,180.00 2.5%
30,754.50 1,260,934.50
No.
7
AHSP
A.5.1.1.12 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Bak Cuci Piring Stainless stell Tenaga Pekerja
L.01
OH
0.0300
60,000.00
1,800.00
Tukang Batu
L.02
OH
0.3000
75,000.00
22,500.00
Kepala Tukang
L.03
OH
0.0300
80,000.00
2,400.00
Mandor
L.04
OH
0.0150
80,000.00
1,200.00 27,900.00
B
Bahan Bak Cuci Piring
unit
1.0000
176,100.00
Water drain
bh
1.0000
60,000.00
176,100.00 60,000.00 236,100.00
8
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.14 A
264,000.00 2.5%
6,600.00 270,600.00
Pemasangan Floor Drain Tenaga Pekerja
L.01
OH
0.0100
60,000.00
600.00
Tukang Batu
L.02
OH
0.1000
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.0100
80,000.00
800.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 9,300.00
B
Bahan Floor Drain
bh
1.0000
23,100.00
23,100.00 23,100.00
9
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.15 A
32,400.00 2.5%
810.00 33,210.00
Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm Tenaga Pekerja
L.01
OH
2.1600
60,000.00
129,600.00
Tukang Batu
L.02
OH
0.7200
75,000.00
54,000.00
Kepala Tukang
L.03
OH
0.0720
80,000.00
5,760.00
Mandor
L.04
OH
0.0110
80,000.00
880.00 190,240.00
B
Bahan Batu Bata
bh
40.0000
760.00
30,400.00
Semen Portland
kg
44.0000
1,410.00
62,040.00
Pasir Pasang
m3
0.0700
142,800.00
9,996.00
Pasir Beton
m3
0.0600
270,300.00
16,218.00
Kerikil
m3
0.0700
215,900.00
15,113.00
Baja Tulangan
kg
1.6000
9,180.00
14,688.00 148,455.00
No.
AHSP
URAIAN PEKERJAAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 338,695.00
2.5%
8,467.38 347,162.38
No.
10
AHSP
A.5.1.1.16 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm Tenaga Pekerja
L.01
OH
3.2000
60,000.00
192,000.00
Tukang Batu
L.02
OH
1.1500
75,000.00
86,250.00
Kepala Tukang
L.03
OH
0.0110
80,000.00
880.00
Mandor
L.04
OH
0.0160
80,000.00
1,280.00 280,410.00
B
Bahan Batu Bata
bh
70.0000
760.00
53,200.00
Semen Portland
kg
Pasir Pasang
m3
77.0000
1,410.00
108,570.00
0.1300
142,800.00
18,564.00
Pasir Beton
m3
0.0900
270,300.00
24,327.00
Kerikil
m3
0.0200
215,900.00
4,318.00
Baja Tulangan
kg
2.6000
9,180.00
23,868.00 232,847.00
11
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.17 A
513,257.00 2.5%
12,831.43 526,088.43
Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm Tenaga Pekerja
L.01
OH
3.2000
60,000.00
192,000.00
Tukang Batu
L.02
OH
1.1500
75,000.00
86,250.00
Kepala Tukang
L.03
OH
0.0110
80,000.00
880.00
Mandor
L.04
OH
0.0160
80,000.00
1,280.00 280,410.00
B
Bahan Batu Bata
bh
123.0000
760.00
93,480.00
Semen Portland
kg
114.0000
1,410.00
160,740.00
Pasir Pasang
m3
0.1840
142,800.00
26,275.20
Pasir Beton
m3
0.1200
270,300.00
32,436.00
Kerikil
m3
0.0330
215,900.00
7,124.70
Baja Tulangan
kg
4.8500
9,180.00
44,523.00 364,578.90
12
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.18 A
644,988.90 2.5%
16,124.72 661,113.62
Pemasangan Pipa Galvanis Ø ½" Tenaga Pekerja
L.01
OH
0.0540
60,000.00
3,240.00
Tukang Batu
L.02
OH
0.0900
75,000.00
6,750.00
Kepala Tukang
L.03
OH
0.0090
80,000.00
720.00
Mandor
L.04
OH
0.0270
80,000.00
2,160.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 12,870.00
B
Bahan Pipa Galvanis Ø ½"
m'
1.2000
19,900.00
23,880.00
Perlengkapan 35% x pipa
Ls
0.3500
19,900.00
6,965.00 30,845.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
43,715.00 2.5%
1,092.88 44,807.88
No.
13
AHSP
A.5.1.1.19 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Kran Ø ½" atau Ø ¾" Tenaga Pekerja
L.01
OH
0.0100
60,000.00
600.00
Tukang Batu
L.02
OH
0.4000
75,000.00
30,000.00
Kepala Tukang
L.03
OH
0.0400
80,000.00
3,200.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 34,200.00
B
Bahan Kran Air
bh
1.0000
36,000.00
Sealtape
bh
0.0250
2,300.00
36,000.00 57.50 36,057.50
14
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.20 A
70,257.50 1,756.44
2.5%
72,013.94
Pemasangan Pipa Galvanis Ø ¾" Tenaga Pekerja
L.01
OH
0.0540
60,000.00
3,240.00
Tukang Batu
L.02
OH
0.0900
75,000.00
6,750.00
Kepala Tukang
L.03
OH
0.0090
80,000.00
720.00
Mandor
L.04
OH
0.0270
80,000.00
2,160.00 12,870.00
B
Bahan Pipa Galvanis Ø ¾"
m'
1.2000
26,000.00
31,200.00
Perlengkapan 35% x pipa
Ls
0.3500
26,000.00
9,100.00 40,300.00
15
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.21 A
53,170.00 1,329.25
2.5%
54,499.25
Pemasangan Pipa Galvanis Ø 1" Tenaga Pekerja
L.01
OH
0.0540
60,000.00
3,240.00
Tukang Batu
L.02
OH
0.0900
75,000.00
6,750.00
Kepala Tukang
L.03
OH
0.0090
80,000.00
720.00
Mandor
L.04
OH
0.0270
80,000.00
2,160.00 12,870.00
B
Bahan Pipa Galvanis Ø 1"
m'
1.2000
40,000.00
48,000.00
Perlengkapan 35% x pipa
Ls
0.3500
40,000.00
14,000.00 62,000.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
74,870.00 2.5%
1,871.75
No.
AHSP F
URAIAN PEKERJAAN Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 76,741.75
No. 16
AHSP A.5.1.1.22 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Pipa Galvanis Ø 1½ " Tenaga Pekerja
L.01
OH
0.1080
60,000.00
6,480.00
Tukang Batu
L.02
OH
0.1800
75,000.00
13,500.00
Kepala Tukang
L.03
OH
0.0180
80,000.00
1,440.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 21,820.00
B
Bahan Pipa Galvanis Ø 1½"
m'
1.2000
60,100.00
72,120.00
Perlengkapan 35% x pipa
Ls
0.3500
60,100.00
21,035.00 93,155.00
17
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.23 A
114,975.00 2,874.38
2.5%
117,849.38
Pemasangan Pipa Galvanis Ø 3" Tenaga Pekerja
L.01
OH
0.1350
60,000.00
8,100.00
Tukang Batu
L.02
OH
0.2250
75,000.00
16,875.00
Kepala Tukang
L.03
OH
0.0230
80,000.00
1,840.00
Mandor
L.04
OH
0.0070
80,000.00
560.00 27,375.00
B
Bahan Pipa Galvanis Ø 3"
m'
1.2000
130,200.00
156,240.00
Perlengkapan 35% x pipa
Ls
0.3500
130,200.00
45,570.00 201,810.00
18
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.24 A
229,185.00 5,729.63
2.5%
234,914.63
Pemasangan Pipa Galvanis Ø 4" Tenaga Pekerja
L.01
OH
0.1350
60,000.00
8,100.00
Tukang Batu
L.02
OH
0.2250
75,000.00
16,875.00
Kepala Tukang
L.03
OH
0.0230
80,000.00
1,840.00
Mandor
L.04
OH
0.0070
80,000.00
560.00 27,375.00
B
Bahan Pipa Galvanis Ø 4"
m'
1.2000
190,300.00
228,360.00
Perlengkapan 35% x pipa
Ls
0.3500
190,300.00
66,605.00 294,965.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
322,340.00 2.5%
8,058.50 330,398.50
No.
19
AHSP
A.5.1.1.25 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Pipa PVC tipe AW Ø ½" Tenaga Pekerja
L.01
OH
0.0360
60,000.00
2,160.00
Tukang Batu
L.02
OH
0.0600
75,000.00
4,500.00
Kepala Tukang
L.03
OH
0.0060
80,000.00
480.00
Mandor
L.04
OH
0.0020
80,000.00
160.00 7,300.00
B
Bahan Pipa PVC Ø ½"
m'
1.2000
5,100.00
6,120.00
Perlengkapan 35% x pipa
Ls
0.3500
5,100.00
1,785.00 7,905.00
20
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.26 A
15,205.00 380.13
2.5%
15,585.13
Pemasangan Pipa PVC tipe AW Ø ¾" Tenaga Pekerja
L.01
OH
0.0360
60,000.00
2,160.00
Tukang Batu
L.02
OH
0.0600
75,000.00
4,500.00
Kepala Tukang
L.03
OH
0.0060
80,000.00
480.00
Mandor
L.04
OH
0.0020
80,000.00
160.00 7,300.00
B
Bahan Pipa PVC Ø ¾"
m'
1.2000
6,600.00
7,920.00
Perlengkapan 35% x pipa
Ls
0.3500
6,600.00
2,310.00 10,230.00
21
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.27 A
17,530.00 438.25
2.5%
17,968.25
Pemasangan Pipa PVC tipe AW Ø 1" Tenaga Pekerja
L.01
OH
0.0360
60,000.00
2,160.00
Tukang Batu
L.02
OH
0.0600
75,000.00
4,500.00
Kepala Tukang
L.03
OH
0.0060
80,000.00
480.00
Mandor
L.04
OH
0.0020
80,000.00
160.00 7,300.00
B
Bahan Pipa PVC Ø 1"
m'
1.2000
8,500.00
10,200.00
Perlengkapan 35% x pipa
Ls
0.3500
8,500.00
2,975.00 13,175.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
20,475.00 2.5%
511.88
No.
AHSP F
URAIAN PEKERJAAN Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 20,986.88
No. 22
AHSP A.5.1.1.28 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Pipa PVC tipe AW Ø 1½" Tenaga Pekerja
L.01
OH
0.0540
60,000.00
3,240.00
Tukang Batu
L.02
OH
0.0900
75,000.00
6,750.00
Kepala Tukang
L.03
OH
0.0090
80,000.00
720.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 10,950.00
B
Bahan Pipa PVC Ø 1½"
m'
1.2000
10,000.00
12,000.00
Perlengkapan 35% x pipa
Ls
0.3500
10,000.00
3,500.00 15,500.00
23
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.29 A
26,450.00 661.25
2.5%
27,111.25
Pemasangan Pipa PVC tipe AW Ø 2" Tenaga Pekerja
L.01
OH
0.0540
60,000.00
3,240.00
Tukang Batu
L.02
OH
0.0900
75,000.00
6,750.00
Kepala Tukang
L.03
OH
0.0090
80,000.00
720.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 10,950.00
B
Bahan Pipa PVC Ø 2"
m'
1.2000
17,000.00
20,400.00
Perlengkapan 35% x pipa
Ls
0.3500
17,000.00
5,950.00 26,350.00
24
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.31 A
37,300.00 932.50
2.5%
38,232.50
Pemasangan Pipa PVC tipe AW Ø 3" Tenaga Pekerja
L.01
OH
0.0810
60,000.00
4,860.00
Tukang Batu
L.02
OH
0.1350
75,000.00
10,125.00
Kepala Tukang
L.03
OH
0.0135
80,000.00
1,080.00
Mandor
L.04
OH
0.0040
80,000.00
320.00 16,385.00
B
Bahan Pipa PVC Ø 3"
m'
1.2000
32,300.00
38,760.00
Perlengkapan 35% x pipa
Ls
0.3500
32,300.00
11,305.00 50,065.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
66,450.00 2.5%
1,661.25 68,111.25
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
No. 25
AHSP A.5.1.1.32 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Pipa PVC tipe AW Ø 4" Tenaga Pekerja
L.01
OH
0.0810
60,000.00
4,860.00
Tukang Batu
L.02
OH
0.1350
75,000.00
10,125.00
Kepala Tukang
L.03
OH
0.0135
80,000.00
1,080.00
Mandor
L.04
OH
0.0040
80,000.00
320.00 16,385.00
B
Bahan Pipa PVC Ø 4"
m'
1.2000
50,800.00
60,960.00
Perlengkapan 35% x pipa
Ls
0.3500
50,800.00
17,780.00 78,740.00
26
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.33 A
95,125.00 2,378.13
2.5%
97,503.13
Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm Tenaga Pekerja
L.01
OH
0.0800
60,000.00
4,800.00
Tukang Batu
L.02
OH
0.0400
75,000.00
3,000.00
Kepala Tukang
L.03
OH
0.0040
80,000.00
320.00
Mandor
L.04
OH
0.0040
80,000.00
320.00 8,440.00
B
Bahan pipa tanah
bh
1.6000
151,500.00
242,400.00
Semen Portlan
kg
35.0000
1,410.00
49,350.00
Pasir Pasang
m3
0.0140
142,800.00
1,999.20
Pasir Urug
m3
0.0140
82,000.00
1,148.00 294,897.20
27
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.34 A
303,337.20 2.5%
7,583.43 310,920.63
Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm Tenaga Pekerja
L.01
OH
0.0600
60,000.00
3,600.00
Tukang Batu
L.02
OH
0.0300
75,000.00
2,250.00
Kepala Tukang
L.03
OH
0.0030
80,000.00
240.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 6,330.00
B
Bahan pipa tanah
bh
1.6000
93,500.00
149,600.00
Semen Portlan
kg
6.8000
1,410.00
9,588.00
Pasir Pasang
m3
0.0130
142,800.00
1,856.40
Pasir Urug
m3
0.0110
82,000.00
902.00 161,946.40
No.
AHSP
URAIAN PEKERJAAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 168,276.40
2.5%
4,206.91 172,483.31
No.
AHSP
28
A.5.1.1.35 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Pipa Beton Ø 20 cm Tenaga Pekerja
L.01
OH
0.1400
60,000.00
8,400.00
Tukang Batu
L.02
OH
0.0700
75,000.00
5,250.00
Kepala Tukang
L.03
OH
0.0070
80,000.00
560.00
Mandor
L.04
OH
0.0070
80,000.00
560.00 14,770.00
B
Bahan pipa beton
bh
1.1000
53,000.00
58,300.00
Batu Bata
m3
0.0270
570,000.00
15,390.00
Semen Portlan
kg
3.9200
1,410.00
5,527.20
Pasir Pasang
m3
0.0560
142,800.00
7,996.80
Pasir Urug
m3
0.0240
82,000.00
1,968.00 89,182.00
29
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.36 A
103,952.00 2,598.80
2.5%
106,550.80
Pemasangan Pipa Beton Ø 100 cm Tenaga Pekerja
L.01
OH
0.3800
60,000.00
22,800.00
Tukang Batu
L.02
OH
0.1900
75,000.00
14,250.00
Kepala Tukang
L.03
OH
0.0190
80,000.00
1,520.00
Mandor
L.04
OH
0.0190
80,000.00
1,520.00 40,090.00
B
Bahan pipa beton
bh
1.1000
225,000.00
247,500.00
Batu Bata
m3
0.5500
570,000.00
313,500.00
Semen Portlan
kg
10.3000
1,410.00
14,523.00
Pasir Pasang
m3
0.0610
142,800.00
8,710.80
Pasir Urug
m3
0.0690
82,000.00
5,658.00 589,891.80
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
629,981.80 2.5%
15,749.55 645,731.35
No.
XI
AHSP
A.4.2.1 1
A.4.2.1.1 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM Pemasangan Besi Profil Tenaga Pekerja
L.01
OH
0.0600
60,000.00
3,600.00
Tukang Besi
L.02
OH
0.0600
75,000.00
4,500.00
Kepala Tukang
L.03
OH
0.0060
80,000.00
480.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 8,820.00
B
Bahan Besi Profil
Kg
1.1500
16,100.00
18,515.00
Meni Besi
Kg
0.0600
29,000.00
1,740.00 20,255.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
29,075.00 2.5%
726.88 29,801.88
Overhead & Profit 2
A.4.2.1.2 A
Pemasangan Rangka Kuda-kuda Baja IWF Tenaga Pekerja
L.01
OH
0.0600
60,000.00
3,600.00
Tukang Besi
L.02
OH
0.0600
75,000.00
4,500.00
Kepala Tukang
L.03
OH
0.0060
80,000.00
480.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 8,820.00
B
Bahan Besi Baja IWF
kg
1.1500
16,100.00
18,515.00 18,515.00
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.2.1.7 A
27,335.00 2.5%
683.38 28,018.38
Pemasangan Pintu Rolling Door Besi Tenaga Pekerja
L.01
OH
1.2000
60,000.00
72,000.00
Tukang Besi
L.02
OH
1.2000
75,000.00
90,000.00
Kepala Tukang
L.03
OH
0.1200
80,000.00
9,600.00
Mandor
L.04
OH
0.0060
80,000.00
480.00 172,080.00
B
Bahan Pintu Gulung Besi
m2
1.0000
350,000.00
350,000.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 350,000.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
522,080.00 2.5%
13,052.00 535,132.00
No.
4
AHSP
A.4.2.1.8 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Pintu Lipat (Folding Door) Tenaga Pekerja
L.01
OH
0.4400
60,000.00
26,400.00
Tukang Besi
L.02
OH
0.4400
75,000.00
33,000.00
Kepala Tukang
L.03
OH
0.0440
80,000.00
3,520.00
Mandor
L.04
OH
0.0220
80,000.00
1,760.00 64,680.00
B
Bahan Pintu Lipat
m2
1.0000
434,000.00
434,000.00 434,000.00
5
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.2.1.10 A
498,680.00 2.5%
12,467.00 511,147.00
Pemasangan Rolling Door Allumunium Tenaga Pekerja
L.01
OH
1.0000
60,000.00
60,000.00
Tukang Besi
L.02
OH
1.0000
75,000.00
75,000.00
Kepala Tukang
L.03
OH
0.1000
80,000.00
8,000.00
Mandor
L.04
OH
0.0500
80,000.00
4,000.00 147,000.00
B
Bahan Rolling Allumunium
m2
1.0000
415,000.00
415,000.00 415,000.00
6
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.2.1.11 A
562,000.00 2.5%
14,050.00 576,050.00
Pemasangan Kusen Pintu Allumunium Tenaga Pekerja
L.01
OH
0.0430
60,000.00
2,580.00
Tukang Besi
L.02
OH
0.0430
75,000.00
3,225.00
Kepala Tukang
L.03
OH
0.0043
80,000.00
344.00
Mandor
L.04
OH
0.0021
80,000.00
168.00 6,317.00
B
Bahan Profil Allumunium
m'
1.1000
103,200.00
113,520.00
Skrup Fixer
buah
2.0000
1,600.00
3,200.00
Sealant
Tube
0.0600
22,500.00
1,350.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 118,070.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
124,387.00 2.5%
3,109.68 127,496.68
No.
7
AHSP
A.4.2.1.12 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Pintu Allumunium Strip Lebar 8 cm Tenaga Pekerja
L.01
OH
0.0850
60,000.00
5,100.00
Tukang Besi
L.02
OH
0.0850
75,000.00
6,375.00
Kepala Tukang
L.03
OH
0.0085
80,000.00
680.00
Mandor
L.04
OH
0.0042
80,000.00
336.00 12,491.00
B
Bahan Profil Allumunium
m'
4.4000
103,200.00
454,080.00
Allumunium Strip
m'
14.6000
34,300.00
500,780.00 954,860.00
8
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.2.1.13 A
967,351.00 2.5%
24,183.78 991,534.78
Pemasangan Pintu Kaca Rangka Allumunium Tenaga Pekerja
L.01
OH
0.0850
60,000.00
5,100.00
Tukang Besi
L.02
OH
0.0850
75,000.00
6,375.00
Kepala Tukang
L.03
OH
0.0090
80,000.00
720.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 12,595.00
B
Bahan Pintu Allumunium
m'
4.4000
103,200.00
454,080.00
Profil Kaca
m'
4.5000
85,000.00
382,500.00
tube
0.2700
22,500.00
6,075.00
Sealant
842,655.00
9
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.2.1.18 A
855,250.00 2.5%
21,381.25 876,631.25
Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm Tenaga Pekerja
L.01
OH
0.2000
60,000.00
12,000.00
Tukang Kayu
L.02
OH
0.2000
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.0200
80,000.00
1,600.00
Mandor
L.04
OH
0.0010
80,000.00
80.00 28,680.00
B
Bahan
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Seng Plaat
Lbr
1.0500
31,300.00
32,865.00
Paku Biasa 1 - 2,5 cm
Kg
0.0150
12,800.00
192.00
Kayu Papan Klas II atau III
m3
0.0190
4,500,000.00
85,500.00 118,557.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
147,237.00 2.5%
3,680.93 150,917.93
No.
10
AHSP
A.4.2.1.19 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm Tenaga Pekerja
L.01
OH
0.1500
60,000.00
9,000.00
Tukang Kayu
L.02
OH
0.3000
75,000.00
22,500.00
Kepala Tukang
L.03
OH
0.0300
80,000.00
2,400.00
Mandor
L.04
OH
0.0080
80,000.00
640.00 34,540.00
B
Bahan Seng Plaat
Lbr
1.0500
31,300.00
32,865.00
Paku Biasa 1 - 2,5 cm
Kg
0.0100
12,800.00
128.00
Besi strip
Kg
0.5000
20,200.00
10,100.00 43,093.00
11
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.2.1.21 A
77,633.00 2.5%
1,940.83 79,573.83
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon Tenaga Pekerja
L.01
OH
0.3500
60,000.00
21,000.00
Tukang Kayu
L.02
OH
0.3500
75,000.00
26,250.00
Kepala Tukang
L.03
OH
0.0350
80,000.00
2,800.00
Mandor
L.04
OH
0.0180
80,000.00
1,440.00 51,490.00
B
Bahan Rangka metal hollow 40.40.2 mm
M1
4.0000
31,300.00
125,200.00
Assesoris (perkuatan, las dll)100% rangka
Ls
1.0000
31,300.00
31,300.00 156,500.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
207,990.00 2.5%
5,199.75 213,189.75
No.
XII
AHSP
A.4.6.2 1
A.4.6.2.2 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
HARGA SATUAN PEKERJAAN KUNCI dan KACA Pemasangan Kunci Tanam Biasa Tenaga Pekerja
L.01
OH
0.0100
60,000.00
600.00
Tukang Kayu
L.02
OH
0.5000
75,000.00
37,500.00
Kepala Tukang
L.03
OH
0.0500
80,000.00
4,000.00
Mandor
L.04
OH
0.0050
80,000.00
400.00 42,500.00
B
Bahan Kunci Tanam Biasa
Buah
1.0000
60,800.00
60,800.00 60,800.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
103,300.00 2.5%
2,582.50 105,882.50
Overhead & Profit
2
A.4.6.2.3 A
Pemasangan Kunci Kamar Mandi Tenaga Pekerja
L.01
OH
0.0050
60,000.00
300.00
Tukang Kayu
L.02
OH
0.5000
75,000.00
37,500.00
Kepala Tukang
L.03
OH
0.0500
80,000.00
4,000.00
Mandor
L.04
OH
0.0025
80,000.00
200.00 42,000.00
B
Bahan Kunci Tanam Kamar Mandi
Buah
1.0000
36,600.00
36,600.00 36,600.00
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.2.4 A
78,600.00 2.5%
1,965.00 80,565.00
Pemasangan Kunci Selinder Tenaga Pekerja
L.01
OH
0.0050
60,000.00
300.00
Tukang Kayu
L.02
OH
0.5000
75,000.00
37,500.00
Kepala Tukang
L.03
OH
0.0500
80,000.00
4,000.00
Mandor
L.04
OH
0.0025
80,000.00
200.00 42,000.00
B
Bahan
No.
AHSP
URAIAN PEKERJAAN Kunci Selinder
KODE
SAT. Buah
KOEF 1.0000
HARGA SATUAN Rp 60,800.00
JUMLAH HARGA Rp 60,800.00 60,800.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
102,800.00 2.5%
2,570.00 105,370.00
No. 4
AHSP A.4.6.2.5 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Engsel Pintu Tenaga Pekerja
L.01
OH
0.0150
60,000.00
900.00
Tukang Kayu
L.02
OH
0.1500
75,000.00
11,250.00
Kepala Tukang
L.03
OH
0.0150
80,000.00
1,200.00
Mandor
L.04
OH
0.0008
80,000.00
64.00 13,414.00
B
Bahan Engsel pintu
Buah
1.0000
20,500.00
20,500.00 20,500.00
5
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.2.6 A
33,914.00 2.5%
847.85 34,761.85
Pemasangan Engsel Jendela Kupu-kupu Tenaga Pekerja
L.01
OH
0.0100
60,000.00
600.00
Tukang Kayu
L.02
OH
0.1000
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.0100
80,000.00
800.00
Mandor
L.04
OH
0.0005
80,000.00
40.00 8,940.00
B
Bahan Engsel Jendela
Buah
1.0000
14,100.00
14,100.00 14,100.00
6
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.6.2.7 A
23,040.00 2.5%
576.00 23,616.00
Pemasangan Engsel Angin Tenaga Pekerja
L.01
OH
0.1000
60,000.00
6,000.00
Tukang Kayu
L.02
OH
0.2000
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.0200
80,000.00
1,600.00
Mandor
L.04
OH
0.0005
80,000.00
40.00 22,640.00
B
Bahan Engsel Angin
Buah
1.0000
19,800.00
19,800.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 19,800.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
42,440.00 2.5%
1,061.00 43,501.00
No. 7
AHSP A.4.6.2.9 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Kait Angin Tenaga Pekerja
L.01
OH
0.0150
60,000.00
900.00
Tukang Kayu
L.02
OH
0.1500
75,000.00
11,250.00
Kepala Tukang
L.03
OH
0.0150
80,000.00
1,200.00
Mandor
L.04
OH
0.0080
80,000.00
640.00 13,990.00
B
Bahan Kait Angin
Buah
1.0000
5,500.00
5,500.00 5,500.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
19,490.00 2.5%
487.25 19,977.25
8 A.4.6.2.10 Pasang Door Closer A
Tenaga Pekerja
L.01
OH
0.0500
60,000.00
3,000.00
Tukang Kayu
L.02
OH
0.5000
75,000.00
37,500.00
Kepala Tukang
L.03
OH
0.0500
80,000.00
4,000.00
Mandor
L.04
OH
0.0025
80,000.00
200.00 44,700.00
B
Bahan Door Closer
Buah
1.0000
93,300.00
93,300.00 93,300.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
138,000.00 2.5%
3,450.00 141,450.00
9 A.4.6.2.11 Pemasangan Kunci Selot A
Tenaga Pekerja
L.01
OH
0.0200
60,000.00
1,200.00
Tukang Kayu
L.02
OH
0.2000
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.0200
80,000.00
1,600.00
Mandor
L.04
OH
0.0010
80,000.00
80.00 17,880.00
B
Bahan Kunci Selot
Buah
1.0000
8,900.00
8,900.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 8,900.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
26,780.00 2.5%
669.50 27,449.50
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
10 A.4.6.2.13 Pemasangan Door Stop A
Tenaga Pekerja
L.01
OH
0.0100
60,000.00
600.00
Tukang Kayu
L.02
OH
0.1000
75,000.00
7,500.00
Kepala Tukang
L.03
OH
0.0100
80,000.00
800.00
Mandor
L.04
OH
0.0005
80,000.00
40.00 8,940.00
B
Bahan Door Stop
Buah
1.0000
35,000.00
35,000.00 35,000.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
43,940.00 2.5%
1,098.50 45,038.50
11 A.4.6.2.14 Pemasangan Rel Pintu Dorong A
Tenaga Pekerja
L.01
OH
0.0600
60,000.00
3,600.00
Tukang Kayu
L.02
OH
0.6000
75,000.00
45,000.00
Kepala Tukang
L.03
OH
0.0600
80,000.00
4,800.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 53,640.00
B
Bahan Rel Pintu Dorong
Buah
1.0000
183,000.00
183,000.00 183,000.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
236,640.00 2.5%
5,916.00 242,556.00
12 A.4.6.2.16 Pemasangan Kaca tebal 3 mm A
Tenaga Pekerja
L.01
OH
0.0150
60,000.00
900.00
Tukang Kayu
L.02
OH
0.1500
75,000.00
11,250.00
Kepala Tukang
L.03
OH
0.0150
80,000.00
1,200.00
Mandor
L.04
OH
0.0008
80,000.00
60.00 13,410.00
B
Bahan Kaca tebal 3mm
m2
1.1000
71,200.00
78,320.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 78,320.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
91,730.00 2.5%
2,293.25 94,023.25
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
13 A.4.6.2.17 Pemasangan Kaca tebal 5 mm A
Tenaga Pekerja
L.01
OH
0.0150
60,000.00
900.00
Tukang Kayu
L.02
OH
0.1500
75,000.00
11,250.00
Kepala Tukang
L.03
OH
0.0150
80,000.00
1,200.00
Mandor
L.04
OH
0.0008
80,000.00
60.00 13,410.00
B
Bahan Kaca tebal 5mm
m2
1.1000
85,000.00
93,500.00 93,500.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
106,910.00 2.5%
2,672.75 109,582.75
14 A.4.6.2.18 Pemasangan Kaca Cermin tebal 5 mm A
Tenaga Pekerja
L.01
OH
0.0150
60,000.00
900.00
Tukang Kayu
L.02
OH
0.1500
75,000.00
11,250.00
Kepala Tukang
L.03
OH
0.0150
80,000.00
1,200.00
Mandor
L.04
OH
0.0008
80,000.00
60.00 13,410.00
B
Bahan Kaca Cermin
m2
1.1000
230,000.00
253,000.00 253,000.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
266,410.00 2.5%
6,660.25 273,070.25
No.
XIII 1
AHSP
A.4.4.3 A.4.4.3.2 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING Pemasangan lantai Ubin PC Abu-abu Uk. 30 x 30 cm Tenaga Pekerja
L.01
OH
0.2500
60,000.00
15,000.00
Tukang Batu
L.02
OH
0.1250
75,000.00
9,375.00
Kepala Tukang
L.03
OH
0.0130
80,000.00
1,040.00
Mandor
L.04
OH
0.0130
80,000.00
1,040.00 26,455.00
B
Bahan Ubin Abu-abu 30x30 cm
Buah
11.8700
2,900.00
34,423.00
Portland Semen
Kg
Pasir Pasang
m3
10.0000
1,410.00
14,100.00
0.0450
142,800.00
6,426.00 54,949.00
2
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.3 A
81,404.00 2,035.10
2.5%
83,439.10
Pemasangan lantai Ubin PC Abu-abu Uk. 20 x 20 cm Tenaga Pekerja
L.01
OH
0.2700
60,000.00
16,200.00
Tukang Batu
L.02
OH
0.1350
75,000.00
10,125.00
Kepala Tukang
L.03
OH
0.0140
80,000.00
1,120.00
Mandor
L.04
OH
0.0140
80,000.00
1,120.00 28,565.00
B
Bahan Ubin Abu-abu 20x20 cm
Buah
26.5000
1,500.00
39,750.00
Portland Semen
Kg
Pasir Pasang
m3
10.4000
1,410.00
14,664.00
0.0450
142,800.00
6,426.00 60,840.00
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.5 A
89,405.00 2,235.13
2.5%
91,640.13
Pemasangan lantai Ubin PC Warna Uk. 30 x 30 cm Tenaga Pekerja
L.01
OH
0.2600
60,000.00
15,600.00
Tukang Batu
L.02
OH
0.1300
75,000.00
9,750.00
Kepala Tukang
L.03
OH
0.0130
80,000.00
1,040.00
Mandor
L.04
OH
0.0130
80,000.00
1,040.00 27,430.00
B
Bahan Ubin Warna 30x30 cm
Buah
11.8700
3,000.00
35,610.00
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Portland Semen
Kg
10.0000
1,410.00
14,100.00
Semen warna
Kg
1.5000
11,790.00
17,685.00
Pasir Pasang
m3
0.0450
142,800.00
6,426.00 73,821.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
101,251.00 2.5%
2,531.28 103,782.28
No.
4
AHSP
A.4.4.3.6 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm Tenaga Pekerja
L.01
OH
0.2700
60,000.00
16,200.00
Tukang Batu
L.02
OH
0.1350
75,000.00
10,125.00
Kepala Tukang
L.03
OH
0.0140
80,000.00
1,120.00
Mandor
L.04
OH
0.0140
80,000.00
1,120.00 28,565.00
B
Bahan Ubin Warna 20x20 cm
Buah
26.5000
1,900.00
50,350.00
Kg
10.4000
1,410.00
14,664.00
Semen warna
Kg
1.6200
11,790.00
19,099.80
Pasir Pasang
m3
0.0450
142,800.00
6,426.00
Portland Semen
90,539.80
5
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.9 A
119,104.80 2.5%
2,977.62 122,082.42
Pemasangan lantai Ubin Granito Uk. 40 x 40 cm Tenaga Pekerja
L.01
OH
0.2500
60,000.00
15,000.00
Tukang Batu
L.02
OH
0.1250
75,000.00
9,375.00
Kepala Tukang
L.03
OH
0.0130
80,000.00
1,040.00
Mandor
L.04
OH
0.0130
80,000.00
1,040.00 26,455.00
B
Bahan Ubin Granito 40x40 cm
Buah
6.6300
32,800.00
217,464.00
Portland Semen
Kg
Semen warna
Kg
9.8000
1,410.00
13,818.00
1.3000
11,790.00
15,327.00
Pasir Pasang
m3
0.0450
142,800.00
6,426.00 253,035.00
6
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.35 A
279,490.00 2.5%
6,987.25 286,477.25
Pemasangan Lantai Keramik 30 x 30 cm warna Tenaga Pekerja
L.01
OH
0.7000
60,000.00
42,000.00
Tukang Batu
L.02
OH
0.3500
75,000.00
26,250.00
Kepala Tukang
L.03
OH
0.0350
80,000.00
2,800.00
Mandor
L.04
OH
0.0350
80,000.00
2,800.00 73,850.00
B
Bahan
No.
AHSP
URAIAN PEKERJAAN Ubin Keramik 30 x 30 cm warna
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Buah
11.8700
4,100.00
48,667.00
Portland Semen
Kg
10.0000
1,410.00
14,100.00
Pasir Pasang
m3
0.0450
142,800.00
6,426.00
Semen Warna
Kg
1.5000
11,790.00
17,685.00 86,878.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
160,728.00 2.5%
4,018.20 164,746.20
No.
7
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
A.4.4.3.35.1 Pemasangan Lantai Keramik 30 x 30 cm putih A
Tenaga Pekerja
L.01
OH
0.7000
60,000.00
42,000.00
Tukang Batu
L.02
OH
0.3500
75,000.00
26,250.00
Kepala Tukang
L.03
OH
0.0350
80,000.00
2,800.00
Mandor
L.04
OH
0.0350
80,000.00
2,800.00 73,850.00
B
Bahan Ubin Keramik 30 x 30 cm putih
Buah
11.8700
3,800.00
45,106.00
Portland Semen
Kg
10.0000
1,410.00
14,100.00
Pasir Pasang
m3
0.0450
142,800.00
6,426.00
Semen Warna
Kg
1.5000
11,790.00
17,685.00 83,317.00
8 SNI
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
157,167.00 2.5%
3,929.18 161,096.18
A.4.4.3.35.2 Pemasangan Lantai Keramik 40 x 40 cm warna A
Tenaga Pekerja
L.01
OH
0.2500
60,000.00
15,000.00
Tukang Batu
L.02
OH
0.1250
75,000.00
9,375.00
Kepala Tukang
L.03
OH
0.0130
80,000.00
1,040.00
Mandor
L.04
OH
0.0130
80,000.00
1,040.00 26,455.00
B
Bahan Ubin Keramik 40 x 40 cm
Buah
6.6300
8,300.00
55,029.00
Portland Semen
Kg
Semen Warna
Kg
9.8000
1,410.00
13,818.00
1.3000
11,790.00
15,327.00
Pasir Pasang
m3
0.0450
142,800.00
6,426.00 90,600.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
117,055.00 2.5%
2,926.38 119,981.38
No.
9 SNI
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
A.4.4.3.35.3 Pemasangan Lantai Keramik 40 x 40 cm putih A
Tenaga Pekerja
L.01
OH
0.2500
60,000.00
15,000.00
Tukang Batu
L.02
OH
0.1250
75,000.00
9,375.00
Kepala Tukang
L.03
OH
0.0130
80,000.00
1,040.00
Mandor
L.04
OH
0.0130
80,000.00
1,040.00 26,455.00
B
Bahan Ubin Keramik 40 x 40 cm putih
Buah
6.6300
7,800.00
51,714.00
Kg
9.8000
1,410.00
13,818.00
Semen Warna
Kg
1.3000
11,790.00
15,327.00
Pasir Pasang
m3
0.0450
142,800.00
6,426.00
Portland Semen
87,285.00
10
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.36 A
113,740.00 2.5%
2,843.50 116,583.50
Pemasangan Lantai Keramik 20 x 20 cm Tenaga Pekerja
L.01
OH
0.7000
60,000.00
42,000.00
Tukang Batu
L.02
OH
0.3500
75,000.00
26,250.00
Kepala Tukang
L.03
OH
0.0350
80,000.00
2,800.00
Mandor
L.04
OH
0.0350
80,000.00
2,800.00 73,850.00
B
Bahan Ubin Keramik 20 x 20 cm
Buah
26.5000
2,000.00
53,000.00
Portland Semen
Kg
Semen Warna
Kg
10.4000
1,410.00
14,664.00
1.6200
11,790.00
19,099.80
Pasir Pasang
m3
0.0450
142,800.00
6,426.00 93,189.80
11
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.46 A
167,039.80 2.5%
4,176.00 171,215.80
Pemasangan Lantai Parquet Jati Tenaga Pekerja
L.01
OH
0.7000
60,000.00
42,000.00
Tukang Batu
L.02
OH
0.3500
75,000.00
26,250.00
Kepala Tukang
L.03
OH
0.0350
80,000.00
2,800.00
Mandor
L.04
OH
0.0350
80,000.00
2,800.00 73,850.00
B
Bahan
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Parquet Jati
m2
1.0500
210,000.00
220,500.00
Lem Vynil
Kg
0.6000
35,000.00
21,000.00 241,500.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
315,350.00 2.5%
7,883.75 323,233.75
No.
12
AHSP
A.4.4.3.53 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Dinding Keramik 10x20 cm, Tenaga Pekerja
L.01
OH
0.9000
60,000.00
54,000.00
Tukang Batu
L.02
OH
0.4500
75,000.00
33,750.00
Kepala Tukang
L.03
OH
0.0450
80,000.00
3,600.00
Mandor
L.04
OH
0.0450
80,000.00
3,600.00 94,950.00
B
Bahan Keramik
Buah
53.0000
1,000.00
53,000.00
Portland Semen
Kg
9.3000
1,410.00
13,113.00
Pasir Pasang
m3
0.0180
142,800.00
2,570.40
Semen Warna
Kg
2.7500
11,790.00
32,422.50 101,105.90
13
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.54 A
196,055.90 2.5%
4,901.40 200,957.30
Pemasangan Dinding Keramik 20x20 cm, Tenaga Pekerja
L.01
OH
0.9000
60,000.00
54,000.00
Tukang Batu
L.02
OH
0.4500
75,000.00
33,750.00
Kepala Tukang
L.03
OH
0.0450
80,000.00
3,600.00
Mandor
L.04
OH
0.0450
80,000.00
3,600.00 94,950.00
B
Bahan Keramik
Buah
26.5000
2,000.00
53,000.00
Portland Semen
Kg
Pasir Pasang
m3
9.3000
1,410.00
13,113.00
0.0180
142,800.00
2,570.40
Semen Warna
Kg
1.9400
11,790.00
22,872.60 91,556.00
14
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.58 A
186,506.00 2.5%
4,662.65 191,168.65
Pemasangan Dinding Batu Paras / Batu Tempel Hitam Tenaga Pekerja
L.01
OH
0.7000
60,000.00
42,000.00
Tukang Batu
L.02
OH
0.3500
75,000.00
26,250.00
Kepala Tukang
L.03
OH
0.0350
80,000.00
2,800.00
Mandor
L.04
OH
0.0350
80,000.00
2,800.00 73,850.00
B
Bahan
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Batu Paras/batu tempel
m2
1.1000
105,000.00
115,500.00
Portland Semen
Kg
11.7500
1,410.00
16,567.50
Pasir Pasang
m3
0.0350
142,800.00
4,998.00 137,065.50
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
210,915.50 2.5%
5,272.89 216,188.39
No.
15
AHSP
A.4.4.3.63 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan Plint Kayu Klas II Ukuran 2x10 cm Tenaga Pekerja
L.01
OH
0.1200
60,000.00
7,200.00
Tukang Batu
L.02
OH
0.1200
75,000.00
9,000.00
Kepala Tukang
L.03
OH
0.0120
80,000.00
960.00
Mandor
L.04
OH
0.0060
80,000.00
480.00 17,640.00
B
Bahan Papan Kayu Klas II
m3
0.0030
6,582,500.00
19,747.50
Paku Sekrup 5 cm
kg
0.0500
13,000.00
650.00 20,397.50
16 SNI
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.64 A
38,037.50 2.5%
950.94 38,988.44
Pasang blok pafing tebal 6 cm K.125 Tenaga Pekerja
L.01
OH
0.5000
60,000.00
30,000.00
Tukang Batu
L.02
OH
0.1500
75,000.00
11,250.00
Kepala Tukang
L.03
OH
0.0150
80,000.00
1,200.00
Mandor
L.04
OH
0.0250
80,000.00
2,000.00 44,450.00
B
Bahan pasir muntilan utk nat
m3
0.0050
270,300.00
1,351.50
paving
m2
1.0000
55,300.00
55,300.00 56,651.50
17 SNI
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.65 A
101,101.50 2.5%
2,527.54 103,629.04
Blok paving tebal 6 cm dengan paving mutu K 225 Tenaga Pekerja
L.01
OH
0.5000
60,000.00
30,000.00
Tukang Batu
L.02
OH
0.1500
75,000.00
11,250.00
Kepala Tukang
L.03
OH
0.0150
80,000.00
1,200.00
Mandor
L.04
OH
0.0250
80,000.00
2,000.00 44,450.00
B
Bahan pasir muntilan utk nat
m3
0.0050
270,300.00
1,351.50
paving
m2
1.0000
60,000.00
60,000.00 61,351.50
C
PERALATAN
No.
AHSP
URAIAN PEKERJAAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 105,801.50
2.5%
2,645.04 108,446.54
No.
18 SNI
AHSP
A.4.4.3.66 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Blok paving tebal 8 cm dengan paving mutu K 300 Tenaga Pekerja
L.01
OH
0.5000
60,000.00
30,000.00
Tukang Batu
L.02
OH
0.1500
75,000.00
11,250.00
Kepala Tukang
L.03
OH
0.0150
80,000.00
1,200.00
Mandor
L.04
OH
0.0250
80,000.00
2,000.00 44,450.00
B
Bahan pasir muntilan utk nat
m3
0.0050
270,300.00
1,351.50
paving
m2
1.0000
94,000.00
94,000.00 95,351.50
19 SNI
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.67 A
139,801.50 2.5%
3,495.04 143,296.54
Blok paving warna tebal 6 cm K.125 Tenaga Pekerja
L.01
OH
0.5000
60,000.00
30,000.00
Tukang Batu
L.02
OH
0.1500
75,000.00
11,250.00
Kepala Tukang
L.03
OH
0.0150
80,000.00
1,200.00
Mandor
L.04
OH
0.0250
80,000.00
2,000.00 44,450.00
B
Bahan pasir muntilan utk nat
m3
0.0050
270,300.00
1,351.50
paving
m2
1.0000
51,000.00
51,000.00 52,351.50
20 SNI
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.68 A
96,801.50 2.5%
2,420.04 99,221.54
Blok paving warna tebal 8 cm K.125 Tenaga Pekerja
L.01
OH
0.5000
60,000.00
30,000.00
Tukang Batu
L.02
OH
0.1500
75,000.00
11,250.00
Kepala Tukang
L.03
OH
0.0150
80,000.00
1,200.00
Mandor
L.04
OH
0.0250
80,000.00
2,000.00 44,450.00
B
Bahan pasir muntilan utk nat
m3
0.0050
270,300.00
1,351.50
paving
m2
1.0000
57,500.00
57,500.00 58,851.50
C
PERALATAN
No.
AHSP
URAIAN PEKERJAAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 103,301.50
2.5%
2,582.54 105,884.04
No.
21 SNI
AHSP
A.4.4.3.69
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
pasang saluran U-20 cm
A
Tenaga
B
Bahan Buis beton U-20 cm
m'
1.0000
46,200.00
46,200.00
Pasang batu bata 1:4
m2
0.8000
223,973.40
179,178.72
Plesteran 1:3
m2
0.5000
48,831.06
24,415.53
Hurugan pasir
m3
0.0200
117,200.00
2,344.00
1.0000
4,500.00
4,500.00
Ongkos pasang Buis U-20
256,638.25
22 SNI
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.70
256,638.25 2.5%
6,415.96 263,054.21
pasang saluran U-30 cm
A
Tenaga
B
Bahan Buis beton U-30 cm
m'
1.0000
58,700.00
58,700.00
Pasang batu bata 1:4
m2
0.8000
223,973.40
179,178.72
Plesteran 1:3
m2
0.5000
48,831.06
24,415.53
Hurugan pasir
m3
0.0200
117,200.00
2,344.00
1.0000
4,500.00
4,500.00
Ongkos pasang Buis U-30
269,138.25 C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
269,138.25 2.5%
6,728.46 275,866.71
No.
AHSP
XIV
A.4.7.1
1
A.4.7.1.1 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
HARGA SATUAN PEKERJAAN PENGECATAN Pengikisan / pengerokan Permukaan Cat Tembok Lama Tenaga Pekerja
L.01
OH
Mandor
L.04
OH
0.1500 0.0030
60,000.00
9,000.00
80,000.00
240.00 9,240.00
B
Bahan Soda Api
Kg
0.0500
20,000.00
1,000.00 1,000.00
2
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.2 A
10,240.00 256.00
2.5%
10,496.00
Pencucian Bidang Permukaan Tembok yang Pernah dicat Tenaga Pekerja
L.01
OH
Mandor
L.04
OH
0.1500 0.0030
60,000.00
9,000.00
80,000.00
240.00 9,240.00
B
Bahan Sabun
Kg
0.0500
15,000.00
750.00 750.00
3
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.3 A
9,990.00 249.75
2.5%
10,239.75
Pengerokan Karat Cat Lama permukaan Baja dg cara manual Tenaga Pekerja
L.01
OH
Mandor
L.04
OH
0.1500 0.0080
60,000.00
9,000.00
80,000.00
640.00 9,640.00
B
Bahan Sabun
Kg
0.0500
15,000.00
750.00 750.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
10,390.00 2.5%
259.75 10,649.75
No. 4
AHSP A.4.7.1.4 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) Tenaga Pekerja
L.01
OH
0.0700
60,000.00
4,200.00
Tukang Cat
L.02
OH
0.0090
75,000.00
675.00
Kepala Tukang
L.03
OH
0.0060
80,000.00
480.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 5,595.00
B
Bahan Cat Menie
kg
0.2000
29,000.00
5,800.00
Plamuur
kg
0.1500
28,700.00
4,305.00
Cat Dasar
kg
0.1700
33,000.00
5,610.00
Cat Penutup
kg
0.2600
51,700.00
13,442.00
Kuas
bh
0.0100
11,500.00
115.00
Pengencer
kg
0.0300
18,000.00
540.00
Amplas
lbr
0.2000
13,100.00
2,620.00 32,432.00
5
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.5 A
38,027.00 950.68
2.5%
38,977.68
Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup) Tenaga Pekerja
L.01
OH
0.0700
60,000.00
4,200.00
Tukang Cat
L.02
OH
0.1050
75,000.00
7,875.00
Kepala Tukang
L.03
OH
0.0040
80,000.00
320.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 12,635.00
B
Bahan Cat Menie
kg
0.2000
29,000.00
5,800.00
Plamuur
kg
0.1500
28,700.00
4,305.00
Cat Dasar
kg
0.1700
33,000.00
5,610.00
Cat Penutup
kg
0.3500
51,700.00
18,095.00
Kuas
bh
0.0100
11,500.00
115.00
Pengencer
kg
0.0300
18,000.00
540.00
Amplas
lbr
0.2000
13,100.00
2,620.00 37,085.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
49,720.00 2.5%
1,243.00 50,963.00
No.
6
AHSP
A.4.7.1.6 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pelaburan Bidang Kayu dg Teak Oil Tenaga Pekerja
L.01
OH
0.0400
60,000.00
2,400.00
Tukang Cat
L.02
OH
0.0630
75,000.00
4,725.00
Kepala Tukang
L.03
OH
0.0630
80,000.00
5,040.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 12,405.00
B
Bahan Teak Oil
Ltr
0.3600
42,000.00
15,120.00 15,120.00
7
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.7 A
27,525.00 2.5%
688.13 28,213.13
Pelaburan Bidang Kayu dg Politur Tenaga Pekerja
L.01
OH
0.0400
60,000.00
2,400.00
Tukang Cat
L.02
OH
0.0600
75,000.00
4,500.00
Kepala Tukang
L.03
OH
0.0160
80,000.00
1,280.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 8,420.00
B
Bahan Politur
Ltr
0.1500
20,000.00
3,000.00
Spiritus
Ltr
0.3720
11,600.00
4,315.20
Ampelas
Lbr
2.0000
13,100.00
26,200.00 33,515.20
8
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.8 A
41,935.20 1,048.38
2.5%
42,983.58
Pelaburan Bidang Kayu dg Cat Residu & Ter Tenaga Pekerja
L.01
OH
Mandor
L.04
OH
0.1000 0.0060
60,000.00
6,000.00
80,000.00
480.00 6,480.00
B
Bahan Residu atau Ter
Ltr
0.3500
3,400.00
1,190.00 1,190.00
C
PERALATAN
D
Jumlah A + B + C
7,670.00
No.
AHSP
URAIAN PEKERJAAN
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
2.5%
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 191.75 7,861.75
No. 9
AHSP A.4.7.1.9 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pelaburan Bidang Kayu dg Vernis Tenaga Pekerja
L.01
OH
0.1600
60,000.00
9,600.00
Tukang Cat
L.02
OH
0.1600
75,000.00
12,000.00
Kepala Tukang
L.03
OH
0.0160
80,000.00
1,280.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 23,120.00
B
Bahan Vernis
Ltr
0.1500
40,000.00
6,000.00
Dempul
Ltr
0.0500
28,700.00
1,435.00
Ampelas
Lbr
0.1000
13,100.00
1,310.00 8,745.00
10
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.10 A
31,865.00 796.63
2.5%
32,661.63
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Decolite Tenaga Pekerja
L.01
OH
0.0200
60,000.00
1,200.00
Tukang Cat
L.02
OH
0.0630
75,000.00
4,725.00
Kepala Tukang
L.03
OH
0.0063
80,000.00
504.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 6,669.00
B
Bahan Plamir
Kg
0.1000
17,500.00
1,750.00
Cat Dasar
Kg
0.1000
45,000.00
4,500.00
Cat Penutup 2 kali
Kg
0.2600
18,000.00
4,680.00 10,930.00
11
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
17,599.00 439.98
2.5%
18,038.98
A.4.7.1.10.1 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex dalam ruangan A
Tenaga Pekerja
L.01
OH
0.0200
60,000.00
1,200.00
Tukang Cat
L.02
OH
0.0630
75,000.00
4,725.00
Kepala Tukang
L.03
OH
0.0063
80,000.00
504.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 6,669.00
B
Bahan
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Plamir
Kg
0.1000
17,500.00
1,750.00
Cat Dasar
Kg
0.1000
45,000.00
4,500.00
Cat Penutup 2 kali
Kg
0.2600
52,600.00
13,676.00 19,926.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
26,595.00 2.5%
664.88 27,259.88
No. 12
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
A.4.7.1.10.2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex luar ruangan A
Tenaga Pekerja
L.01
OH
0.0200
60,000.00
1,200.00
Tukang Cat
L.02
OH
0.0630
75,000.00
4,725.00
Kepala Tukang
L.03
OH
0.0063
80,000.00
504.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 6,669.00
B
Bahan Plamir
Kg
0.1000
17,500.00
1,750.00
Cat Dasar
Kg
0.1000
45,000.00
4,500.00
Cat Penutup 2 kali
Kg
0.2600
80,000.00
20,800.00 27,050.00
13
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.11 A
33,719.00 842.98
2.5%
34,561.98
Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup)Decolite Tenaga Pekerja
L.01
OH
0.0280
60,000.00
1,680.00
Tukang Cat
L.02
OH
0.0420
75,000.00
3,150.00
Kepala Tukang
L.03
OH
0.0042
80,000.00
336.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 5,406.00
B
Bahan Cat Dasar
Kg
0.1200
45,000.00
5,400.00
Cat Penutup 2 kali
Kg
0.1800
18,000.00
3,240.00 8,640.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
14,046.00 2.5%
351.15 14,397.15
14 A.4.7.1.11.1 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup)Mowilex dalam ruangan A
Tenaga Pekerja
L.01
OH
0.0280
60,000.00
1,680.00
Tukang Cat
L.02
OH
0.0420
75,000.00
3,150.00
Kepala Tukang
L.03
OH
0.0042
80,000.00
336.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 5,406.00
B
Bahan Cat Dasar
Kg
0.1200
45,000.00
5,400.00
No.
AHSP
URAIAN PEKERJAAN Cat Penutup 2 kali
KODE
SAT. Kg
KOEF 0.1800
HARGA SATUAN Rp 52,600.00
JUMLAH HARGA Rp 9,468.00 14,868.00
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
20,274.00 2.5%
506.85 20,780.85
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
15 A.4.7.1.11.2 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup)Mowilex luar ruangan A
Tenaga Pekerja
L.01
OH
0.0280
60,000.00
1,680.00
Tukang Cat
L.02
OH
0.0420
75,000.00
3,150.00
Kepala Tukang
L.03
OH
0.0042
80,000.00
336.00
Mandor
L.04
OH
0.0030
80,000.00
240.00 5,406.00
B
Bahan Cat Dasar
Kg
0.1200
45,000.00
5,400.00
Cat Penutup 2 kali
Kg
0.1800
80,000.00
14,400.00 19,800.00
16
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.16 A
25,206.00 2.5%
630.15 25,836.15
Pengecatan Permukaan Baja dg Meni Besi Tenaga Pekerja
L.01
OH
0.0200
60,000.00
1,200.00
Tukang Cat
L.02
OH
0.2000
75,000.00
15,000.00
Kepala Tukang
L.03
OH
0.0200
80,000.00
1,600.00
Mandor
L.04
OH
0.0025
80,000.00
200.00 18,000.00
B
Bahan Meni Besi
Kg
0.1000
29,000.00
2,900.00
Perekat / Lem
Kg
0.0100
35,000.00
350.00 3,250.00
17 SNI
C
PERALATAN
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.22 A
21,250.00 2.5%
531.25 21,781.25
Pengecatan 1 m2 permukaan Besi 3x Tenaga Pekerja
L.01
OH
0.0500
60,000.00
3,000.00
Tukang Cat
L.02
OH
0.0750
75,000.00
5,625.00
Kepala Tukang
L.03
OH
0.0075
80,000.00
600.00
Mandor
L.04
OH
0.0025
80,000.00
200.00 9,425.00
B
Bahan Cat Pengencer Meni Amplas
Kg L Kg Bh
0.2600 0.1740 0.0750 0.2000
57,600.00 18,000.00 29,000.00 13,100.00
14,976.00 3,132.00 2,175.00 2,620.00
No.
AHSP
C D E F
URAIAN PEKERJAAN
PERALATAN Jumlah A + B + C Overhead 2.5% Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 22,903.00 32,328.00 808.20 33,136.20
No.
AHSP
URAIAN PEKERJAAN
18 SNI
A.4.7.1.23 A
Pengecatan 1 m2 permukaan Trotoir 3x Tenaga Pekerja Tukang Cat Kepala Tukang Mandor
B
C D E F
Bahan Cat Pengencer Amplas PERALATAN Jumlah A + B + C Overhead 2.5% Harga Satuan Pekerjaan (D+E)
KODE
L.01 L.02 L.03 L.04
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
OH OH OH OH
0.0500 0.0750 0.0075 0.0025
60,000.00 75,000.00 80,000.00 80,000.00
3,000.00 5,625.00 600.00 200.00 9,425.00
Kg L Bh
0.2600 0.1740 0.2000
57,600.00 18,000.00 57,600.00
14,976.00 3,132.00 11,520.00 29,628.00 39,053.00 976.33 40,029.33
No.
AHSP
XV
A.8.4.1
1
A.8.4.1.1 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
HARGA SATUAN PEKERJAAN PEMASANGAN PIPA Pemasangan 1 m pipa PVC Ø 50 mm (2") TENAGA Pekerja
L.01
OH
0.081
50,000.00
4,050.00
Tukang pipa
L.02
OH
0.041
60,000.00
2,460.00
Mandor
L.04
OH
0.008
70,000.00
560.00 7,070.00
B
BAHAN Pipa PVC Ø 50 mm
m
1.000
24,350.00
24,350.00 24,350.00
C
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
0.006
-
2
D
Jumlah A + B + C
31,420.00
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
2.5%
785.50 32,205.50
A.8.4.1.1.1 Pemasangan 1 m pipa PVC Ø 25 mm (1") A
TENAGA Pekerja
L.01
OH
0.067
50,000.00
3,347.11
Tukang pipa
L.02
OH
0.034
60,000.00
2,033.06
Mandor
L.04
OH
0.007
70,000.00
462.81 5,842.98
B
BAHAN Pipa PVC Ø 25 mm
m
1.000
8,450.00
8,450.00 8,450.00
C
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
0.006
-
3
D
Jumlah A + B + C
E
Overhead
14,292.98
F
Harga Satuan Pekerjaan (D+E)
2.5%
357.32 14,650.30
A.8.4.1.1.2 Pemasangan 1 m pipa PVC Ø 40 mm (1½") A
TENAGA Pekerja
L.01
OH
0.074
50,000.00
3,681.82
Tukang pipa
L.02
OH
0.037
60,000.00
2,236.36
Mandor
L.04
OH
0.007
70,000.00
509.09 6,427.27
B
BAHAN Pipa PVC Ø 40 mm
m
1.000
19,100.00
19,100.00 19,100.00
C
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
0.006
-
D
Jumlah A + B + C
25,527.27
No.
AHSP
URAIAN PEKERJAAN
E
Overhead
2.5%
F
Harga Satuan Pekerjaan (D+E)
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 638.18 26,165.45
No.
AHSP
4
A.8.4.1.2 A
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Pemasangan 1 m pipa PVC Ø 75 mm (3") TENAGA Pekerja
L.01
OH
0.094
50,000.00
4,700.00
Tukang pipa
L.02
OH
0.047
60,000.00
2,820.00
Mandor
L.04
OH
0.009
70,000.00
630.00 8,150.00
B
BAHAN Pipa PVC Ø 75 mm
m
1.000
50,900.00
50,900.00 50,900.00
C
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
0.009
-
5
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.8.4.1.3 A
59,050.00 2.5%
1,476.25 60,526.25
Pemasangan 1 m pipa PVC Ø 90 mm (4") TENAGA Pekerja
L.01
OH
0.105
50,000.00
5,250.00
Tukang pipa
L.02
OH
0.053
60,000.00
3,180.00
Mandor
L.04
OH
0.011
70,000.00
770.00 9,200.00
B
BAHAN Pipa PVC Ø 90 mm
m
1.000
73,900.00
73,900.00 73,900.00
C
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
0.009
-
6
D
Jumlah A + B + C
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
A.8.4.1.17 A
83,100.00 2.5%
2,077.50 85,177.50
Pemasangan 1 m pipa HDPE OD 63 mm TENAGA Pekerja
L.01
OH
0.035
50,000.00
1,750.00
Tukang pipa
L.02
OH
0.017
60,000.00
1,020.00
Mandor
L.04
OH
0.003
70,000.00
210.00 2,980.00
B
BAHAN Pipa HDPE OD 63 mm
m
1.000
50,050.00
50,050.00 50,050.00
C
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
0.019
-
D
Jumlah A + B + C
E
Overhead
53,030.00 2.5%
1,325.75
No.
AHSP F
URAIAN PEKERJAAN Harga Satuan Pekerjaan (D+E) Overhead & Profit
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 54,355.75
No. 7
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
A.8.4.1.17.1 Pemasangan 1 m pipa HDPE OD 75 mm A
TENAGA Pekerja
L.01
OH
0.039
50,000.00
1,925.00
Tukang pipa
L.02
OH
0.019
60,000.00
1,122.00
Mandor
L.04
OH
0.003
70,000.00
231.00 3,278.00
B
BAHAN Pipa HDPE OD 75 mm
m
1.000
69,900.00
69,900.00 69,900.00
C
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
0.019
-
8
D
Jumlah A + B + C
73,178.00
E
Overhead
F
Harga Satuan Pekerjaan (D+E)
2.5%
1,829.45 75,007.45
A.8.4.1.17.2 Pemasangan 1 m pipa HDPE OD 90 mm A
TENAGA Pekerja
L.01
OH
0.040
50,000.00
2,000.00
Tukang pipa
L.02
OH
0.020
60,000.00
1,200.00
Mandor
L.04
OH
0.004
70,000.00
280.00 3,480.00
B
BAHAN Pipa HDPE OD 90 mm
m
1.000
101,300.00
101,300.00 101,300.00
C
PERALATAN Sewa Tripot/Tackel & handle crane 2 T
hari
0.019
-
D E F 9
10
11
A.8.4.1.80
A.8.4.1.81
A.8.4.1.82
Jumlah A + B + C Overhead 2.5% Harga Satuan Pekerjaan (D+E)
104,780.00 2,619.50 107,399.50
Biaya 1 m' pemasangan pipa PVC Ø 25 mm (galian 0,25m x 0,3m + Bahan) Galian tanah keras m3 0.075 Urugan tanah kembali m3 0.065 Buangan sisa galian m3 0.010 Pemasangan Pipa 1.000 Harga Satuan Pekerjaan
64,124.00 11,616.67 21,115.00 14,650.30
4,809.30 755.08 211.15 14,650.30 20,425.83
Biaya 1 m' pemasangan pipa PVC Ø 40 mm (galian 0,25m x 0,4m + Bahan) Galian tanah keras m3 0.100 Urugan tanah kembali m3 0.080 Buangan sisa galian m3 0.020 Pemasangan Pipa 1.000 Harga Satuan Pekerjaan
64,124.00 11,616.67 21,115.00 26,165.45
6,412.40 929.33 422.30 26,165.45 33,929.49
64,124.00 11,616.67 21,115.00
8,015.50 1,103.58 633.45
Biaya 1 m' pemasangan pipa PVC Ø 50 mm (galian 0,25m x 0,5m + Bahan) Galian tanah keras m3 0.125 Urugan tanah kembali m3 0.095 Buangan sisa galian m3 0.030
No.
AHSP
URAIAN PEKERJAAN Pemasangan Pipa Harga Satuan Pekerjaan
12
A.8.4.1.83
KODE
SAT.
KOEF 1.000
Biaya 1 m' pemasangan pipa PVC Ø 75 mm (galian 0,25m x 0,6m + Bahan) Galian tanah keras m3 0.150 Urugan tanah kembali m3 0.120 Buangan sisa galian m3 0.030 Pemasangan Pipa 1.000 Harga Satuan Pekerjaan
HARGA JUMLAH HARGA SATUAN Rp Rp 32,205.50 32,205.50 41,958.03
64,124.00 11,616.67 21,115.00 60,526.25
9,618.60 1,394.00 633.45 60,526.25 72,172.30
No.
13
14
15
16
AHSP
A.8.4.1.84
A.8.4.1.85
A.8.4.1.86
A.8.4.1.87
XVI
A.8.4.5
1
A.8.4.5.1 A
B
2
URAIAN PEKERJAAN
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp
Biaya 1 m' pemasangan pipa PVC Ø 100 mm (galian 0,30m x 1,00m + Bahan) Galian tanah keras m3 0.300 Urugan tanah kembali m3 0.265 Buangan sisa galian m3 0.035 Pemasangan Pipa 1.000 Harga Satuan Pekerjaan
64,124.00 11,616.67 21,115.00 85,177.50
19,237.20 3,078.42 739.03 85,177.50 108,232.14
Biaya 1 m' pemasangan pipa HDPE OD 63 mm (galian 0,25m x 0,5m + Bahan) Galian tanah keras m3 0.125 Urugan tanah kembali m3 0.095 Buangan sisa galian m3 0.030 Pemasangan Pipa 1.000 Harga Satuan Pekerjaan
64,124.00 11,616.67 21,115.00 54,355.75
8,015.50 1,103.58 633.45 54,355.75 64,108.28
Biaya 1 m' pemasangan pipa HDPE OD 75 mm (galian 0,25m x 0,6m + Bahan) Galian tanah keras m3 0.150 Urugan tanah kembali m3 0.120 Buangan sisa galian m3 0.030 Pemasangan Pipa 1.000 Harga Satuan Pekerjaan
64,124.00 11,616.67 21,115.00 75,007.45
9,618.60 1,394.00 633.45 75,007.45 86,653.50
Biaya 1 m' pemasangan pipa HDPE OD 90 mm (galian 0,25m x 0,70m + Bahan) Galian tanah keras m3 0.175 64,124.00 Urugan tanah kembali m3 0.140 11,616.67 Buangan sisa galian m3 0.035 21,115.00 Pemasangan Pipa 1.000 107,399.50 Harga Satuan Pekerjaan
11,221.70 1,626.33 739.03 107,399.50 120,986.56
HARGA SATUAN PEKERJAAN PENGETESAN PIPA Pengetesan 1 m pipa Ø 50 mm TENAGA Pekerja Mandor
L.01 L.04
BAHAN Air test (air bersih) Bahan bakar Oli
C D E F
PERALATAN Jumlah A + B + C Overhead 2.5% Harga Satuan Pekerjaan (D+E)
A.8.4.5.2 A
Pengetesan 1 m pipa Ø 75 mm TENAGA Pekerja Mandor
B
KODE
BAHAN Air test (air bersih) Bahan bakar Oli
OH OH
m3 liter liter
0.0080 0.0008
0.002 0.060 0.002
50,000.00 80,000.00
400.00 64.00 464.00
20,000.00 6,400.00 33,600.00
40.00 384.00 67.20 491.20 955.20 23.88 979.08
L.01 L.04
OH OH
m3 liter liter
0.0080 0.0008
0.004 0.060 0.002
50,000.00 80,000.00
400.00 64.00 464.00
20,000.00 6,400.00 33,600.00
80.00 384.00 67.20
No.
AHSP
URAIAN PEKERJAAN
KODE
SAT.
KOEF
HARGA SATUAN Rp
JUMLAH HARGA Rp 531.20
C D E F
PERALATAN Jumlah A + B + C Overhead 2.5% Harga Satuan Pekerjaan (D+E)
995.20 24.88 1,020.08
No.
AHSP
3
A.8.4.5.3 A
B
C D E F 4
A.8.4.5.4 A
B
C D E F 5
A.8.4.5.5 A
B
C D E F
URAIAN PEKERJAAN Pengetesan 1 m pipa Ø 100 mm TENAGA Pekerja Mandor
KODE
L.01 L.04
BAHAN Air test (air bersih) Bahan bakar Oli
SAT.
OH OH
m3 liter liter
KOEF
0.0080 0.0008
0.008 0.060 0.002
HARGA SATUAN Rp
400.00 64.00 464.00
20,000.00 6,400.00 33,600.00
160.00 384.00 67.20 611.20 1,075.20 26.88 1,102.08
L.01 L.04
BAHAN Air test (air bersih) Bahan bakar Oli
OH OH
m3 liter liter
0.0080 0.0008
0.018 0.060 0.002
50,000.00 80,000.00
400.00 64.00 464.00
20,000.00 6,400.00 33,600.00
360.00 384.00 67.20 811.20
PERALATAN Jumlah A + B + C Overhead 2.5% Harga Satuan Pekerjaan (D+E) Pengetesan 1 m pipa Ø 200 mm TENAGA Pekerja Mandor BAHAN Air test (air bersih) Bahan bakar Oli PERALATAN Jumlah A + B + C Overhead 2.5% Harga Satuan Pekerjaan (D+E)
Rp
50,000.00 80,000.00
PERALATAN Jumlah A + B + C Overhead 2.5% Harga Satuan Pekerjaan (D+E) Pengetesan 1 m pipa Ø 150 mm TENAGA Pekerja Mandor
JUMLAH HARGA
1,275.20 31.88 1,307.08
L.01 L.04
OH OH
m3 liter liter
0.0080 0.0008
0.031 0.060 0.002
50,000.00 80,000.00
400.00 64.00 464.00
20,000.00 6,400.00 33,600.00
620.00 384.00 67.20 1,071.20 1,535.20 38.38 1,573.58
PEKERJAAN : PEMBUATAN SUMUR PRODUKSI An.1
Jenis pekerjaan
NO
URAIAN
UPAH Site manager Operator pemboran Crew pengeboran Pengemudi II. PERALATAN 1 Sewa kendaraan angkut ( truk )
: Mobilisasi/demobilisasi driling rig & peralatan pemboran
SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
I
1 2 3 4
Hari Hari Hari Hari
1.00 1.00 4.00 2.00
x x x x
1.00 1.00 1.00 2.00
75,000.00 50,000.00 50,000.00 40,000.00
75,000.00 50,000.00 200,000.00 160,000.00
Hari
2.00
x
2.00
250,000.00
1,000,000.00
JUMLAH
An.2
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 6 7 8 II. 1 2 3 4 III.
UPAH Site manager Geologist Keuangan Logistik Operator pemboran Mekanik Crew pengeboran Buruh lokal PERALATAN Solar Olie mesin Veet Bentonite PERALATAN Peralatan pemboran
1,485,000.00
:Pemboran pilot hole diameter 6", 0 -- 50 m SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
Hari Hari Hari Hari Hari Hari Hari Hari
1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00
x x x x x x x x
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
75,000.00 60,000.00 50,000.00 50,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 60,000.00 50,000.00 50,000.00 50,000.00 60,000.00 100,000.00 80,000.00
Ltr Ltr Kg Kg
70.00 5.00 2.00 40.00
x x x x
1.00 1.00 1.00 1.00
6,400.00 33,600.00 33,100.00 11,400.00
448,000.00 168,000.00 66,200.00 456,000.00
Unit
1.00
x
1.00
400,000.00
400,000.00
JUMLAH 1 HARI RATA-RATA 10 M' ----> JADI PER METER Overhead 2.5%
2,063,200.00 206,320.00 5,158.00
211,478.00
An.3
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 6 7 8 II. 1 2 3 4 III.
UPAH Site manager Geologist Keuangan Logistik Operator pemboran Mekanik Crew pengeboran Buruh lokal PERALATAN Solar Olie mesin Veet Bentonite PERALATAN Peralatan pemboran
:Pemboran pilot hole diameter 6", 50 -- 100 m SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
Hari Hari Hari Hari Hari Hari Hari Hari
1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00
x x x x x x x x
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
75,000.00 60,000.00 50,000.00 50,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 60,000.00 50,000.00 50,000.00 50,000.00 60,000.00 100,000.00 80,000.00
Ltr Ltr Kg Kg
75.00 5.00 2.00 50.00
x x x x
1.00 1.00 1.00 1.00
6,400.00 33,600.00 33,100.00 11,400.00
480,000.00 168,000.00 66,200.00 570,000.00
Unit
1.00
x
1.00
375,000.00
375,000.00
JUMLAH 1 HARI RATA-RATA 10 M' ----> JADI PER METER Overhead 2.5%
2,184,200.00 218,420.00 5,460.50
223,880.50
An.4
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 6 7 8 II. 1 2 3 4 III.
UPAH Site manager Geologist Keuangan Logistik Operator pemboran Mekanik Crew pengeboran Buruh lokal PERALATAN Solar Olie mesin Veet Bentonite PERALATAN Peralatan pemboran
:Pemboran pilot hole diameter 6", 100 -- 150 m SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
Hari Hari Hari Hari Hari Hari Hari Hari
1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00
x x x x x x x x
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
75,000.00 60,000.00 50,000.00 50,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 60,000.00 50,000.00 50,000.00 50,000.00 60,000.00 100,000.00 80,000.00
Ltr Ltr Kg Kg
85.00 6.00 3.00 60.00
x x x x
1.00 1.00 1.00 1.00
6,400.00 33,600.00 33,100.00 11,400.00
544,000.00 201,600.00 99,300.00 684,000.00
Unit
1.00
x
1.00
375,000.00
375,000.00
JUMLAH 1 HARI RATA-RATA 10 M' ----> JADI PER METER Overhead 2.5%
2,428,900.00 242,890.00 6,072.25
248,962.25
An.5
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 6 7 8 II. 1 2 3 4 III.
UPAH Site manager Geologist Keuangan Logistik Operator pemboran Mekanik Crew pengeboran Buruh lokal PERALATAN Solar Olie mesin Veet Bentonite PERALATAN Peralatan pemboran
: Pekerjaan reaming, 0 -- 65 m SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
Hari Hari Hari Hari Hari Hari Hari Hari
1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00
x x x x x x x x
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
75,000.00 60,000.00 50,000.00 50,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 60,000.00 50,000.00 50,000.00 50,000.00 60,000.00 100,000.00 80,000.00
Ltr Ltr Kg Kg
60.00 4.00 2.00 40.00
x x x x
1.00 1.00 1.00 1.00
6,400.00 33,600.00 33,100.00 11,400.00
384,000.00 134,400.00 66,200.00 456,000.00
Unit
1.00
x
1.00
375,000.00
375,000.00
JUMLAH 1 HARI RATA-RATA 10 M' ----> JADI PER METER Overhead 2.5%
1,940,600.00 194,060.00 4,851.50
198,911.50
An.6
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 6 7 8 II. 1 2 3 4 III.
UPAH Site manager Geologist Keuangan Logistik Operator pemboran Mekanik Crew pengeboran Buruh lokal PERALATAN Solar Olie mesin Veet Bentonite PERALATAN Peralatan pemboran
: Pekerjaan reaming ,65 -- 130 m SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
Hari Hari Hari Hari Hari Hari Hari Hari
1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00
x x x x x x x x
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
75,000.00 60,000.00 50,000.00 50,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 60,000.00 50,000.00 50,000.00 50,000.00 60,000.00 100,000.00 80,000.00
Ltr Ltr Kg Kg
75.00 6.00 3.00 55.00
x x x x
1.00 1.00 1.00 1.00
6,400.00 33,600.00 33,100.00 11,400.00
480,000.00 201,600.00 99,300.00 627,000.00
Unit
1.00
x
1.00
375,000.00
375,000.00
JUMLAH 1 HARI RATA-RATA 10 M' ----> JADI PER METER Overhead 2.5%
2,307,900.00 230,790.00 5,769.75
236,559.75
An.7
Jenis pekerjaan
NO
URAIAN
UPAH Site manager Geologist Operator pemboran Crew pengeboran II. PERALATAN 1 Recorder paper 2 Alat tulis III. PERALATAN Mesin peralatan logging Tranportasi peralatan logging
: Electric logging SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
I
1 2 3 4
Hari Hari Hari Hari
1.00 1.00 1.00 2.00
x x x x
1.00 1.00 1.00 1.00
75,000.00 60,000.00 50,000.00 50,000.00
75,000.00 60,000.00 50,000.00 100,000.00
Unit Unit
1.00 1.00
x x
1.00 1.00
20,000.00 15,000.00
20,000.00 15,000.00
Unit Unit
1.00 1.00
x x
1.00 1.00
700,000.00 150,000.00
700,000.00 150,000.00
JUMLAH 1 HARI RATA-RATA 50 M' ----> JADI PER METER Overhead 2.5%
1,170,000.00 23,400.00 585.00
23,985.00
An.8
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 II. 1 2 3 4 III.
UPAH Site manager Operator pemboran Mekanik Crew pengeboran Penjaga malam PERALATAN Solar Olie mesin Veet Kawat las Pipa jambang diameter 8" PERALATAN Peralatan pemboran Sewa mesin las
: Pengadaan dan pemasangan pipa jambang diametr 8" SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
Hari Hari Hari Hari Hari
1.00 1.00 1.00 3.00 2.00
x x x x x
1.00 1.00 1.00 1.00 1.00
75,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 50,000.00 60,000.00 150,000.00 80,000.00
Ltr Ltr Kg Btg Mtr
120.00 3.00 2.00 120.00 60.00
x x x x x
1.00 1.00 1.00 1.00
6,400.00 33,600.00 33,100.00 900.00 578,400.00
768,000.00 100,800.00 66,200.00 108,000.00 34,704,000.00
Unit Unit
1.00 1.00
x x
1.00 1.00
375,000.00 50,000.00
375,000.00 50,000.00
JUMLAH 1 HARI RATA-RATA 60 M' ----> JADI PER METER Overhead 2.5%
36,587,000.00 609,783.33 15,244.58
625,027.92 DIBULATKAN
625,000.00
An.9
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 II. 1 2 3 4 5 III.
UPAH Site manager Operator pemboran Mekanik Crew pengeboran Penjaga malam PERALATAN Solar Olie mesin Veet Kawat las Pipa buta diameter 6" PERALATAN Peralatan pemboran Sewa mesin las
: Pengadaan dan pemasangan pipa buta diametr 6" SATUAN
KUANTITAS
Hari Hari Hari Hari Hari
1.00 1.00 1.00 3.00 2.00
x x x x x
Ltr Ltr Kg Btg Mtr
40.00 1.00 0.60 60.00 30.00
x x x x x
Unit Unit
1.00 1.00
x x
HARGA SAT.
1.00 1.00 1.00 1.00 1.00
1.00 1.00
JUML. HARGA
75,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 50,000.00 60,000.00 150,000.00 80,000.00
6,400.00 33,600.00 33,100.00 900.00 310,000.00
256,000.00 33,600.00 19,860.00 54,000.00 9,300,000.00
375,000.00 50,000.00
375,000.00 50,000.00
JUMLAH 1 HARI RATA-RATA 30 M' ----> JADI PER METER Overhead 2.5%
10,503,460.00 350,115.33 8,752.88
358,868.22 DIBULATKAN
358,000.00
An.10
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 II. 1 2 3 4 5 III.
UPAH Site manager Operator pemboran Mekanik Crew pengeboran Penjaga malam PERALATAN Solar Olie mesin Veet Kawat las Screen stainless steel dia 6 : PERALATAN Peralatan pemboran Sewa mesin las
: Pengad. dan pemasangan screen stainless steel diametr 6" SATUAN
KUANTITAS
Hari Hari Hari Hari Hari
1.00 1.00 1.00 3.00 2.00
x x x x x
Ltr Ltr Kg Btg Mtr
40.00 1.00 0.60 60.00 30.00
x x x x x
Unit Unit
1.00 1.00
x x
JUMLAH 1 HARI RATA-RATA 30 M' ----> JADI PER METER Overhead 2.5%
HARGA SAT.
1.00 1.00 1.00 1.00 1.00
1.00 1.00
JUML. HARGA
75,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 50,000.00 60,000.00 150,000.00 80,000.00
6,400.00 33,600.00 33,100.00 900.00 1,719,900.00
256,000.00 33,600.00 19,860.00 54,000.00 51,597,000.00
375,000.00 50,000.00
375,000.00 50,000.00
52,800,460.00 1,760,015.33 44,000.38
1,804,015.72 DIBULATKAN
1,804,000.00
An.8'
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 II. 1 2 3 4 5 III.
UPAH Site manager Operator pemboran Mekanik Crew pengeboran Penjaga malam PERALATAN Solar Olie mesin Veet Kawat las Pipa jambang diameter 6" PERALATAN Peralatan pemboran Sewa mesin las
: Pengadaan dan pemasangan pipa jambang diametr 6" (GIP) SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
Hari Hari Hari Hari Hari
1.00 1.00 1.00 3.00 2.00
x x x x x
1.00 1.00 1.00 1.00 1.00
75,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 50,000.00 60,000.00 150,000.00 80,000.00
Ltr Ltr Kg Btg Mtr
120.00 3.00 2.00 120.00 60.00
x x x x x
1.00 1.00 1.00 1.00
6,400.00 33,600.00 33,100.00 900.00 323,200.00
768,000.00 100,800.00 66,200.00 108,000.00 19,392,000.00
Unit Unit
1.00 1.00
x x
1.00 1.00
375,000.00 50,000.00
375,000.00 50,000.00
JUMLAH 1 HARI RATA-RATA 60 M' ----> JADI PER METER Overhead 2.5%
21,275,000.00 354,583.33 8,864.58
363,447.92 DIBULATKAN
363,000.00
An.9'
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 II. 1 2 3 4 5 III.
UPAH Site manager Operator pemboran Mekanik Crew pengeboran Penjaga malam PERALATAN Solar Olie mesin Veet Kawat las Pipa buta diameter 4" PERALATAN Peralatan pemboran Sewa mesin las
: Pengadaan dan pemasangan pipa buta diametr 4" (GIP) SATUAN
KUANTITAS
Hari Hari Hari Hari Hari
1.00 1.00 1.00 3.00 2.00
x x x x x
Ltr Ltr Kg Btg Mtr
40.00 1.00 0.60 60.00 30.00
x x x x x
Unit Unit
1.00 1.00
x x
JUMLAH 1 HARI RATA-RATA 30 M' ----> JADI PER METER Overhead 2.5%
HARGA SAT.
1.00 1.00 1.00 1.00 1.00
1.00 1.00
JUML. HARGA
75,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 50,000.00 60,000.00 150,000.00 80,000.00
6,400.00 33,600.00 33,100.00 900.00 283,500.00
256,000.00 33,600.00 19,860.00 54,000.00 8,505,000.00
375,000.00 50,000.00
375,000.00 50,000.00
9,708,460.00 323,615.33 8,090.38
331,705.72 DIBULATKAN
331,000.00
An.10'
Jenis pekerjaan
NO
URAIAN
I 1 2 3 4 5 II. 1 2 3 4 5 III.
UPAH Site manager Operator pemboran Mekanik Crew pengeboran Penjaga malam PERALATAN Solar Olie mesin Veet Kawat las Screen stainless steel dia 4" : PERALATAN Peralatan pemboran Sewa mesin las
: Pengad. dan pemasangan screen stainless steel diametr 4" SATUAN
KUANTITAS
Hari Hari Hari Hari Hari
1.00 1.00 1.00 3.00 2.00
x x x x x
Ltr Ltr Kg Btg Mtr
40.00 1.00 0.60 60.00 30.00
x x x x x
Unit Unit
1.00 1.00
x x
JUMLAH 1 HARI RATA-RATA 30 M' ----> JADI PER METER Overhead 2.5%
HARGA SAT.
1.00 1.00 1.00 1.00 1.00
1.00 1.00
JUML. HARGA
75,000.00 50,000.00 60,000.00 50,000.00 40,000.00
75,000.00 50,000.00 60,000.00 150,000.00 80,000.00
6,400.00 33,600.00 33,100.00 900.00 1,181,300.00
256,000.00 33,600.00 19,860.00 54,000.00 35,439,000.00
375,000.00 50,000.00
375,000.00 50,000.00
36,642,460.00 1,221,415.33 30,535.38
1,251,950.72 DIBULATKAN
1,251,000.00
ANALISA BIAYA PEKERJAAN LAPIS PENETRASI MAKADAM (LAPEN) 5 CM ( MENGGUNAKAN BURUH )
PROPINSI : JAWA TENGAH
KODE 33
URAIAN : 1. Semprotkan aspal tack coat 0,8 liter/m2 2. Hamparkan agregat pokok 3-5 25 m2/m3 dan padatkan 3. Haparkan split 2-3 45 m2/m3 dan padatkan 4. Semprotkan aspal (2,5 kg/m2) 5. Hamparkan agregat pengunci split 1-2 90 m2/m3 & padatkan 6. Semprotkan aspal 1,5 kg/m2 dan gilas 7. Taburkan pasir rata-rata 400m2 per m3
Mandor Operator terlatih Sopir Buruh tak terlatih Buruh terlatih ( Tenaga Aspal )
Jumlah Orang 0.004 0.004 0.002 0.141 0.004
MATERIAL
M A T E R I A L
Alat bantu Material batu pecah : -Batu pecah 3-5 cm - Batu pecah 2-3 cm - Batu pecah 1-2 cm - Batu ciping 0,5 cm - Abu batu Aspal Minyak bakar
P E R A L A T A N
Mesin gilas 3 roda 6 - 10 ton Sprayer aspal 200 L Flatbed truck 3,5 T /115 HP
Hari
2.00 2.00 1.00 66.00 2.00
Jumlah
0.0400 0.0221 0.0111 0.0051 0.0025 4.4786 0.3214
PERALATAN
KODE: 20
DISIAPKAN OLEH : CIPTAKARYA
Kode
3 3 3 3 3
Volume Satuan
Jumlah Hari-Org 6.00 6.00 3.00 198.00 6.00
Kode
Upah (Rp./Org/Hari) 80,000.00 70,000.00 40,000.00 40,000.00 60,000.00
:
1,400.00
Biaya (Rp.)
Sub Total (Rp.)
480,000.00 420,000.00 120,000.00 7,920,000.00 360,000.00
Harga Satuan (Rp.)
9,300,000.00 Sub Total (Rp.)
Biaya (Rp.)
3.10
Set
465,000.00
1,441,500.00
56.00 31.00 15.50 7.13 3.50 6,270.00 450.00
m3 m3 m3 m3 m3 kg liter
191,900.00 215,900.00 217,100.00 189,400.00 172,700.00 13,500.00 13,500.00
10,746,400.00 6,692,900.00 3,365,050.00 1,350,422.00 604,450.00 84,645,000.00 6,075,000.00
Jumlah Alat
Hari Kerja
1.00 1.00 1.00
Kode
3 3 3
Jam Kerja 15.00 15.00 15.00
Harga (Rp./jam) 44,000.00 50,000.00 71,500.00
TOTAL Overhead TOTAL BIAYA VOLUME/ QUANTITY
TANGGAL: Jepara, Februari 2015
ANGGAPAN / ASUMSI : 1. Menggunakan tenaga buruh 2. Harga material ( agregat dan aspal) adalah harga di lokasi proyek 3. Volume aspal cair untuk tack coat/prime coat 0,8 liter/m2 4. Tebal lapisan penetrasi 5 cm 5. Agregat dikirim ke lokasi oleh leveransir
PEKERJA
P E K E R J A
KABUPATEN : JEPARA
KODE K 618
SATUAN:
m2
HARGA SATUAN Rp.
114,920,722.00 Sub Total (Rp.)
Biaya (Rp.) 660,000.00 750,000.00 1,072,500.00
Rp. 2.5%
2,482,500.00 126,703,222.00 3,167,580.55 129,870,802.55
92,764.86 Per m2
ANALISA BIAYA PEKERJAAN MEMBUAT CAMPURAN, MENGHAMPAR DAN PEMADATAN LATASIR 2 CM ( MENGGUNAKAN BURUH )
PROPINSI : JAWA TENGAH
KODE 33
URAIAN : 1. Supplier mengirim material sampai ke bin spreader 2. Material dihampar dengan mesin spreader, dipadatkan dengan mesin gilas roda baja
Jumlah Orang
Mandor Operator terlatih Buruh tak terlatih Buruh semi terlatih
0.0075 0.0075 0.19 0.08
MATERIAL
M A T E R I A L
Aspal untuk campuran Pasir beton Abu batu (filler) Aspal untuk prime coat Minyak bakar
3.4285 0.01715 0.003925 0.251425 0.5575
Roller 3 Wheled 8-10 T 51 HP Aspal Sprayer Towed 350 L 7 HP
Hari
1.00 1.00 25.00 10.00
Jumlah
PERALATAN
P E R A L A T A N
KODE: 20
DISIAPKAN OLEH : CIPTAKARYA
3 3 3 3
L 061 L 085 L 092 L 091
Volume Satuan
Kode
kg m3 m3 kg Ltr
M061 M041 M027 M061 M065
Hari Kerja
Kode
1,371.40 6.86 1.57 100.57 223.00
Jumlah Alat
Kode
1.00 1.00
1 E 080 1 E 154
Jumlah Hari-Org 3.00 3.00 75.00 30.00
Upah (Rp./Org/Hari) 80,000.00 70,000.00 40,000.00 55,000.00
:
400.00
SATUAN:
m2
Biaya (Rp.)
13,500.00 270,300.00 172,700.00 13,500.00 13,500.00
Jam Kerja 5.00 5.00
5,100,000.00 Sub Total (Rp.)
Biaya (Rp.)
18,513,900.00 1,854,258.00 271,139.00 1,357,695.00 3,010,500.00
Harga (Rp./jam)
25,007,492.00 Sub Total (Rp.)
Biaya (Rp.)
44,000.00 50,000.00
HARGA SATUAN Rp.
Sub Total (Rp.)
240,000.00 210,000.00 3,000,000.00 1,650,000.00
Harga Satuan (Rp.)
TOTAL Overhead TOTAL BIAYA VOLUME/ QUANTITY
TANGGAL: Jepara, Februari 2015
ANGGAPAN / ASUMSI : 1. Menggunakan tenaga buruh 400 m2/hari 2. Pasir aspal dikirim oleh levelansier ketempat pekerjaan 3. Rata - rata tebal lapisan padat 2 cm
PEKERJA
P E K E R J A
KABUPATEN : JEPARA
KODE K 621.a
220,000.00 250,000.00
Rp. 2.5%
470,000.00 30,577,492.00 764,437.30 31,341,929.30
78,354.82 Per m2
ANALISA BIAYA PEKERJAAN KONSTRUKSI LAPIS PONDASI BAWAH (LPB) KLAS C SIRTU ( MENGGUNAKAN BURUH )
PROPINSI : JAWA TENGAH
KODE KABUPATEN : 33 JEPARA
URAIAN : 1. Kerikil ditimbun sepanjang jalan oleh leveransir 2. Menghampar agregat dengan tenaga manusia 3. Pemadatan dalam 2 lapis dg truk air dan mesin gilas 4. Perapihan dengan tangan
PEKERJA
P E K E R J A
Mandor Operator terlatih Sopir Buruh tak terlatih
Alat bantu Sirtu
P E R A L A T A N
Jumlah Orang
Hari
Jumlah
Mesin gilas 3 roda 6 Ton Truck tangki air 68 HP
Jumlah Alat
Kode
1 1 1 1
L 061 L 081 L 091 L 101
Volume Satuan
Kode
Set m3
M 170 M 029
Hari Kerja
Kode
2.50 75.00
PERALATAN
DISIAPKAN OLEH : CIPTAKARYA
1.00 1.00
1 E 080 1 E 182
Jumlah Hari-Org 3.00 1.00 1.00 60.00
Upah (Rp./Org/Hari)
:
60.00
SATUAN:
m3
Biaya (Rp.)
80,000.00 70,000.00 40,000.00 40,000.00
5.00 5.00
343,750.00 6,187,500.00
Harga (Rp./jam)
6,531,250.00 Sub Total (Rp.)
Biaya (Rp.)
44,000.00 82,500.00
HARGA SATUAN Rp.
2,750,000.00 Sub Total (Rp.)
Biaya (Rp.)
137,500.00 82,500.00
Jam Kerja
Sub Total (Rp.)
240,000.00 70,000.00 40,000.00 2,400,000.00
Harga Satuan (Rp.)
TOTAL Overhead TOTAL BIAYA VOLUME/ QUANTITY
TANGGAL: Jepara, Februari 2015
ANGGAPAN / ASUMSI : 1. Menggunakan tenaga manusia setempat 2. Kerikil ditimbuan disepanjang jalan oleh leveransir 3. Kerikil dg ukuran lebih yang tersingkir saat penghamparan dg orang dihitung 6 % 4. Dihampar dalam 2 lapis & dipadatkan tebal 10 cm padat 5. Penggunaan alat bantu 1 bulan-orang 6. Hasil kerja menghampar & memadatkan 600 m2/hari ( 4 m x 150 m) 7. Kerikil kali tanpa disaring dikirim leveransir samapi tempat pekerjaan
3.00 1.00 1.00 60.00
MATERIAL
M A T E R I A L
KODE: 20
KODE K 515
220,000.00 412,500.00
Rp. 2.5%
632,500.00 9,913,750.00 247,843.75 10,161,593.75
169,359.90 Per m3
ANALISA BIAYA PEKERJAAN KONSTRUKSI LAPIS PONDASI ATAS (LPA) KLAS A ( MENGGUNAKAN ALAT )
PROPINSI : JAWA TENGAH
KODE KABUPATEN : 33 JEPARA
URAIAN : 1. Agregat ditempatkan sepanjang oleh leveransir 2. Menghampar agregat dengan grader 3. Pemadatan dilakukan dengan mesin gilas getar disertai dg truk air
PEKERJA
P E K E R J A
Mandor Operator terlatih Sopir Buruh tak terlatih
Pasir hurug Batu pecah Batu pecah Batu pecah Batu pecah Alat bantu
PERALATAN
P E R A L A T A N
Jumlah Orang
Hari
Jumlah
Grader 110 HP Mesin gilas getar 1 ton Truck tangki air 68 HP
Jumlah Alat
Kode
1 1 1 1
L 061 L 081 L 091 L 101
Volume Satuan
Kode
m3 m3 m3 m3 m3 Set
M 040 M 023 M 024 M 025 M 026 M 170
Hari Kerja
Kode
72.00 45.00 23.00 13.00 27.00 1.00
3 - 5 cm 2 - 3 cm 1 - 2 cm 0,5 - 1 cm
DISIAPKAN OLEH : CIPTAKARYA
1.00 1.00 1.00
1 E 010 1 E 087 1 E 182
Jumlah Hari-Org 1.00 2.00 1.00 4.00
Upah (Rp./Org/Hari)
:
150.00
SATUAN:
m3
Biaya (Rp.)
80,000.00 70,000.00 40,000.00 40,000.00
5.00 5.00 4.00
5,904,000.00 8,635,500.00 4,965,700.00 2,822,300.00 5,113,800.00 21,000.00
Harga (Rp./jam)
27,462,300.00 Sub Total (Rp.)
Biaya (Rp.)
236,500.00 30,200.00 82,500.00
HARGA SATUAN Rp.
420,000.00 Sub Total (Rp.)
Biaya (Rp.)
82,000.00 191,900.00 215,900.00 217,100.00 189,400.00 21,000.00
Jam Kerja
Sub Total (Rp.)
80,000.00 140,000.00 40,000.00 160,000.00
Harga Satuan (Rp.)
TOTAL Overhead TOTAL BIAYA VOLUME/ QUANTITY
TANGGAL: Jepara, Februari 2015
ANGGAPAN / ASUMSI : 1. Menggunakan peralatan berat 2. Material dikirim dan ditimbun oleh leveransir 3. Penghamparan & pemadatan sampai tebal 10 cm 4. Menggunakan : 135 m3 batu pecah, mesin dg binder 24 m3 atau 140 m3 kerikil pecah mesin dengan binder 15 m3 5. Tambahkan binder untuk mengisi rongga 6. Dicampur dan dipadatkan 1200 m2 per-hari
1.00 2.00 1.00 4.00
MATERIAL
M A T E R I A L
KODE: 20
KODE K 520
1,182,500.00 151,000.00 330,000.00
Rp. 2.5%
1,663,500.00 29,545,800.00 738,645.00 30,284,445.00
201,896.30 Per m3
ANALISA BIAYA PEKERJAAN KONSTRUKSI LAPIS PONDASI ATAS (LPA) KLAS A ( MENGGUNAKAN BURUH )
PROPINSI : JAWA TENGAH
KODE KABUPATEN : 33 JEPARA
URAIAN : 1. Agregat ditempatkan sepanjang oleh leveransir 2. Menghampar agregat dengan Tenaga manusia 3. Pemadatan dilakukan dengan mesin gilas roda baja disertai dg tangki air
PEKERJA
P E K E R J A
Mandor Operator terlatih Sopir Buruh tak terlatih
Pasir hurug Alat bantu Kerikil pecah tersaring: Batu pecah 3 - 5 cm Batu pecah 2 - 3 cm Batu pecah 1 - 2 cm Batu pecah 0,5 - 1 cm
PERALATAN
P E R A L A T A N
Mesin gilas 3 roda 6 T Truck tangki air 68 HP
DISIAPKAN OLEH : CIPTAKARYA
Jumlah Orang
Hari
Jumlah
Kode
1 2 2 2
L 061 L 085 L 087 L 092
Jumlah Hari-Org 1.00 2.00 2.00 66.00
Upah (Rp./Org/Hari)
:
Sub Total (Rp.)
80,000.00 140,000.00 80,000.00 2,640,000.00
Kode
29.00 2.00
m3 Set
M 023
82,000.00 147,000.00
2,378,000.00 294,000.00
18.00 9.00 6.00 10.00
m3 m3 m3 m3
M 004 M 005 M 006 M 007
191,900.00 215,900.00 217,100.00 189,400.00
3,454,200.00 1,943,100.00 1,302,600.00 1,894,000.00
Hari Kerja
Kode
Jumlah Alat
1 E 080 1 E 182
Harga Satuan (Rp.)
2,940,000.00 Sub Total (Rp.)
Volume Satuan
1.00 1.00
60.00
Biaya (Rp.)
80,000.00 70,000.00 40,000.00 40,000.00
Jam Kerja
5.00 4.00
SATUAN:
m3
Biaya (Rp.)
Harga (Rp./jam)
HARGA SATUAN Rp.
11,265,900.00 Sub Total (Rp.)
Biaya (Rp.)
44,000.00 82,500.00
TOTAL Overhead TOTAL BIAYA VOLUME/ QUANTITY
TANGGAL: Jepara, Februari 2015
ANGGAPAN / ASUMSI : 1. Menggunakan tenaga manusia 2. Material dikirim dan ditimbun oleh leveransir 3. Buruh menghampar batu pecah diatas ( kurang lebih 15 cm) 4. Menggunakan : 135 m3 batu pecah, mesin dg binder 24 m3 atau 140 m3 kerikil pecah mesin dengan binder 15 m3 5. Tambahkan binder untuk mengisi rongga 6. Dipadatkan sampai 10 cm padat 7. Hasil kerja menghampar dan memadatkan 600 m2/hari
1.00 1.00 1.00 66.00
MATERIAL
M A T E R I A L
KODE: 20
KODE K 521
220,000.00 330,000.00
Rp. 2.5%
550,000.00 14,755,900.00 368,897.50 15,124,797.50
252,079.96 Per m3
ANALISA BIAYA PEKERJAAN KONSTRUKSI LAPIS PONDASI BAWAH (LPB) TELFORD ( MENGGUNAKAN BURUH )
PROPINSI : JAWA TENGAH
KODE KABUPATEN : 33 JEPARA
URAIAN : 1. Material disiapkan dilokasi pekerjaan 2. Menghampar pasir tebal 5 cm 3. Batu pecah berukuran besar 10-15 cm disusun berdiri 4. Batu pecah yang lebih kecil mengisi rongga diatasnya sehungga rata & dipadatkan dg mesin gilas
PEKERJA
P E K E R J A
Mandor Operator terlatih Buruh tak terlatih
Alat bantu Batu belah 15 - 20 cm Batu pecah 5 - 7 cm Pasir hurug
P E R A L A T A N
Jumlah Orang
Hari
Jumlah
Mesin gilas 3 roda 6 Ton
Jumlah Alat
Kode
1 L 061 1 L 081 1 L 101
Volume Satuan
Kode
Set m3 m3 m3
M 170 M 020 M 022 M 040
Hari Kerja
Kode
4.00 50.00 20.00 30.00
PERALATAN
DISIAPKAN OLEH : CIPTAKARYA
1.00
1 E 080
Jumlah Hari-Org 3.00 1.00 99.00
Upah (Rp./Org/Hari)
:
80.00
SATUAN:
m3
Biaya (Rp.)
80,000.00 70,000.00 40,000.00
5.00
854,000.00 7,150,000.00 3,838,000.00 2,460,000.00
Harga (Rp./jam)
14,302,000.00 Sub Total (Rp.)
Biaya (Rp.)
44,000.00
HARGA SATUAN Rp.
4,270,000.00 Sub Total (Rp.)
Biaya (Rp.)
213,500.00 143,000.00 191,900.00 82,000.00
Jam Kerja
Sub Total (Rp.)
240,000.00 70,000.00 3,960,000.00
Harga Satuan (Rp.)
TOTAL Overhead TOTAL BIAYA VOLUME/ QUANTITY
TANGGAL: Jepara, Februari 2015
ANGGAPAN / ASUMSI : 1. Menggunakan tenaga manusia 400 m2 perhari 2. Kerikil ditimbuan disepanjang jalan oleh leveransir 3. Batu sudah dipecah 4. Tanah dasar sudah disiapkan 5. Dipadatkan sampai tebal 20 cm
3.00 1.00 99.00
MATERIAL
M A T E R I A L
KODE: 20
KODE K 516
220,000.00
Rp. 2.5%
220,000.00 18,792,000.00 469,800.00 19,261,800.00
240,772.50 Per m3
RENCANA ANGGARAN BIAYA PEKERJAAN
: PEMBANGUNAN DRAINASE
LOKASI
: RW. 03 DAN RW. 04
TAHUN ANGGARAN
: 2015
VOLUME
: …………………
NO
URAIAN PEKERJAAN
KOEFISIEN
VOLUME
HARGA SATUAN
JUMLAH HARGA
JUMLAH
Rp
Rp
Rp
232.54 m3
A
Menggali Tanah Biasa sedalam 1 m
1
TENAGA - Pekerja - Mandor
0.7500 0.0250
Overhead ( 2.5% )
0.0250
174.405 5.8135
HOK HOK
60,000 80,000
10,464,300 465,080 10,929,380 273,235
Harga Satuan Pekerjaan B 1
Urugan Pasir TENAGA Pekerja Mandor
11,202,615
16.61 m3 0.3000 0.0100
4.983 0.1661
HOK HOK
60,000 80,000
298,980 13,288 312,268
2
BAHAN Pasir Urug
Overhead ( 2.5% )
C
Pemasangan Pondasi Batu Belah 1SP : 5 PP lokal
1
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
1.2000
19.932
m3
82,000
1,634,424 Jumlah 1 + 2
1,634,424 1,946,692
Harga Satuan Pekerjaan
48,667 1,995,359
0.0250
123.82
m3
1.5000
185.73
HOK
60,000
11,143,800
0.7500 0.0750
92.87 9.29
HOK HOK
75,000 80,000
6,964,875 742,920
0.0750
9.29
HOK
80,000
742,920 19,594,515
2
BAHAN Batu Belah 15/20 Portland Sement Pasir Pasang
Overhead ( 2.5% )
D 1
Pemasangan Plesteran 1 Pc : 5 Pp muntilan Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor
1.2 136
148.58 16839.52
m3 Kg
143,000 1,410
21,247,512 23,743,723
0.544
67.36
m3
142,800
9,618,734 Jumlah 1 + 2
54,609,969 74,204,484 1,855,112
Harga Satuan Pekerjaan
76,059,596
0.0250
694.60
m2
0.3000 0.1500
208.38 104.19
HOK HOK
60,000 75,000
12,502,800 7,814,250
0.0150 0.0150
10.42 10.42
HOK HOK
80,000 80,000
833,520 833,520 21,984,090.00
2
Bahan Portland Semen
5.1840
3600.81
Kg
1,410
5,077,137
Pasir Muntilan
0.0260
18.06
m3
270,300
4,881,510
Overhead ( 2.5% )
Jumlah 1 + 2
9,958,646.90 31,942,736.90 798,568.42
Harga Satuan Pekerjaan
32,741,305.33
TOTAL
121,998,875.25
PPn dan PPh (11.5 %) JUMLAH TOTAL DIBULATKAN
14,029,870.65 136,028,745.91 136,020,000.00
0.0250
TERBILANG
Err:511 Jepara, 25 April 2015 PANITIA PEMBANGUNAN RT. 01 RW. 03
NO
URAIAN PEKERJAAN
KOEFISIEN
VOLUME
Ketua
HARGA SATUAN
JUMLAH HARGA
JUMLAH
Rp
Rp
Rp
Sekretaris
ASYHADI, S.Ag
ACHMAD MUNIF Mengetahui Ketua RT. 02 RW. 02
MUSTA'IN
RENCANA ANGGARAN BIAYA PEKERJAAN
: PEMBANGUNAN DRAINASE
LOKASI
: RW. 03 DAN RW. 04
TAHUN ANGGARAN
: 2015
VOLUME
: …………………
NO
URAIAN PEKERJAAN
A
Pemasangan Lantai Keramik 40 x 40 cm putih
1
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
KOEFISIEN
VOLUME
HARGA SATUAN
JUMLAH HARGA
JUMLAH
Rp
Rp
Rp
49 m2 0.2500 0.1250 0.0130 0.0130
12.25 6.125 0.637 0.637
HOK HOK HOK HOK
60,000 75,000 80,000 80,000
735,000 459,375 50,960 50,960
Harga Satuan Pekerjaan B
Bahan Ubin Keramik 40 x 40 cm putih Portland Semen Semen Warna Pasir Pasang
6.6300 9.8000 1.3000 0.0450
49.00 324.87 480.2 63.7 2.205
m2 Buah Kg Kg m3
7,800 1,410 11,790 142,800
2,533,986 677,082 751,023 314,874
Harga Satuan Pekerjaan C
Pemasangan Pondasi Batu Belah 1SP : 5 PP lokal
1
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
1,296,295
123.82
m3
1.5000
185.73
HOK
60,000
11,143,800
0.7500 0.0750
92.87 9.29
HOK HOK
75,000 80,000
6,964,875 742,920
0.0750
9.29
HOK
80,000
742,920
4,276,965
19,594,515 2
BAHAN Batu Belah 15/20 Portland Sement Pasir Pasang
Overhead ( 2.5% )
D 1
Pemasangan Plesteran 1 Pc : 5 Pp muntilan Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor
1.2 136
148.58 16839.52
m3 Kg
143,000 1,410
21,247,512 23,743,723
0.544
67.36
m3
142,800
9,618,734 Jumlah 1 + 2
54,609,969 74,204,484 1,855,112
Harga Satuan Pekerjaan
76,059,596
0.0250
694.60
m2
0.3000 0.1500
208.38 104.19
HOK HOK
60,000 75,000
12,502,800 7,814,250
0.0150 0.0150
10.42 10.42
HOK HOK
80,000 80,000
833,520 833,520 21,984,090.00
2
Bahan Portland Semen
5.1840
3600.81
Kg
1,410
5,077,137
Pasir Muntilan
0.0260
18.06
m3
270,300
4,881,510
Overhead ( 2.5% )
Jumlah 1 + 2
9,958,646.90 31,942,736.90 798,568.42
Harga Satuan Pekerjaan
32,741,305.33
TOTAL
114,374,161.45
PPn dan PPh (11.5 %) JUMLAH TOTAL DIBULATKAN
13,153,028.57 127,527,190.02 127,520,000.00
0.0250
TERBILANG
Err:511 Jepara, 25 April 2015 PANITIA PEMBANGUNAN RT. 01 RW. 03
NO
URAIAN PEKERJAAN
KOEFISIEN
VOLUME
Ketua
HARGA SATUAN
JUMLAH HARGA
JUMLAH
Rp
Rp
Rp
Sekretaris
ASYHADI, S.Ag
ACHMAD MUNIF Mengetahui Ketua RT. 02 RW. 02
MUSTA'IN