1
Introduction
This short report presents the design calculations of the proposed soldier pile wall as a temporary earth retaining system for the proposed substation at Colombo. Two options have been considered in terms of the lateral supporting.
Draw a sketch here with AUTOCAD
Fig. 1: General arrangement of shoring system Subsoil condition Depth (m)
Soil type
SPT
Soil subgrade reaction (kN/m3)
2
Loose sand
7
560
5
Dense sand
35
2800
Properties of soil Soil dry density
=
18
kN/m3
Soil wet density
=
22
kN/m3
Ka
=
0.33
Soil subgrade reaction has been taken as 80 x SPTN
2
Loading
Consider a surcharge of 10 kN/m2. Following pressures will apply on a unit width of shoring.
2.6m
Water
1m
Soil pressure
1m
Surcharge
Prop
Bottom of excavation
10
Fig. 2: Loading on retaining wall
kN/m2
15.5 kN/m2
15.7 kN/m2
3