Page 1 of 3 Issue No : 4 Title: HACCP for Whole Milk Po wder (Reg.) & ‘Instant’ FCP FLOWCHART
Date: 1/3/06
Approved by: Jim O’Neill Pat O’Leary
Condensate used in external lorry wash. Daily Milk tanker washes to effluent. Tankers flushed to silo prior to CIP with mains water. First stage of CIP uses recovered rinse water. Lactol detergent is also recovered. CIP of silos and lines to effluent. Recovered rinse water and Lactol used. Separator desludges and CIP to effluent.
e. u s r h e o t . Antibiotic milk disposed of to y CCP 1 Antibiotics l y a n n WHOLE MILK INTAKE effluent r o o s s e e d f o p u i r Buffer silos 7/8 p u r q e r n (Filters) i o e r e c t w n p o s stored Cooled i n & h t r r i g o F p y SILOS c o9AND 10 SEPARATOR o f t e n s n SKIM CREAMDISPATCHED C o PLANT 1 PLANT 2 BY TANKER SILO 1, 2, 3, 4, or SILO 5,6 or 14 CIP of silos and lines to STANDARDISATION OF FAT(Batching Silo) effluent. Lines/silo flushes recovered BALANCE TANK CIP Evaporator and
contaminated condensate and seal water to effluent
Page 2 of 3 Issue No : 4 Title: HACCP for Whole Milk Po wder (Reg.) & ‘Instant’ FCP FLOWCHART
Date: 1/3/06
Approved by: Jim O’Neill Pat O’Leary
e. u s r WHOLE MILK CONCENTRATE h e o t . y l y n o n o r a s s e e d f p o u i r r DRIER FEED TANK p u r e q n i o n e r t s p e c o w n g h t r i r i TUBE HEATER SHELL AND y F o o p f c o n t s e n o (with Filter) CHOMOGENISER CCP 6 Lecithin addition (for
Uncontaminated cooling water seal water and condensate to SW-2 Conductivity & Turbidity probes control divert valves.
‘Instant FCP’ only) -Plant 1 or 2
(Filters)
Drier washes to effluent
DRYERFINES RETURNED TO ATOMISER/INST (INSTANT ONLY)
Air emissions to A2-1, A2-2 & A2-3 for No.1 Plant Cyclones capture fines. A2-4 for No.2 Plant ‘Via Bag filter
FINES RETURNED TO INSTANTISER ONLY FOR REGULAR.
INSTANTISER BED
Page 3 of 3 Issue No : 4 Title: HACCP for Whole Milk Po wder (Reg.) & ‘Instant’ FCP FLOWCHART
Date: 1/3/06
Approved by: Jim O’Neill Pat O’Leary
e. u s r h e CCP o t3 SIEVE . y l y n o n o r a s s e e d f p o u i r r POWDER q p uSILOS e r n i o e r t ) (B) FROM SILOS 4,5,6 BULK BAGS (1 TONNE) e c o w n p s t (POWDER STORAGE SILOS) h i n i g r F o p y r SCREW CONVEYOR c o f t o CCP 4 e n s n METAL DETECTOR C o AIR (BAG INFLATION)