RANCANGAN TEBA T EBATAN TAN BANJIR LEMBAH BERTAM, CAMERON HIGHLANDS, PAHANG PROJEK MELEBAR DAN MENDALAMKAN SUNGAI BERTAM DAN KERJA - KERJA BERKAITAN METHOD STATEMENT STATEMENT INTERIM 0
DOCUMENT NO :
FLEXIBLE PAVEMENT
JSSB/QAP/MS/P JSSB/QAP/MS/PAV AV
Refere!e : "#$ "#$ SCOP SCOPE E OF OF %OR %ORKS KS 1.1 The structural structural elements elements that are covered covered by this method statement statement be include;
Contract document Sect.4/P Sect.4/PA AV JK/SPJ/!""#
"#"#" N& B'()*'&)+ C&)r+e+# 1.1.1.1 Sub $rade 1.1.1.! Sub %ase 1.1. 1.1.1. 1.& & oad oad %ase %ase// %ase %ase Cour Course se 1.1. 1.1.1. 1.4 4 'ens 'ense e %it %itum umino inous us (aca (acada dam m )'%( )'%(** "#"# B'()*'&)+ C&)r+e+# 1.1. 1.1.!. !.1 1 As+h As+hal altic tic Conc Concre rete te %in %inde derr Cou Cours rse e 1.1. 1.1.!. !.! ! As+h As+hal altic tic Conc Concre rete te ,ea ,earin rin- Cou Cours rse e #$ #$ SU SURV RVE E AND AND SETT SETTIN ING G OUT OUT !.1
To determine determine eistineistin- and and to +avemen +avementt level0 cross cross all all and ali-nment ali-nment shall be carried out.
!.! Settin- out and control control +e-s +e-s shall be be installed installed on site site to control control 23 23 ! .! .1 ! .! .! ! .! .& ! .! .4 ! .! .# ! .! .5 ! .! .6
euired desi-n level. Alili-nment o road and lan lanes. ,idth o road and lanes. Junction ion an and road connection. 'i++in- measurement Automatic +avinin- strin- lin line. Cross all and su+er ele elev vation ion
.#$ TEMPORAR TEMPORAR TRAFFIC TRAFFIC DIVER DIVERSION SION AND CONTROL# CONTROL#
&.1
Tra7c (ana(ana-ement ement Plan shall shall be submitted submitted or or a++roval a++roval to ensur ensure e tra7c 8o9 is not much disru+ted.
&.! 'iversion 'iversion o road road shall shall be constru constructed cted to the the most suitab suitable le an-le o o entry0 adeuate 9idth0 hori:ontal curvature and level that 9ould constitute a sae 8o9. &.& The s+eed s+eed limit or or the tra7c tra7c alonalon- the divers diversion ion shall shall be as reuir reuirement. ement. &.4 The diversion diversion shall shall be 9ell sealed sealed 9ith +remi +remi and to to be maintained maintained re-ula re-ularly rly.. &.# All diversion diversion shall shall be adeua adeuately tely urnis urnished hed 9ith the the necessary necessary si-na-es0 si-na-es0 barriers0 re8ective strin-s0 barricades0 ni-ht illumination bliner0 beacons0 marers and tra7c controller as and 9hen necessary. The diversion and a++roach road shall also be +rovided 9ith +ro+er road marin- in accordance to Arahan Teni ) Jalan * !C/ <# .
Page 1 of 59
RANCANGAN TEBA T EBATAN TAN BANJIR LEMBAH BERTAM, CAMERON HIGHLANDS, PAHANG PROJEK MELEBAR DAN MENDALAMKAN SUNGAI BERTAM DAN KERJA - KERJA BERKAITAN METHOD STATEMENT STATEMENT INTERIM 0
DOCUMENT NO :
FLEXIBLE PAVEMENT
JSSB/QAP/MS/P JSSB/QAP/MS/PAV AV
Refere!e : 1#$ 1#$ SU SURF RFAC ACE E DRAI DRAINA NAGE GE 4 .1
Prior ior to to an any +a +aveme ement 9o 9or0 al all dr draina ina-e sy system sh shall be +r +resent an an unctional.
Contract document Sect.4 t.4/PAV JK/SPJ/!""#
4.! Permanent Permanent subso subsoil il drains0 drains0 ) i any * must have have already already been installed installed to ensure rm oundation and any locali:ed sot s+ot shall be identied and rectied in advance.
2#$ PREPARA PREPARATION TION OF FORMA FORMATION #.1 Prior Prior to +re+ar +re+aration ation o ormation ormation or or sub-rade sub-rade00 all oundatio oundation n and earth9or must have been com+leted u+ to the level o tolerance as s+ecied in the s+ecication. =illin- or cuttin- is normally done u+ to >/ 3 &"" mm rom the ormation level0 ater 9hich it is considered as ormation o sub-rade level. #.!
?cess ?cess material material shall shall be remove removed d to acilitate acilitate the the 9ors. 9ors. The materia materiall shall be im+orted rom a++roved source o borro9ed +it and shall satisy all suitability reuirement as 9ell as the C% @ #.
#.& The com+actio com+action n shall be chec checed ed by the =ield =ield 'ensity 'ensity Test Test B# the the elative Com+action. #.4 o heavy heavy vehicles vehicles shall be allo9ed allo9ed over over the +re+ar +re+ared ed sub-rad sub-rade. e. ,here ,here necessary0 a +rotective layer shall be +laced over the sub-rade and to be removed 9hen no lon-er needed. #.#
Sub-rade Sub-rade shall shall be develo+ develo+ed ed alonalon- the ull ull 9idth o o the carria-e carria-e 9ay 9ay and and com+acted in lon-itudinal direction rom the outer ed-e to the inner ed-e and shall be rom the lo9er end to the hi-her hi -her end in the su+er3elevated su+er3elevated areas.
#.5 Any material material that that ound unsuitable0 unsuitable0 to to be remove removed d and re+lac re+laced ed 9ith im+orted material. #.6 The line and and level level shall be contr control ol by di++in di++in- +e-s0 +e-s0 9hich 9hich indicated indicated the oDsets and levels.
3#$ PLACING PLACING OF SUB-B SUB-BASE ASE AND RO ROAD AD BASE BASE 5.1
SUB BASE 5.1. 5.1.1 1 Prior rior to lay layin in- any any sub sub bas base e mate materi rial al00 the the unde underr layi layinnsub-rade shall have been sha+ed and com+acted as +er reuirements.
Page 2 of 59
RANCANGAN TEBA T EBATAN TAN BANJIR LEMBAH BERTAM, CAMERON HIGHLANDS, PAHANG PROJEK MELEBAR DAN MENDALAMKAN SUNGAI BERTAM DAN KERJA - KERJA BERKAITAN METHOD STATEMENT STATEMENT INTERIM 0
DOCUMENT NO :
FLEXIBLE PAVEMENT
JSSB/QAP/MS/P JSSB/QAP/MS/PAV AV
Refere!e : 1#$ 1#$ SU SURF RFAC ACE E DRAI DRAINA NAGE GE 4 .1
Prior ior to to an any +a +aveme ement 9o 9or0 al all dr draina ina-e sy system sh shall be +r +resent an an unctional.
Contract document Sect.4 t.4/PAV JK/SPJ/!""#
4.! Permanent Permanent subso subsoil il drains0 drains0 ) i any * must have have already already been installed installed to ensure rm oundation and any locali:ed sot s+ot shall be identied and rectied in advance.
2#$ PREPARA PREPARATION TION OF FORMA FORMATION #.1 Prior Prior to +re+ar +re+aration ation o ormation ormation or or sub-rade sub-rade00 all oundatio oundation n and earth9or must have been com+leted u+ to the level o tolerance as s+ecied in the s+ecication. =illin- or cuttin- is normally done u+ to >/ 3 &"" mm rom the ormation level0 ater 9hich it is considered as ormation o sub-rade level. #.!
?cess ?cess material material shall shall be remove removed d to acilitate acilitate the the 9ors. 9ors. The materia materiall shall be im+orted rom a++roved source o borro9ed +it and shall satisy all suitability reuirement as 9ell as the C% @ #.
#.& The com+actio com+action n shall be chec checed ed by the =ield =ield 'ensity 'ensity Test Test B# the the elative Com+action. #.4 o heavy heavy vehicles vehicles shall be allo9ed allo9ed over over the +re+ar +re+ared ed sub-rad sub-rade. e. ,here ,here necessary0 a +rotective layer shall be +laced over the sub-rade and to be removed 9hen no lon-er needed. #.#
Sub-rade Sub-rade shall shall be develo+ develo+ed ed alonalon- the ull ull 9idth o o the carria-e carria-e 9ay 9ay and and com+acted in lon-itudinal direction rom the outer ed-e to the inner ed-e and shall be rom the lo9er end to the hi-her hi -her end in the su+er3elevated su+er3elevated areas.
#.5 Any material material that that ound unsuitable0 unsuitable0 to to be remove removed d and re+lac re+laced ed 9ith im+orted material. #.6 The line and and level level shall be contr control ol by di++in di++in- +e-s0 +e-s0 9hich 9hich indicated indicated the oDsets and levels.
3#$ PLACING PLACING OF SUB-B SUB-BASE ASE AND RO ROAD AD BASE BASE 5.1
SUB BASE 5.1. 5.1.1 1 Prior rior to lay layin in- any any sub sub bas base e mate materi rial al00 the the unde underr layi layinnsub-rade shall have been sha+ed and com+acted as +er reuirements.
Page 2 of 59
RANCANGAN TEBA T EBATAN TAN BANJIR LEMBAH BERTAM, CAMERON HIGHLANDS, PAHANG PROJEK MELEBAR DAN MENDALAMKAN SUNGAI BERTAM DAN KERJA - KERJA BERKAITAN METHOD STATEMENT STATEMENT INTERIM 0
FLEXIBLE PAVEMENT
DOCUMENT NO : JSSB/QAP/MS/P JSSB/QAP/MS/PAV AV
Refere!e : 5.1. 5.1.! !
(ate (ateri rial al s+ec s+eci ica catio tion n re reuir uireme ement nt or or lo9 lo9er er sub sub base base ) C% C% Value alue @ &" &" and and -rad -radati ation on Eimit Eimit00 table table 4.1 *. and andom om sam+ sam+ll shall be ta taen rom site ite to com+ly 9ith ith the s+ecic ication ion.
5.1. 5.1.& &
Suit Suitab able le s+r s+rea ead dinin- +la +lant nt such such as moto motorr -ra -rade derr and and bac+usher and com+action shall be carried out usin- suitable com+actin- +lant.
5.1. 5.1.4 4
Clea Cleanli nline ness ss and and uni unior ormit mity y o o moi moist stur ure e and and +rev +reven entio tion n o o +hysical se-re-ation se-re-ation o the material m aterial laid shall al9ays be ensured throu-h the used o a bo s+reader or +rudent used o the motor -rader0 9ater taner0 com+actor combination.
5.1.#
The material shall be done in a sin-le lit. F the reuired reuired thicness is more !""mm0 the +lacin-0 s+readin- and com+actin- o material shall be done in t9o layers.
5.1. 5.1.5 5
Gnce Gnce the reuir euired ed B# B# ela elativ tive e 'ens 'ensity ity is achi achiev eved ed00 the the lev level el shall be checed usin- di++in- +e-s at 1!.# m interval to ensure the correct cross all and adeuacy thicness is achieved 9ith the tolerance > 1"mm / 3 !"mm.
5.1.6
C&*45!('& re6)'re*e( 5.1.6.1 Com+action ion is not less B# o the maimum mum dry density as determined by %S 1&66 test )4.# - rammer method *
5.1.<
F'e78 C&(r&7 5.1 5.1.<.1 .<.1
5.!
Tria rial com com+ +actio ction n sha shall be car carried ied out out to ecess ess the suitability o the com+action +lant and to establish the rollin- +attern reuired reuired to achieved the s+ecied com+action reuirement.
ROAD BASE 5.!. 5.!.1 1
Prio Priorr to to +la +laci cinn- the the roa road d base base mate materia rial0 l0 the the und under erly lyininsub-rade or sub base shall have been sha+ed and com+acted.
5.!. 5.!.! !
H+on H+on a++r a++rov oval al o the the +r +reced ecedin in- sub sub base base laye layer0 r0 the the roa road d base shall be in layers havin- com+acted thicness not less than 1""mm and not eceedin- !""mm.
5.!. 5.!.& &
Suita Suitabl ble e s+r s+rea eadi dinn- +lan +lantt suc such h as as mot motor or-r -rad ade e or or bac bac+ +us ushe herr shall be used and as 9ell as or com+action activity. activity.
Page 3 of 59
Contra Contract ct docu documen mentt Sect.4 t.4/PAV JK/SPJ/!""# JK/SPJ/!""#
RANCANGAN TEBA T EBATAN TAN BANJIR LEMBAH BERTAM, CAMERON HIGHLANDS, PAHANG PROJEK MELEBAR DAN MENDALAMKAN SUNGAI BERTAM DAN KERJA - KERJA BERKAITAN METHOD STATEMENT STATEMENT INTERIM 0
FLEXIBLE PAVEMENT
DOCUMENT NO : JSSB/QAP/MS/P JSSB/QAP/MS/PAV AV
Refere!e : 5.!. 5.!.4 4
Clea Cleanli nline ness ss00 uni unior ormit mity y or or mois moistu ture re and and +re +reve vent ntio ion n o +hys +hysic ical al se-r se-ree-at atio ion n o o the the mate materi rial al sha shall ll al9 al9ay ays sb be e ens ensur ured ed and and Cont Contra ract ct docu docume ment nt com+ com+ac acti tion on shall hall be +rovid ovided ed usin usin- a suit suita able com+ om+actin ctinSect. ect.4 4/PA /PAV +lant and tested. JK/SPJ/!""#
5.!. 5.!.# #
Chec Chec the the di++ di++inin- at 1!.# 1!.#m m inte interv rval als0 s0 shal shalll be be car carri ried ed out out to to ensure that the correct cross all 9ithin the tolerance ater the reuired B# relative density is achieved.
5.!.5
C&*45!('& re6)'re*e( 5.!.5.1
(eth ethod o o co com+action ion sh shall achiev ieved no not les less s than B# o the dry density as determined by %S 1&66 ) 4.# - rammer method *
5.&
5.! 5.!.5.! .5.!
Tria rial com com+ +actio ction n sha shall be car carried ied out out to asse asses ss the suitability o the com+action +lant and establish the rollin- +attern reuired.
5.!.5.&
The ma material sh shall conorm th the re reu uirement ) C% Value @ &" and -radation limit0 table 4.! *
BITUMINOUS COATING 5.&.1
P75( 58 E6)'4*e( 5.&.1.1
5.&.!
%itu itumen ?m ?mulsio lsion n us usin- Se Sel3 l3Pro+elle lled Ia Iand G+erated 'istributor.
Pr'*e !&5(# 5.&.!.1
Clea lean the the surace o com+acted oad base rom loose sand0 clay or silt usin- a t ractor attached 9ith +o9er broom.
5.& 5.&.!.! .!.!
The resul esulti tinn- sur surace ace shall hall revea eveall an inta intact ct but rou-h and irre-ular surace nish0 9ith enou-h voids to allo9 the s+rayed +rime coat achieve -ood +enetration in the road base.
5.&.!.&
The ra rates tes o o a+ a++lic licatio tion sh shall be aa-reed u+ u+on the s+ray trial ) 9ithin the ran-e o ".# to 1." litre/ s. m at the tem+erature ran-e o the bet9een !# c and 4# c.
Page 4 of 59
RANCANGAN TEBA T EBATAN TAN BANJIR LEMBAH BERTAM, CAMERON HIGHLANDS, PAHANG PROJEK MELEBAR DAN MENDALAMKAN SUNGAI BERTAM DAN KERJA - KERJA BERKAITAN METHOD STATEMENT STATEMENT INTERIM 0
FLEXIBLE PAVEMENT
DOCUMENT NO : JSSB/QAP/MS/P JSSB/QAP/MS/PAV AV
Refere!e : 5.& 5.&.!.4 .!.4
5.&.&
5.&.4
The a++ a++lic licatio ation n shall hall be distr istrib ibut uted ed uni unio ormly mly over over the the sur sura ace ce havi havinn- devi deviat atio ion n not not more more than 1" 1" rom th those +r +rescribed and shall b normally be let undisturbed or at least !4
T5!9 C&5( 5.&.&.1
,ors sh shall commence on on sit site e u+ u+on a+ a++roval and acce+tance o the +revious bituminous layer.
5.&.&.!
%itu itumino inous ta tac co coat ma mater terial ials sh shall be ra ra+id settin- bitumen o -rade K14"0 S31 or S31K conormin- to (S 151.
5.&.&.&
The su surace to to receiv eive ta tac coat sh shall ree rom all loose material0 standin- 9ater and any dama-e or deterioration o it shall be mae -ood +rior to a++lication.
5.&.&.4
The ra rate o ta tac co coat a+ a++lic lication ion sh shall be ". ".!# to ".## litres/ s m. at tem+erature ran-e bet9een !# c and 4#c.
F'e78 C&(r&7 These shall be carried out out to assess and determine determine the rate o s+read. A tray 9ill be 9ei-hed0 measured and 9ill be +ut at the middle o area to be s+rayed. Ience0 the rate o the s+read 9ill be determine as ollo9s 2 ate o s+read 2
) tac coat > tray * 3 ) tray * ) density o tac coat * ) area o tray *
#$ ASPHAL ASPHALTIC CONCR CONCRETE ETE BINDE BINDER R COURSE COURSE 6.1
,ors ,ors shall shall commence commence on site site u+on a++r a++roval oval o o desi-n desi-n mi and acce+tance o +revious +rime layer.
6.! The surace surace to receive receive the the as+haltic as+haltic concrete concrete binder binder course course shall shall be ree ree o all dirt0 loose material and 9ater +ondin-. 6.& The a++rov a++roved ed mi shall shall be delivered delivered to to site by ti++er ti++er trucs trucs covere covered d 9ith tar+aulin to +revent heat lost. 6.4 The as+haltic as+haltic concr concrete ete shall be laid laid usin- Vo-ele Vo-ele Su+er Su+er 1#"! 1#"! +aver +aver or euivalent in sin-le layer.
Page 5 of 59
Cont Contra ract ct docu docume ment nt Sect.4/PAV JK/SPJ/!""# JK/SPJ/!""#
RANCANGAN TEBA T EBATAN TAN BANJIR LEMBAH BERTAM, CAMERON HIGHLANDS, PAHANG PROJEK MELEBAR DAN MENDALAMKAN SUNGAI BERTAM DAN KERJA - KERJA BERKAITAN METHOD STATEMENT STATEMENT INTERIM 0
FLEXIBLE PAVEMENT
DOCUMENT NO : JSSB/QAP/MS/P JSSB/QAP/MS/PAV AV
Refere!e : 6.# F the laid surac surace e in o+en3tetur o+en3tetured0 ed0 bac bac castincastin- shall be carrie carried d out and the the bi bi--er si: si:e e o o aa--re-ates sh shall be re removed be beore ro rollin llin-. Contract do document Sect.4/PAV 6.5 6.5 The The tra trans nsv verse erse oin ointt sha shall ll be ea eath ther ered ed do9n0 9n0 at at the the end end o o the the +avin JK/S K/SP PJ/!" J/!""# "# o+eration on ) and vertical oint shall be +rovided *. Tac Tac coat shall be uniormly a++lied evenly over the vertically cut oint 1# minutes beore ointin-. 6.6 Com+action Com+action shall shall be carri carried ed out usinusin- s+ecied s+ecied or euivalen euivalentt ty+e o o com+actors and the rollin- +attern shall be as +er established durin- trial lay rom the lo9er to the hi-her side o the carria-e 9ay. 9ay. The minimum rollin- tem+erature is 11"C. 6.< The surace surace shall shall be nished nished to the -rade -rade and and line as reuire reuired. d. 'i++in'i++in- at at 1!.#m intervals shall be carried out and to chec that the tolerance o L #mm is achieved. 6.B
COMPACTION REQUIREMENT 6.B. 6.B.1 1
The The com+ com+ac acte ted d As+h As+hal altic tic Conc Concre rete te %in %inde derr Cour Course se shal shalll achieved B# 3 1"" o (arshall 'ensity.
6.B. 6.B.! !
Corin Corin- shal shalll be carr carrie ied d out out to dete determ rmine ine (ars (arsha hall ll Sta Stabi bilit lity y Test est and the com+action0 !4 hours ater layin-.
6.1" FIELD CONTROL 6.1".1
Tr'57 M'; M' ; 58 Tr'57 L5< 6.1 6.1".1. ".1.1 1
Thes hese sha shall ll be carri arried ed out out to acces ccess s the the suitability o the miin-0 l ayin- and com+actin+lant and to establish the seuence o the layin- o+eration.
6.1 6.1".1. ".1.! !
Com+ om+actio ction n shall hall be car carried ried out usin usinrollers as -iven belo923
M Vibratory Tandem oller G+eratin- 9ei-ht0 total 'rum 9idth S+eed M Pneumatic Tyre oller G+eratin- 9ei-ht0 total 'rum 9idth S+eed
2 (odel 3 'yna+ac CC!1 or euivalent 2 5<"" 2 104#" mm 2 & 3 # m/h 2 (odel 3 Pyna+ac ,P!" or euivalent 2 1&065" 2 !01"" mm 2 & 3 # m/h
Page 6 of 59
RANCANGAN TEBATAN BANJIR LEMBAH BERTAM, CAMERON HIGHLANDS, PAHANG PROJEK MELEBAR DAN MENDALAMKAN SUNGAI BERTAM DAN KERJA - KERJA BERKAITAN METHOD STATEMENT INTERIM 0
DOCUMENT NO :
FLEXIBLE PAVEMENT
JSSB/QAP/MS/PAV
Refere!e : 6.1".1.&
The +ro+osed rollin- +attern a++lied shall be as ollo9s23
• %reado9n ollin-
• Fntermediate ollin-
• =inal ollin-
! +asses 9ith vibration usin- 'yna+ac CC!1 or euivalent < +asses 9ith ,P!" +neumatic tyre roller or euivalent ! +asses 9ith 'yna+ac CC!1 or euivalent
Contract document Sect.4/PAV JK/SPJ/!""#
=#$ ASPHALTIC CONCRETE %EARING COURSE <.1
,ors shall commence on site u+on a++roval and acce+tance o the as+haltic concrete binder course.
<.!
A++ly tac coat on the +re+ared surace. The ull 9idth o surace to the treated shall be s9e+t usin- a +o9er broom ollo9ed by a com+ressed air blo9er to remove all dirt0 dust and loose material.
<.&
Tac coat o a++roval bitumen emulsion ) (S 151 * shall be a++lied as +er +rocedure on the +re+ared surace +rior to layin- the 9earincourse.
<.4
The as+haltic concrete 9earin- course shall be laid usin- +aver in sin-le layer and the tem+erature o mi shall not less than 1!#C +rior to unloadin- rom truc into the +aver.
<.#
%accastin- shall be carried out i the laid surace is o+en3tetured and uneven si:e o a--re-ates removed beore rollin-.
<.5
Construction oints in a layer o bituminous mi shall be oDset rom those in any immediately underlyin- bituminous layer at least 1""mm or lon-itudinal oints and at least ".#m or transverse oints.
<.6
Com+action shall be carried out usin- s+ecied com+actor and rollin+attern shall be as establish durin- trial lay rom the lo9er to the hi-her side o the carria-e 9ay 9ith 1!"C rollin- tem+erature.
<.<
The nished surace shall be to -rade and line as reuired. 'i++in- at 1!.#m intervals shall be carried out to chec that the tolerance o L #mm is achieved.
Page 7 of 59
RANCANGAN TEBATAN BANJIR LEMBAH BERTAM, CAMERON HIGHLANDS, PAHANG PROJEK MELEBAR DAN MENDALAMKAN SUNGAI BERTAM DAN KERJA - KERJA BERKAITAN METHOD STATEMENT INTERIM 0
FLEXIBLE PAVEMENT
DOCUMENT NO : JSSB/QAP/MS/PAV
Refere!e : <.B
COMPACTION REQUIREMENT <.B.1
The com+acted As+haltic Concrete ,earin- Course shall achieved B< 3 1"" o (arshall 'ensity.
<.B.!
Corin- shall be carried out to determine (arshall Stability Test and the com+action0 !4 hours ater layin-.
<.1" FIELD CONTROL <.1".1
Tr'57 M'; 58 Tr'57 L5< <.1".1.1
These shall be carried out to assess the suitability o the miin-0 l ayin- and com+actin+lant and to establish the seuence o the layin- o+eration.
<.1".1.!
Com+action shall be carried out usin- rollers as -iven belo923
M Vibratory Tandem oller G+eratin- 9ei-ht0 total 'rum 9idth S+eed M Pneumatic Tyre oller G+eratin- 9ei-ht0 total 'rum 9idth S+eed <.1".1.&
2 (odel 3 Pyna+ac ,P!" or euivalent 2 1&065" 2 !01"" mm 2 & 3 # m/h
The +ro+osed rollin- +attern a++lied shall be as ollo9s23
• %reado9n ollin-
• Fntermediate ollin-
• =inal ollin-
2 (odel 3 'yna+ac CC!1 or euivalent 2 5<"" 2 104#" mm 2 & 3 # m/h
! +asses 9ith vibration usin- 'yna+ac CC!1 or euivalent 1! +asses 9ith ,P!" +neumatic tyre roller or euivalent ! +asses 9ith 'yna+ac CC!1 or euivalent
Page 8 of 59
Contract document Sect.4/PAV JK/SPJ/!""#
RANCANGAN TEBATAN BANJIR LEMBAH BERTAM, CAMERON HIGHLANDS, PAHANG PROJEK MELEBAR DAN MENDALAMKAN SUNGAI BERTAM DAN KERJA - KERJA BERKAITAN METHOD STATEMENT INTERIM 0
FLEXIBLE PAVEMENT
DOCUMENT NO : JSSB/QAP/MS/PAV
Refere!e : EQUIPMENT/ MANPO%ER/ TEST
50
PLANT AND EQUIPMENT Com+actor oller Proo oller %ac+usher (otor $rader Pavin- Set 'um+trucs ,ater %ro9ser S+rayer
>0
MANPO%ER Su+ervisor (achine o+erator $eneral ,orer
!0
1 no 1 no 1 no ! nos 1 nos & nos 1 no 1 no
1 nos 1" nos 5 nos
TEST eer to Fns+ection N Test Plan )FTP*
Page 9 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
TEMPORAR %ORK FOR BORED PILING %ORK FOR BRIDGE OVER SUNGAI MASAI B=
METHOD STATEMENT INTERIM 0
"#$ INTRODUCTION 1.1 The +ur+ose o this method statement is to describe the activities a documentation reuired to commence the tem+orary 9or or brid#$ SCOPE OF %ORKS !.1 Pre+aration o access road !.! Pre+aration o tem+orary +latorm !.& Fnstallation o sheet +ile .#$ %ORK SEQUENCE FLO% STAT Settin- out
Site clearin- N +re+arin- access road Pre+aration o tem+orary +latorm Fnstallation o sheet +ile Additional site investi-ation )S.F* %ored +ilin- 9or commence Construction o column %acllin9or
emoval o sheet +ile ?'
Page 10 of 59
DOCUMENT NO : IDX/QAP/MS/T%B=
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
DOCUMENT NO :
TEMPORAR %ORK FOR BORED PILING %ORK FOR BRIDGE OVER SUNGAI MASAI B=
IDX/QAP/MS/TMB=
1#$ METHOD STATEMENT 1#" SETTING OUT 4.1.1 The land surveyor 9ill identiy the i-ht o ,ay boundary and location o the +ilin- +oint. 4.1.! GDset or the +ilin- +oint0 nished road level0 cut oD level 9ill be +rovided at the +e- allocated or the +ilin- +oint. 1# SITE CLEARING 4.!.1 The site clearin- 9ill be +erormed at the allocated location.
F'O/AP/(S/SC
4.!.! The o+enin- as a mean o access to the location 9ill be constructed and llin- and cuttin- o the G$E are reuired until the diDerence in -round level is a++ro+riate or machineries and trans+ortation 4.!.& The location o machineries0 the o+enin-0 the material 9ill be arranbased on the suitability o site condition 1#. CONSTRUCTION OF THE %ORKING PLATFORM 4.&.1 The 9orin- +latorm is +re+ared as +er cut oD level reerence. The ecavation 9ill tae +lace and the levelin- o the area is +erormed until it reaches a satisactory +erimeter or the bored +ilin- machine maneuver. 1#1 INSTALLATION OF SHEET PILE 4.4.1 The access and +latorm or vibro hammer 9ill be +re+ared by means o levelin- and cut and ll method 4.4.! The vibro hammer 9ill install the sheet +ile as +er dia-ram
T?(P/CGSS3S?CT3%<3S1
4.4.& Previously the desi-n calculation or sheet +ilin- had been 9ored o as a reerence or the installation o sheet +ile 9or
Attachment 1
1#2 COMMENCEMENT OF BORED PILING ? SUB STRUCTURE %ORK 4.#.1 Gnce the sheet +ile has been installed0 the levelin- 9or continues until it is a++ro+riate or bored +ilin- machine to o+erate on the +latorm 4.#.! The bored +ilin- 9or commence
F'O/AP/(S/%P,
4.#.& The column 9ill be constructed and once the base is baclled as +er construction dra9in- and under +ermission by S.G the sheet +ile 9ill be removed rom the base
F'O/AP/(S/SS, F'O/AP/(S/CPC
Page 11 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
TEMPORAR %ORK FOR BORED PILING %ORK FOR BRIDGE OVER SUNGAI MASAI B=
DOCUMENT NO : IDX/QAP/MS/TMB=
4.#.4 The sheet +ile 9ill be transerred to the another 9orin- +latorm and installed there as +er dia-ram 1#3 SHEET PILE ? STEEL PLATE DESCRIPTION 4.5.1 The sheet +ile to be used is Ty+e SP &A )reer to the attachment* 1# TIDE LEVEL 4.6.1 The hi-hest tide level and lo9est tide level is recorded as +er table belo92
4.6.! =or detail reerences on the tide level0 the ull table can be obtained rom Jabatan (eteorolo-i (alaysia and Jabatan Pen-airan dan Saliran (alaysia. The record sho9n in table is based on actual level measured on the site in res+ect to sea 9ater level. 1#= SEQUENCES OF %ORK 4.<.1 The 9orin- +latorm 9ill be +re+ared as +er this seuence2
Abutment A
Abutment %
Abutment %31
Abutment A31 4.<.! The seuence or +ilin- 9or as +er dia-ram attached.
Page 12 of 59
T?(P/S?3%<3S1
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
TEMPORAR %ORK FOR BORED PILING %ORK FOR BRIDGE OVER SUNGAI MASAI B=
2#$ SAFET REQUIREMENT #.1 T e e st n- tra c o9 9 e mon tore y tra c su+erv s on team and mobili:ation and demobili:ation o machineries are not allo9ed i the tra7c su+ervision team is not available. #.! Gnly e+erienced +ersonnel are allo9ed at 9orin- area. #.& Site +ersonnel must be brieed and be 9ell versed 9ith all site saety measures. #.4 Site +ersonnel Qmust be in +ro+er saety 9orin- attire e.-. Saety boots and helmets must be 9orn at all times. #.# Site saety member should be available at all times and must be able to res+ond correctly to emer-ency #.5 Pro+er and adeuate +rovisions o Tem+orary Si-na-e and %arricades at diversions and haul road as necessary. 3#$ AUTHORIT REQUIREMENT 5.1 The contractor 9ill issue to the local authority involved such as JPS a liability letter that 9ill transer the res+onbility o dama-e to the surroundin- area due to the 9or at site to the contractor. #$ PLANT AND EQUIPMENT
?cavator oller com+actor %ac+usher Ti++er Vibro Iammer
! nos ! nos 1 nos 1 nos 1 nos
=#$ MANPO%ER
Su+ervisor (achine o+erator $eneral ,orer
1 +erson 6 +ersons 4 +ersons
Page 13 of 59
DOCUMENT NO : IDX/QAP/MS/TMB=
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
TEMPORAR %ORK FOR CONSTRUCTION OF PILE CAP FOR BRIDGE OVER SUNGAI MASAI - B=
"#$ INTRODUCTION 1.1 The +ur+ose o this method statement is to describe the activities a documentation reuired to commence the tem+orary 9or durinconstruction o +ile ca+ or %rid-e <. #$ SCOPE OF %ORKS !.1 Pre+aration o coDerdam !.! ?cavation to the cut3oD level !.& Commencement o +ile ca+ construction .#$ %ORK SEQUENCE FLO% STAT Settin- out
Pre+aration o +latorm or ecavation Fnstallation o sheet +ile N +ermanent steel +late
?cavation 9or to the cut3oD level Pile ca+ construction
%acllin9or
emoval o sheet +ile ?'
Page 14 of 59
DOCUMENT NO : IDX/QAP/MS/T%B=
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
DOCUMENT NO :
TEMPORAR %ORK FOR CONSTRUCTION OF PILE CAP FOR BRIDGE OVER SUNGAI MASAI - B=
IDX/QAP/MS/T%B=
1#$ METHOD STATEMENT 1#" SETTING OUT 4.1.1 The land surveyor 9ill tae the as3built data o the bored +ile level and +latorm level beore ecavation 9or 4.1.! The +erimeter o the +ile ca+ 9ill be determined at site based on the +ilin- location and construction dra9in-. 1# SITE CLEARING 4.!.1 The site clearin- 9ill be +erormed at the allocated location.
F'O/AP/(S/SC
4.!.! The o+enin- as a mean o access to the location 9ill be constructed and llin- and cuttin- o the G$E are reuired until the diDerence in -round level is a++ro+riate or machineries and trans+ortation 4.!.& The location o machineries0 the o+enin-0 the material 9ill be arranbased on the suitability o site condition 1#. CONSTRUCTION OF THE %ORKING PLATFORM 4.&.1 The 9orin- +latorm is +re+ared as +er cut oD level reerence. The ecavation 9ill tae +lace and the levelin- o the area is +erormed until it reaches a satisactory +erimeter or the bored +ilin- machine maneuver. 1#1 INSTALLATION OF SHEET PILE 4.4.1 The access and +latorm or vibro hammer 9ill be +re+ared by means o levelin- and cut and ll method 4.4.! The vibro hammer 9ill install the sheet +ile as +er dia-ram
T?(P/CGSS3S?CT3%<3S1
4.4.& Previously the desi-n calculation or sheet +ilin- had been 9ored o as a reerence or the installation o sheet +ile 9or
Attachment 1
1#2 COMMENCEMENT OF BORED PILING ? SUB STRUCTURE %ORK 4.#.1 Gnce the sheet +ile has been installed0 the levelin- 9or continues until it is a++ro+riate or bored +ilin- machine to o+erate on the +latorm 4.#.! The bored +ilin- 9or commence
F'O/AP/(S/%P,
4.#.& The +ile ca+ and +ier 9ill be constructed and once the base is bacl as +er construction dra9in- and under +ermission by S.G the sheet +ile 9ill be removed rom the base
F'O/AP/(S/SS, F'O/AP/(S/CPC
Page 15 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
TEMPORAR %ORK FOR CONSTRUCTION OF PILE CAP FOR BRIDGE OVER SUNGAI MASAI - B=
METHOD STATEMENT INTERIM 0
DOCUMENT NO : IDX/QAP/MS/T%B=
4.#.4 The sheet +ile 9ill be transerred to the another 9orin- +latorm and installed there as +er dia-ram 1#3 SHEET PILE ? STEEL PLATE DESCRIPTION 4.5.1 The sheet +ile to be used is Ty+e FFFA )reer to the attachment* 1# TIDE LEVEL 4.6.1 The hi-hest tide level and lo9est tide level is recorded as +er table belo92
4.6.! =or detail reerences on the tide level0 the ull table can be obtained rom Jabatan (eteorolo-i (alaysia and Jabatan Pen-airan dan Saliran (alaysia. The record sho9n in table is based on actual level measured on the site in res+ect to sea 9ater level. 1#= SEQUENCES OF %ORK 4.<.1 The 9orin- +latorm 9ill be +re+ared as +er this seuence2
Abutment A
Abutment %
Abutment %31
Abutment A31 4.<.! The seuence or +ilin- 9or as +er dia-ram attached.
Page 16 of 59
T?(P/S?3%<3S1
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
TEMPORAR %ORK FOR CONSTRUCTION OF PILE CAP FOR BRIDGE OVER SUNGAI MASAI - B=
METHOD STATEMENT INTERIM 0
2#$ SAFET REQUIREMENT #.1 T e e st n- tra c o9 9 e mon tore y tra c su+erv s on team and mobili:ation and demobili:ation o machineries are not allo9ed i the tra7c su+ervision team is not available. #.! Gnly e+erienced +ersonnel are allo9ed at 9orin- area. #.& Site +ersonnel must be brieed and be 9ell versed 9ith all site saety measures. #.4 Site +ersonnel Qmust be in +ro+er saety 9orin- attire e.-. Saety boots and helmets must be 9orn at all times. #.# Site saety member should be available at all times and must be able to res+ond correctly to emer-ency #.5 Pro+er and adeuate +rovisions o Tem+orary Si-na-e and %arricades at diversions and haul road as necessary. 3#$ AUTHORIT REQUIREMENT 5.1 The contractor 9ill issue to the local authority involved such as JPS a liability letter that 9ill transer the res+onbility o dama-e to the surroundin- area due to the 9or at site to the contractor. #$ PLANT AND EQUIPMENT ?cavator oller com+actor %ac+usher Ti++er
! nos ! nos 1 nos 1 nos
Vibro Iammer
1 nos
=#$ MANPO%ER Su+ervisor (achine o+erator $eneral ,orer
1 +erson 6 +ersons 4 +ersons
Page 17 of 59
DOCUMENT NO : IDX/QAP/MS/T%B=
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
CONSTRUCTION OF PILE CAP
"#$ INTRODUCTION 1.1 The +ur+ose o this method statement is to describe the activities a documentation reuired to commence the construction o +ile ca+ #$ SCOPE OF %ORKS !.1 Settin- Gut !.! einorcement 9or or the +ile ca+ !.& Concretin- 9or o the +ile ca+ .#$ %ORK SEQUENCE FLO% STAT Settin- out
Pre+arin- the base N lean concretinFnstallation o orm9or Fnstallation o reinorcement steel Concretin9or %itumen layerinsurroundin- the buried surace
%acllin9or
?'
Page 18 of 59
DOCUMENT NO : IDX/QAP/MS/CPC
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
DOCUMENT NO :
CONSTRUCTION OF PILE CAP
IDX/QAP/MS/CPC
1#$ METHOD STATEMENT 1#" SETTING OUT 4.1.1 The land surveyor 9ill identiy the eact location o +ile ca+ and mar the ed-e o the +ile ca+ 4.1.! GDset or the +ilin- +oint0 nished road level0 cut oD level 9ill be recorded or reerence 1# PREPARING THE BASE ? LEAN CONCRETE 4.!.1 The surace o the base 9ill be cleared rom any debris and levelled to ensure the 8at and conceivable surace or lean concretin-. 4.!.! %eore the lean concrete is +oured0 the ins+ection 9ill tae +lace to ensure the base is ready or such 9or.
euest or Fns+ection =orm
4.!.& Eean concretin- 9or 9ill commence once the ins+ection has been d and a-reeable uality is achieved 1#. REBAR ? FORM%ORK INSTALLATION 4.&.1 H+on com+letion o bored +ilin- the de+th o ecavation rom -round level to lean concrete i.e. 2 #"mm belo9 +ile ca+ so7t determine by the surveyor. 4.&.! Pre+aration o +ile head by hacin- to the reuired level or starter bar etended into +ile ca+. 4.&.& Prior to lean concrete0 the +ile ca+ dimension and so7t level shall be mared by the surveyor. 4.&.4 The lean concrete +reerably be 1""31#"mm lar-er then the si:e o ca+ and mar +ile ca+ dimension +rior to install rebars and orm9or. 4.&.# The bar bendin- schedule 9ill be submitted in advance to the consul or a++roval0 9here some o the rebars are custom cut. The si:e ty+e member0 s+acin- and la+ len-th shall be accordance to the dra9in-. 4.&.5 Concrete s+acer shall be +rovided or adeuate s+acin- and cover the rebars are ree rom dirt or -rease and in a +ro+er stora-e. 4.&.6 All starter bar member0 si:e0 ty+e and la+ len-th are installed accordinto the dra9in-s. 4.&.< The orm9or are cut in si:e and dimension usin- 9ater+roo +ly9oo and shall be a++lied 9ith mould oil to enhance the nish surace and to +revent adhension o concrete.
Page 19 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
CONSTRUCTION OF PILE CAP
DOCUMENT NO : IDX/QAP/MS/CPC
4.&.B The orm9or shall be so erected to com+ly 9ith the ollo9inreuirement ; 4.&.1" a* Conormity o dimension 9ithin allo9able tolerance. b* Stren-th and ri-idity o orm9or c* Su7cient +ro++in- and bracin- to the orm9or su++ort. d* Ti-htness and sealin- o oint rom loss o -rout. 4.&.11 Place the rebars in +osition accordin- to si:e and s+acin- and +ro+erly tied 9ith 9ire. 4.&.1!The +rocess o orm9or dismantlin- 9ill be done soon ater the curin+eriod has achieved 9ithout shoc0 disturbance and dama-e to the structures. 1#1 CASTING 4.4.1 The ualities o cement0 ne a--re-ates and coarse a--re-ates as dened rom the a++roved sources and the consultant shall be aDorded all reasonable o++ortunity to do the ins+ection and to carry out relevant test com+ly to the s+ecication. 4.4.! 'esi-n mi and trial mi to the a++ro+riated -rade o concrete shall be submitted or a++roval +rior to commencement o concretin- activity. 4.4.& Prior to the commencement o 9or0 the ollo9in- item shall be carried out2 a* All +lant and eui+ment are adeuate in +lace. b* Pro+er access to +oint o dischar-e c* Arran-ement or +rotection a-ainst rain and 9ater. d* Com+liance to the saety reuirement. e* =inished levels are clearly mared or reerence. 4.4.4 Concrete shall be de+osited in hori:ontal layer to a com+acted de+th not eceedin- 4#"mm by usin- vibratin- +oer0 Hntil e+ulsion o air has +ractically caused but 9ould not cause over vibration that 9ill lead to mi se-re-ation. 4.4.# Concrete shall not be dro++ed rom hei-ht eceedin- 1.#m unless tremie +i+e or chute are used. 4.4.5 Curin- shall be carried out ater the com+action to the e+osed suraces to ee+ the concrete continuously dam+ed. (ethods o curin- may vary subect to the +racticality.
Page 20 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
CONSTRUCTION OF PILE CAP
2#$ SAFET REQUIREMENT #.1 The eistin- tra7c 8o9 9ill be monitored by tra7c su+ervision team and mobili:ation and demobili:ation o machineries are not allo9ed i the tra7c su+ervision team is not available. #.! Gnly e+erienced +ersonnel are allo9ed at 9orin- area. #.& Site +ersonnel must be brieed and be 9ell versed 9ith all site saety measures. #.4 Site +ersonnel Qmust be in +ro+er saety 9orin- attire e.-. Saety boots and helmets must be 9orn at all times. #.# Site saety member should be available at all times and must be able to res+ond correctly to emer-ency #.5 Pro+er and adeuate +rovisions o Tem+orary Si-na-e and %arricades at diversions and haul road as necessary. 3#$ PLANT AND EQUIPMENT
Crane eady mied truc Vibrator Poer
1 nos 4 nos 1 nos
#$ MANPO%ER Su+ervisor (achine o+erator $eneral ,orer
1
1 #
Page 21 of 59
DOCUMENT NO : IDX/QAP/MS/CPC
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
VIBRATION MONI TORING
DOCUMENT NO : IDX/QAP/MS/VM
"#$ I(r&8)!('& Vibration monitorin- shall be carried out at all such locations 9here it is reuired to access the eDect o induced vibrations due to any dynamic loadin-. A standard vibration monitorin- system shall carry out this assessment o vibration. This eui+ment should be able to evaluate the +arameters o vibrations in all three +lanes i.e. Eon-itudinal0 Transverse and vertical. Construction +rocess lie +ile drivin-0 blastin-0 soil com+action induces vibrations that are at times above +ermissible limits. Permissible limits o vibrations shall be as dened by relevant com+liance code.
The method ado+ted shall measure +ea +ulse velocity0 +ea acceleration and +ea dis+lacement in transverse0 lon-itudinal and vertical direction or a +articular reuency. ?very structure has its o9n reuency and unless the induced vibration reuency does not match 9ith this resonance reuency the structure can sustain vibration saely. Io9ever vibrator orces above limits s+ecied in com+liance code are detrimental to the health o the structure and action contributory to such vibration should be immediately sto++ed.
#$ S!&4e &f %&r9+ The vibration monitorin- 9ill be conducted or < selected locations at the +roect site0 Eebuhraya Pasir $udan- 3 Johor %ahru The obective o this monitorin- is to measure the induced vibrations or use in vibration im+act assessment and/or or com+liancee verication durinconstruction sta-e o the +ro+osed +roect based on the 'e+artment o ?nvironment -uidelines. The sam+lin- +oints 9ill be taen at the nearest constructed brid-e and the selections 9ill be a-reed by client. The vibration level readin-s 9ere taen or a consultant/S.GRs decided duration at each selected location durin- +ilin- and these readin-s 9ill +rovide data o the vibration level -enerated rom the surroundin- o the selected +oints.
A++endi %
.#$ Te+( E6)'4*e( The instrumentation used 9as the Fnstantel (odel (inimate Plus. The instrument ca+tures the reuired data and stores in the memory or later retrieval via com+uter sot9are or direct +rint out. (onitorin- data 9as taen on the -round or structure o the locations. =or -round vibrations0 the instrument measures the vibrations in three ortho-onal aes0 namely transverse0 vertical and lon-itudinal vibrations. transverse -round vibrations a-itate +articles in a side to side motion. Vertical -round vibrations a-itate +articles in an u+ and do9n motion. Eon-itudinal -round vibrations a-itate +articles in a or9ard and bac motion +ro-ressin- out9ard rom the source o vibration
Page 22 of 59
A++endi C
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
VIBRATION MONI TORING
DOCUMENT NO : IDX/QAP/MS/VM
The +arameter that is used in the assessment o vibration is based on the vectorial sum o vibration in the three ortho-onal aes0 termed +ea +article velocity )mm/s ++v*
1#$ Me(@&8&7&< a* Conduct sensor chec usin- internal chec acilities +rior to measurement. Set u+ the Vibration (eter by mountin- the tri3aial sensors in the soil0 +ointin- to the sources o vibration. b* The location o the sensor should be installed near the brid-e structure. There should be no obstacles alon- side the +erimeter involved. The radius shall not beyond !"" meter rom the sensorRs location and +oint o observation.
c* Three vibration readin-s 9ill be taen simultaneous 9hich is vertical0 transverse and lon-itudinal. d* Ater certain +redetermined duration the vibration readin-s 9ill be stored in the memory o the vibration meter 9hich can be retrieved or data +rocessinusin- vibration sot9are. 2#$ D5(5 Pr&!e++' The test re+ort shall consist o i* Site name0 client and test a-ency ii* 'istance rom activity. iii* Eocation o monitorin-. iv* Pea +article velocity0 +ea acceleration0 and +ea dis+lacement in all three +lanes. S+ecic ob obectives need to be addressed durin- the inter+retation and result evaluation. Any +eculiar ndin-s shall be hi-hli-hted and re+orted durin- the study. Clear statement o limitation and di7culties aced durinvarious sta-es o testin- shall also be re+orted. 3#$ Re4&r(' The test re+ort shall consists on2 5.1 A brie descri+tion about the l ocation 9here maimum dis+lacement is evaluated. 5.! An inter+retation o all tests done and locations 9here the dis+lacement is beyond acce+table limits. 5.& S+ecic ob obectives need to be addressed durin- the inter+retation and results evaluation.
Page 23 of 59
A++endi A
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
VIBRATION MONI TORING
IDX/QAP/MS/VM
#$ L'*'(5('&+ The test cannot +rovide data about the maimum vibration that can occur as the test +rovides result or the loadin- im+osed on the location durin- testin+rocedure. This test enables evaluation o more s+ecic stren-th +arameters only 9hen used in conunction 9ith other tests. Eocation and time s+ecic dam+in- can aDect the results o the test. 'is+lacement evaluated and maimum reuencies are evaluated durin- se+arate tests and i the loadinis not same the result could vary.
=#$ A!!e4(5!e Cr'(er'5 (S codal +rovision +rovides or acce+tance criteria or brid-e and its de+endant on the use o the brid-e. This should be e+t in mind 9hen evaluatin- the results o the test. #$ S5fe(< Re6)'re*e( The eistin- tra7c 8o9 9ill be monitored by tra7c su+ervision team and mobili:ation and demobili:ation o machineries are not allo9ed i the tra7c su+ervision team is not available. Gnly e+erienced +ersonnel are allo9ed at 9orin- area. Site +ersonnel must be brieed and be 9ell versed 9ith all site saety measures. Site +ersonnel Qmust be in +ro+er saety 9orin- attire e.-. Saety boots and helmets must be 9orn at all times. Site saety member should be available at all times and must be able to res+ond correctly to emer-ency Pro+er and adeuate +rovisions o Tem+orary Si-na-e and %arricades at diversions and haul road as necessary. "$#$ P75( 58 E6)'4*e(
Vibration (onitorin- ?ui+ment
1 nos
""#$ M5P&er
Su+ervisor Assistant Su+ervisor
DOCUMENT NO :
1 1
Page 24 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
DISPLACEMENT MONITORING
DOCUMENT NO : IDX/QAP/MS/DM
"#$ GENERAL Structures such as brid-es and tunnels may be reuired to be monitored or hori:ontal and vertical dis+lacement. Ft is im+ortant to be able to accurately measure the amount o dis+lacement at +redetermined locations over a +eriod o time. All survey 9or associated and undertaen or the monitorin- o structures must be su7ciently accurate to detect hori:ontal and vertical movement o > or 3 !mm #$ SURVE DATUM All co3ordinates su++lied shall be as +er settin- out dra9in-s +rovided at the latest unless other9ise s+ecied. .#$ SURVE CONTROL Survey control or the monitorin- o structures should be established so that the inte-rity o the monitorin- data can be -uaranteed. 4 +oints on each structure 9ill be taen into consideration. The actual co3ordinates and level 9ill be recorded.
APP?'FO A
1#$ SURVE EQUIPMENT All instrumentation shall be calibrated on any certied baselines +rior to the commencement o 9or and be checed and adusted or hori:ontal and vertical collimation. The instrument 9ill have been serviced by an authorised a-ent or that mae o instrument 9ithin the last 1! months. 2#$ METHOD OF SURVE Times o etreme 9eather )heat and 9ind* should be avoided. Care should be taen to avoid monitorin- durin- +eriods o hi-h tra7c volumes as this may aDect the survey results All tar-ets are interchan-ed and tribrachs must remain ed durinobservations )orced centerin-*0 thus minimi:in- +lumbin- erros. All results should be recorded electronically in the correct ormat to allo9 the reduction o an-le sets and distances. Iori:ontal Survey The coordinates or each ei-ht +oints 9ill be com+ared 9eely and the diDerences 9ill be recorded as the hori:ontal dis+lacement.
Page 25 of 59
APP?'FO A
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
DISPLACEMENT MONITORING
DOCUMENT NO : IDX/QAP/MS/DM
Vertical Survey The eistin- level 9ill be recorded 9eely and any reduction 9ill be recorded as vertical dis+lacement 3#$ RECORDING AND PRESENTATION OF DATA Survey control +oints shall be recorded in s+readsheet. Point identication0 eastin-0 northin-0 elevation and a descri+tion o the +oint shall be recorded as a minimum. Any subseuent chan-es in elevation shall also be recorded. 'iDerences in eastin-0 northinand E should be com+ared to the initial observations and tabulated. Any movement o 4mm or -reater in hori:ontal +osition and !mm in vertical +osition should be 8a--ed or urther scrutiny. 'i-ital and hard co+ies o survey control data shall be +rovided to client/S.G ollo9in- initial and subseuent surveys.
An eam+le o the reuired ormat or recordin- o monitorinresults or structures is included in A++endi % #$ SAFET REQUIREMENT Gnly e+erienced +ersonnel are allo9ed at 9orin- area. Site +ersonnel must be brieed and be 9ell versed 9ith all site saet y measures. Site +ersonnel Qmust be in +ro+er saety 9orin- attire e.-. Saety boots and saety vest and helmets must be 9orn at all times. Site saety member should be available at all times and must be able to res+ond correctly to emer-ency =la-man 9ill be +rovided durin- the monitorin- 9or conducted
to ensure the saety o the +erson3in3char-e rom the heavy tra7c =#$ PLANT ? EQUIPMENT
Survey ?ui+ment
1
#$ MANPO%ER Eand Surveyor Chainmen
1
!
Page 26 of 59
APP?'FO %
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
CONSTRUCTION OF BORED PILE
"#$ INTRODUCTION 1.1 %ore cast3in3situ +iles are +iles ormed by ecavatin- a hole0 o the s+ecied si:e )diameter*0 to the reuired de+th and castin- the ecavated hole 9ith concrete o s+ecied stren-th ater the reinorcement is lo9ered into the holes. 1.1 The +ur+ose o this method statement is to describe the activities and documentation reuired to commence the construction o bored +ile. #$ SCOPE OF %ORKS !.1 !.! !.! !.&
Settin- Gut ?cavation o hole )%orin- 9or* einorcement 9or Concretin- 9or
.#$ %ORK SEQUENCE FLO%
Site Pre+aration
Settin- Gut
%orin- ,or
Fnstallation o Casin-
einorcement ,or
Concretin- ,or
Testin- and commisionin-
?'
Page 27 of 59
DOCUMENT NO : IDX/QAP/MS/BP
Page 28 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
CONSTRUCTION OF BORED PILE
1#$ METHOD STATEMENT 1#" SITE PREPARATION The +latorm shall be +re+ared to the reuired +latorm level and it shall be reasonably rm0 8at and accessible. Pro+er draina-e systems shall be +rovided and a +um+ sum+ shall be constructed0 i necessary. A +ro+er access road shall be established +rior to the construction 9ors to allo9 un3obstructed 8o9 o tra7c or concrete trucs durin- bore +ile castin- and or e+ortin- o bore +ile s+oil )ecavated earth*. 'urin- the commencement o 9or0 a steel +late 9ill be +laced over the +latorm to ensure the stability o the borin- +lant o to+ o the +latorm. 1# ADDITIONAL S#I %eore commencement o any borin- 9ors0 the S.F data must be obtained or each +oint involved to determine the hard layer )@#"*. This data 9ill be reuired to ensure the drillin- +ro-ress 9ors 9ell 9ithout any obstruction. (odication to the drillin+rocedure 9ill be decided once the hard layer is determined. 1#. SETTING OUT The contractor shall +rovide a surveyor or settin- out o the +ile +oints. ! oDset +e- 9ill be +re+ared or each +ile +oints. The +ile +oints should be set3out as sho9n in the Construction 'ra9in-s. Attention shall be +aid or rain- +iles and shall be set3out in accordance to the inclination reuired in the Construction 1#1 BORING PLANT The borin- +lant intended to be used or the site is a (echanical %orin- i- (odel C(V T( /!1 mounted on a &<% base crane or euivalent. A telesco+ic elly bar o eternal dimension 4""mm diameter and 4 1! metre len-th is mounted on the borin- +lant. The lo9er end o this Kelly bar is ada+table to other drillin- tools0 e.- au-ers0 corin- bucets0 cleanin- bucets0 etc. %eore any commencement o 9or0 documentation such as borin+lant catalo-ue0 P(A and o+erator certicate 9ill be submitted to client or a++roval. 1#2 POSITIONING OF BORING PLANT
The borin- +lant 9ill be moved to the +ile +oint intended or ecavation. The elly bar mounted 9ith an au-er is +laced ust above the +ile +oint. The verticality o the elly bar shall be checed by means o a s+irit level. Adustment should be made so as to enable the elly bar to be as vertical as +ossible. Then the +osition o the au-er is checed a-ainst the +ile +oint. Adustment shall be made so that the centre o the au-er is nearest to the +ile +oint. The au-er is then lo9ered and borin- o+eration commences. easonable care shall be taen so that the +ile +osition and verticality are constructed 9ithin the s+ecied tolerance. The maimum +ermitted tolerance shall be 6# mm rom the +ile Page 29 of 59
DOCUMENT NO : IDX/QAP/MS/BP
+osition and the verticality shall not eceed 1 in 6#. PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
CONSTRUCTION OF BORED PILE
1#3 BORING %orin- commence ater the +osition o the borin- +lant is checed. Hsually0 an au-er o the reuired si:e is used to ecavate the hole. 'urin- ecavation0 the hole shall be observed or its stability. F the ecavated hole is colla+sible0 a tem+orary casin- o the same si:e shall be installed usin- a vibro3hammer0 to +revent colla+se. ?cavation o the hole then continues until the reuired de+th. ,hen roc is encountered durin- the ecavation )usually observed by the di7culty in advancin- the ecavation* other drillin- tools may be utilised. A roc au-er0 corin- bucet0 chisel or a combination o these tools may be used to brea u+ the roc. Ater reachin- the reuired de+th0 a cleanin- bucet shall be used to clean u+ the bottom o the borehole. A oint measurement o the de+th shall be made beore lo9erin- o the reinorcement and 1# REINFORCEMENT einorcement or the bored +iles shall be +re3abricated in the reinorcement yard )near the +ili n- +latorm* and lited to the borehole or +lacin-0 usin- a service crane. Ater abrication by the bar benders0 the helical lins 9ill be tac 9elded to the main reinorcement. Ea+s are also to be 9elded su7ciently so that they remain intact durin- trans+ortation and handlin-. 1""mm diameter round s+acers 9ill be 9elded to the reinorcement to +rovide the cover to ther reinorcement a-ainst the soil durin- concretin-. 4 numbers o sonic lo--in- +i+es 9ith #"mm diameter and 5 meter len-th 9ill be tac 9elded to the main reinorcement. ?ach len-th 9ill be ointed by another 5 meter len-th sonic lo--in- +i+es until it reaches the bottom o the hole. The o+enin- o sonic lo--in- +i+e must be located eactly above the cut3oD level )on the same level as +latorm level* and be cleared rom any debris or bloca-e by The reinorcement 9ill be lo9ered into the com+leted borehole0 +rior to concretin-0 by means o a service crane and to be adusted to the correct level. 1#= CONCRETING Concretin- shall commence immediately ater the reinorcement is +laced. Concrete shall be su++lied by ready3mied truc to the +ile +ositions. The concrete slum+ to be used shall de+end on the method o concretin-0 as belo9. The tremie +i+e shall be etended to the bottom o the ecavation. The tremie +i+e shall at all times be embedded in the concrete and shall be 9ithdra9n ater com+letion o the concretin- +rocess. o direct dischar-e method shall be used be the borehole is dry or Page 30 of 59
DOCUMENT NO : IDX/QAP/MS/BP
un er9a er o avo
se-re-a on.
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
CONSTRUCTION OF BORED PILE
DOCUMENT NO : IDX/QAP/MS/BP
1# PERMANENT CASING Permanent casin-s are to be installed usin- a vibro3hammer. Permanent casin- shall be driven to a de+th that is su7cient to +revent any colla+se o the borehole durin- the 9hole installation +rocess.
'ia-ram
Io9ever0 the +ermanent casin- shall be i nstalled ater ecavation o hole or & meters dee+ only. 1#"$ SEQUENCE OF PILING %ORK The seuence o +ilin- 9or can be reerred to (ethod Statement or Tem+orary ,or at %rid-e or each brid-e involved.
(ethod Statement or Tem+orary ,or at %rid-e
1#"" RECORDS All bore +ilin- records are to be recorded in the %ore Eo- +rovided. A co+y is enclosed or reerence
%ore Eo- ecord
2#$ MATERIAL Concrete $rade 4"/!" Tremie einorcement Steel %entonite )F any*
%ar Schedule
3#$ MACHINER Vibro hammer ?cavator %orin- Plant (obile Crane $enerator Set
1 1 1 1 !
#$ MANPO%ER Site su+ervisor (achine G+erator $eneral ,orer
1 4 1"
=#$ PRODUCTIVIT & days or each +oint rom settin- out until cut3oD level
Page 31 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
CONSTRUCTION OF BORED PILE
#$ SAFET ? ENVIRONMENT REQUIREMENT B.1 Gnly e+erienced +ersonnel are allo9ed at 9orin- area. B.! Site +ersonnel must be brieed and be 9ell versed 9ith all site saety measures. B.& Site +ersonnel Qmust be in +ro+er saety 9orin- attire e.-. Saety boots and helmets must be 9orn at all times. B.4 Site saety member should be available at all times and must be able to res+ond correctly to emer-ency B.# Pro+er and adeuate +rovisions o Tem+orary Si-na-e and %arricades at diversions and haul road as necessary. B.5 Slud-e tan )i any* must be +re+ared nearby ecavation area and +rotected rom s+illa-e into the nearby river/body 9ater "$#$ INSPECTION AND TEST PLAN/FORMS As +er attached ""#$ D'5r5* ? Dr5'+ As +er attached
Page 32 of 59
DOCUMENT NO : IDX/QAP/MS/BP
Page 33 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
"#$ INTRODUCTION 1.1 The +ur+ose o this method statement is to describe the activities and documentation reuired or structural concretin- or +ile ca+0 column/abutment 9all0 dec slab and +ara+et 9all. #$ SCOPE OF %ORKS !.1 !.! !.& !.4
einorcement ,or 3 Iandlin-0 Stora-e0 Placement =orm9or 3 =abrication0 in- N striinConcretin- 3 Testin- N Placement emedial (easures
.#$ %ORK SEQUENCE FLO% einorcement 3 Iandlin- N Stora-e STAT 'elivery o einorcement steel bars Checin- on the (ill Certicate Fdentiy i the bars ree rom surace rust/scale dirt Hnloaded and staced in bundles
?'
einorcement 3 Placement STAT Checin- on concrete cover Fntersectin- bars and lins 3 tied to-ether 9ith bindin- 9ire Eay the reinorcement accordin- to s+ecication and construction dra9inFnstall s+acers ,elded i necessary as +er instruction )i any* Pre3concretin- Fns+ection
Page 34 of 59
DOCUMENT NO : IDX/QAP/MS/STC
?'
Page 35 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
Gn Site =abrication N =iin- o =orm9or STAT Settin- out the reerence line Settin- out the side line o the structure based on reerence line 'etermine the level o the lean concrete Clean the base and chec the level Fnstallation o orm9or Placement o rebar Checin- on any un9anted o+enin- and bloc it Concretin- ,or Striin- o orm9or
?'
Concrete Placement
STAT Preliminary Fns+ection on Structure Placin- order or concrete su++ly Standby all 9ormen necessary or concrete +lacement 9or
Arran-e rotation o su+ervisory staD )i necessary* Fnstallation o orm9or Placin- o concrete ?'
Page 36 of 59
DOCUMENT NO : IDX/QAP/MS/STC
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
1#$ METHOD STATEMENT 1#" MANUFACTURES AND SUPPLIERS a* Steel %ars (anuacturers Steel bars o $rade #"" to be used in the 9ors shall com+ly 9ith (.S 14521B<< or %S 444B. These shall be obtained rom (aSteel or any a++roved manuacturer. (ill Certicate shall be submitted to S.G.Rs e+resentative or every batch o steel bars delivered to +roect sites. b* Cement The cement be used in this 9or shall be com+lyin- 9ith construction dra9in- +rovided or this +roect. c* Concrete uality ?lement %lindin- Concrete Cast Fn3Situ %ored Piles Pile Ca+ Piers N Crossheads Abutments N ,in-9all Prestressed Concrete 'ec Slab N 'ia+hra-m %earin- Plinth N H+stand %rid-e Para+ets etainin- ,all A++roach Slab
$rade 1#/!" 4"/!" 4"/!" 4"/!" 4"/!" #"/!" 4"/!" #"/!" 4"/!" 4"/!" 4"/!"
1# MIX DESIGN 'etails on every concrete ready mi su++lier selected shall be submitted to the ?n-ineer or a++roval0 9hich shall include0 but not i. ame o Su++lier ii. 'esi-n (i iii. $rade o Concrete Su++lied iv. Eocation o Plant v. Ty+e o Plant ),et/'ry (i* vi. Calibration Certicate o Plant vii. Source o A--re-ate0 Cement0 Sand0 ,ater and Test esults viii. Cube Test esults or Trial (ies 1#. REINFORCEMENT - HANDLING ? STORAGE a* einorcement steel bars shall be delivered at site +ro-ressively b* The su++lier or manuacturer shall submit the (ill Certicate beore
or durin- delivery o the steel bars. The (ill Certicates shall clearly state the -rade0 uantity0 chemical com+osition0 test Page 37 of 59
DOCUMENT NO : IDX/QAP/MS/STC
results0 si:e0 truc re-istration number and the date o delivery. c* All bars shall be ree rom surace rust0 scale dirt etc.
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
d* (aterials so acce+ted shall be unloaded rom the truc by a mobile crane and staced in bundles at the abrication yard accordin- to e* The rebar shall be staced at least 5 inches above the -round level. 1#1 REINFORCEMENT - PLACEMENT a* The en-ineer shall direct and su+ervise the +ersonnel res+onsible or the +lacement o rebar in accordance 9ith all related desi-ns0 s+ecications0 conditions o contract and associated +rocedures. b* All reinorcement shall be securely +laced to ensure a-ainst dis+lacement durin- the +lacement o concrete. Provide the ollo9in- clear cover to all reinorcement unless other9ise noted on the dra9in-s.
?lement Cast3Fnsitu %ored Piles Pile Ca+s Piers N Crossheads Abutments N ,in-9all %earin- Plinth H+stand Prestressed Concrete %rid-e Para+ets Pretensioned %eam 'ec Slab and 'ia+hra-m etainin- ,all Stem etainin- ,all %ase A++roach Slab
Cover to einorcement 6#mm 6#mm or %= 4#mm or G= 4#mm 4#mm 4#mm &"mm 4#mm &"mm 4#mm 4#mm 6#mm or %= 4#mm or G= 4#mm
otes2 %= denotes %ottom =ace einorcement G= denotes Gther =ace einorcement c* Tolerance on nominal cover shall be L #mm. d* All intersectin- bars shall be tied to-ether 9ith bindin- 9ire and the
ends o the 9ire shall be turned into the main body to concrete. e* Eins shall be securely ed 9ith bindin- 9ire to the lon-itudinal
reinorcement. * The reinorcement shall be laid out in accordance 9ith the
a++roved dra9in-s and schedules. The reinorcement shall be sus+ended by annealed 9ire0 su++orted on concrete s+acers to +revent dis+lacement durin- the +lacin- and com+actin- o S+acers0 9here used to maintain concrete cover to reinorcement0 -* may be either concrete or +lastic construction unless other9ise
s+ecied. Page 38 of 59
DOCUMENT NO : IDX/QAP/MS/STC
h* (inimum la+ len-th should be reerred to construction dra9in- +rovided. i* Hnless other9ise sho9n on the dra9in-0 s+lices in adacent bars shall be sta--ered.
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
* Gn no account shall reinorcement be heated to acilitate bendin-. einorcement shall not be re3bent unless a++roved by the * einorcement in structures shall not be 9elded 9ithout the a++roval o the ?n-ineer. l* The su+ervisor shall also ensure that all reuired builderRs 9or in connection 9ith (N? reuirements includin- o+enin-s0 conduits0 bloc outs0 +uddle 8an-es etc. are installed beore +lacement o the to+ bars. m* Carry out ins+ection on reinorcement +laced as +er Pre3ConcretinCheclist. %ar bendin- schedule shall be submitted beore concretin-. 1#2 ON SITE FABRICATION ? FIXING OF FORM%ORK a* The surveyor 9ill rst set u+ a reerence line oDset rom the nearest T%( or rom a +reviously constructed structure 9ith established survey data. b* The subcontractors shall determine the side line o the structure o
oDsettin- rom the reerence +oints0 established by the surveyor usin- strin- lines and measurin- ta+es. c* %eore installation o orm9or0 the surveyor shall survey the level
o the lean concrete and the ?n-ineer shall ensure that the base is clean and level. d* =or hori:ontal structures0 one side o the orm shall be erected initially alon- the strin-ed side line. Tem+orary strutts and shores are +laced to hold the orm in +osition. e* erected. Strai-htness and verticality chec eecuted and strutts secured in +laced to-ether 9ith hori:ontal braces to maintain the reuired 9idth throu-hout.
*
,here holes are needed in orm9or to accommodate +roectinreinorcement starters0 services o in- devices0 care shall be taen to ensure that all holes or o+enin-s are +lu--ed or bloced to +revent the loss o -rout 9hen concretin- or dama-e to the concrete surace 9hen removin- orms.
-* %eore concretin-0 the Site Su+ervisor shall ensure that all orms are thorou-hly cleaned out0 ree rom sa9dust shavin-s0 dust0 mud or other debris and deleterious matter by usin- a++ro+riate tools and eui+ments as ollo9s2 i* (ud de+osits on or in orm9or shall be removed by brushin- or Page 39 of 59
DOCUMENT NO : IDX/QAP/MS/STC
9ater et as reuired. ii* Sa9dust shavin-s0 dust or loose +articles and matters can be moved to a corner usin- a com+ressor. These can be removed by s9ee+ininto a bin i a hatch o+enin- is +rovided or. h* The orm9or ace in contact 9ith the concrete shall be coated 9ith
a suitable mould oil or a++roved release a-ent. Such oils or release a-ents shall not come into contact 9ith the reinorcement. PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
i* All orms shall be ormally ins+ected by the ?n-ineer ater +re+aration and +rior to +lacin- o concrete as +er Pre3ConcretinCheclist. o +lacin- o concrete shall be commenced until the orm9or has been a++roved. 1#3 STRIKING OF FORM%ORK a* The Sub3contactors shall liase 9ith the ?n-ineer to obtain a++roval beore striin- any orm9or and t o conduct ins+ection ater striin- o orms as +er Post Concretin- Checlist. b* The removal shall be done in such a manner as not to dama-e the concrete and shall tae +lace at times to suit the reuirements or its curin-. c* ,here it is intended that orms are to be reused0 it shall be cleaned and made -ood to the a++roval o the S.GRs re+resentative. 1# PREPARATION FOR CONCRETING H+on com+letion o the orm9or0 reinorcement and all associated a* builderRs 9ors in connection 9ith the (echanical0 ?lectrical and other related services the Su+ervisor shall undertae a +reliminary ins+ection to ensure that such items are com+lete and in accordance 9ith all controllin- relevant construction dra9in-s and +re concretin- checlists. b* =ollo9in- this +reliminary ins+ection the Site Su+ervisor shall advise the Proect (ana-er 9ho shall ensure that the ollo9inarran-ements have been or bein- made +rior to +lacement. c* Place an order or the su++ly o concrete on a scheduled date. d* Standby all 9ormen necessary to carry out the 9ors till com+letion. =or lon- hours )more than 15 hours*0 shit may be reuired and ni-ht li-htin- a must. e* Arran-e the rotation o su+ervisory staD. 1#= PLACING OF CONCRETE a* =or lean concretin-0 a minimum o #"mm thicness blindin- layer shall be laid on 9ell +re+ared rm -round ater or beore orm9or is +laced in +osition. b* Concrete shall be +laced into the orms or ecavations usin- the a++ro+riate +lant and eui+ment or the +ur+ose includin- direct Page 40 of 59
DOCUMENT NO : IDX/QAP/MS/STC
chute dischar-e rom concrete mier trucs0 concrete +um+s or crane assisted concrete bucet. c* Concretin- shall start resh or rom a +redetermined construction
oint and shall continue uninterru+ted u+ to the net +redetermined construction oint or com+letion. d* F concretin- is to commence rom a construction oint0 the said
oint shall be rou-hened beore receivin- resh concrete and mortar 9ater must also be +oured over this area. PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
e* Placement o concrete shall be in hori:ontal layers and to a com+act de+th not eceedin- 4#"mm. The rate o dischar-e shall be such that the concrete +lacement is uniorm across the section and increasin- at a rate to +revent se-re-ation o the bottom layers. * Com+action shall be carried out by both hand tam+in- and mechanical vibrator and shall be thorou-hly 9ored into corners. -* To avoid a vertical dro+ o concrete -reater than 1.# metres0 trunin- and chutes shall be used. h* =resh concrete shall not be +laced a-ainst in3situ concrete durinthe +ourin- seuence 9ithin certain time limits based u+on the desi-n mi o the concrete. o +ourin- o 9ater into semi3hardness concrete in the truc is allo9ed. i* Concretin- o+eration shall cease immediately i leas occurs in the
orm9or and shall be rectied on the s+ot. * All concrete0 ater it has set shall be e+t continuously dam+ by +lacin- 9et ute sac on to+ o the surace. * The use o any curin- com+ound shall be subected to the a++roval o the ?n-ineer. 1# CONSTRUCTION JOINTS a* Construction oints shall be located in the +ositions as sho9n on dra9in-s or as reuired. b* The oints shall be at ri-ht an-les to the -eneral direction o the member and shall tae due account o shear and other stresses. c* Concrete shall not be allo9ed to run to a eather ed-e and vertical oints shall be ormed a-ainst a sto+ board. 1#"$ TESTING OF CONCRETE %ORKS a* The indicative sam+lin- rate shall be as ollo9s2 3 Gne sam+le +er 1"." m & or every -rou+ o 1" batches or critical structures such as columns0 +ile ca+s and abutment 9all. - One sample per 20.0 m3 or every group of 20 ba!"es for slabs.
Page 41 of 59
DOCUMENT NO : IDX/QAP/MS/STC
c*
0 0 be taen o concrete on the rst day o concretin- or each -rade o concrete to be used in the ,or0 irres+ective o the volume o concrete +roduced or the sam+lin- rate. Subseuent rate o sam+lin- shall be at least one sam+le rom each source o +roduction on each day that concrete o any +articular -rade is used.
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
d* The actual rate o sam+lin- may be increased in a++ro+riate circumstances e.-. or critical elements0 9hen reuired by the S.G. =or each sam+lin-0 three cubes shall be made rom a sin-le sam+le e* taen rom a randomly selected bacth o concrete. The sam+le shall be taen at the +oint o dischar-e rom the mier or0 in the case o ready mied concrete0 at the +oint o dischar-e rom the delivery vehicle. * All cubes shall be clearly mared 9ith undeletable +aint 9ith the date o castin- and serial number. A record shall be clearly e+t to identiy each cube by date and by -* serial number relatin- to the +art o the 9or rom 9hich they are taen. h* Gne cube rom each sam+le batch shall be tested or the 63day com+ressive stren-th. The remainin- t9o cubes rom the sam+le batch shall be tested or the !<3day com+ressive stren-th. 2#$ MATERIAL Concrete $rade 4"/#"/## einorcement Steel =orm9or )Steel/,ood* ScaDoldin3#$ MACHINER Concrete Eorry ?cavator (echanical Vibrator (obile Crane $enerator Set Air com+ressor ,ater +um+ Concrete mier
# 1 1 1 ! 1 1 1
#$ MANPO%ER Site su+ervisor (achine G+erator $eneral ,orer
1 ! 1"
Page 42 of 59
DOCUMENT NO : IDX/QAP/MS/STC
=#$ SAFET ? ENVIRONMENT REQUIREMENT <.1 Gnly e+erienced +ersonnel are allo9ed at 9orin- area. <.! Site +ersonnel must be brieed and be 9ell versed 9ith all site saety measures. <.& Site +ersonnel Qmust be in +ro+er saety 9orin- attire e.-. Saety boots and helmets must be 9orn at all times. <.4 Site saety member should be available at all times and must be able to res+ond correctly to emer-ency <.4 Pro+er and adeuate +rovisions o Tem+orary Si-na-e and %arricades at diversions and haul road as necessary. PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
<.# All the letover/debris shall be removed and collected at one s+ecic location beore bein- carried a9ay rom site in accordance 9ith environment +rotection s+ecication. #$ INSPECTION AND TEST PLAN/FORMS As +er attached "$#$ PRODUCTIVIT RATE
Page 43 of 59
DOCUMENT NO : IDX/QAP/MS/STC
Page 44 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
"#$ INTRODUCTION 1.1
This 9or shall consists o AnchorSGE retainin- 9all constructed in accordance 9itht these s+ecications and in reasonably close conormity 9ith the lines0 -rades0 desi-n and dimensions sho9n on the dra9in- or established by the Su+erintendent G7cer )S.G*
#$ SCOPE OF %ORKS !.1 !.! !.& !.4
einorcement ,or 3 Iandlin-0 Stora-e0 Placement =orm9or 3 =abrication0 in- N striinConcretin- 3 Testin- N Placement emedial (easures
.#$ %ORK SEQUENCE FLO% einorcement 3 Iandlin- N Stora-e STAT 'elivery o einorcement steel bars Checin- on the (ill Certicate Fdentiy i the bars ree rom surace rust/scale dirt Hnloaded and staced in bundles
?'
einorcement 3 Placement STAT Checin- on concrete cover Fntersectin- bars and lins 3 tied to-ether 9ith bindin- 9ire Eay the reinorcement accordin- to s+ecication and construction dra9inFnstall s+acers ,elded i necessary as +er instruction )i any* Pre3concretin- Fns+ection
Page 45 of 59
DOCUMENT NO : IDX/QAP/MS/STC
?'
Page 46 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
Gn Site =abrication N =iin- o =orm9or STAT Settin- out the reerence line Settin- out the side line o the structure based on reerence line 'etermine the level o the lean concrete Clean the base and chec the level Fnstallation o orm9or Placement o rebar Checin- on any un9anted o+enin- and bloc it Concretin- ,or Striin- o orm9or
?'
Concrete Placement
STAT Preliminary Fns+ection on Structure Placin- order or concrete su++ly Standby all 9ormen necessary or concrete +lacement 9or
Arran-e rotation o su+ervisory staD )i necessary* Fnstallation o orm9or Placin- o concrete ?'
Page 47 of 59
DOCUMENT NO : IDX/QAP/MS/STC
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
1#$ METHOD STATEMENT 1#" MANUFACTURES AND SUPPLIERS a* Steel %ars (anuacturers Steel bars o $rade #"" to be used in the 9ors shall com+ly 9ith (.S 14521B<< or %S 444B. These shall be obtained rom (aSteel or any a++roved manuacturer. (ill Certicate shall be submitted to S.G.Rs e+resentative or every batch o steel bars delivered to +roect sites. b* Cement The cement be used in this 9or shall be com+lyin- 9ith construction dra9in- +rovided or this +roect. c* Concrete uality ?lement %lindin- Concrete Cast Fn3Situ %ored Piles Pile Ca+ Piers N Crossheads Abutments N ,in-9all Prestressed Concrete 'ec Slab N 'ia+hra-m %earin- Plinth N H+stand %rid-e Para+ets etainin- ,all A++roach Slab
$rade 1#/!" 4"/!" 4"/!" 4"/!" 4"/!" #"/!" 4"/!" #"/!" 4"/!" 4"/!" 4"/!"
1# MIX DESIGN 'etails on every concrete ready mi su++lier selected shall be submitted to the ?n-ineer or a++roval0 9hich shall include0 but not i. ame o Su++lier ii. 'esi-n (i iii. $rade o Concrete Su++lied iv. Eocation o Plant v. Ty+e o Plant ),et/'ry (i* vi. Calibration Certicate o Plant vii. Source o A--re-ate0 Cement0 Sand0 ,ater and Test esults viii. Cube Test esults or Trial (ies 1#. REINFORCEMENT - HANDLING ? STORAGE a* einorcement steel bars shall be delivered at site +ro-ressively b* The su++lier or manuacturer shall submit the (ill Certicate beore
or durin- delivery o the steel bars. The (ill Certicates shall clearly state the -rade0 uantity0 chemical com+osition0 test Page 48 of 59
DOCUMENT NO : IDX/QAP/MS/STC
results0 si:e0 truc re-istration number and the date o delivery. c* All bars shall be ree rom surace rust0 scale dirt etc.
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
d* (aterials so acce+ted shall be unloaded rom the truc by a mobile crane and staced in bundles at the abrication yard accordin- to e* The rebar shall be staced at least 5 inches above the -round level. 1#1 REINFORCEMENT - PLACEMENT a* The en-ineer shall direct and su+ervise the +ersonnel res+onsible or the +lacement o rebar in accordance 9ith all related desi-ns0 s+ecications0 conditions o contract and associated +rocedures. b* All reinorcement shall be securely +laced to ensure a-ainst dis+lacement durin- the +lacement o concrete. Provide the ollo9in- clear cover to all reinorcement unless other9ise noted on the dra9in-s.
?lement Cast3Fnsitu %ored Piles Pile Ca+s Piers N Crossheads Abutments N ,in-9all %earin- Plinth H+stand Prestressed Concrete %rid-e Para+ets Pretensioned %eam 'ec Slab and 'ia+hra-m etainin- ,all Stem etainin- ,all %ase A++roach Slab
Cover to einorcement 6#mm 6#mm or %= 4#mm or G= 4#mm 4#mm 4#mm &"mm 4#mm &"mm 4#mm 4#mm 6#mm or %= 4#mm or G= 4#mm
otes2 %= denotes %ottom =ace einorcement G= denotes Gther =ace einorcement c* Tolerance on nominal cover shall be L #mm. d* All intersectin- bars shall be tied to-ether 9ith bindin- 9ire and the
ends o the 9ire shall be turned into the main body to concrete. e* Eins shall be securely ed 9ith bindin- 9ire to the lon-itudinal
reinorcement. * The reinorcement shall be laid out in accordance 9ith the
a++roved dra9in-s and schedules. The reinorcement shall be sus+ended by annealed 9ire0 su++orted on concrete s+acers to +revent dis+lacement durin- the +lacin- and com+actin- o S+acers0 9here used to maintain concrete cover to reinorcement0 -* may be either concrete or +lastic construction unless other9ise
s+ecied. Page 49 of 59
DOCUMENT NO : IDX/QAP/MS/STC
h* (inimum la+ len-th should be reerred to construction dra9in- +rovided. i* Hnless other9ise sho9n on the dra9in-0 s+lices in adacent bars shall be sta--ered.
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
* Gn no account shall reinorcement be heated to acilitate bendin-. einorcement shall not be re3bent unless a++roved by the * einorcement in structures shall not be 9elded 9ithout the a++roval o the ?n-ineer. l* The su+ervisor shall also ensure that all reuired builderRs 9or in connection 9ith (N? reuirements includin- o+enin-s0 conduits0 bloc outs0 +uddle 8an-es etc. are installed beore +lacement o the to+ bars. m* Carry out ins+ection on reinorcement +laced as +er Pre3ConcretinCheclist. %ar bendin- schedule shall be submitted beore concretin-. 1#2 ON SITE FABRICATION ? FIXING OF FORM%ORK a* The surveyor 9ill rst set u+ a reerence line oDset rom the nearest T%( or rom a +reviously constructed structure 9ith established survey data. b* The subcontractors shall determine the side line o the structure o
oDsettin- rom the reerence +oints0 established by the surveyor usin- strin- lines and measurin- ta+es. c* %eore installation o orm9or0 the surveyor shall survey the level
o the lean concrete and the ?n-ineer shall ensure that the base is clean and level. d* =or hori:ontal structures0 one side o the orm shall be erected initially alon- the strin-ed side line. Tem+orary strutts and shores are +laced to hold the orm in +osition. e* erected. Strai-htness and verticality chec eecuted and strutts secured in +laced to-ether 9ith hori:ontal braces to maintain the reuired 9idth throu-hout.
*
,here holes are needed in orm9or to accommodate +roectinreinorcement starters0 services o in- devices0 care shall be taen to ensure that all holes or o+enin-s are +lu--ed or bloced to +revent the loss o -rout 9hen concretin- or dama-e to the concrete surace 9hen removin- orms.
-* %eore concretin-0 the Site Su+ervisor shall ensure that all orms are thorou-hly cleaned out0 ree rom sa9dust shavin-s0 dust0 mud or other debris and deleterious matter by usin- a++ro+riate tools and eui+ments as ollo9s2 i* (ud de+osits on or in orm9or shall be removed by brushin- or Page 50 of 59
DOCUMENT NO : IDX/QAP/MS/STC
9ater et as reuired. ii* Sa9dust shavin-s0 dust or loose +articles and matters can be moved to a corner usin- a com+ressor. These can be removed by s9ee+ininto a bin i a hatch o+enin- is +rovided or. h* The orm9or ace in contact 9ith the concrete shall be coated 9ith
a suitable mould oil or a++roved release a-ent. Such oils or release a-ents shall not come into contact 9ith the reinorcement. PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
i* All orms shall be ormally ins+ected by the ?n-ineer ater +re+aration and +rior to +lacin- o concrete as +er Pre3ConcretinCheclist. o +lacin- o concrete shall be commenced until the orm9or has been a++roved. 1#3 STRIKING OF FORM%ORK a* The Sub3contactors shall liase 9ith the ?n-ineer to obtain a++roval beore striin- any orm9or and t o conduct ins+ection ater striin- o orms as +er Post Concretin- Checlist. b* The removal shall be done in such a manner as not to dama-e the concrete and shall tae +lace at times to suit the reuirements or its curin-. c* ,here it is intended that orms are to be reused0 it shall be cleaned and made -ood to the a++roval o the S.GRs re+resentative. 1# PREPARATION FOR CONCRETING H+on com+letion o the orm9or0 reinorcement and all associated a* builderRs 9ors in connection 9ith the (echanical0 ?lectrical and other related services the Su+ervisor shall undertae a +reliminary ins+ection to ensure that such items are com+lete and in accordance 9ith all controllin- relevant construction dra9in-s and +re concretin- checlists. b* =ollo9in- this +reliminary ins+ection the Site Su+ervisor shall advise the Proect (ana-er 9ho shall ensure that the ollo9inarran-ements have been or bein- made +rior to +lacement. c* Place an order or the su++ly o concrete on a scheduled date. d* Standby all 9ormen necessary to carry out the 9ors till com+letion. =or lon- hours )more than 15 hours*0 shit may be reuired and ni-ht li-htin- a must. e* Arran-e the rotation o su+ervisory staD. 1#= PLACING OF CONCRETE a* =or lean concretin-0 a minimum o #"mm thicness blindin- layer shall be laid on 9ell +re+ared rm -round ater or beore orm9or is +laced in +osition. b* Concrete shall be +laced into the orms or ecavations usin- the a++ro+riate +lant and eui+ment or the +ur+ose includin- direct Page 51 of 59
DOCUMENT NO : IDX/QAP/MS/STC
chute dischar-e rom concrete mier trucs0 concrete +um+s or crane assisted concrete bucet. c* Concretin- shall start resh or rom a +redetermined construction
oint and shall continue uninterru+ted u+ to the net +redetermined construction oint or com+letion. d* F concretin- is to commence rom a construction oint0 the said
oint shall be rou-hened beore receivin- resh concrete and mortar 9ater must also be +oured over this area. PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
e* Placement o concrete shall be in hori:ontal layers and to a com+act de+th not eceedin- 4#"mm. The rate o dischar-e shall be such that the concrete +lacement is uniorm across the section and increasin- at a rate to +revent se-re-ation o the bottom layers. * Com+action shall be carried out by both hand tam+in- and mechanical vibrator and shall be thorou-hly 9ored into corners. -* To avoid a vertical dro+ o concrete -reater than 1.# metres0 trunin- and chutes shall be used. h* =resh concrete shall not be +laced a-ainst in3situ concrete durinthe +ourin- seuence 9ithin certain time limits based u+on the desi-n mi o the concrete. o +ourin- o 9ater into semi3hardness concrete in the truc is allo9ed. i* Concretin- o+eration shall cease immediately i leas occurs in the
orm9or and shall be rectied on the s+ot. * All concrete0 ater it has set shall be e+t continuously dam+ by +lacin- 9et ute sac on to+ o the surace. * The use o any curin- com+ound shall be subected to the a++roval o the ?n-ineer. 1# CONSTRUCTION JOINTS a* Construction oints shall be located in the +ositions as sho9n on dra9in-s or as reuired. b* The oints shall be at ri-ht an-les to the -eneral direction o the member and shall tae due account o shear and other stresses. c* Concrete shall not be allo9ed to run to a eather ed-e and vertical oints shall be ormed a-ainst a sto+ board. 1#"$ TESTING OF CONCRETE %ORKS a* The indicative sam+lin- rate shall be as ollo9s2 3 Gne sam+le +er 1"." m & or every -rou+ o 1" batches or critical structures such as columns0 +ile ca+s and abutment 9all. - One sample per 20.0 m3 or every group of 20 ba!"es for slabs.
Page 52 of 59
DOCUMENT NO : IDX/QAP/MS/STC
c*
0 0 be taen o concrete on the rst day o concretin- or each -rade o concrete to be used in the ,or0 irres+ective o the volume o concrete +roduced or the sam+lin- rate. Subseuent rate o sam+lin- shall be at least one sam+le rom each source o +roduction on each day that concrete o any +articular -rade is used.
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
d* The actual rate o sam+lin- may be increased in a++ro+riate circumstances e.-. or critical elements0 9hen reuired by the S.G. =or each sam+lin-0 three cubes shall be made rom a sin-le sam+le e* taen rom a randomly selected bacth o concrete. The sam+le shall be taen at the +oint o dischar-e rom the mier or0 in the case o ready mied concrete0 at the +oint o dischar-e rom the delivery vehicle. * All cubes shall be clearly mared 9ith undeletable +aint 9ith the date o castin- and serial number. A record shall be clearly e+t to identiy each cube by date and by -* serial number relatin- to the +art o the 9or rom 9hich they are taen. h* Gne cube rom each sam+le batch shall be tested or the 63day com+ressive stren-th. The remainin- t9o cubes rom the sam+le batch shall be tested or the !<3day com+ressive stren-th. 2#$ MATERIAL Concrete $rade 4"/#"/## einorcement Steel =orm9or )Steel/,ood* ScaDoldin3#$ MACHINER Concrete Eorry ?cavator (echanical Vibrator (obile Crane $enerator Set Air com+ressor ,ater +um+ Concrete mier
# 1 1 1 ! 1 1 1
#$ MANPO%ER Site su+ervisor (achine G+erator $eneral ,orer
1 ! 1"
Page 53 of 59
DOCUMENT NO : IDX/QAP/MS/STC
=#$ SAFET ? ENVIRONMENT REQUIREMENT <.1 Gnly e+erienced +ersonnel are allo9ed at 9orin- area. <.! Site +ersonnel must be brieed and be 9ell versed 9ith all site saety measures. <.& Site +ersonnel Qmust be in +ro+er saety 9orin- attire e.-. Saety boots and helmets must be 9orn at all times. <.4 Site saety member should be available at all times and must be able to res+ond correctly to emer-ency <.4 Pro+er and adeuate +rovisions o Tem+orary Si-na-e and %arricades at diversions and haul road as necessary. PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
STRUCTURAL CONCRETING
<.# All the letover/debris shall be removed and collected at one s+ecic location beore bein- carried a9ay rom site in accordance 9ith environment +rotection s+ecication. #$ INSPECTION AND TEST PLAN/FORMS As +er attached "$#$ PRODUCTIVIT RATE
Page 54 of 59
DOCUMENT NO : IDX/QAP/MS/STC
Page 55 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
TEMPORAR %ORK FOR BORED PILING %ORK FOR BRIDGE OVER PLENTONG INTERSECTION - B2
METHOD STATEMENT INTERIM 0
"#$ INTRODUCTION 1.1 The +ur+ose o this method statement is to describe the activities a documentation reuired to commence the tem+orary 9or or brid#$ SCOPE OF %ORKS !.1 Pre+aration o access road !.! Pre+aration o tem+orary +latorm !.& Fnstallation o sheet +ile .#$ %ORK SEQUENCE FLO% STAT Settin- out
Site clearin- N +re+arin- access road Pre+aration o tem+orary +latorm Fnstallation o sheet +ile %ored +ilin9or commence Construction o +ile ca+ and hal o +ier %acllin9or
emoval o sheet +ile ?'
Page 56 of 59
DOCUMENT NO : IDX/QAP/MS/T%B2
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
METHOD STATEMENT INTERIM 0
DOCUMENT NO :
TEMPORAR %ORK FOR BORED PILING %ORK FOR BRIDGE OVER PLENTONG INTERSECTION - B2
IDX/QAP/MS/T%B2
1#$ METHOD STATEMENT 1#" SETTING OUT 4.1.1 The land surveyor 9ill identiy the i-ht o ,ay boundary and location o the +ilin- +oint. 4.1.! GDset or the +ilin- +oint0 nished road level0 cut oD level 9ill be +rovided at the +e- allocated or the +ilin- +oint. 1# SITE CLEARING 4.!.1 The site clearin- 9ill be +erormed at the allocated location.
F'O/AP/(S/SC
4.!.! The o+enin- as a mean o access to the location 9ill be constructed and llin- and cuttin- o the G$E are reuired until the diDerence in -round level is a++ro+riate or machineries and trans+ortation 4.!.& The location o machineries0 the o+enin-0 the material 9ill be arranbased on the suitability o site condition 1#. CONSTRUCTION OF THE %ORKING PLATFORM 4.&.1 The 9orin- +latorm is +re+ared as +er cut oD level reerence. The ecavation 9ill tae +lace and the levelin- o the area is +erormed until it reaches a satisactory +erimeter or the bored +ilin- machine maneuver. 1#1 INSTALLATION OF SHEET PILE 4.4.1 The access and +latorm or vibro hammer 9ill be +re+ared by means o levelin- and cut and ll method 4.4.! The vibro hammer 9ill install the sheet +ile as +er dia-ram
T?(P/CGSS3S?CT3%<3S1
4.4.& Previously the desi-n calculation or sheet +ilin- had been 9ored o as a reerence or the installation o sheet +ile 9or
Attachment 1
1#2 COMMENCEMENT OF BORED PILING ? SUB STRUCTURE %ORK 4.#.1 Gnce the sheet +ile has been installed0 the levelin- 9or continues until it is a++ro+riate or bored +ilin- machine to o+erate on the +latorm 4.#.! The bored +ilin- 9or commence
F'O/AP/(S/%P,
4.#.& The +ile ca+ and +ier 9ill be constructed and once the base is bacl as +er construction dra9in- and under +ermission by S.G the sheet +ile 9ill be removed rom the base
F'O/AP/(S/SS, F'O/AP/(S/CPC
Page 57 of 59
PROJEK MENAIKTARAF LEBUHRAA JOHOR BAHRU - PASIR GUDANG DARI 1 LORONG KE 3 LORONG, JOHOR
TEMPORAR %ORK FOR BORED PILING %ORK FOR BRIDGE OVER PLENTONG INTERSECTION - B2
METHOD STATEMENT INTERIM 0
DOCUMENT NO : IDX/QAP/MS/T%B2
4.#.4 The sheet +ile 9ill be transerred to the another 9orin- +latorm and installed there as +er dia-ram 1#3 SHEET PILE ? STEEL PLATE DESCRIPTION 4.5.1 The sheet +ile to be used is Ty+e FFFA )reer to the attachment* 1# SEQUENCES OF %ORK 4.6.1 The 9orin- +latorm 9ill be +re+ared as +er this seuence2 Pier !31
Pier & 3 1
Pier 13!
Pier !
Pier &
Pier 1
Abutment A
Abutment %
Abutment %31 T?(P/S?3%<3S1 Abutment A 3 1
Page 58 of 59