This document describes the installation method for GRP tanks installations. especially needed by the consultants and to be provided by contractors.Full description
This document describes the installation method for GRP tanks installations. especially needed by the consultants and to be provided by contractors.
Guide to transformer installation.
method statement for tanks erection Api 650Full description
bacaan
okay
bacaanFull description
okayFull description
cathode protection Method statement for installtion
DETAIL PROCEDURE AND METHOD STATEMENT FOR TANK JACK LIFTING
DETAIL PROCEDURE AND METHOD STATEMENT FOR TANK JACK LIFTINGFull description
DETAIL PROCEDURE AND METHOD STATEMENT FOR TANK JACK LIFTING
dfgffDescription complète
Method StatementDescrição completa
Method Statement for Installation of TransformerFull description
dgdfgDescription complète
Method Statement for Installation of Cable TraysFull description
dfgffDescription complète
Method Statement for Installation of Cable Trays
ergerger
dfgff
MS AHU
Ensure the civil works are completed for the area of installation, and clearance is obtained from the respective respective authorities & parties to proceed further with installation work. Prior to the start the installation, refer to the approved shop drawings related to the area a rea of installations and ensure that the required material are available on the site as per approved material submittals. Ensure the materials are stored stored properly and there is no mark of damage or deformity of any kind on proposed items before issuing the material work ahead on site installations. Water tanks shall be installed on the uniform concrete plinth (beams of recommended dimensions by Water !ank "anufacturer and as per approved pro#ect foundation drawings to ensure the adequate clearance is available for valves, piping and future maintenance purposes. Ensure that the concrete beams should be hori$ontal and smooth %nishes from top to ensure proper settlement of water tank skid base and a nd to avoid tank base deformation. Painting Painting if required required in civil scope s cope details. tainless teel skid base shall be %'ed on the uniform concrete plinth (beams teel skid base shall be placed and leveled properly as required to drain o the !anks water. )ase panels shall be installed on the leveled steel skid base. ide panels shall be installed on the base panels. *asket shall be put in between the panels pa nels for preventing water leakage from the #oints. Water !ank panels shall be #ointed as per "anufacturers recommendations by bolts. +ocation and installation of panels for the inlet, outlet, drain and overow pipe shall be as per approved shop drawings. -nstallation of the internal accessories shall be carried out after side panels installation. Panels shall be tied internally by steel tie rod for side panel reinforcement reinforcement and e'ternally by stay plates as per the manufacturer recommendations. recommendations. -nlet, outlet, drain and overow no$$les shall be connected to tanks with ange connection. !op !op panels shall be installed on side panels.
/ecommended /ecommended pipe support to be provided for roof panels block supports. tainless steel internal and e'ternal ladders shall be provided. 0ll stainless steel nut bolts to be securely tied with washer. !ank !ank installation is to be provided provided to consultant for approval. 0fter 0fter the approval of the installation procedure1work, water tanks shall be allowed for water leak test as per the manufacturer recommendations. 2or testing of water tanks, all openings shall be closed, water shall be %lled in the tanks by temporary water supply line. 0ir vent shall be installed on each tank for the smooth escape of air from water tank. Water shall be kept inside the tank for at least 34 hours and leaks shall be checked, if any leak found, it shall be recti%ed and again oered for the same for consultant approval.