Open Pit Mine Planning Fundamentals EP
Home
Open Pit Mine Planning Fundamentals EP
Perencanaan TambangFull description...
Author:
Erland Prasetya
22 downloads
137 Views
2MB Size
Report
DOWNLOAD .PDF
Recommend Documents
Open Pit Mine Planning Fundamentals EP
Descripción: Perencanaan Tambang
Open Pit Mine Planning Handbook.pdf
Full description
Strategic Open Pit Mine Planning Course
MINING PLANNING BASICS
Strategic Open Pit Mine Planning Course
MINING PLANNING BASICSFull description
Strategic Open Pit Mine Planning Course
MINING PLANNING BASICS
Tambang Terbuka (Open Pit Mine)
tambangFull description
220609508-Open-Pit-Mine-Planning-and-Design-Vol-1-Hustrulid.pdf
Full description
Open Pit Mine Planning and Design Vol.1-Hustrulid
Descripción: Open Pit Mine Planning and Design Vol.1-Hustrulid
220609508-Open-Pit-Mine-Planning-and-Design-Vol-1-Hustrulid.pdf
Full description
Open Pit Mine Planning and Design Vol.1-Hustrulid
Open Pit Mine Planning and Design Vol.1-HustrulidDeskripsi lengkap
Open Pit Mine Planning and Design Vol.1-Hustrulid
Open Pit Mine Planning and Design Vol.1-Hustrulid
220609508-Open-Pit-Mine-Planning-and-Design-Vol-1-Hustrulid.pdf
Deskripsi lengkap
220609508-Open-Pit-Mine-Planning-and-Design-Vol-1-Hustrulid.pdf
Descripción completa
220609508-Open-Pit-Mine-Planning-and-Design-Vol-1-Hustrulid.pdf
Full description
Open Pit Planning and Desing - Limites Del Pit
Open Pit Planning and Desing - Limites Del Pit
DATAMINE Open Pit Basico
Descripción completa
9. Open Pit Mining
9. Open Pit Mining
Full description
Open Pit Stabiliti-report
op
Open Thou Mine Eyes
piece
Open Stope Mine Method
Open Stope Mine MethodFull description
Open Pit Design 1
ppDescripción completa
Vulcan Mina Open Pit
E.P
Geometrical Considerations
Parts of a bench
Cumulative frequency distribution of measured bench face angles (Call, 1986).
2
Geometrical Considerations
Functioning of catch benches. Section through a working bench.
3
Geometrical Considerations
Double benches at final pit limits.
Catch bench geometry (Call, 1986).
Typical catch bench design dimensions (Call, 1986). Bench height Impact zone Berm height Berm width Minimum bench width (m) (m) (m) (m) (m) 15 3.5 1.5 4 7.5 30 4.5 2 5.5 10 45 5 3 8 13
4
Geometrical Considerations
Safety berms at bench edge
5
Geometrical Considerations
Height of reach as a function of bucket size.
6
Geometrical Considerations Ramp access for the example orebody.
Example orebody geometry.
Blast design for the ramp excavation.
7
Shovel Working Range
8
Geometrical Considerations
Minimum width drop cut geometry with shovel alternating from side to side.
9
Geometrical Considerations
Minimum width drop cut geometry with shovel alternating from side to side.
10
Geometrical Considerations
Diagrammatic representation of the expanding mining front. Isometric view of the ramp in waste approaching the orebody.
11
Geometrical Considerations
Dropcut / ramp placement in ore.
Expansion of the mining front.
12
Geometrical Considerations
Plan view of an actual pit bottom Showing drop cut and mining Expansion (McWilliams, 1959).
13
Geometrical Considerations
Extension of the current Ramp close to the pit wall (McWilliams, 1959).
14
Geometrical Considerations
Creating initial access / benches.
Sidehill cut with a shovel.
Shovel cut sequence when initiating benching in a hilly terrain (Nichols, 1956). 15
Geometrical Considerations
Detailed steps in the development of a new production level.
16
Geometrical Considerations
Parallel cut with drive by.
17
Geometrical Considerations
Parallel cut with the double spotting of trucks.
18
Geometrical Considerations
Parallel cut with the single spotting of trucks.
19
Geometrical Considerations
Time sequence showing shovel loading with single spotting. 20
Geometrical Considerations
Time sequence showing shovel loading with double spotting.
22
Geometrical Considerations
(Continued). 23
Geometrical Considerations
(Continued). 24
Geometrical Considerations
Section and plan views through a working bench.
Simplified presentation of a safety berm.
25
Geometrical Considerations
Initial geometry for the push back example.
Cut mining from bench 1.
Cut mining from bench 2. 26
Geometrical Considerations
Safety bench geometry showing bench face angle.
Overall slope angle. 27
Geometrical Considerations
Overall slope angle with ramp included. Interramp slope angles.
28
Geometrical Considerations
Overall slope angle with Working bench included.
Interramp angles associated with the working bench. 29
Geometrical Considerations
Overall slope angle with one working bench an a ramp section.
Interramp slope angles for a slope containing a working bench and a ramp. 30
Geometrical Considerations Overall slope angle for a slope containing two working benches.
31
Geometrical Considerations
Slopes for each working group. 32
Geometrical Considerations
Final overall pit slope.
33
THANKS
×
Report "Open Pit Mine Planning Fundamentals EP"
Your name
Email
Reason
-Select Reason-
Pornographic
Defamatory
Illegal/Unlawful
Spam
Other Terms Of Service Violation
File a copyright complaint
Description
×
Sign In
Email
Password
Remember me
Forgot password?
Sign In
Our partners will collect data and use cookies for ad personalization and measurement.
Learn how we and our ad partner Google, collect and use data
.
Agree & close