REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB ) PROVINSI
:
JAWA TENGAH
KABUPATEN
:
TEGAL
KEGIATAN
:
PEMBANGUNAN RUMAH TYPE 36
PEKERJAAN
:
RENCANA PEMBANGUNAN PERUMAHAN
LOKASI
:
NO.
PEKERJAAN
JUMLAH HARGA ( RP.)
2
3
1
I
PEKERJAAN PERSIAPAN
900,000.00
II
PEKERJAAN PONDASI
3,280,151.00
III
PEKERJAAN BETON BERTULANG
8,080,100.00
IV
PEKERJAAN PASANGAN DAN PLASTERAN
V
PEKERJAAN LANTAI
VI
PEKERJAAN ATAP DAN PLAFOND
20,088,600.00
VII
PEKERJAAN KUSEN PINTU DAN JENDELA
10,280,000.00
VIII
PEKERJAAN PENGECATAN
17,292,865.00 3,181,760.00
6,410,300.00
IX
PEKERJAAN PENGUNCI DAN PENGANTUNG
202,000.00
X
PEKERJAAN INSTALASI LISTRIK
2,361,750.00
XI
PEKERJAAN SANITASI
6,920,000.00
JUMLAH
78,997,529.00
PEMBULATAN
78,997,500.00
Terbilang
:
Jutuh Puluh Delapan Juta Sembilah Ratus Sembilan puluh Tujuh Ribu Lima Ratus Rupiah
RENCANA ANGGARAN BIAYA ( RAB )
No.
Uraian Pekerjaan 2
1
Harga
Volume Satuan 4
3
I.
PEKERJAAN PERSIAPAN
1
Pembersihan Lapangan
ls.
300,000.00
2
Pengukuran dan Pemasangan Bowplank
ls.
600,000.00 Sub Total
II.
Jumlah 5
300,000.00 600,000.00 900,000.00
PEKERJAAN PONDASI
1
Galian tanah pondasi menerus
11.864
m³
25,000.00
2
Urugan kembali 1/4 galian
2.966
m³
15,000.00
44,490.00
3
Urugan tanah bawah lantai
3.780
m³
80,000.00
302,400.00
4
Urugan pasir bawah lantai
1.890
m³
82,000.00
154,980.00
5
Urugan pasir bawah pondasi
1.402
m³
82,000.00
114,923.00
6
Pekerjaan batu kosong
2.803
m³
226,000.00
633,478.00
7
Pekerjaan beton pondasi batu kali
11.040
m³
157,000.00
1,733,280.00
Sub Total III.
296,600.00
3,280,151.00
PEKERJAAN BETON BERTULANG
1
Beton sloof
0.803
m³
3,400,000.00
2,731,050.00
2
Beton kolom praktis
0.770
m³
3,400,000.00
2,618,000.00
3
Beton reng balok
0.803
m³
3,400,000.00 Sub Total
IV.
2,731,050.00 8,080,100.00
PEKERJAAN PASANGAN DAN PLASTERAN
1
Pasangan batu bata 1:2
4.215
m²
67,000.00
282,405.00
2
Pasangan batu bata 1:4
168.250
m²
60,000.00
10,095,000.00
3
Plasteran dinding 1:2
8.430
m²
22,000.00
185,460.00
4
Plasteran dinding 1:4
336.500
m²
20,000.00
6,730,000.00
Sub Total V.
PEKERJAAN LANTAI
1
Lantai keramik 40 x 40
36.220
m²
83,000.00
2
Lantai keramik 20 x 20
1.350
m²
130,000.00 Sub Total
VI.
17,292,865.00
3,006,260.00 175,500.00 3,181,760.00
PEKERJAANATAP DAN PLAFOND
1
Rangka Baja Ringan
51.900
m²
220,000.00
11,418,000.00
2
Atap multi roof
51.900
m²
80,000.00
4,152,000.00
3
List plank GRC 200x10
17.040
m1
7,500.00
127,800.00
5
Plafond gypsum Rangka Hollow
36.590
m²
120,000.00
4,390,800.00
Sub Total
20,088,600.00
VII. PEKERJAAN KOSEN PINTU JENDELA 1
Pintu Jendela PJ1
1
bh
2,200,000.00
2,200,000.00
2
Pintu Jendela PJ2
1
bh
1,800,000.00
1,800,000.00
3
Pintu P1
3
bh
1,200,000.00
3,600,000.00
4
Pintu Plastik
1
bh
200,000.00
200,000.00
5
Jendela J1
1
bh
1,500,000.00
1,500,000.00
7
Jendela J2
1
bh
900,000.00
900,000.00
8
Louvre toilet
1
bh
80,000.00 Sub Total
80,000.00 10,280,000.00
VIII. PEKERJAAN PENGECATAN 1
Cat Kosen / pintu, jendela, listplank, dll
2 3
Cat dinding tembok Cat plafond
36.50 337 36.59
m²
22,300.00
813,950.00
m² m²
15,000.00 15,000.00
5,047,500.00 548,850.00
Sub Total IX.
6,410,300.00
PEKERJAAN PENGUNCI DAN PENGANTUNG
1
Engsel pintu
5
bh
20,000.00
100,000.00
2
Engsel jendela
5
bh
15,000.00
75,000.00
3
Pacok jendela
5
bh
3,000.00
15,000.00
4
Grendel jendela
4
bh
3,000.00 Sub Total
12,000.00 202,000.00
X.
PEKERJAAN INSTALASI LISTRIK
1
Biaya penyambungan baru 4 amper
ls
2,000,000.00
2,000,000.00
2
Box zekering
1
bh
85,000.00
85,000.00
3
Saklar ganda setara broco
2
bh
25,500.00
51,000.00
4
Lampu philip 15 watt
7
bh
32,250.00 Sub Total
225,750.00 2,361,750.00
No.
Uraian Pekerjaan
Volume
1
2
3
XI.
Harga Satuan
Jumlah
4
5
PEKERJAAN SANITASI
1
Pas instalasi air
6
ttk
150,000.00
900,000.00
2
Pas kran air
3
bh
30,000.00
90,000.00
3
Pas kran wastafel/Zink
1
bh
50,000.00
50,000.00
4
Pemasangan pipa pembuangan air bak
1
bh
15,000.00
15,000.00
5
Pas saringan kamar mandi
1
bh
20,000.00
20,000.00
6 7
Tempat sabun keramik Pas kloset jongkok keramik
1 1
bh bh
125,000.00 160,000.00
125,000.00 160,000.00
8
Pas pipa Ø 3 inci + acsesoris
11
M
45,000.00
495,000.00
9
Pas pipa Ø 4 inci + acsesoris
13
M
55,000.00
715,000.00
10
Zink
1
bh
850,000.00
850,000.00
11
Septictank
1
unit
3,500,000.00 Sub Total
3,500,000.00 6,920,000.00