Report submitted for a course in earning my Master's Degree in Geotechnical Engineering. CE 260 Soil and Rock Testing Candidates must learn the requirements of a project/construction t…Full description
Full description
Geotechnical Report Sample
Risk Management
Risk ManagementFull description
Risk ManagementFull description
Risk ManagementFull description
There are four different types of geological formation and group. In western part of the project area, calcitic nature of Upper Plateau Limestone is found nearby north south trending intra formational fault. About two third of the mapped area is cons
Abaqus user manual for geotechnical engineering fieldFull description
Abaqus user manual for geotechnical engineering field
Descripción: Geotechnical Manual for Slopes
Abaqus user manual for geotechnical engineering fieldDescription complète
Abaqus user manual for geotechnical engineering field
Description : Geotechnical Manual for Slopes
Geotechnical Manual for Slopes
Abaqus user manual for geotechnical engineering fieldFull description
Sample Motion for P.I
dasfsdFull description
Geotechnical Manual for Slopes
JOBSAFETY ANALYSIS FOR GEOTECHENICAL INVESTIGATION COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUANCE OF POTENTIAL HAZARD BASIC HAZARD 1.0 Utilization of 1.1 Failure of vessel survey vessel and equipment
HAZARD CONTROL
RESPOSIBILITY
1.1.1 The vessel must be certified and approved by QP approved third party
Dodsal Site Supervisor
1.1.2 Operator of the vessel must have valid licence and must be certified certified by QP approved third party
Dodsal Site Supervisor
1.1.3 Radio communication facility must be available between vessel and relevant control room at shore and one dedicated supervisor shall be monitored the activity at shore 1.1.4 Rescue team with vessel to be available to attend any undue event 1.2 Fall of material and 1.2.1 The crew members must be trained and should wear personnel in to sea life jacket
Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor
1.2.2 Paramedic to be available in the vessel
Dodsal Site Supervisor
1.2.3 Equipments, tools, and materials to be secured properly to prevent falling
Dodsal Site Supervisor
1.2.4 All personnel should be inducted with details of activity and sea survival training
Dodsal Site Supervisor
1.2.5 Vessel shall be equipped with rescue buoys and rope
Dodsal Site Supervisor Page : 1 of 5
JOBSAFETY ANALYSIS FOR GEOTECHENICAL INVESTIGATION COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUANCE OF POTENTIAL HAZARD BASIC HAZARD
1.3 Local Marine traffic 2.0 Drilling of boreholes
HAZARD CONTROL 1.2.6 Good house keeping to be maintained on deck and platform all time and spillage of fuel,grease and oil to be cleaned properly and disposed
Dodsal Site Supervisor
1.3.1 Communication with RLIC port control room to be established prior to start of survey
Dodsal Site Supervisor
2.1 Failure of jack up 2.1.1 The jack up rig and associated equipments / pontoon drilling rig/ pontoon and must be certified and by QP approved third party equipments
2.2 Fall of personnel and material in to sea
RESPOSIBILITY
Dodsal Site Supervisor
2.1.2 Operator must have a valid license respect to the vessel and must be certified by QP approved third party
Dodsal Site Supervisor
2.2.1 Experienced and competent workers to be deployed and they shall wear life jacket
Dodsal Site Supervisor
2.2.2 Equipments, tools, casings, drill rods and materials to be secured properly to prevent rolling and falling
Dodsal Site Supervisor
2.2.3 Vessel shall be equipped with rescue buoys and rope
Dodsal Site Supervisor
Page : 2 of 5
JOBSAFETY ANALYSIS FOR GEOTECHENICAL INVESTIGATION COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUANCE OF POTENTIAL HAZARD BASIC HAZARD
2.3 Faliure of high pressure pump and flushing system
HAZARD CONTROL
RESPOSIBILITY
2.2.4 Positioning of Rig/ pontoon to be done as per the procedure with supervision
Dodsal Site Supervisor
2.2.5 Erection of Rig/ pontoon shall not be done when rough sea and strong wind prevails
Dodsal Site Supervisor
2.2.6 All crew members to be well conversant and adhered to Emergency Procedure which is applicable
Dodsal Site Supervisor
2.3.1 Equipments, associated tools and fittings must be checked prior to its use
Dodsal Site Supervisor
2.3.2 Only trained and experienced workers shall be deployed for the task
Dodsal Site Supervisor
2.3.3 The materials and fittings must be approved prior to its use
Dodsal Site Supervisor
2.3.4 Defective equipments to be discarded from the service
Dodsal Site Supervisor
Page : 3 of 5
JOBSAFETY ANALYSIS FOR GEOTECHENICAL INVESTIGATION COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUANCE OF POTENTIAL HAZARD BASIC HAZARD 3.0 Lifting of Tools and Equipments
4.0 General safety
3.1 Fall of material, collapse and injury
4.1 Personnel injury and health hazard
HAZARD CONTROL
RESPOSIBILITY
3.1.1 Crane and lifting tackles must be certified by QP approved third party
Dodsal Site Supervisor
3.1.2 Operator must have a valid license and to be certified by QP approved third party
Dodsal Site Supervisor
3.1.2 Rigger and signal man to be trained. They should keep a good communication with operator
Dodsal Site Supervisor
3.1.3 Tag lines to be used for holding suspended load
Dodsal Site Supervisor
3.1.4 Crew members shall kept minimum as required and no load should swing over personnel.
Dodsal Site Supervisor
4.1.1 Each member of the crew member to be phisically fit and in good health
Dodsal Site Supervisor
4.1.2 Safe entrance and exit platform with ladder to be provided for sailors.
Dodsal Site Supervisor
Page : 4 of 5
JOBSAFETY ANALYSIS FOR GEOTECHENICAL INVESTIGATION COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUANCE OF POTENTIAL HAZARD BASIC HAZARD
HAZARD CONTROL
RESPOSIBILITY
4.2.1 Flammable materials shall not be stored in the vessel if required it shall stored in a purpose designed container
Dodsal Site Supervisor
4.2.2 Appropriate fire extinguishers shall be provided in the vessel
Dodsal Site Supervisor
5.1 High tide
5.1.1 Tide table shall be evaluated before sailing
Dodsal Site Supervisor
5.2 Exposure to extreme weather
5.2.1 Weather forecast must be followed
Dodsal Site Supervisor
5.3 Sun Burn
5.3.1 Adequate shelter to be provided for workers to take rest
Dodsal Site Supervisor
5.4 Heat stress and dehydration
5.4.1 Sufficient quantity of cool drinking water to be made available
Dodsal Site Supervisor
4.2 Fire
5.0 Weather
Notes: 1- Prior to start any work it to be made sure that personnel are safety inducted 2- Prior to start any work Tool Box Talk to be carried out 3- Personnel shall wear all applicable PPE 4- Adequate First Aid facility to be provided Prepared By : M.P Gupta ( Civil Engineer ) Reviewed By: Solayappan ( HSE Officer ) Page : 5 of 5