Details of Query : Holes on bottom side of beam (UB305x102x33-62) not drilled during fabrication Please see attached markup and advice.
Please refer to drawings. Job No. ED14-28 DRG.No. 1 Revision 0. Raised by Name SAMUEL YEKO Position QC Signature Date (NB : Please state the drawing number and relevant specifications)
Reponse
Response by Name Signature Comments
Position Date
(NB : Cost or time implication)
Copyright Redis Construction Afrika (Pty) Ltd. All Rights Reserved - This documentation is considered the intellectual property of Redis Construction Afrika (Pty) Ltd. Unauthorised reproduction or distribution of this documentation or any portion of it may result in severe civil and criminal penalties, and violators will be prosecuted.