SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 1
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011) THIS IS AN ABRIDGED VERSION OF THE FULL VERSION OF THIS PLAN. YOU WILL ALWAYS SEE THE CAPTION ******SOME TEXT MISSING****** THEREIN BECAUSE I DELIBRATELY DELETED THOSE TEXT JUST TO SHOW YOU PART OF THE START-UP PLAN.
THE FULL-VERSION IS WELL DETAILED AND IS APPROXIMATELY 4,000 WORDS LONG. LONG. IT ALSO CONTAINS THE CONTACT OF THE SACHET MACHINE FABRICATOR AND THE POLYETHYLENE MANUFACTURER/PRINTER.
THIS ABRIDGED VERSION WHICH IS ONLY ABOUT 1400 WORDS LONG IS LONG IS ONLY A TIP OF THE ICEBERG.
MY INTENTION IS TO SHOW YOU PART OF THE DOCUMENT IN ORDER TO CLEAR ALL DOUBTS.
THE FULL VERSION OF THIS START-UP PLAN IS AVAILABLE AT A PRICE.
CALL +2348065008899 to order.
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 2
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
NAFDAC GUIDELINES Below are some of the NAFDAC Guidelines you will find in the report:
******SOME TEXT MISSING****** ...A successful application attracts a Certificate of Registration with a validity period of 5 (five) years whereas products with Listing status has a validity of 2 (two) years...
... payments to the Agency should be in Bank Draft payable to National Agency for Food and Drug Administration and Control (NAFDAC). •
Water in sachet Thirty thousand naira (N30, (N 30, 000:00) + 5% VAT.
•
Water in bottle Fifty thousand naira (N50, 000:00) + 5% VAT...
******SOME TEXT MISSING******
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 3
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
REQUIREMENTS FOR THE BUSINESS Registration of business with Corporate Affairs Commission (CAC) Registration with NAFDAC Accommodation: NAFDAC recommends that the factory must not be residential nor
share compound with residential ones. Floor of production room and store must be tiles; pallets must be on the floor of the store. Two Dyna Trucks Good Bore hole well Nylon sachets Sacheting machine 7.5 KVA Generating set Other Consumables
These requirements are detailed later later on in this report.
******SOME TEXT MISSING******
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 4
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
HUMAN RESOURCES FOR THE BUSINESS 1. Production Manager: This ideal candidate must be well experienced and qualified.
A degree holder in related fields such as microbiology, food and drinks, e.t.c. Especially someone who has previously worked with a sachet water company. 2. Administrative Manager: Who must be experienced and qualified in administration
of business. You can fit in here with the help of the Production Manager. 3. Machine operators 4. Parkers/Loaders/Supervisors 5. Cleaners 6. Drivers
CHALLENGES OF THIS BUSINESS 1. Meeting the NAFDAC requirements. NAFDAC is the main regulatory agency you must meet its requirement before and after your products are approved. 2. Generating effective marketing strategies that would transform into money. 3. During the rainy season, demand for pure water may drop drastically. 4. How to get responsible, honest and reliable workers. 5. Since generating constant power is a problem in Nigeria, you have to plan your business on generating set.
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 5
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
FACTORY BUILDING PLAN The building to be used has been specified by the regulatory agency – NAFDAC as follows: The building must be spacious, with many rooms. It must not be close to a cemetery, abattoir, petrol station, refuse dump, sewage system, saw mill, or any source of pollution .
The building compound shall be strictly used for the water production only and shall not share compound with any residence. Every building to be used must be approved before commencement of production. The building must make provision for: 1. Water Sacheting Machine room. 2. Cloak room. 3. Packaging materials room. 4. Finished product room 5. Offices.
******SOME TEXT MISSING******
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 6
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
FACTORY OPERATING PLAN A typical sachet-water factory setting consists of a storage system (tanks), a conveyance system (piping), a decentralized water treatment system (filters, UV disinfection units), and a packaging system. The sachet water production follows this same order. The packaging is done by making use of automatic liquid filling and packaging machines, also commercially know as “automatic liquid packaging machines”, “form, fill and seal machines”, “form, fill, seal, vertical (flow) sachet machines” or simply “sachet machines”.
******SOME TEXT MISSING******
Typical sachet-water factory set-up (Water Sacheting Room)
Filter
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 7
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011) The filters used for the factories that were surveyed included yarn (strung wound) filters, granular carbon filters, and fiber matrix carbon filters. The filter cartridges and housings come in two sizes, 20’’ and 10’’ sizes, which corresponded to the filter lengths.
Sand Filter
Carbon Filter
Water Pum
Figure A: Sand and carbon filters. Filter media in cylinders
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 8
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
Figure B: Series of yarn, fiber, granular carbon and carbon matrix filters. Arrow shows flow direction
Yarn filter cartridge(used)
Fibre filter cartridge(used)
Matrix carbon filter cartridge (used)
Figure C
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 9
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
******SOME TEXT MISSING******
Figure D: Loading of polythene rolls in sachet machine
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 10
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
Figure E: Polythene rolls rolls adjusted by folding on base board of bag former
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 11
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
Heat sealing plates “ Longitudinal Sealing” Sealing”
Heat sealing plates “ Transverse Sea Sealing” ling”
Figure F: 0.5m of sachet rolls sealed longitudinally and at one end
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 12
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
Figure G: Final adjustment of roll and trimming below seal
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 13
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
UV bulb u sed to disinfect polythene roll
Figure H: UV-bulb in sachet machine used to disinfect polythene roll
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 14
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
Figure I: Automatic Automatic Counter(Indicated by Red Circle)
Figure J: Automatic Counter (Shown blown up)
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 15
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011) Table Of Approximate Capital Cost Required For Sachet Water Factory
******SOME TABLE VALUES MISSING****** Item
Sachet Filling and Packaging
Unit
No.
Unit Cost
Approximate
Cost
(Naira)
Quantity
(Naira)
500,000
1
500,000
Machine
GRAND TOTAL
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
1,174,180
Page 16
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011) Operation and Maintenance Costs
******SOME TABLE VALUES MISSING****** Item
Units Per Time
Unit Cost
Approximate
Cost
(Naira)
Quantity
(Naira)
Electricity
Fuel
Litres per day
Total Costs Per Month
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
2,340
30
70,200
696,730.83
Page 17
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011) Computation of cost of printing polythene bags used in sachet-water production
One roll of polythene weighs 13.8kg, including 1kg of an inner support the polythene is rolled on. The weight of the polythene alone is thus 12.8 kg. The cost of printing 2 colours on the polythene is approximately
******SOME TEXT
MISSING****** .
One roll of polythene (12.8kg polythene) is able to produce *** bags of sachets, with 20 individual sachets per bag. This is therefore equivalent to *** individual sachets per kg.
The equivalent cost a printed polythene bag for one individual sachet is thus N *** per individual sachet.
These bags may be printed outside the State, so additional costs for transportation may apply.
Since the sachets were packaged in bigger bags of 20 individual sachets, the cost of the bigger bag is factored into the N *** for individual individual printed bags calculated above. The packaging bags cost N *** per 100 bags. This amounted to N *** *** per bag, and is equivalent to N *** per individual sachet. Hence, the total packaging cost per individual sachet was thus calculated as N ***. The total amount required per month for packaging material is therefore N *** for the production of *** *** sachets per month (*** individual individual sachets per day).
Sachet-water Quantities Produced
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 18
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011) The number of sachets produced by factory should vary from approximately *** sachets per day (*** litres/day) during the rainy and cold seasons to approximately twice as much (*** sachets or *** litres/day) during the dry and hot seasons. The quantities is summarised in the table below:
Quantity of sachet water produced per day by sachet-water factories Description
Rainy Season
Dry Season
Production per day (Individual Sachets) No. of Individual sachets per bag Production per day (bags) Volume (litres produced/day)
******SOME TEXT MISSING****** Each bag of pure water sachet goes for as low as N 50. So if we are to use the rainy season numbers to estimate the expected sales amount, the calculation will be as follows: Number of bags sold daily=*** Cost per bag = N 50 Total Daily Sales = N 50 X *** bags = N *** Total Monthly Sales = N *** X 26 days = N ***** Estimated Monthly Profit = Total Monthly Sales – Total Monthly Expenses = N ******* - N ***** = N 428,000
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 19
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
MARKETING TECHNIQUES There are various marketing techniques that can be applied. You must direct all your techniques toward sales generations.
1.
Price: Good pricing mechanism is one marketing technique you must have. Your products
must not be the cheapest; otherwise it
******SOME TEXT
MISSING****** . ******SOME TEXT MISSING****** .
2.
Promos:
3.
Use of promotional materials :
******SOME TEXT
MISSING****** . ******SOME TEXT MISSING*****.
4.
Donation:
5.
Advertisement:
******SOME TEXT
MISSING****** . Remember to inform NAFDAC of any advertising plans you may have.
APENDIX I Sachet Machine
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 20
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
Schematic Diagram of a Sachet Machine (Front)
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 21
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
Schematic Diagram of a Sachet Machine (Back)
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 22
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011) Key To The schematic diagram of the sachet machine
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 23
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)
USEFUL CONTACTS SACHET MACHINE MANUFACTURER CONTACT (CHINA)
******SOME TEXT MISSING******
POLYETHYLENE ROLLS (SACHET) CONTACT (NIGERIA)
******SOME TEXT MISSING******
http://www.NairaMan.com http://www.NairaMan.com +2348065008899
Page 24