COURSE CODE
: 3208
COURSE TITTLE
: Entrepreneurship Development
ASSIGNMENT ON
: New Business Plan
COURSE TEACHER
: Nafisa Rounok Assistant Professor Dept. Of Finance Jagannath university
SUBMITTED BY
: Group 2 Dept. of Finance Jagannath university Batch 4,3rd year 2nd semester BBA, 2012
SUBMITTING DATE
: 30/09/2012
Solar Panel Private Limited Company.| Solar Panel Project
1
Introducing: (Group Members) NAMES
ROLL
SAKIB TANVIR
105319
RIAJUR RAHAMAN
105276
ADNANUR RAFI
105270
ARIF HOSSIAN BHUIYAN
105324
ABDULLAH AL MAMUN
105269
MD.SALAH UDDIN
105206
MD. OSMAN GONI
105261
SHIMUL CHANDRA BISWAS
105231
AHMED IMTIAZ SHAMIM
105224
MOHAMMAD NOOR NOBI
105235
TABLE OF CONTENTS Solar Panel Private Limited Company.| Solar Panel Project
2
Particulars:
Details:
Pages
Submission of the report
5
Acknowledgement
6
Executive summary
7
Methodology
8
Limitation
9
Introduction
10
1.Company Profile
2. Industry analysis
3.
General
description
of
1.1Vision and mission statement
11
1.2Business and industry profile
12
2.1Significance trends
13
2.2 Growth rate
13
2.3 Key success factors in the industry
13
2.4 Competitors Analysis
14 15
the
venture 4.Production Plan
5. Marketing plan
4.1Machineries and equipments
16
4.2Service concern
17
4.3 Sources of Raw materials
17
5.1Purposes and objectives
18
5.2 labor supply
18
5.3 Manufacturing cost data and pricing 19 5.4 Marketing Strategy
20
5.5 Advertising
21
5.6 Target Market
21
5.7. Marketing Mix Analysis
22
5.8 Sensitivity analysis
22
5.9 SWOT Analysis
23 24-27
6. Organization plan Solar Panel Private Limited Company.| Solar Panel Project
3
28-29
7. Risk Analysis 8. Financial plan
8.1 Particulars of required resources
30
8.2 Cost of project collection
31
8.3 Financing Plan and loan required
32
8.4 Pro forma income statement
33-35
8.5 projected sales and profit statement
36
8.6 Projected Balance sheet
37
8.7 Ratio analysis
38-39
8.8 Break-even analysis
40
9. Appendix And conclusion
41
10. Bibliography
42
30th September, 2012 Nafisa Rounok Solar Panel Private Limited Company.| Solar Panel Project
4
Assistant professor Department of Finance Jagannath University. Subject: Submission of the report.
Dear Madam, We the student of 4th batch 6th semester department of Finance group-2 Jagannath University, are very grateful to you for giving us such an interesting and important topic for the course term paper. As per your direction, we have completed the report successfully.
While preparing the report, we faced few problems. But we could go for solving them and at the same time we got a lot of new experiences. For this reason we are thanking you heartily. We tried our best to make this report the best one. We think this report can serve us in our future life.
Submitting this report, we are feeling very happy. We conclude here and again unending thanks to you.
Yours ever, Group -02
Acknowledgement
Solar Panel Private Limited Company.| Solar Panel Project
5
This is high time we conveyed our deepest gratitude and sincere submission to the Almighty ALLAH for giving us the opportunity to accomplish such an enjoyable and tough task of preparing this report in time.
We express our thanks to our dear course instructor Nafisa Rounok for assigning us a term paper dealing with Developing New Business Ideas which includes recognizing opportunities and generating ideas, feasibility analysis, writing a business plan, industry and competitor analysis and developing an effective business model. In this regard, we would also like to thank ourselves for our good teamwork and successful team spirit.
The presentation of this term paper is of a great expectation in our B.B.A program and we are quite happy to submit it duly applying that we think should have to be included .The knowledge should be valued when we enter into job market.
So lastly, we would again like to express our heart full thanks to our course teacher for providing the knowledge and valuable guidelines related to our assigned report.
All the members of the group Group- 2
Solar Panel Private Limited Company.| Solar Panel Project
6
EXECUTIVE SUMMARY We are the students of Finance, so we have to know significance knowledge about the sectors of entrepreneurship and finding new ideas on different business. Here we prepared a report on the basis of new business plan in the product of “SOLAR PANEL”. From the preparation of this report we gather significance knowledge about various business sectors in Bangladesh. Our country is a developing country and so the capability of our government is very low. In this regard we have to utilize our natural energy for the development of our country and creating a great flow of our development process. Solar Energy is one of the most important and successful source of natural energy. By using this Solar Energy we can make the “SOLAR PANEL” project. In the report we show a complete structure of the process of making this product. Here we explain the whole process, how we make our product and how we marketwise the essential product. First of all we start our business with the money we receive from our project maker and then we collect loan from various commercial bank for the fulfillment of our powerful project. We have been communicating some expertise on this field for the suggestion on the successful process of our project. For the success of our project we collect various matters from different sources. We make the production process on the basis of various steps. We also identified some key factors on which we acknowledge a great concern for the success of our project. We design our project a systematic way so that the production process goes to the main structure. In the ending of this new business plan project we provide a great concern on the activities of marketing of the product because we know that marketing is one of the most important factors for the success of new business plan. We make a good procedure for the whole marketing arrangements. We gather significance knowledge about marketing from some marketing Expertise. At last we tried our best for making a new successful business plan for the development of new successful product. So in the circumstances we are very glad that we try to start a new business on the basis of new product which is very important of our nation in this stage.
Solar Panel Private Limited Company.| Solar Panel Project
7
Methodology of the study: Correct and smooth completion of the research work requires adherence to some rules and methodologies. Rules were followed to ease the data collection procedures. Accuracy of the study depends on the information and the data analysis. To make a smooth and watchful report we have collected, summarized and arranged data of the every possible source. We also prepared the report in a decent way that it will be attractive for the readers.
Sources of data: We collect data from both internal and external sources for preparing our report which are shown below:
Relevant documents provided by different research. Group discussion. Discussion with our superior. Wikipedia Research papers. Various analyses. Documents provided by the various news papers.
Solar Panel Private Limited Company.| Solar Panel Project
8
LIMITATION OF THE STUDY:
While preparing this report, we have faced some problems. The problems that we find while preparing this report are as follows:
Due to assumption this report may not be perfect to the scent percent. Lack of enough experience in analyzing of the data. Due to inadequate time we cannot furnished our report properly. Lack of availability of data and documents. Up- to –date information is not available. Time constraints. As we are not perfect analyst thus lack of presentation is must here. Our analysis may contain some sorts of data which is not correct to the percent.
Solar Panel Private Limited Company.| Solar Panel Project
9
Introduction: Clean energy is the need of today‘s world. The world is suffering from the energy crisis and the existing source of energy is too expensive. Fossil fuels are at its end stage and these fuels creating environmental problems like global warming, climate change, etc. The whole world is moving towards renewable energy sources which are cheaper and effective source of energy and solar power has stood in front as the solution to it. New technology has been developed to trap the alternative sources of energy of which solar PV technology is being mostly used worldwide to solve the present solution. The increase in the load shedding in the context of our country Bangladesh is a major problem at present. There is uncertain to solve this problem until we depend on the existing source i.e. hydroelectricity. So the time has arisen to go for alternative like solar power. Most of the works in the government as well as private offices, banks, hospitals, hotels, etc are stopped due to this growing load shedding. There is a need of backup systems for them. At the household level, people are bound to stay in the darkness, apart from news, television, radio, water pumping problem in the valley and so on. In the next 10 years there is no chance of getting rid of load shedding in Bangladesh. Similarly, most of the western part and hilly region of Bangladesh is not linked to the electricity grid. People living in those part are under hardship life. Some sectors like vaccines refrigeration, hospitals instruments and equipments etc essentially require electricity power for their operation. The people are afraid of investing in Bangladesh in the industrial and manufacturing sector due to insecurity, political instability, and energy problems. They want quick return of their investment. Investment in the hydropower, factories, projects, etc is a long term return. Realizing this entire problem, establishment of more Solar Companies is essential in Bangladesh. The market is growing up as well. At present Solar business in Bangladesh is like a hot cake. More number of solar companies providing efficient solar PV system is to be established to solve the present problems. So with this objective, this venture is proposed. Solar Panel Company Pvt. Ltd. is a form of organization which deals with the installation and operation of various systems to solve the problems of energy crisis in the present situation. It provides backup system in the present load shedding problems with minimum investment and long run benefit. It is situated at Rangpur. The company will start its business from installation of Solar home system and expand its business to total solar solution in future. Solar Panel Private Limited Company.| Solar Panel Project
10
1. Company Profile:
Company name: Solar Panel Private Limited Company. Address: Dhanmondi,1202,Dhaka Contact Number:01737179410 www.solarpanelpvt.bd.com Solar Panel Private Limited Company.| Solar Panel Project
11
1.1 Vision and Mission statements 1.1.i) Vision statement ‗To change Bangladseh Into a nation where solar energy provides power to everyday needs.‘ 1.1.ii)Mission statement The mission of Solar Energy Private Limited Company is to increase the quality of life of people of urban areas by eliminating the problems created by load shedding. For this, SPC provides high tech, high quality green energy alternative to home or office use.
1.2 Business and Industry profile: 1.2.i) Stage of growth : The solar electrification companies of Bangladesh at present are at an infant stage. It is in introductory stage but consciousness as well as needs of people is increasing at a good rate and the existing companies are getting popular among upper class of residents. We think at this rate, the popularity and the use of renewable energy will increase. Our Company SPC is in the start up phase of business. As initial market we‘ll serve the residential customer and offices. Then we will proceed to large organizations and apartments after getting publicity. After covering our initial market, we are likely to attract the customers outside the valley.Besides we are planning to expand our firm that deals only with parts of solar products 1.2. ii) Company History: Our company is a newly introduced company on solar panel manufacturing and electricity supply purpose. We started to think about this company from our social responsibility. We discoussed about the issue of electricity problem and found that this sector is the needy of help for shorting out the backings in this sector. Our company was incorporated on June 03, 2012 under the companies Act, 1994 and registered with register as a private limited company. The company started to manufacture and produce electricity from January 01, 2013. The company is situated at Rangpur in Bangladesh. 1.2. iii ) Uniqueness of the Service: Solar system is a better electronic system. In preset world electricity is produced by different ways. And its raw materials are too costly. But solar system is such kind of system which is cheaper than other electronic system. For example a 20WP system plants cost is Solar Panel Private Limited Company.| Solar Panel Project
12
BDT 18100. Which is too much cheap than other electronic system, for producing solar system, we need only sun light which we get from nature not only this. We will use it maximum 20 years after establishing solar panel. It is also free from environment pollution. No load shedding and no monthly bill are one of the facilities in this project. Its cost is also cheaper than fuel, dine etc.
2. Industry Analysis 2.1 Significant trends The trend of existing renewable energy companies is to collect money from different rural development projects. None of the existing companies focuses on urban areas and hence they are untapped opportunities.
2.2 Growth rate Currently lotus energy installs 15-20 systems per month in urban areas and this number is increasing even though lotus has no advertisement campaigns. This shows that this rate will increase once people are aware of the availability of such systems. Moreover, the main reason for people not being attracted to solar systems is due to the initial high cost. From our installment provision, people will not be burdened by initial high cost and hence sales will increase.
2.3 Key success factors In the industry 2.3.i) Load shedding: It has become a huge burden on the life style of urban people. People need other sources of energy to do their jobs as well as for recreation. Also, load shedding problem is forecasted to continue and grow till the next 10 years. So sooner or later, people will search for alternative sources. 2.3.ii) Renewable source of energy: Solar energy is renewable source of energy and due to this reason customers are not burdened by any running cost. Once they install the system, they get energy for their lifetime without having to pay any penny. 2.3.iii) Pollution free energy: Photovoltaic (PV) modules (Solar Panels) gives free and environment friendly electricpower whenever we want it. PV modules generate electricity directly from sunlight and their operation is completely noise and pollution free. Because they have no moving parts to wear and tear, they will provide reliable power for decades. 2.3.iv) Outlook for the future Presently in many developed countries, there are laws which enable people to sell excessive electricity generated from solar home systems to their regional electricity Solar Panel Private Limited Company.| Solar Panel Project
13
company. Similarly, such types of laws are being discussed to be applied in Bangladesh. This process might be completed in the coming few years. So after few years, demand for our products will increase rapidly.
2.4 Competitors Analysis: As solar energy business in our country is on a primitive stage so the business isn‘t spread mostly. But still there are some few solar organizations who provide solar energy and services to different sectors. Some Information about our likelihood competitors are given below:
Competitor A
Competitor B
Competitor C
Name of Company Public or Private Products
5R3M Companies Ltd
Best way Powertech Ltd
Private Ltd.
AKSHAYA Solar Power LTD Private Ltd.
Home solar system,solar pump,solar IPS
Solar Energy, Inverter and Charge Controller
Companies Physical Location Services
Kachukhet,Karful
Niketon, Gulshan-1, DHAKA
Alternative Power System,Batteries,Solar Energy, Road No.17,Banani,Dhaka
Engeneering,Installation
Design ,Installation
Design,Installation
Additional Ser vices
Alternative Power System
Customer Service and Warranty Issue
Consultancy,Wind Energy
Targeted Customers
Solar Home System For City Dwellers
City Peoples
Mission
Make solar company economical
Serve nation with quality products
Industry and corporate houses for alternative backup system Develop sustainable green energy
Vision
Safeguard the future with solar energy Only city dwellers can get services
Bring the benefits of renewable energy Have no Branch in rural area
Weakness
Private Ltd.
Create green living country Costly for home backup as price is high for company reputation
Solar Panel Private Limited Company.| Solar Panel Project
14
3.General description of the venture: There are diverse types of Entrepreneurship available.According to Hans Schollhammer‘s ―Analysis and Assessment of Internal Corporate Enterprenurship Strategies‖Soler Panel Project is Administrative and Imitative Entrepreneurship.We need both General management and Scientific technical personnel. The Idea of this business generating through Focus group and Problem Inventory Analysis.The query of the list of problems provided by the customers are the method of the developing this new idea.Our business name is Soler panel Project which is mainly service oriented. We will produce electricity and supply it.
4.Production Plan : To accomplish the production process we need to follow four major steps. They are
Machineries and equipments
Sources of raw materials
Production Plan
Manufacturing process
Physical plant
Solar Panel Private Limited Company.| Solar Panel Project
15
4.1 Machineries & Equipments: For our production process we need four major machineries they are a)Panels Panels are the main part of this project. Because sun shining on solar. Panel produces direct current electricity or DC. our system is designed for 120 watt Panels. It means per panel capacity vary to different panel system. b) Preserver: Reserves is another most important device. It reserves the power what we want to for emergency save with the help of experts we will establish our reserves. It will be maintained by engineers. c) Converter: The converter is inverter is the major component that converts the DC current into 120 volt AC current. d) Transformer: Transformer is essential for supplying electricity to each area. It will again covert electrify from AC to DC. Because DC current is stand and for household appliances. e) Power Zone: For power zone 25000 sq. ft area is allotted. In this Zone we will set up our panels and towers. We will establish our reserves room and converter room here. Power Zone will be restricted for civilians. f) Power Productions: i) Producing electricity: We will be producing 800Wt per day by using 15 panels. ii) Reserving & Supplying Electricity: 15 panels will produce 800Wt electricity per day which we with supply. And the rest 3 panels will produce 160Wt electricity per day which we will reserve for bad weather & any emergency. For our office usage we will get electricity from our reserve energy. Solar Panel Private Limited Company.| Solar Panel Project
16
4.2 Service Concern: I) Service related facilities, utilizes & equipment etc: A consumer will be facilitated in different wax like we will ensure there will be no load – shedding except major breakdown. We will provide energy saving lights and other equipments. If there is any problem in home electricity service, our technician will solve it. We will provide electricity in cheap rate.
ii) Service delivery Plan: The AC currant converted in the corrector will be supplied to people through cables; every area will have a point with a transformer which wills again covert Ac current to DC.
4.3 Sources of Raw Materials: At other Raw materials which are essential for our project is available in Bangladesh .Japan is the main suppliers for panels. We will import panels by ways. We will receive it in Chittagong port, than we will fetch them to our plant by we will collect other Raw materials in a convenient way.
Solar Panel Private Limited Company.| Solar Panel Project
17
5. Marketing Plan 5.1 Purposes or objectives: We are dealing with electricity in our business plan. But it‘s a great matter of sorrow that this electricity sector of Bangladesh is not in a good position that‘s why we need to upgrade our production of electricity. The present condition of Bangladesh is like that. a)To establish a customer base of 10% of the define target market in the first year. b)To generate BDT 1,50,000 in Net income for the first year. c)To increase sales by 20% in only for the first three years. d)To expand at least two new locations by end of the first three years. 5.2 Labor Supply: About 40% of the people have access to grid electricity most of them living in the urban areas. The need of the movement is to find an energy source that would serve the needs of rural people, help them to develop economically without further damage We will hire electrical engineers, computer engineers, programmers, technicians for managing our power systems. Also we will need officers for managing our business & 4th class labor for other maintenance.
5.3 Manufacturing cost Data and Pricing: For producing 800 wt we need 5,78,000 Tk. including all costs .To produce 800wt electricity we use 3 types of panel systems with various capacity. From each type of panel system we use five panels from which the electricity of 100wt(20wtsystem,)300wt(60wt system) and 400wt(80wt system) will be generated.
Solar Panel Private Limited Company.| Solar Panel Project
18
Manufacturing cost data and different panel systems pricing as follows:
20 Wp system 20 Wp System S.N
Particulars
Capacity
Quantity
Cost(Tk)
1 2
Panel Battery
20Wp 35ah
1 1
9000 4000
Selling Price 12600 5250
3
Charge Controller
8Amp
1
1400
1500
4
DC/AC Converter Structure
20w
1
1400
1500
1
800
1500
1500 18100
3000 2000 27350
5 6 7
Installation Miscellaneous Total
Remarks
2CFL of 5 watt each (4 hours) 1CFL of 3 watt(4 hours) 1 LED light (4 hours) Mobile charge
60 Wp System: 60 Wp System S.N
Particulars
Capacity
Quantity
Cost(Tk)
1 2
Panel Battery
60Wp 57ah
1 1
27000 7500
Selling Price 37800 8550
3
Charge Controller
8Amp
1
2000
2250
4
DC/AC Converter
60w
1
1700
1800
5
Structure
1
800
1500
6
Installation
7
Miscellaneous
2000
2850
Total
41000
57750
3000
Remarks
2CFL of 7 watt each (5 hours) 3CFL of 5 watt(5 hours) 3 LED light (5 hours) Mobile charge Internet router
Solar Panel Private Limited Company.| Solar Panel Project
19
80 Wp System S.N
80 Wp System Particulars
Capacity
Quantity
Cost(Tk)
1 2
Panel Battery
80Wp 100ah
1 1
36000 14000
Selling Price 50400 16750
3
10Amp
1
2000
2250
60watt
1
1700
1800
5
Charge Controller DC/AC Converter Structure
1
800
1500
6
Installation
7
Miscellaneous Total Discount 5 % Grand total
4
3000 2000 56500
Remarks
1CFL of 11watt each (5 hours) 3CFL of 5 watt(5 hours) 3 LED light (5 hours) Mobile charge(2hours) Router(2 hours)
3000 78700 3935 74765
5.4 Marketing Strategies:
5.4.i) STP Analysis: Every business has marketing strategies and to ours business marketing strategy is basically STP analysis bared. The marketing strategic of our business are given below:
5.4.ii)Segmentation: The prime theme of our business is to provide electricity to remote villages and in the industrial areas where electricity supply is short reducing our electricity problems. That‘s why first we will supply electrically to some portion of our country . We have
Solar Panel Private Limited Company.| Solar Panel Project
20
made this regimentation mainly for the remote villagers who are sufferer for not having electricity. With the help of our project they will be able to lead a smoother life.
5.5 Advertising: In the process of marketing the advertising process is very much important. Because, the more powerful our advertisement is the more we can express ourselves in this riddle sector. Only the proper advertisement can show and teach general people about us and encourage them to use our product .Advertisement of our project in the ways are mentioned below:
Advertise Through Newspaper: We can advertise our product through newspaper. It will draw attention of general people.
Leaf – Letting: We can publish leaf – let to serve the general people which will provide them knowledge about the main theme of our project.
Using bill- board and hoarding: Using bill- board and hoarding can be a helpfully method for advertising our product. It can make delicate progress.
Public promotions through camping: This kind of advertisement is generally conducted by the consumers of our product. General people who are receiving our services or products can advertise our project just telling about it to others. It can gain maximum response from public.
5.6 Target Market: Our main target is to provide electricity to the people who are willing to use electricity but do not have any source. And also to make available electricity to industrial areas, helping them to continue their industrial works more effectively without consuming so much of country‘s electricity or natural resources. The areas in which we will provide electricity and our solar energy are given below:D= Dhaka, R- Rajshahi, K- Khulan, B- Barisal, C- Chittagong, S- Sylhet, (v) = Industrial areas (o) Remote area.
Solar Panel Private Limited Company.| Solar Panel Project
21
5.7 Marketing mix Analysis:
Marketing Mix Variable
Critical Decision
Product
Our business is service oriented; we will install solar plant and produce electricity plant as well as supply it to different places.Various materials we will use including: Panels,Reserve system,converter,power zone,transformer to supply electricity.We will provide 2 years Warranty to our potential customer .
Pricing
About 20Wt system price estimated BDT 27,550,60Wt system price estimated BDT 57,350 and 80Wt system price estimated BDT 78,700 along with 5% discount rate.
Channels of distribution
Self distribution.
Promotion
We will promote our business through the advertisement, Leaf – Letting, Using billboard and hoarding, camping.
5.8 Sensitivity Analysis In the event of an economic downturn, the business may have a decline in its revenues. However, solar panel installation companies are in high demand with the current state of the energy markets. As such, Management does not anticipate that the business will have any trouble generating revenues from the onset of operations
Solar Panel Private Limited Company.| Solar Panel Project
22
5.9 SWOT Analysis: The SWOT analysis system mainly used for finds out the over focuses to the direct and indirect area and all other sector of an organization. Here, by all position and also using strengths we can find aggressive advantage in meeting the need of its target markets and weaknesses refer to any limitations that a firm faces in marketing strategy development and execution. Opportunity is mainly positive conditions in any environment that could produce a Great profit for the organization if it works properly and threats are mainly the negative side or barrier that may prevent the firm from reaching its objectives. SWOT Analysis : SWOT Analysis for SEC is done as follows: Strength •Good quality of service. •Strong public relationship. •Highly skilled manpower . •Understanding and Unity among the partners . •Strong relation with the manufacturers . Weakness •Inexperience. •Inadequate information about customer‘s needs . Opportunities •Load shedding •Target customer are unsatisfied with current available services •Promotion of renewable energy from government level •Subsidies and tax credit on the solar products Threats •Political instability •Existing competitors
Solar Panel Private Limited Company.| Solar Panel Project
23
6. Organizational plan: 6.1 Company Name: Solar Panel Private Ltd. Company. 6.2 Legal Form of Business: Private Ltd. Company. 6.3 Liability of owners: Amount of capital contribution is limit to share holder liability. 6.4 Continuity of Business: Death or withdrawal of owner(s) will not affect legal existence of business. 6.5 Capital requirement: BDT 40,00,000 (BDT 33,00,000 is owners equity & BDT 7,00,000 is Long term loan) 6.6 Management Control: Majority share holder(s) have most control from legal point of view.. 6.7 Distribution of Profits and losses: Shareholders can share a profits by receipt of dividends.
6.8 Management Team: 1. Adnanur Rafi Chairman Solar Panel Private Ltd.Company. 2. Sakib Tanvir Vice Chairman Solar Panel Private Ltd.Company.
3 . Riajur Rahaman Head of Finance Department. Solar Panel Private Ltd.Company. 4. Md.Salah Uddin Head of the Marketing Department. Solar Panel Private Ltd. Company. 5. Mohammad Noor Nabi Electric Manager Solar Panel Private Ltd. Company. .
Solar Panel Private Limited Company.| Solar Panel Project
24
6.9 Graphical Chart of Management Team
6.10 Roles and responsibilities of members of the organization:
Operational manager: Responsibilities: General Management of the whole project. Authorities: Go / No-go Decisions Competencies needed: Leadership, communication, financial and management skills
Installation dept 1st line manager
Responsibilities: performance of his dept, coordinating with other depts. Authorities: can take important decisions within his dept. Competencies needed: technical awareness, Leadership, communication, financial & management skills.
Solar Panel Private Limited Company.| Solar Panel Project
25
Installation team leader engineer
Responsibilities: Following up on his team's KPIs, coordination within his own team. Authorities: dividing team members upon different tasks. Competencies needed: High technical awareness, Leadership, communication skills.
Installation Engineer Responsibilities: Following up on installations performed by technicians, quality assurance. Authorities: subdivision of work within his team of technicians. Competencies needed: High technical awareness, Leadership, communication skills.
Installation Technicians Responsibilities: Equipment installation Authorities: None. Competencies needed: High stamina, ability to understand what is needed to be done.
Commissioning dept 1st line manager Responsibilities: performance of his dept, coordinating with other depts. Authorities: can take important decisions within his dept. Competencies needed: technical awareness, Leadership, communication, financial & management skills
Commissioning team leader engineer
Responsibilities: Following up on his team's KPIs, coordination within his own team. Authorities: dividing team members upon different tasks. Competencies needed: High technical awareness, Leadership, communication skills.
Solar Panel Private Limited Company.| Solar Panel Project
26
Commissioning Engineer Responsibilities: Software installation and configuration. Authorities: only within his task. Competencies needed: high technical awareness.
Power Engineer Responsibilities: Determine and follow up installation of the power needed. Authorities: only within his task. Competencies needed: high technical awareness.
Program Manager Responsibilities: Managing/coordinating multiple projects Authorities: upper level decisions, for example, which project needs to be prioritized? Competencies needed: All Project management skills.
Project manager Responsibilities: Managing only one project most of the time. Authorities: project level decisions. Competencies needed: All Project management skills.
Project coordinator Responsibilities: Assistance to the project manager Authorities: low level decision with regards to the project he/she is involved in. Competencies needed: basic project management skills.
Solar Panel Private Limited Company.| Solar Panel Project
27
7. Risk analysis: For the solar power project, there could be the following challenges
Because Solar Energy is very new to the region, Local Human resources will not have the skill set to work on the project. So SEC need to provide the training to the Human resources. The knowledge workers / High skilled workforce, will have to be trained to interact with the local low skilled workforce- who will be used to carry out routine activities Since the Project Manager is not a local person, (s)he will need a local person as assistant to help deal with local administrative work. Since the region is not a completely developed country, during production / execution, they might run into addition, unknown (to the Project manager) delays. Thus they will have to take in extra buffer time during planning.
7.1) Evaluation the weakness of this business: High costs: Solar photovoltaic (PV) and concentrating solar power (CSP) generating plants, for example, produce electricity at costs significantly higher than for electricity produced from wind or fossil-fueled power plants. Transmission: Transmission lines carry electricity from power plants to cities, industry, and other locations where it is needed. As explained below, utility-scale wind and solar power plants are often located more remotely than fossil-fueled plants. Therefore, they require construction of new, expensive, and controversial transmission lines—and this has proven very difficult. Variability/intermittency: The wind and the sun are variable resources, meaning that their availability as an energy source fluctuates due to weather patterns, clouds, and cycles of day and night. The Solar Panel Private Limited Company.| Solar Panel Project
28
electricity output from power plants dependent on these variable resources varies accordingly. The demand for electricity, however, does not follow the same pattern. In the case of wind electricity, electricity generation is sometimes greatest at night when electricity demand is lowest. There are other barriers as well, including siting and permitting challenges for the renewable power plants themselves and for the transmission lines that connect them to the grid, higher perceived technical risk, high ratio of capital to operating costs, and policy uncertainty. However, the three barriers noted above—higher costs,the need for new transmission capacity, and variability of output—are currently the most significant and thus are the focus of this report. We will be able to know about project risk, management, obstacles and competitive market from risk analysis. There are three parts of risk analysis. And they are – a)
Potential Problems
b)
Obstacles and Risks
c)
Alternative course of action
7.1.i) Potential Problem: a) Service cost: In our project, service cost is the main problem. Bangladesh is a developing country, so here cost is a great factor. It we produce 20 Watt from a single panel which capacity is 20 W system the production cost will be Tk.18100 Tk. And about 60 Watt from a single panel which capacity is 60W system the production cost is Tk. 41000 and about 80 Watt from a single panel which capacity is 80W system the production cost is Tk.56500. then according to the present situation it may be costly for our people. b) Natural Calamities: Different types of natural calamities can create different type of problems.
7.1.ii) Obstacles and Risk: a) Autocracy Problem: Autocracy problem means different types of political problems. Political collaboration can hinder our service of power supply. b) Other problems: Unfairness of labors demand and high wage, variation of cost etc.
Solar Panel Private Limited Company.| Solar Panel Project
29
7.1.iii) Alternative Course of Action: In near future nuclear power plant is the main alternative of this project. It can be one of our main competitors. So, we will have to over come it by our competence.
8. Financial Plan:
8.1 Particulars of Required Resource Solar Panel Company Private Limited Dhanmondi,1202,Dhaka Particulars
Owners Equity
Loan
Total
Fixed Capital Land Building Equipment
10,00,000 1,20,000 3,80,000
Pre-Operating Expenses
10,00,000 1,20,000 3,80,000
7,00,000
7,00,000
Working Capital
18,00,000
18,00,000
Total
33,00,000
7,00,000
40,00,000
Percent
82%
18%
100%
Solar Panel Private Limited Company.| Solar Panel Project
30
8.2 Cost of Project Collection:
Solar Panel Company Private Limited Dhanmondi,1202,Dhaka
Capital Requirement
Fixed Assets: Land Building Equipment Total Fixed Asset Pre-Operating Expenses Working Capital Total Working Capital Total Cost Project
Amount (TK)
Amount (TK)
10,00,000 1,20,000 3,80,000 15,00,000 7,00,000 18,00,000
40,00,000
40,00,000
Solar Panel Private Limited Company.| Solar Panel Project
31
8.3 Financing plan and Loan Required: ―Sun power‖ company plans to contribute taka 40,00,000 covering the cost of the land, building and Equipment cost, A loan with be required for the rest of the project cost.
Source of Financing loan 18%
OwnersEquity 82%
8.3. i) Loan Repayment Schedule:
Year
Principal amount outstanding
Installment
Interest @12%
Principal repayment
1
7,00000
200000
84000
584000
2
584000
200000
70080
654080
3
654080
200000
54489
508569
Solar Panel Private Limited Company.| Solar Panel Project
32
4
508569
200000
37028
345597
5
345597
345597
-
-
8.4 Pro forma income statement (1st year)
Solar Panel Company Private Limited Dhanmondi,1202, Dhaka End of Year 31st December 2013
Particulars
Amount(Tk)
Net sales revenue Cost per installation Last year inventory Gross Profit Operating Expenses Rent Salaries Telephone Electricity cost Transportation Internet Advertisement Stationary Auditing Other miscellaneous Total Operating Expenses Depreciation Computer Furniture Fax & Printer Electronic appliances Scooter Total Depreciation
7,99,325 (45,000) 0 7,54,325 , 60,000 2,20,000 5,000 5,000 20,000 12,000 75,000 15,000 10,000 22,000 4,44,000 12,000 14,000 2,000 5,000 2,500 35,500 Solar Panel Private Limited Company.| Solar Panel Project
33
Inventory
85,000 1,89,825 (70,235) 1,19,590
Tax (37%) Net Income
Pro forma income statement (2nd Year) Solar Panel Company Private Limited Dhanmondi,1202, Dhaka End of Year 31st December 2014
Particulars Net sales revenue Cost per installation
Amount(Tk) 8,23,304.75 (45,675)
7,77629.75 85000 862629.75
Last year inventory Operating Expenses Rent Salaries Telephone Electricity cost Transportation Internet Advertisement Stationary Auditing Other miscellaneous Total Operating Expenses Depreciation Computer Furniture Fax & Printer Electronic appliances Scooter
Amount(Tk)
60900 2,23,300 5075 5075 20300 12180 76125 15225 10150 22330 4,49,660
12,000 14,000 2,000 5,000 2,500 Solar Panel Private Limited Company.| Solar Panel Project
34
Total Depreciation
35,500
Inventory
(75000) 3,02,469.75 1,11,913.80 1,90,556
Tax (37%) Net Income Pro forma income statement (3rd Year)
Solar Panel Company Private Limited Dhanmondi,1202, Dhaka End of Year 31st December 2015 Particulars Net sales revenue Cost per installation
Amount(Tk) 8,80,936 (47,045)
8,33,890.75 75,000 9,08,890.75
last year inventory Operating Expenses rent salaries telephone electricity cost Transportation internet advertisement stationary Auditing other miscellaneous Total Operating Expenses Depreciation Computer Furniture Fax & Printer Electronic appliances scooter
Amount(Tk)
62,422.5 2,28,882.5 5202 5202 20,807.5 12,484.5 78,028 15,607 10,404 22,888 4,60,901.5
12,000 14,000 2,000 5,000 2,500 Solar Panel Private Limited Company.| Solar Panel Project
35
Total Depreciation
35,500
Inventory
(89,000) 3,23,489.25 1,19,691 2,03,798.25
Tax (37%) Net Income
8.5 Projected Sales and profit statement:
Solar Panel Company Private Limited Dhanmondi1202, Dhaka Sales
Praofit
1st Year
7,99,325
1,19,590
2nd Year
8,23,304.75
1,90,556
3rd Year
8,80,936
2,03,798.25
Forecast of Profit First Three Years:
Solar Panel Private Limited Company.| Solar Panel Project
36
Sales
Profit
823304
799325
119590
1st year
190556
2nd year
880936
203798
3rd year
8.6 Projected Balance Sheet: Solar Panel Company Private Limited Dhanmondi, 1202, Dhaka
Particulars
Amount (Tk.)
Amount (Tk.)
Amount (Tk.)
Current Asset Cash
25,10,800
Accounts Receivable
37,500
Pre-operating expenses
14,200
Total current Asset
25,62,500
Fixed Asset Land
10,00,000
Building
2,20,000
Less: Depreciation
(20,000)
Equipment
5,23,600
Less: Depreciation
(15,500)
2,00,000
5,08,100
Solar Panel Private Limited Company.| Solar Panel Project
37
Total Fixed Asset
17,08,100
Total Asset
42,70,600
Current Liabilities Accounts Payable
24,700
Tax Payable
70,235
Dividend Payable
88,000
Total Current Liabilities
1,82,935
Long Term Bank Loan
7,00,000
Owner’s Equity Common stock
33,00,000
Retained Earnings
87,665
Total stock holder‘s equity
33,87,665
Total Liability
42,70,600
8.7 Ratio Analysis: 8.7. i) Net profit on Sales ratio: Net profit on Sales ratio = Net profit ÷ net sales 1st year
2nd Year
3rd year
Net Profit
119590
190556
203798
Net Sales
7,99,325
823304.75
880936
Profit Sales Ratio
14.96%
23.14%
23.98%
8.7.ii) Net profit to equity (Return on Investment Ratio) : Net profit to equity Ratio= net profits before tax / shareholders equity First Year Solar Panel Private Limited Company.| Solar Panel Project
38
Profit
1,89,825
Equity
33,00,000
IRR
5.75%
Conclusion: The earning of SPC is 5.75%on the money the partners have invested in SEC for first year.
8.7 iii) Times Interest earned ratio: Times interest earned ratio= (earnings before interest and taxes)/ (total interest expense) First Year
Earnings Before Tax
1,89,825
Tax Paid
70235
Profit tax ratio
2.7%
Conclusion: SEC earned 3 times more than its tax expenses.
8.7 iv) Return On Asset (ROA): Return On Asset=(Net Income/ Average Total Asset) First Year
Solar Panel Private Limited Company.| Solar Panel Project
39
Net Income
1,19,590
Average Total Asset
42,70,600
ROA
2.8%
8.7 v ) Return On Equity (ROE): Return On Equity = (Net Income/Total Equity) First Year
Net Income
1,19,590
Average Total Equity
33,87,650
ROE
3.5%
8.8 Breakeven Analysis:
Fixed cost Cost price per unit Selling price per unit Breakeven point in unit
Q
BE
1st year 578000 38533 53288 39
2nd year 595340 38533 53288 41
3rd year 625107 38533 53288 43
=FC/(P-V)
For the first year
Q
BE is
39 units,Second year
Q
BE is
41 units,and Third year
Q
BE is
43 units.
SBE = (QBE).(V) + FC For the first year SBE is BDT 20,81567,Second year SBE is BDT 21,75,193 and Third year is SBE is BDT 22,82,026.
Solar Panel Private Limited Company.| Solar Panel Project
40
8.9 Graphical Presentation of Breakeven Point:
Appendix and Conclusion Although it may be somewhat unfamiliar to us Entrepreneurship Development is neither sophisticated nor complicated. It is nothing more than enhancing our knowledge about how entrepreneurship can be developed. The business plan of Solar Panel Company Pvt. Ltd. can be implemented in the Rangpur. We are very confident that our business will reap lots of benefits economically as well as socially in the country. The market area of SPC will keep on rising day by day within short period of its establishment. The company will provide lots of facilities and services regarding solar technology. It will mainly focus on the customer satisfaction and need. We are sure that it will solve the problems of energy crisis, load shedding and backup systems in the various sectors like banks, offices, hospitals, houses, etc. So, at last we can say that Entrepreneurship Development helps us to develop our efficiency proficiency.
Solar Panel Private Limited Company.| Solar Panel Project
41
Findings & Recommendations 1. 2. 3. 4. 5.
Availability of sparing time a lot is needed. To have pre-experience all of the members. Availability of electricity facility. Getting technological convenience. Having all of the information related to the topics.
Bibliography
https://www.elance.com/.../solar-panel-business-plan-businesssmallbusiness.chron.com › ... › Starting a Company http://en.wikipedia.org/wiki/Solar_energy http://ownleader.net
faculty.ksu.edu.sa/alsalloum www.oppapers.com www.wbiconpro.com
Solar Panel Private Limited Company.| Solar Panel Project
42
Collection of Books:
Robert D Hisrich, Michael P Peters and Dean A Shepherd ‘‘Entrepreneurship’’ Bruce R. Barringer and R. Duance Ireland
Others: Engineer of solerhydry shop Sciencelab,Dhaka The industry weekly magazine Free boss firms report. The daily sun report.
Solar Panel Private Limited Company.| Solar Panel Project
43