DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
2 of 50 Glossary 2.0
PURPOSE AND INTRODUCTION.................................................... ..................................................3 2.1
INTRODUCTION INTRODUCTION...................................................... ........................................................ ........... 3
2.2
PURPOSE PURPOSE .............................................. ........................................................ ............................... 3
3.0
SCOPE.....................................................................................................................................................4
4.0
RESPONSIBILITIES ..............................................................................................................................4 4.1 SITE QUALITY ASSURANCE VALIDATION ......................................................................... 5 4.2 SITE ENGINEERING VALIDATION ............................................................................ ............ 6 4.3 SITE MANUFACTURING TECHNICAL SUPPORT.................................................. ............ 6 4.4 SITE MANUFACTURING ............................................... ........................................................ ... 7 4.5 SITE ENGINEERING ..................................................................................................... ............ 8 4.6 QUALITY CONTROL .................................................................................. ............................... 8 4.7 REGULATORY AFFAIRS ......................................................................................................... 9
5.0
DEFINITIONS, ABREVIATIONS AND REFERENCES ...................................................................9 5.1 DEFINITIONS LIST .............................................................................................. ...................... 9 5.2 ABBREVIATION LIST..................................................... ........................................................ . 12 12 5.3 REFERENCES........................................................ ........................................................ .......... 12
6.0
MATERIALS ..........................................................................................................................................12
7.0
PROCEDURE .......................................................................................................................................13 7.1 SPRINGFIELD, NY FACILITY OVERVIEW ..................................................... .................... 13 7.2 VALIDATION MASTER PLAN GOVERNANCE ..................................... ............................. 13 7.3 VALIDATION APPROACH....................................................... ............................................... 15 7.4 VALIDATION PROCEDURES ............................................................................................... . 17 7.5 VALIDATION SUPPORT SYSTEMS........................................................ ............................. 18 7.6 KEY SOPs GOVERNING AND SUPPORTING THE ALLSTON LANDING VALIDATION PROGRAM ....................................................................... ........................................................ . 21 7.7 IDENTIFICATION AND DESCRIPTION OF MANUFACTURING SYSTEMS AND EQUIPMENT PRESENTLY IN USE AT THE SPRINGFIELD, NY FACILITY AND ASSOCIATED COMPLETED VALIDATION VALIDATION ........................................... ............................. 21 21 7.8 VALIDATION MASTER PLAN REVIEW .............................................................................. . 21
8.0 ATTACHMENTS...................................................................................................................................21 8.1 Att achment achm ent A : Process Flow Diagrams ................................................... ............................. 21 21 8.2 Att achment achm ent B : Key SOPs Governing and Supporting the Springfield, NY Facility Validation Program .................................................. ........................................................ .......... 21 8.3 Attac At tachm hment ent C: Process Equipment List and Associated Validation Protocol Numbers ....................................................... ........................................................ ...................................... 21
9.0
REVISION HISTORY...........................................................................................................................27 Revision History Table ................................................................................................... .......... 27 9.1 27
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
3 of 50 2.0
PURPOSE AND INTRODUCTION 2.1
INTRODUCTION
The validation program at the Springfield, NY Facility is intended to satisfy current domestic and international regulations, guidelines and policies for drugs, biologics and APIs to verify the equipment, systems, utilities, software and processes are properly designed, installed, and function as intended in a consistent and controlled manner. The validation program complies with Corporate Quality Standards and Polices (Ref. SOP-XXXX – Validation Program ). The revision of the Site Validation Master Plan (SVMP) comes from the validation philosophy changes resulting from the implementation of the “validation lifecycle” approach at Springfield, NY Facility. The changes made in this revision of the Springfield, NY Facility SVMP bring the plan into alignment with the new lifecycle approach. The Springfield, NY Facility has developed the site validation governance document SOPSOP-XX XXXX XX,, “ Vali Validatio datio n Project Life Cycle Approach at the Springfield, NY Facility” , which defines the validation philosophy to be used for validation at Springfield, NY Facility. SOP-XXXX SOP-XXX X uses a risk-based approach with emphasis on verification and qualification that is focused on the high risk attributes of facilities, utilities, equipment, and processes. This SVMP introduces use of subordinate VMPs (sub-VMPs) that are categorized into eight areas and address the full scope of Validation requirements applicable to the Springfield, NY Facility site in support of SVMP. 2.2
PURPOSE
The purpose of validation is to assure that the facility, manufacturing process, and supporting services are capable of supporting the manufacture of pharmaceutical product that consistently meets its predetermined quality attributes. For this reason, each facet of the Springfield, NY Facility site related to CGMP manufacture, monitoring, storage, and testing will be validated. The Validation program is integral to design, construction / fabrication, and CGMP Operation of the facility. Validation testing is intended to proactively establish CGMP compliance prior to initiating manufacture of commercial product for distribution. In addition, the sustenance operations at Springfield, NY Facility, such as quality change control, calibration program, preventive maintenance, and periodic requalification of critical equipment and processes ensure that manufacturing equipment and processes stay under the validated state. The purpose of this SVMP is to: •
•
Define the requirements and validation approach for validation of systems, equipment, and processes at Pharma Co., Inc. Corporation’s Springfield, NY Facility. To list or reference the documentation supporting the current validated state of the Springfield, Springfield, NY Facility.
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
4 of 50 This SVMP explains the governance structure in place that will achieve, demonstrate and maintain acceptable standards of validation for systems, equipment, and processes used in the manufacture of drug product at the Springfield, NY Facility. If the methodologies and rationale presented herein are not followed, the rationale behind the alternate approach must be documented appropriately. This document is designed to accomplish the following objectives: •
•
•
3.0
Identify the key Standard Operating Procedures governing and supporting the validation program presented in SOP-XXXX. Describe the manufacturing systems, equipment, and processes presently in use at the Springfield, NY Facility. Itemize the equipment and utilities used in the Springfield, NY Facility manufacturing systems and link them to completed validation studies as evidence of a validated state.
SCOPE This Site Validation Master Plan applies to all verification, qualification, and validation activities that support commercial manufacturing at Pharma Co., Inc. Corporation’s Springfield, NY Facility. This VMP is a high-level document that refers to various supporting documents. Validation program elements include: •
• • • • • •
Validation/qualification of facilities/utilities/equipment and corresponding automation/controls Validation of manufacturing processes Cleaning validation Sterilization and depyrogenation Enterprise Computer systems QC Laboratory equipment and methods Interval based requalification
The commercial products that are currently manufactured, packaged, or stored at the Springfield, NY Facility are listed in Table 7.1-1. The equipment within the scope of this Validation Master Plan are listed in Attachm ent D, Process Equipment List and Associated Validation. 4.0
RESPONSIBILITIES This SVMP will be approved by the heads of the departments (or their designees) listed in this section.
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
5 of 50 The validation activities in Springfield, NY Facility are the responsibility of the Validation, Engineering, Manufacturing, MTS, and Quality Assurance groups as shown in Figure 1.
The responsibilities outlined below align with the Validation Lifecycle Approach that is presented in SOP-XXXX. 4.1
SITE QUALITY ASSURANCE VALIDATION •
Generate, review, and maintain approve SVMP
•
Review and approve the sub-VMPs and Project VPs
•
Assist with the generation of User Requirements (URs) document
•
Review and approve the URS document
•
Assist with the performance of risk assessments
•
Review and approve Risk Assessments documents
•
Review and approve Critical Aspects (CAs) list and acceptance criteria, as applicable
•
Review and approve the Process Control Strategy
•
Review and approve the Operational Control Strategy
•
Review and approve Commissioning and Qualification and Validation Plans
•
Review and approve Qualification Protocols and Reports for facilities, utilities, equipment, and processes that have CAs
•
Review and approve Computerized Systems’ Protocols and Reports
•
Review and approve Performance Qualification (PQ) Protocols and Reports
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
6 of 50 •
•
•
Review and approve Process Validation (PV) and Continued Verification Protocols and Reports Review and approve Qualification and Validation Protocol Deviations Approve the use of vendor documentation to verify functionality of facility, utility, and equipment
Reviewing and documents
•
4.2
the
Site’s
Equipment
Requalification
related
SITE ENGINEERING VALIDATION •
•
•
•
Review and approve SVMP Generate, review, approve, and maintain sub-VMP for Facilities, Equipment (including QC Lab storage and process equipment, such as refrigerators, autoclaves and incubators) and Utilities, Cleaning Process, Sterilization and Depyrogenation Process, and Computerized Systems Lead/generate, review and approve Site Project VP for new products or projects Maintain Validation Schedule per the Project Execution Plan (PEP) and Project VP and CCR timelines
•
Assist with the generation of URS document
•
Review and approve URS document
•
Lead/perform risk assessments using CA list
•
Review and approve the Operational Control Strategy
•
Review and approve Risk Assessment document
•
4.3
approving
Generate, review, and approve IQ, OQ, PQ Protocols and Reports for facilities, utilities, equipment, and processes
•
Generate, review, and approve PQ Protocols and Reports
•
Generate, review, and approve Protocol Deviations
•
Review and approve Computer Systems’ Protocols and Reports
SITE MANUFACTURING TECHNICAL SUPPORT •
Review and approve the SVMP, sub-VMPs, and Project VPs, as appropriate
•
Generate, review, approve, and maintain sub-VMP or PV
•
Assist with the generation of URS document
•
Review and approve URS of document
•
Review and approve Risk Assessment document, as applicable
•
Review and approve Validation Plans, as applicable
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
7 of 50 •
Review approve and assist in updating the Process Control Strategy
•
Generate, review, and approve the Operational Control Strategy
•
Lead /perform Technical Transfer activities for product transfer
•
Lead/perform process development / engineering runs
•
•
Execute PV Protocols
•
Generate, review, and approve PV Protocol Deviations
•
4.4
Lead. generate, review, and approve PV and Continued Verification Protocols and Reports
Create and update Manufacturing Process Descriptions and associated Manufacturing Flow Diagrams (MFDs)
•
Generate process related sections of the Project VPs
•
Review and approve Project VPs that include PV
•
Lead/perform risk assessments for PV
•
Create and update Manufacturing History File (MHF)
SITE MANUFACTURING •
Assist with the performance of risk assessments
•
Assist with the generation of URS document
•
Review and approve URS document
•
Assist with the generation of the SVMP, sub-VMPs, and Project VPs, as applicable
•
Review and approve the SVMP, sub-VMPs, and Project VPs, as applicable
•
Review and approve the Process Control Strategy
•
Review and approve the Operational Control Strategy
•
Assist Site Engineering with generation of project schedule
•
Generate manufacturing SOPs for use during validation
•
•
•
Review and approve IQ, OQ, PQ, PV, and Continued Verification Protocols and Reports for facilities, utilities, equipment, and processes as applicable Prepare schedule in support of IQ, OQ, PQ, PV, and Continued Verification Protocols execution Ensure equipment/facilities/materials/personnel availability and technical support on the operation of the equipment during execution of qualification and validation activities
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
8 of 50 •
4.5
•
Review and approve Protocol Deviations affecting process equipment
•
Manage and execute the Site’s Equipment Requalification program
SITE ENGINEERING •
Assist with the performance of risk assessments
•
Lead the generation of URS document
•
Review and approve URS document
•
Generate Functional Specifications based on URS
•
Assist with the generation of the SVMP, sub-VMPs, and Project VPs, as applicable
•
Review and approve the SVMP, sub-VMPs, and Project VPs, as applicable
•
Generate, review, approve, and maintain sub-VMP for Computer Systems
•
Review and approve the Operational Control Strategy
•
Generate, review, and approve Computer Systems Protocols and Reports
•
•
•
•
4.6
Ensure manufacturing procedures are developed for maintaining the validated equipment in its validated state throughout its lifecycle
Review and approve Verification (including IQ and OQ) and PQ Protocols and Reports for facilities, utilities, equipment, and processes as applicable Participate in execution of Verification Protocols, as necessary Review and approve Protocol Deviations affecting facilities, utilities, and Computer Systems Review and approve the Site’s Equipment Requalification documents related to facilities and utilities
QUALITY CONTROL •
•
•
•
Assist with the generation of the SVMP, sub-VMPs, and Project VPs, as applicable Review and approve the SVMP and sub-VMPs, as applicable Generate, review, approve, manage execution of, and maintain sub-VMPs for QC Laboratories Review and approve Site Project VP for new products when QC testing is required
•
Receive and use transferred validated methods
•
Review and approve method validation protocols and reports
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
9 of 50 •
•
•
•
•
•
4.7
Review and approve laboratory equipment validation protocols and reports storage and process equipment, such as refrigerators, autoclaves and incubators Review the PQ and PV protocols for analytical and microbiological testing requirements, as applicable Perform testing required for validation samples, as applicable Review the PQ and PV Final Reports and verify the accuracy of testing data, as applicable Review and approve Protocol Deviations affecting QC test results and equipment
REGULATORY AFFAIRS •
5.0
Generate, review and approve validation protocols and reports for laboratory test instrumentation
Assist with the review of SVMP, sub-VMPs, and validation requirements to ensure compliance with regulatory filings
•
Update regulatory filings as necessary based on approved validation data
•
Assess the impact of validation activities on current approved product filings
•
Provide filing dates as part of validation activity scheduling
•
Incorporate pertinent validation data into annual reports
DEFINITIONS, ABREVIATIONS AND REFERENCES 5.1
DEFINITIONS LIST
Cleaning Validation (CV)
Documented evidence that a cleaning process is consistently and effectively reducing potential product and/or cleaning agent residues to pre-determined acceptable limits. Cleaning Documented evidence that equipment is cleaned to pre-determined Verification specifications and may be released for use. Clean in Place Introduction of cleaning solution and/or water rinses into equipment that (CIP) is fixed in place, for purposes of removing potential product and/or cleaning agent residues. Clean out of Cleaning of portable or disassembled equipment/parts involving the use Place (COP) of a cleaning station in a remote designated location. Commissioning A well-planned, documented, and managed engineering approach to the startup and turnover of facilities, systems, and equipment to the System Owner that results in a safe and functional environment that meets established design requirements and stakeholder expectations. Concurrent Validation of equipment, systems or processes while the equipment, Validation system or process is in current use for clinical or commercial production. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
10 of 50 Critical Aspects (CA) Critical Process Parameter (CPP) Critical Quality Attribute (CQA)
Elements of the systems or equipment, which are critical to the product quality. A process parameter whose variability has an impact on a critical quality attribute and therefore should be monitored or controlled to ensure the process produces the desired quality (ICH Q8 (R2)). A physical, chemical, biological or microbiological property or characteristic that should be within an appropriate limit, range, or distribution to ensure the desired product quality (ICH Q8 (R2)). Design Review A formal, documented, comprehensive and systematic examination of the technical aspects of a product design or process. (21CFR Part 820.30) Direct Impact Utility that is used for manufacturing of the product or critical processes Utility (CIP, SIP) such as Water for Injection, Clean Steam, and Process Gases Family A Performance Qualification approach that allows for a reduced number Approach of validation studies when using equipment of equivalent design, manufacture and operational functionality. This approach is typically used for PQ for Bioreactors and Vessels Functional A prospective document that builds on the User Requirement Requirement Specification (URS) and provides a basic narrative on what functions Specification the process and its control system are expected to perform. Installation Establishing documented evidence that the equipment, system or Qualification software received is correct, is installed properly, in accordance with (IQ) Pharma Co., Inc.’s and the manufacturer’s requirements, and has the proper documentation and support information. Matrix approach A validation approach that uses a philosophy which allows for the testing of a subset of product batches or “model / placebo products to validate the entire range of a product /batch, in lieu of testing each product / batch in the matrix. Typical examples of appropriate applications of this approach include mixing validation and pooling validation. The bracketing selection is based upon product / batch attributes such as concentration, solubility, ingredient types, and batch size. Operational Establishing documented evidence that the equipment, system or Qualification software installed, functions in accordance with Pharma Co., Inc.’s and (OQ) the manufacturer’s requirements over the intended range of use, or for the intended applications. Performance Establishing documented evidence that equipment or systems perform Qualification in a controlled and reproducible manner in accordance with Pharma (PQ) Co., Inc.’s requirements under specific operational parameters, either at the allowable upper and lower limits of the operation or using worse case conditions compared to intended operating ranges. Process The collection and evaluation of data, from the process design stage Validation (PV) through commercial production, which establishes scientific evidence that a process is capable of consistently delivering quality products. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
11 of 50 (Guidance for Industry – Process Validation: General Principles and Practices, FDA, January 2011, Rev 1). Project A prospective document that defines the scope, requirements, rationale Validation Plan and protocols necessary for the validation of a new project or process in an existing site, which is under validated state. Prospective Validation of equipment, systems or processes prior to the Validation release/approval of the equipment, system or process for commercial production or commercial distribution of product. Protocol A prospective or concurrent test plan with pre-established acceptance criteria that when executed is intended to produce documented evidence that a system or system component has been properly tested. Quality Attribute A physical, chemical, or microbiological property of characteristic of a material that directly or indirectly impacts quality. Re-Qualification Establishing documented evidence that existing equipment and (Periodic processes continue to operate in a validated state, demonstrating Qualification) continued compliance, effective and reproducibility. This protocol type is utilized for time based re-qualification activities, such as autoclaves, SIP, ovens, SIP ovens, lyophilizers, environmental rooms, and cleaning and is not applicable to Change Control Request driven validation. Re-Validation The validation of a previously validated process typically necessitated by a change modification to the process. Risk Based An approach that allows basing the project related activities on risk Approach analysis and placing extra effort on activities that are assessed as posing a higher risk to the processes and product quality. User A prospective document that describes what the equipment or system is Requirement supposed to do, thus containing at least a set of criteria or conditions Specification that have to be met. This can include regulatory, corporate, and process (URS) requirements. Validation Documented evidence, which provides a high degree of assurance that a specific process will consistently meet its pre-determined specifications and quality attributes. Validation A prospective document that defines the scope, requirements, rationale, Master Plan and protocols necessary for the validation of a new project or process. Validation A prospective document that provides a detailed test plan used to Protocol qualify/validate equipment, systems, utilities, software or processes. Validation A document that provides a detailed summary of the results from the Protocol Final execution of a Validation Protocol. Report
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
12 of 50 5.2
ABBREVIATION LIST API ASME CFR cGMP CIP
5.3
Active Pharmaceutical Ingredient American Society of Mechanical Engineers Code of Federal Regulations current Good Manufacturing Practices Clean-In-Place
CPP
Critical Process Parameters
CQA
Critical Quality Attributes
CA EMA FDA GAMP ICH IQ ISO ISPE KPP MFD OQ PEP PQ PV QA QC RQ SIP SME SOP SVMP UR VMP
Critical Aspects European Medicines Agency Food and Drug Administration Good Automated Manufacturing Practices International Conference on Harmonization Installation Qualification International Standards Organization International Society of Pharmaceutical Engineers Key Process Parameter Manufacturing Flow Diagram Operational Qualification Project Execution Plan Performance Qualification Process Validation Quality Assurance Quality Control Re-Qualification Steam-In-Place Subject Matter Expert Standard Operating Procedure Site Validation Master Plan User Requirement Validation Master Plan
REFERENCES See Attachment B for Key regulatory references and Corporate and site SOPs Governing and Supporting the Springfield, NY Facility Validation Program.
•
6.0
MATERIALS All materials needed to perform the functions referenced in this document will be found in the individual referenced documents. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
13 of 50 7.0
PROCEDURE 7.1
SPRINGFIELD, NY FACILITY OVERVIEW The Pharma Co., Inc., and is located at: 1 Main Street, Springfield, NY. Pharma Co., Inc.’s Springfield, NY facility is a multi-product manufacturing facility for xxxx products. Manufacturing operations performed at the Springfield, NY facility include bulk drug substance activities, testing, labeling, and packaging. Drug substance manufacture for Product A is performed at this facility (see Attachm ent A for Process Flow Diagram.) Packaging and labeling operations are performed at this facility for Product A. Quality Control (QC) testing for Product A may be performed in qualified laboratories at Springfield, NY Facility, and approved vendor sites. Table 7.1-1 outlines the manufacturing activities performed at the Springfield, NY Facility for each product. Table 7.1-1: Manufacturing Activities Performed at Springfield by Product Product
Product A
7.2
Act ivit ies Perfor med at Springf ield, NY Facility
Manufacturing, formulation, testing, labeling, and packaging
VALIDATION MASTER PLAN GOVERNANCE
The Validation Program incorporates evaluation and testing to establish: Manufacturing & Laboratory Facility Installation Direct Impact Utility Installation, Operation, & Performance Manufacturing Equipment Installation, Operation, & Performance Validation of Computer Systems & Software Validation of Manufacturing Equipment Cleaning Processes and Cycles Qualification of Laboratory Equipment and Instruments Validation of Analytical, Physical, & Microbiological Test Methods Transfer / Development of Manufacturing Processes Qualification of Environmental Controls and Clean Rooms Validation of Manufacturing Processes Assessment and pre-determination of the longevity of CGMP equipment • • • • • • • • • • •
It is not intended that the SVMP will describe the requirements in detail for execution of the various Validation Program elements. The detailed requirement description may be found in sub-VMPs, Standard Operating Procedures, Corporate Level Standards or Practices, or relevant protocols. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
14 of 50 This SVMP will be revised at a minimum once per year to reflect the changes made to the validated facilities, utilities, equipment, and processes at Springfield, NY Facility. In addition, a periodic SVMP Summary Report (issued annually, at minimum) will document the summary of changes to the validated systems and corresponding validation documents. The Process Equipment List and associated document numbers will be updated with the new document numbers and titles. In order to address the full scope of Validation requirements applicable to the Springfield, NY Facility site, validation activities have been categorized into eight areas, which will be executed by corresponding sub-VMPs, to be created, and as listed below: • • • •
• • •
•
Sterilization and Depyrogenation Master Plan for Springfield, NY Facility Cleaning Validation Master Plan for Springfield, NY Facility Process Validation Master Plan for Springfield, NY Facility Facility, Equipment, and Utility Validation Master Plan for Springfield, NY Facility Computer System Validation Master Plan for Springfield, NY Facility Requalification Validation Master Plan for Springfield, NY Facility QC Laboratory Equipment and Instrumentation Qualification Master Plan for Springfield, NY Facility Test Method Validation Master Plan for Springfield, NY Facility
The eight sub-VMPs will supplement the overarching SVMP, and will be governed by corresponding Corporate Quality Operations Standards. The Sub-VMPs will present the specific validation requirements and projects within each of these validation groupings, along with the necessary details on the scope, validation approach, roles and responsibilities, required deliverables (equipment, systems, processes to be validated and corresponding protocols and documentation, URS, SOPs, test methods, etc.), and acceptance criteria. The projected schedule and required resources will be covered by the Project Execution Plan (PEP) and Project VP. Standard content of the Sub-VMPs will include: Policy statement and description of Validation Methodology to be followed. Listing of applicable governance policy and procedures describing program requirements. Listing of current approved documentation supporting the validated state for the program addressed. Execution plan for the specific validation program addressed (based on calendar year) • •
•
•
Upon approval of the Sub-VMP, annual updates will be issued to describe the current year’s project plan status. Record of the annual review will be attached to the Sub-VMP.
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
15 of 50 7.3
VALIDATION APPROACH Validation of facilities, equipment, computer systems, and processes is performed at the Springfield, NY Facility for production, monitoring, control, evaluation, and storage of CGMP products. As indicated in the INTRODUCTION section, this site VMP is based on the Validation Life Cycle approaches presented at the site level through governing document SOP-XXXX. SOP-XXXX focuses extensively on the early phases of a project (risk assessment, requirement specification, design, construction, and engineering). The Validation Lifecycle Process Key Activities shown in Figure 2 depicts the use of risk based approach that drives the verification and qualification activities, which are within the scope of this VMP. The Life Cycle Approach may be summarized as follows: Facility Qualification will entail verifying that construction and utility installation is according to design, and that the process requirements are met. Equipment & Instrument Verification will verify and document that installation is according to design (Installation Qualification), meets functional requirements (Operational Qualification), and user requirements (Performance Qualification). All computer and automated control systems employed in the facility will also be validated. Process demonstration, or engineering runs, for new processes/products will be executed utilizing the proposed manufacturing processes. The process demonstration phase will be based on documented process descriptions developed for the product to be transferred to the Springfield, NY Facility site. To support process demonstration, the test instruments will be qualified, and test methods will be validated and / or formally transferred to the site Quality Control / Microbiology Laboratories. During the demonstration phase, raw material supply, equipment settings, process parameters, batch record, product storage, standard operating procedures, and testing will be evaluated to assure satisfactory function. During the demonstration phase, evaluations specific to processing and product quality may also be undertaken. After successful demonstration, confirmatory production performance qualification and continued verification protocols will be executed to verify and document that the manufacturing processes are capable of consistently yielding product that meets predetermined quality attributes when run at prescribed operating settings and within acceptable operating ranges. Stability testing will also be conducted to support product expiration dating intervals. Cleaning validation will be performed for process contact surfaces to assure that the cleaning operation reduces product and cleaning agent to acceptable levels. Subsequent to initial validation activities, the facilities, equipment, systems, and processes are to be maintained in the validated state through implementation of site procedures, including calibration, preventive maintenance, requalification, work NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
16 of 50 order review, and change control. The validated manufacturing processes will be assessed regularly to assure that it operates within specified critical parameter ranges and the product produced continues to meet critical quality attribute specifications. As necessary validation activities can and will be repeated for facilities, equipment, instruments or processes that have been modified, replaced, or otherwise altered to a state outside of the originally validated operating parameters. The validated state of the critical processes, such as cleaning, sterilization, and storage rooms, will be requalified periodically. NOTES about the Validation Life Cycle Process: •
•
•
•
•
•
The activities in this process are executed by a cross functional team, which include Subject Matter Experts (SMEs) from the impacted stakeholder departments. The responsibilities of SMEs from various functional areas are listed in Section 4.0 of this VMP. The order of activities in the Life Cycle Process follows the sequence shown in Figure 2. The requirement documents (user, functional, regulatory, etc) are generated by contributions from stakeholder groups. Risk assessment is conducted to identify Critical Aspects (CA) of the equipment and processes. Relevant documents are generated and executed per the Verification Plan, such as FAT, SAT, commissioning, IQ, OQ, and approved prior to starting the next activity. Content of the verification protocols will depend upon the risk assessment as delineated in the Verification Plan.
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
17 of 50
The procedures that follow are part of the infrastructure for the validation process and are a harmonization of these approaches supplemented by direction to specific Standards and SOPs, when appropriate. 7.4
VALIDATION PROCEDURES Validation activities occur for new or modified equipment, systems, utilities, software, processes or routinely for the re-qualification of equipment, systems or processes per VP-XXXX, Validation Program for Springfield Manufacturing Operations . NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
18 of 50 Prospective validation is required for all new facilities, equipment, systems, utilities, software, or processes that are necessary for the manufacture, testing, and storage/distribution of commercial product and for clinical material. The steps followed for a validation project are referred to as the Validation Life Cycle. Concurrent validation can be used for PV if the manufactured product must be used for commercial needs in which case, the PV test results must meet all of acceptance criteria defined in the protocol as well as any other QA, corporate, and regulatory requirements. For concurrent validation, the details of the conditions that have to be met prior to the release of the batch for commercial use must be included in the PV protocol. The verification (commissioning, IQ, OQ, etc), PQ, and PV protocols are generated and executed per the SOPs XXXX. The verification / qualification / validation results are summarized in corresponding final reports. The final reports are written in accordance with procedure SOP-XXXX and are reviewed and approved by the same departments that reviewed and approved the initial protocol.
7.5
VALIDATION SUPPORT SYSTEMS 7.5.1 Re-Qualification Program The Re-Qualification (RQ) process is governed by SOP-XXXX. The purpose of this standard is to provide the mandatory compliance requirements for the routine requalification practices to be utilized for equipment and processes used in the manufacture of commercial and clinical material. The intent of requalification is to ensure critical equipment and processes continue to perform within defined limits and operate in a similar manner as originally validated. This document is intended to provide direction to all applicable Pharma Co., Inc. sites to ensure validation requalification programs comply with current regulations and guidance documents authored by regulatory agencies and industry organizations worldwide. Detailed re-qualification requirements for equipment, systems and processes at Pharma Co., Inc. facilities, which include the Springfield, NY Facility, are governed by SOP-XXXX. This procedure is intended to define the time-based re-qualification program for equipment, systems, and processes at Pharma Co., Inc. facilities. Specifically, the procedure will identify the equipment, systems and processes requiring routine re-qualification, the required frequency and the type of testing and documentation required. In addition, the Steam-in-Place requalification schedule at Pharma Co., Inc.’s Springfield, NY Facility is governed by SOP-XXXX. This requalification plan identifies the equipment / systems group into families requiring Steam-in-Place NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
19 of 50 sterilization procedures as part of a validated process. This requalification plan also specifies and justifies the requalification frequency of the family group and the family group members. The validated family groups then require requalification according to SOP-XXXX. The re-qualification program assures that critical equipment, systems, and processes continue to perform within prescribed limits and are operating in a similar manner as originally validated, thereby demonstrating a continued state of control. The re-qualification approach is to perform similar testing utilized during the initial validation, however at an attenuated level deemed sufficient to evaluate the performance of the equipment, system or process, and detect potential adverse changes. 7.5.2 Metrology Program Calibration policies and procedures are governed by SOP-XXXX, Metrology Program. The Metrology Program covers the services provided by the Pharma Co., Inc. Metrology Department to Pharma Co., Inc. Corporation. This includes, but is not limited to, all Manufacturing and Quality Control operations at Pharma Co., Inc.’s Springfield, NY Facility. Services by the Pharma Co., Inc. Metrology Department may also be provided to Pharma Co., Inc.’s subsidiaries and to joint projects involving other companies having partnerships with Pharma Co., Inc. and its subsidiaries. In order for equipment to be included in this program, it must be used to measure, gauge, test, inspect or otherwise examine a quantitative value to a known degree of accuracy. If such equipment is used, it must be identified as a Critical, Non-Critical, or Reference Use Only instrument. Instrumentation requiring calibration must be current prior to and remain current during protocol execution and throughout the Validation Program. 7.5.3 Change Control Program The Corporate Quality Operations Standard for Change Control is documented as SOP-XXXX. The Change Control Program to ensure that equipment within the Springfield, NY Facility maintains its validated state is governed by SOPXXXX. These program requirements apply to all Pharma Co., Inc. functional groups involved in the manufacture and testing of products (both commercial and clinical including material/ assays used to demonstrate product comparability) at the Springfield, NY Facility. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
20 of 50 New equipment, both within Quality Control and Manufacturing intended to be validated, is covered under this Change Control System. 7.5.4 Maintenance Program The process used for developing and optimizing an effective asset maintenance program is governed by SOP-XXXX, Springfield, NY Facility Maintenance Management Program / Work Order System Procedure. The procedure applies to new and in-service assets based on risks and operational reliability while assuring employee safety. The process calls for utilizing operational and maintenance experience relative to 21 CFR Part 210/211 and quality management systems that must be compliant with CGMP regulations. The process to determine / evaluate Part 11 compliance and security risks is included. The maintenance program targets critical production equipment, QC Laboratory equipment and test instrumentation, plant utilities and environmental areas with significant risk to product quality. Process steps for developing / optimizing the maintenance program are described in the program. Additionally, instructions for work order management and integration with the Computerized Maintenance Management System (CMMS) are also described. 7.5.5 Training Program The general definitions, responsibilities, methodologies for assignments, assessments, documentation of training, and integration with the LMS is governed by SOP-XXXX Learning Management System. This document outlines the activities required to document training in compliance with CGMPs and other applicable regulatory requirements and ensures personnel performing work affecting product quality will be competent on the basis of appropriate education, training, and experience. This document applies to the recording of training for full-time, part-time and non-employees (temporary/contractors) and either concurrent or subsequent entry of records into the LMS database, where applicable. If a Business Unit has its own local training procedures, that procedure may take precedence. Training is further defined in SOP-XXXX, to establish a set of initial, minimal regulatory training requirements for personnel having the ability to impact medical device or therapeutic product quality. This document applies to all full-time, part-time, and temporary employees at all levels whose tasks affect the design, production, testing, handling and distribution of products, or affect the environment, process or systems in which products or data are produced, controlled or managed.
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
21 of 50 7.6
KEY SOPs GOVERNING VALIDATION PROGRAM
AND
SUPPORTING
THE
ALLSTON
LANDING
See At tachm ent B for a full list of key SOPs and standards used to support the Springfield, NY Facility Validation Program. The site SOPs are written, revised, and controlled per SOP-XXXX, Documentation System and Control.
7.7
IDENTIFICATION AND DESCRIPTION OF MANUFACTURING SYSTEMS AND EQUIPMENT PRESENTLY IN USE AT THE SPRINGFIELD, NY FACILITY AND ASSOCIATED COMPLETED VALIDATION See Attachm ent C for a Process Equipment List and Associated Validation Protocol Numbers.
7.8
VALIDATION MASTER PLAN REVIEW This document must be reviewed, updated and approved on an annual basis to reflect current philosophy, standards and Good Manufacturing Practices. A “VMP Review Schedule” must be generated for the time of the year, when the Site VMP and sub-VMPs will be reviewed and a VMP Review Summary Report generated.
8.0
ATTACHMENTS 8.1 8.2 8.3
Attachment A: Process Flow Diagrams Att achment B: Key SOPs Governing and Supporting the Springfield, NY Facility Validation Program Attachm ent C: Process Equipment List and Associated Validation Protocol Numbers
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
22 of 50
8.1
At tachm ent A: Product Process Flow Diagrams
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
23 of 50 8.2
Attachment B: Key Documents Governing and Supporting the Springfield, NY Facility Validation Program Reference Documents •
Food and Drug Administration (FDA) – 21 CFR Parts 11, 210 & 211
•
European Medicines Agency (EMA) – EudraLex Vol 4
•
International Committee on Harmonization (ICH) – Q7, Q8, Q9 & Q10
•
International Standards Organization (ISO) - ISO 9001
•
•
•
FDA Guidance for Industry – Quality Systems Approach to Pharmaceutical cGMP Regulations FDA Guidance for Industry – Process Validation: General Principles and Practices – January 2011 ASTM International – Designation E2500-07, Standard Guide for the Specification, Design, and Verification of Pharmaceutical and Biopharmaceutical Manufacturing Systems and Equipment
Corporate Standards: •
SOP-XXXX: Change Control
•
SOP-XXXX: Quality Manual for the Pharma Co., Inc. Quality System
•
SOP-XXXX: Corporate Quality Operations Standard: Risk Management
•
SOP-XXXX: Corporate Quality Operations Standard for Equipment and Process Requalification
•
SOP-XXXX: Method Development and Validation
•
SOP-XXXX: Validation Program
•
SOP-XXXX: Laboratory Equipment Qualification
•
SOP-XXXX: Cleaning Validation
•
SOP-XXXX: Process Validation
•
SOP-XXXX: Sterilization and Depyrogenation Validation
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
24 of 50 General and Administrative SOPs: •
SOP-XXXX: Documentation System and Control
•
SOP-XXXX: Generation of Protocols and Final Reports for Validation
•
SOP-XXXX: Change Control Procedure
•
SOP-XXXX: Metrology Program
•
SOP-XXXX: Records Retention
•
•
•
•
SOP-XXXX: Springfield, NY Facility Maintenance Management Program / Work Order System Procedure SOP-XXXX: Technology Transfer into TMD Manufacturing and Quality SOP-XXXX: Guidance for 21 CFR Part 11 Compliance for TMD Computer Systems SOP-XXXX: Pharma Co., Inc. Corporate Quality Manual Note: This manual also lists pertinent SOPs for validation related topics
•
SOP-XXXX: Documentation of Employee Training
•
SOP-XXXX: Installation Qualification of Laboratory Instruments
•
•
SOP-XXXX: Learning Management System (LMS)– Governance and Documentation SOP-XXXX: cGMP & Regulatory Training Requirements for Personnel
Engineering SOPs: •
•
•
•
•
•
SOP-XXXX: Technical Project Management Process for Springfield, NY Facility Manufacturing Facility SOP-XXXX: Facility
Project Lifecycle Management Process - Springfield, NY
SOP-XXXX: Commissioning Procedure for Start-Up of Systems and Equipment at Springfield, NY Facility SOP-XXXX: Engineering Document Management Procedure at the Springfield, NY Facility SOP-XXXX: Administration of Drawings at Pharma Co., Inc. Springfield, NY Facility SOP-XXXX: Project Change Management Procedure at the Springfield, NY Facility
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
25 of 50 Technical SOPs: •
•
•
•
SOP-XXXX: Validation of Autoclaves SOP-XXXX: Validation of Dry Heat Ovens used in Sterilization or Depyrogenation Processes SOP-XXXX: Validation of Filter Integrity Test Instruments SOP-XXXX: Validation of Temperature/Relative Humidity Controlled Warm Rooms/Chambers
Key Validation Department Operational SOPs: •
•
•
•
•
SOP-XXXX: Master Validation Plan for the Pharma Co., Inc. Laboratory Information Management System SOP-XXXX: Standard Operating Procedure Guidelines for Determination of Validation Requirements for Change Control Requests SOP-XXXX: Guidelines for Computer Validation Protocols SOP-XXXX: Guidelines for Generating, Approving, Amending and Closingout a Validation Plan at Pharma Co., Inc. SOP-XXXX: Guidelines for the Performance of Airflow Pattern Testing for Clean Rooms and Laminar Flow Hoods
•
SOP-XXXX: Protocol Execution Procedure at Springfield, NY Facility
•
SOP-XXXX: Routine Re-Qualification of Equipment, Systems and Processes
•
SOP-XXXX: Cleaning Validation and Changeover Verification
•
SOP-XXXX: Process Validation for Springfield, NY Facility
•
•
•
SOP-XXXX: Process Equipment Steam-in-Place (SIP) Requalification Matrices and Scheduling Plan at Springfield, NY Facility SOP-XXXX: Cleaning Master Plan for the Springfield, NY Facility Manufacturing Facility SOP-XXXX: Validation Project Execution Life Cycle Approach at the Springfield, NY Facility
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
26 of 50 8.3
EQ #
At tachm ent C: Process Equipment List and Associated Validation Protocol Numbers Description
Size
Location
IQ
OQ
CIP
SIP
CQ
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
PQ/PV
DOCUMENT NO.:
xxxx TITLE:
Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility
EFFECTIVE DATE:
TRAINING DATE:
SUPERSEDES DATE:
PAGE NO.:
27 of 50 9.0
REVISION HISTORY Revision History Table
9.1
Revision
1
Descript ion of Changes
Initial Release
DCR Number
xxxx
Related document
Date
xxxx
mm/dd/yyyy
NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.