John Jordan
Product Cost Controlling with SAP
®
Bonn Boston
167.book Seite 5 Dienstag, 4. November 2008 12:12 12
Contents at a Glance 1
Introduction ........................................................................
17
PART I Integrated Planning 2 Integrated Planning .............................................................
27
PART II Product Cost Planning 3 Controlling Master Data ......................................................
51
4
Material Master Data ..........................................................
91
5
Logistics Master Data .......................................................... 149
6
Costing Sheets ..................................................................... 207
7
Cost Components ................................................................ 213
8
Costing Variant Components ............................................... 245
9
Costing Variant Tabs ............................................................ 303
10 Standard Cost Estimate ....................................................... 325 11 Preliminary Cost Estimate .................................................... 349 12 Unit Cost Estimate ............................................................... 357 PART III Cost Object Controlling 13 Preliminary Costing ............................................................. 367 14 Simultaneous Costing .......................................................... 375 15 Overhead ............................................................................ 391 16 Work in Process .................................................................. 395 17 Variance Calculation ............................................................ 417 18 Settlement .......................................................................... 435 19 Special Topics ...................................................................... 459 20 Information System ............................................................. 491 Appendices A Glossary .............................................................................. 523 B
Bibliography ........................................................................ 547
C
Author Biography ................................................................ 549
167.book Seite 7 Dienstag, 4. November 2008 12:12 12
Contents 1
Introduction .................................................................
17
1.1
18 19 19 21 22
1.2
PART I 2
Integrated Planning
Integrated Planning .....................................................
27
2.1 2.2 2.3
28 29 30 32 33
2.4
2.5
2.6
PART II 3
Structure of this Book ..................................................... 1.1.1 Part 1 – Integrated Planning ............................... 1.1.2 Part 2 – Product Cost Planning ........................... 1.1.3 Part 3 – Cost Object Controlling ......................... Looking Ahead ...............................................................
Profitability Analysis ....................................................... Sales and Operations Planning ........................................ Long-Term Planning ....................................................... 2.3.1 Create Planning Scenario .................................... 2.3.2 Planning Run ..................................................... 2.3.3 Transfer Requirements to Purchasing Information System ............................................ 2.3.4 Transfer Activity Quantities to Cost Center Accounting ........................................................ Cost Center Planning ...................................................... 2.4.1 Cost Element Planning ....................................... 2.4.2 Activity Price Planning ....................................... Final Planning ................................................................. 2.5.1 Calculate Standard Costs .................................... 2.5.2 Transfer Standard Costs to CO-PA ...................... Summary ........................................................................
34 37 39 40 42 46 46 46 47
Product Cost Planning
Controlling Master Data ..............................................
51
3.1
51 52
Cost Element .................................................................. 3.1.1 Primary Postings ................................................
7
167.book Seite 8 Dienstag, 4. November 2008 12:12 12
Contents
3.1.2 Secondary Postings ............................................. 3.1.3 Basic Data .......................................................... 3.1.4 Indicators ........................................................... 3.1.5 Default Account Assignment .............................. 3.1.6 History ............................................................... Cost Center ..................................................................... 3.2.1 Standard Hierarchy ............................................. 3.2.2 Basic Data .......................................................... 3.2.3 Control ............................................................... 3.2.4 Templates .......................................................... 3.2.5 Address and Communication .............................. 3.2.6 History ............................................................... Activity Type ................................................................... 3.3.1 Basic Data .......................................................... 3.3.2 Indicators ........................................................... 3.3.3 Output ............................................................... 3.3.4 History ............................................................... Statistical Key Figure ....................................................... Summary ........................................................................
56 57 59 60 64 65 65 67 71 73 75 75 76 76 83 85 86 87 89
Material Master Data ..................................................
91
3.2
3.3
3.4 3.5
4
4.1
4.2 4.3 4.4
4.5
4.6
8
MRP 1 View ................................................................... 4.1.1 General Data ...................................................... 4.1.2 Lot Size Data ...................................................... MRP 2 View ................................................................... MRP 4 View ................................................................... Costing 1 View ............................................................... 4.4.1 General Data ...................................................... 4.4.2 Quantity Structure Data ..................................... Costing 2 View ............................................................... 4.5.1 Standard Cost Estimate ...................................... 4.5.2 Planned Prices .................................................... 4.5.3 Valuation Data ................................................... Accounting 1 View ......................................................... 4.6.1 General Data ...................................................... 4.6.2 Current Valuation ............................................... 4.6.3 Previous Period/Year .......................................... 4.6.4 Standard Cost Estimate ......................................
92 92 94 95 98 102 103 107 115 116 117 119 125 125 127 130 130
167.book Seite 9 Dienstag, 4. November 2008 12:12 12
Contents
4.7
4.8
4.9
5
131 133 135 138 139 144 146
Logistics Master Data .................................................. 149 5.1
5.2
5.3
5.4
5.5
5.6
6
Accounting 1 View – Material Ledger Activated .............. 4.7.1 General Valuation Data ...................................... 4.7.2 Prices and values ................................................ Accounting 2 View ......................................................... 4.8.1 Populate Tax and Commercial Price Fields .......... 4.8.2 Using the Tax and Commercial Price Fields ......... Summary ........................................................................
Bill of Material ................................................................ 5.1.1 Basic Data .......................................................... 5.1.2 Status/Long Text ................................................ 5.1.3 Administration ................................................... 5.1.4 Document Assignment ....................................... Work Center ................................................................... 5.2.1 Basic Data .......................................................... 5.2.2 Default Values ................................................... 5.2.3 Capacities .......................................................... 5.2.4 Scheduling ......................................................... 5.2.5 Costing .............................................................. 5.2.6 Technical Data ................................................... Routing .......................................................................... 5.3.1 Header ............................................................... 5.3.2 Operation Overview ........................................... 5.3.3 Operation Details ............................................... Product Cost Collector .................................................... 5.4.1 Data .................................................................. 5.4.2 Header ............................................................... 5.4.3 Production Process ............................................ Purchasing Info Record ................................................... 5.5.1 Purchasing Organization Data 1 ......................... 5.5.2 Conditions ......................................................... Summary ........................................................................
149 151 154 156 157 158 159 161 164 167 171 173 173 175 177 178 184 186 191 197 200 201 202 205
Costing Sheets ............................................................. 207 6.1 6.2
Overhead ....................................................................... 207 Calculation Base ............................................................. 209
9
167.book Seite 10 Dienstag, 4. November 2008 12:12 12
Contents
6.3 6.4 6.5
7
Cost Components ......................................................... 213 7.1 7.2
7.3
7.4
7.5
7.6
8
Cost Component Terms ................................................... Cost Components with Attributes ................................... 7.2.1 Control ............................................................... 7.2.2 Filter Criteria for Cost Component Views on Itemization .................................................... 7.2.3 Delta Profit for Group Costing ............................ 7.2.4 Cost Summarization ........................................... 7.2.5 Assignment of Cost Elements to Cost Components ....................................................... 7.2.6 Update of Additive Costs .................................... 7.2.7 Transfer Structure ............................................... Cost Component View .................................................... 7.3.1 Cost Estimate Display ......................................... 7.3.2 Overhead Calculation ......................................... 7.3.3 Other Components ............................................. Organizational Units of Cost Components ....................... 7.4.1 Main Cost Component Structure ........................ 7.4.2 Auxiliary Cost Component Structure ................... 7.4.3 Check Assignment to Organizational Units ......... Cost Component Groups ................................................. 7.5.1 Create Cost Component Groups ......................... 7.5.2 Assign Cost Component Groups to Cost Components ............................................... 7.5.3 Assign Cost Component Groups to Report Columns ................................................. Summary ........................................................................
213 217 218 221 223 224 225 226 227 229 232 233 234 235 236 237 237 239 239 240 241 244
Costing Variant Components ....................................... 245 8.1 8.2
10
Overhead Rate ................................................................ 210 Credit Key ....................................................................... 211 Summary ........................................................................ 212
Define Costing Variant .................................................... 245 Costing Type ................................................................... 247 8.2.1 Price Update ...................................................... 249
167.book Seite 11 Dienstag, 4. November 2008 12:12 12
Contents
8.3
8.4
8.5
8.6
8.7 8.8
9
8.2.2 Save Parameters ................................................. 8.2.3 Miscellaneous .................................................... Valuation Variant ............................................................ 8.3.1 Material Valuation ............................................. 8.3.2 Activity Types and Processes .............................. 8.3.3 Subcontracting ................................................... 8.3.4 External Processing ............................................ 8.3.5 Overhead ........................................................... 8.3.6 Miscellaneous .................................................... Date Control ................................................................... 8.4.1 Costing Date From ............................................. 8.4.2 Costing Date To ................................................. 8.4.3 Quantity Structure Date ..................................... 8.4.4 Valuation Date ................................................... Quantity Structure Control ............................................. 8.5.1 BOM .................................................................. 8.5.2 Routing .............................................................. Transfer Control .............................................................. 8.6.1 Single-Plant ....................................................... 8.6.2 Cross Plant ......................................................... Reference Variant ........................................................... Summary ........................................................................
252 254 257 257 266 271 273 275 277 279 281 281 282 282 282 284 291 293 295 297 298 302
Costing Variant Tabs .................................................... 303 9.1 9.2
9.3
9.4
Control ........................................................................... Quantity Structure .......................................................... 9.2.1 Pass On Lot Size ................................................. 9.2.2 Ignore Product Cost Estimate without Quantity Structure ............................................. 9.2.3 Transfer Control Can Be Changed ....................... 9.2.4 Transfer Active Standard Cost Estimate if Material Costed with Errors ............................... 9.2.5 Transfer Cost Estimate of an Order BOM ............ Additive Costs ................................................................ 9.3.1 Additive Cost Components ................................. 9.3.2 Include Additive Costs with Stock Transfers ....... Update Tab .................................................................... 9.4.1 Saving Allowed ..................................................
303 304 305 306 307 310 311 312 312 313 314 314
11
167.book Seite 12 Dienstag, 4. November 2008 12:12 12
Contents
9.5
9.6
9.7
9.4.2 Save Error Log .................................................... 9.4.3 Defaults Can Be Changed by User ....................... 9.4.4 Itemization ......................................................... Assignments ................................................................... 9.5.1 Cost Component Structure ................................. 9.5.2 Costing Version .................................................. 9.5.3 Cost Component Split in Controlling Area Currency ............................................................ 9.5.4 Cross-Company Costing ...................................... Miscellaneous ................................................................. 9.6.1 Error Management ............................................. 9.6.2 Parameters for Error Management ...................... Summary ........................................................................
315 315 317 317 318 318 319 320 321 322 322 323
10 Standard Cost Estimate ............................................... 325 10.1
10.2 10.3
10.4
Create Standard Cost Estimate ........................................ 10.1.1 Costing Data ...................................................... 10.1.2 Dates ................................................................. 10.1.3 Quantity Structure .............................................. Mark and Release ........................................................... Costing Run .................................................................... 10.3.1 Costing Data ...................................................... 10.3.2 Dates ................................................................. 10.3.3 Valuation ........................................................... 10.3.4 Costing Run Steps .............................................. Summary ........................................................................
326 326 327 329 331 334 335 335 336 336 347
11 Preliminary Cost Estimate ........................................... 349 11.1 11.2 11.3 11.4 11.5
12
Create Preliminary Cost Estimate .................................... Production Process ......................................................... Transfer Control .............................................................. Mass-Processing ............................................................. Summary ........................................................................
349 352 352 355 356
167.book Seite 13 Dienstag, 4. November 2008 12:12 12
Contents
12 Unit Cost Estimate ....................................................... 357 12.1
12.2 12.3
Base Planning Object ...................................................... 12.1.1 Item ................................................................... 12.1.2 Category ............................................................ 12.1.3 Resource ............................................................ 12.1.4 Plant/Activity ..................................................... 12.1.5 Quantity ............................................................ 12.1.6 Value – Total ...................................................... 12.1.7 Cost Element ..................................................... Material Cost Estimate Without Quantity Structure ........ Summary ........................................................................
357 359 359 360 360 360 360 361 361 363
PART III Cost Object Controlling 13 Preliminary Costing ...................................................... 367 13.1
13.2 13.3
Production Order Control ............................................... 13.1.1 Costing Variant for Planned Costs ...................... 13.1.2 Costing Variant for Actual Costs ......................... 13.1.3 Costing Sheet ..................................................... 13.1.4 Overhead Key .................................................... 13.1.5 Results Analysis Key ........................................... 13.1.6 Variance Key ...................................................... 13.1.7 Determine Plan Costs ......................................... Display Planned Costs ..................................................... Summary ........................................................................
368 370 370 371 371 371 371 371 372 374
14 Simultaneous Costing .................................................. 375 14.1
14.2
14.3 14.4
Goods Movements ......................................................... 14.1.1 Debits ................................................................ 14.1.2 Credits ............................................................... Confirmations ................................................................. 14.2.1 Secondary Postings ............................................ 14.2.2 Create Production Order .................................... 14.2.3 Confirm Activities .............................................. Report Costs ................................................................... Summary ........................................................................
375 375 379 381 381 382 386 388 389
13
167.book Seite 14 Dienstag, 4. November 2008 12:12 12
Contents
15 Overhead ...................................................................... 391 15.1 15.2 15.3
Configuration .................................................................. 391 Overhead Period-End Processing .................................... 392 Summary ........................................................................ 394
16 Work in Process ........................................................... 395 16.1
16.2 16.3
16.4
WIP Configuration .......................................................... 16.1.1 Define Results Analysis Keys ............................... 16.1.2 Define Results Analysis Versions ......................... 16.1.3 Define Valuation Method (Target Costs) ............. 16.1.4 Define Valuation Variant for WIP and Scrap (Target Costs) ..................................................... 16.1.5 Assignment of Valuation Variant for WIP ............ 16.1.6 Define Line IDs .................................................. 16.1.7 Define Assignment ............................................. 16.1.8 Define Update .................................................... 16.1.9 Define Posting Rules for Settling Work in Process ............................................................... Results Analysis Configuration ......................................... WIP Period-End .............................................................. 16.3.1 Product Cost by Period ....................................... 16.3.2 Product Cost by Order ........................................ Summary ........................................................................
396 396 397 400 401 403 403 404 406 407 408 411 411 416 416
17 Variance Calculation .................................................... 417 17.1
17.2
14
Types of Variance Calculation ......................................... 17.1.1 Total Variance .................................................... 17.1.2 Production Variance ........................................... 17.1.3 Planning Variance .............................................. Variance Configuration ................................................... 17.2.1 Define Variance Keys .......................................... 17.2.2 Define Default Variance Keys for Plants .............. 17.2.3 Define Variance Variants .................................... 17.2.4 Define Valuation Variant for WIP and Scrap (Target Costs) ..................................................... 17.2.5 Define Target Cost Versions ...............................
417 417 418 418 418 418 420 420 421 422
167.book Seite 15 Dienstag, 4. November 2008 12:12 12
Contents
17.3
17.4
17.5
Variance Categories ........................................................ 17.3.1 Input Variances .................................................. 17.3.2 Output Variances ............................................... Variance Period-End ....................................................... 17.4.1 Product Cost by Period ...................................... 17.4.2 Product Cost by Order ....................................... Summary ........................................................................
425 426 427 428 429 433 434
18 Settlement .................................................................... 435 18.1
18.2 18.3
Settlement Configuration ................................................ 18.1.1 Create Settlement Profile ................................... 18.1.2 Create Allocation Structure ................................ 18.1.3 Create Source Structure ..................................... 18.1.4 Create PA Transfer Structure .............................. Settlement Period-End ................................................... Summary ........................................................................
435 435 440 447 449 454 457
19 Special Topics ............................................................... 459 19.1
19.2
19.3
19.4
Sales Order Controlling ................................................... 19.1.1 Configuration ..................................................... 19.1.2 Period-End Processing ....................................... Subcontracting ............................................................... 19.2.1 MRP 2 View ...................................................... 19.2.2 Purchase Order .................................................. 19.2.3 Monitoring Stocks Provided to Vendor .............. 19.2.4 Goods Receipt of End Product ........................... Material Ledger .............................................................. 19.3.1 Multiple Currencies or Valuations ...................... 19.3.2 Actual Costing ................................................... 19.3.3 Configuration ..................................................... 19.3.4 Period-End Processing ....................................... Summary ........................................................................
459 460 468 473 474 474 475 477 477 477 478 479 485 489
20 Information System ...................................................... 491 20.1
Product Cost Planning .................................................... 491 20.1.1 Analyze Costing Runs ......................................... 492 20.1.2 List Material Cost Estimates ............................... 496
15
167.book Seite 16 Dienstag, 4. November 2008 12:12 12
Contents
20.2
20.3 20.4
20.5
20.1.3 Detailed Reports ................................................ 20.1.4 Object Comparisons ........................................... Cost Object Controlling .................................................. 20.2.1 Product Drilldown Reports ................................. 20.2.2 Summarization Hierarchy Reports ....................... 20.2.3 Detailed Reports ................................................ 20.2.4 Line Item Reports ............................................... Summary ........................................................................ Book Summary ................................................................ 20.4.1 Integrated Planning ............................................ 20.4.2 Product Cost Planning ........................................ 20.4.3 Cost Object Controlling ...................................... Looking Ahead ................................................................
497 497 500 502 506 514 516 518 519 519 520 521 521
Appendices ......................................................................... 523 A B C
Glossary .................................................................................... 523 Bibliography .............................................................................. 547 Author Biography ...................................................................... 549
Index ................................................................................................ 551
16
167.book Seite 391 Dienstag, 4. November 2008 12:12 12
Overhead calculation refers to the allocation of overhead from cost centers to manufacturing orders or product cost collectors.
15
Overhead
In previous chapters we created master data, configuration, and standard cost estimates, and carried out preliminary and simultaneous costing. We’re now ready to carry out period-end processing, which includes the following processing steps: 왘
Overhead
왘
Work in process
왘
Variance calculation
왘
Settlement
Although other more advanced and specialized transactions are possible during period-end processing, the four explained in this and the following chapters are the most common. If you use other period-end processes, you can apply the principles you learn in this section to those processes. We’ll look first at overhead configuration and then at the period-end process.
15.1
Configuration
During a fiscal period, primary (external) costs, such as payroll and electricity are debited to cost centers. Some of these costs may be included as part of the planned activity rate and allocated to products from production cost centers during activity confirmations, as discussed in Chapter 14.
391
167.book Seite 392 Dienstag, 4. November 2008 12:12 12
15
Overhead
Refer to Chapter 6 for more information on costing sheets
Another method to allocate overhead costs to products is period-end overhead calculation. Overhead calculation offers flexible allocation across products through costing sheet configuration, as discussed in Chapter 6. Allocating overhead with costing sheets requires an additional period-end activity, although this is a straightforward procedure.
15.2
Overhead Period-End Processing
You run period-end overhead calculation with Transactions CO42 (individual) and CO43 (collective) or by following the menu path Accounting Controlling Product Cost Controlling Cost Object Controlling Product Cost by Period Period-End Closing Single Functions: Product Cost Collector Overhead. A selection screen is displayed, as shown in Figure 15.1. Note You can carry out overhead calculation for production and process orders with Transactions KGI2 (individual) and CO43 (collective).
Figure 15.1 Actual Overhead Calculation Selection Screen
392
167.book Seite 393 Dienstag, 4. November 2008 12:12 12
Overhead Period-End Processing
In this example we’ll calculate overhead only for product cost collectors by selecting the With Product Cost Collectors checkbox. You can also select other objects depending on period-end processing time and the number of messages that require analysis following overhead calculation. Select the Dialog display checkbox if you require more detailed information when analyzing the overhead calculation and messages. You normally only need this level of detail when initially calculating overhead following system implementation. It is most useful when analyzing overhead calculation for a single production order or product cost collector. Complete the selection screen and click the execute icon to display the screen shown in Figure 15.2.
Figure 15.2 Actual Overhead Calculation Basic List
This screen provides basic information on the parameters entered in the previous selection screen such as period and fiscal year. Click the rightpointing arrow icon to proceed to a detailed overhead list (if you selected the Detail Lists checkbox in Figure 15.1) as shown in Figure 15.3. Let’s review each column: 왘
The Senders column shows the cost center credited.
왘
The Receivers column shows the product cost collector or manufacturing order debited.
393
15.2
167.book Seite 394 Dienstag, 4. November 2008 12:12 12
15
Overhead
왘
The Debit cost column shows the secondary cost element identifying the type of overhead cost. These cost elements appear on cost center and product cost collector reports.
왘
The ValueCOCur column shows the overhead value allocated in controlling area currency. By selecting Settings Layout Current form the menu bar you can display additional columns, such as overhead value in object (company code) currency.
Figure 15.3 Actual Overhead Calculation Details
This concludes the overhead chapter, so let’s review what we’ve covered.
15.3
Summary
In this chapter we calculated and allocated actual overhead. The next period-end processing step we’ll examine, in Chapter 16, is to calculate work in process.
394
167.book Seite 551 Dienstag, 4. November 2008 12:12 12
Index A Account assignment Automatic 61 Default 61 Account determination 55 Account modifier 120, 377 Accounting 118 Accrual account 132 Active pharmaceutical ingredient 104 Activity Confirmation 56, 58, 59, 381 Input planning 85 Plan 85 Price 31, 38, 82 Rate 43 Scheduled 85 Activity price calculation 227, 229 Activity quantity Parameters 37 Activity type 41, 43, 76, 266 Activity quantity 81 Activity unit 85 Actual price indicator 80 Actual quantity set 81 Allocation cost element 79 Alternative output factor 86 Alternative output unit 85 Average price 81 Basic data 76, 77 Category 78 Description 76 History 86 Indicators 83 Indirect allocation 79 Indirect determination 79 Lock indicator 83 Long text 76 Manual allocation 79 Manual entry 79 Multiple categories 78 No allocation 79
Activity type (cont.) Output 85 Plan Price indicator 80 Plan quantity set 81 Planning 45 Predistribution of fixed costs 82 Price indicator 80 Scheduled activity 81 Sender 84 Standard category 78 Activity-independent costs 41 Actual costing 123, 132, 133, 134, 478, 523, 532 Preliminary periodic unit price 487 Actual costs 423 Allocation structure Account assignment category 444 Assessment 440 Assessment cost element 443 Assignments 441 By cost element 445 Cost element completeness 441 Cost element uniqueness 441 Overview screen 441 Sender 440 Settlement cost element 445, 446 Settlement receiver 444 Source 442 Source cost element 442, 445 Alternative BOM 99, 108 Alternative sequence 109, 293 Alternative unit of measure 93 API 104 Apportionment structure 97, 98, 153 Area of responsibility 65 Assembly scrap 95, 384 Automatic account assignment 61, 63 Automatic account determination 377 Automating communications 119 Auxiliary cost component Activated 237 Structure 236, 244
551
167.book Seite 552 Dienstag, 4. November 2008 12:12 12
Index
B Backflushing 386 Balance sheet account 545 Base 209 Base planning object 357 Development process 361 Explode 362 Item 362 Master data 357 Spreadsheet format 359 Base unit of measure 93, 384 Basic dates 384 Batch 121 Beginning inventory 137 Bill of material (see also BOM) 65, 149 BOM 149 Administration 156 Alternative 150, 288 Application 284 Component 151 Component scrap 153 Co-product 153 Costed multilevel 224, 241, 243 Costing 108, 287 Costing relevancy 155 Document assignment 157 Fixed quantity 152 General item overview 151 Group 108 Item category 152 Item number 151 Item text 154 Material 150 Material components 183 Net ID checkbox 153 Operation scrap 153 Production 109, 287 Text items 152 Usage 108, 150, 292 Validity period 157 BOM application Selection ID 284 BOM item 153 Administration 156 Apportionment structure 153
552
BOM item (cont.) Basic data 151 Bulk material 155 Category 151, 152 Change dates 156 Componenet scrap 153 Costing relevancy 155 Creation date 156 Linked documents 157 Operation scrap 153 Production relevant checkbox 154 Quantity structure date 157 Validity period 157 Valuable components 153 Bulk material 98, 155 Business transactions External 51 Within Controlling 52
C Calculate activity price 229 Calculation base 104, 233 Possible entries 233 Capacity 168 Available 166 Button 165 Category 165 Header 165 Labor 165 Machine 165 Machine outages 165 Pooled 166 Capacity category 167 Scheduling 167 Chart of accounts 59, 376, 379 Company code 222, 223, 235, 265, 377 Company code currency 123, 136 Comparison value Possible entries 494 Component Overview 385 quantities 46 scrap 102 Condition type 259, 263 Company code 265
167.book Seite 553 Dienstag, 4. November 2008 12:12 12
Index
Condition type (cont.) Duty 265 Freight 265 Insurance 265 Conditions 261 Configurable materials 459 Configure automatic postings Documentation 378, 399 Confirmation 113, 381 Activity 433 Labor 433 Line item details 432 Time event 386 Time ticket 386 Consolidated financial statement 136 Constant activity price 82 Consumption account 375 Contribution margin 234 Control costs 423 Control key 161 Auto goods receipt 163 Confirmations 163 Cost indicator 163 External processing 163 Reference ID 164 Rework indicator 163 Controlling 91, 127, 149, 213 Area 61, 65, 187 Master data 51 Co-product Fixed-price 112 Indicator 97 Cost Accountant 216, 224 Activity confirmation 375 Actual 27, 375, 388 Administrative 215, 223 Analysis 224, 361 Analyze 237 By period 388 Categorizing 234 Cumulated 388 External processing 182 Filter 221 Fixed 83, 242 Goods movement 375
Cost (cont.) Initial planning 357 Initial research 361 Labor 31, 40 Lot size-independent 95 Manufacturing 70, 194, 214, 216, 221 Miscellaneous 228 Object 52, 61 Ordering 95 Other 225 Overhead 56, 392 Plan 375 Planned 325 Primary 214, 215, 381, 391 Procure components 325 Procurement 215 Produce assemblies 325 Reconcile 52 Rollup 220 Sales and administration 216 Secondary 215 Storage 95 Summarization 224 Type 51 Variable 83, 218, 242 Cost Center Functional area 530 Profit Center 537 Cost center 58, 65 Activate 67 Activated status 67 Address 75 Administrative 69, 78 Advanced functionality 82 Advanced reporting 60 Basic data 67, 71 Block 72 Category 69, 78 Change document 76, 87 Communication 75 Control 71 Currency 71 Debit 381 Default 61 Department 69 Description 67
553
167.book Seite 554 Dienstag, 4. November 2008 12:12 12
Index
Cost center (cont.) Drag and drop 66 Functional area 70, 194 Group 65 Hierarchy area 69 History 64, 75, 87 Inactive status 67 Input planning 84 Lock checkboxes 72 Long text 68 Manager 39 Master data 65 Overhead 58 Overhead rates 74 Person responsible 68 Plan activity quantity 80 Primary cost planning 84 Production 58, 381, 386 Profit center 71 Receiver 83, 84 Record quantity checkbox 72 Report 44, 68 Restrict activity types 69 Sender 83, 84 Service 83 Standard hierarchy 65 Standard report 55 Target cost analysis 72 Templates 73 Total cost 73 Under absorption 80 User responsible 68 Variance 44 Cost Center Accounting 28, 37, 38, 215 Cost Center Planning 39, 46 Cost component 104, 214, 221, 223, 239 Assign to cost component view 229 Assignment 216 Attributes 217 Blank entry 225 Column 241 Commercial inventory 222 Compare 224 Configuration 213 Control section 218
554
Cost component (cont.) Cost of goods manufactured 220, 227 Cost roll up checkbox 220 Cost summarization 224, 240 Delta profit for group costing 223 Details screen 218 Display as columns 216 Energy 227 External procurement 223 Filter 221 Filter criteria 223, 229 Group 216, 224, 239 Group 1 field 224, 241 Group 2 field 224, 241 Group key 239 Include all materials 225 Increasing over time 214 Individual 240 Initial cost split indicator 223 Inventory valuation 220, 223 Labor 225, 242 Material 242 Maximum number 214 Overhead 242 Primary 227, 228 Sales and administration costs 222 Source 227 Split 214 Structure 104, 216, 217, 218 Subtotal 241 Target 227 Tax inventory 222 Terminology 213, 217 Total material group 216 Transfer price surcharge 223 Transfer structure 215, 227 View 216, 221, 222, 229 Cost component group 239 Assign cost components 239 Create 239, 240 Existing 239 Key 239 Maintain 239 Maximum number 239 Number 240 Overview screen 239
167.book Seite 555 Dienstag, 4. November 2008 12:12 12
Index
Cost component group (cont.) Report columns 241 Summary 224 Cost component split 229 Auxiliary 215 Cost of goods manufactured 227 Initial 215 Main 215 Primary 214, 227, 228, 229, 236 Principal 236 Cost component structure 217, 223, 227, 235 Activate source 228 Active 243 Active checkbox 217 Assign to organizational units 235 Assignment 216 Auxiliary 236, 237, 244 Check organizational unit 237, 318 Configuration 217 Different across plants 235 Main 236, 244 Organizational unit 229 Overview screen 217 Source 228 Cost component view 229, 231 Calculation base 233 Cost of goods sold 234 Inventory valuation 235 Overhead calculation 233, 254 Overview screen 230 Possible entries 232 Summarized 241 Cost element 41, 51, 104, 209, 214, 223, 225, 394 Assessment 58 Attribute mix 59 Category 54, 58 Category change 55 Change document 65 Collective display 62 Default 79 Default account assignment 61 Define attribute 59 Define attribute mix 59 Description 54, 57
Cost element (cont.) From 225 Group 59, 209 Indicators 59 Masked 404 Master data 61 Name 54 Numbering logic 58 Physical inventory adjustment 55 Planning 39, 45, 47 Primary 40, 51, 52, 53, 54, 379, 380 Purchase price difference 55 Range 209, 225 Record quantity checkbox 59 Secondary 52, 56, 212, 381 To 225 Type 59 Unit of measure 60 Valid from 53 Cost estimate 111, 221 Additive 215, 222, 312, 313 Adjust cost component views 233 Automatic 265 Compare 499 Component 305 Cost component 265, 500 Costing data tab 237 Create 217 Current button 497 Details 492 Display 229 Display screen 232 Error 310 Future 296 Higher-level 307 Individual 491 Integrity 315 Itemization 112, 264, 316, 317 List 491, 496 List reports 224, 239 Log 316 Lower-level 307, 310 Period-based 296 Preliminary 358, 497 Raw material 265 Release 146, 266
555
167.book Seite 556 Dienstag, 4. November 2008 12:12 12
Index
Cost estimate (cont.) Sales order 306 Save error log 315 Standard 221, 223, 224, 235, 292, 310, 357, 498 Status 315 Total costs 233, 255 Unit 223, 266 Valid to 53 With quantity structure 105, 363 Without quantity structure 112, 226, 306, 361 Cost object 52, 379 Default 61 Cost of goods manufactured 214, 227, 229 Cost of goods sold 234 Cost of sales accounting 70 Cost sheet Cost element 209 Cost viability 118 Costed multilevel BOM 224, 239, 243 Costing 91 Preliminary 391 Simultaneous 391 Costing BOM 287 Costing lot size 111, 305 Costing run 103, 111, 310, 326, 334 Alllow marking 344 Analysis 341, 343 Analyze 492 Compare 494 Costing 339 Costing data 335 Costing level 340 Costing sheet 336 Costing version 344 Create 334 Data 491 Dates 335 Display errors only 339 Exceptions 494 Existing 334 Highest-level assembly 340 Inventory valuation 341 Log 340
556
Costing run (cont.) Lowest-level materials 339 Maintain 334 Mark 344 Material master price 495 Material overview 338, 345 Other prices 345 Parallel processing 340 Parameter 339, 344 Release 345, 346 Selection 337 Status 339 Steps 336, 491 Structural explosion 338 Threshold values 494 Valuation 336 Valuation variant 336 Costing sheet 58, 104, 207, 367 Calculation base 209 Configuration 207, 392 Credit 211 Current settings 211 Dependency field 210 Fixed cost 210 Origin group 209 Overhead rate 210 Percentage 211 Quantity based 211 Variable cost 210 Costing status FR 333, 347 VO 332 Costing type 233, 246 Additive cost estimate 253 Group valuation 251 Inventory valuation 249 Legal valuation 249 Miscellaneous 254 Overhead 255 Parallel valuation 250 Partner version 255 Price update 249 Profit center valuation 251 SAP standard 248 Save parameters 252 Transfer pricing 251
167.book Seite 557 Dienstag, 4. November 2008 12:12 12
Index
Costing type (cont.) Valuation view 249 Costing variant 118, 128, 145, 235, 237, 243, 246 Actual 187, 188, 370 Additive costs 313 Assignments tab 237, 243 Change transfer control 307 Components 303 Configurable products 311 Configuration 245, 303 Control parameters 247, 303 Control tab 303 Controlling area currency 320 Cost component split 316, 319 Cost component structure 243 Costing type 247, 248 Costing version 318 Cross-company costing 320 Customers 311 Date control 279 Error management 322 Existing product design 307 Highest-level material 310 Make-to-order scenario 311 New product development 307 Overview 247, 304 Pass on lot size 304 Plan 370 Planned 187 PPC1 246 PPP3 189 PREM 188 Product development 250 Proposed improvements 310 Prototyping 307 Quantity structure control 282 Quantity structure indicator 306 Quantity structure tab 304 Reference variant 298 Sales order 311 SAP standard 246 Saving allowed 314 Status 310 Tabs 303 Transfer control 293, 308
Costing variant (cont.) Transfer cost estimate of order BOM 311 Unit cost estimate 307 Update tab 314 Valuation variant 247, 257 ZPC1 246 Costs actual 523 Transportation 313 Credit 209 Credit key 211 Cumulative Difference 137 Inventory 137 Currency 123, 132, 134 Company code 124, 136 Group 136 Current Period 123 Planned price 117 Standard price 117 Valuation 127
D Data Master 51 Transactional 78 Data browser 120 Data collection Product drilldown report 504 Summarization hierarchy 511 Database update 142 Date control 279 Costing date from 281 Costing date to 282 Manual entry checkbox 281 Quantity structure date 282 SAP standard 280 Valuation date 282 Debit 375 Default account assignment 60 Delivery costs 262 Delivery dates 29 Delta profits 223
557
167.book Seite 558 Dienstag, 4. November 2008 12:12 12
Index
Demand Management 30 Dependency field 210 Dependent requirements Collectively only 101 Individual and collective 101 Individual only 101 Possible entries 101 Detailed planning 113 Detailed report 514 Cost element detail 514 Source document 514 Variance 514 Development process 361 Direct activity allocation 81 Direct update 143 Discontinued material 93 Division 126 Do Not Cost checkbox 103 Driver-based planning 27
Freight charges 215, 223 Functional area 194 Future planned price 116 Future price 127, 128, 138
G General ledger accounts 120 Expense 52 Goods issue 377 Automatic 386 Goods receipt 113, 122, 538 Automatic 386 Group counter 109, 176 Group valuation 138 Grouping code 377
H HALB 149
E Electricity 381 Employee 158 Energy 227 Error message 259 European implementations 237 Expense type 70, 194 External procurement 32
F Factory calendar ID 165 FERT 149 Field selection 129 Field status group 55 Financial accounting 127 Finished goods 149, 377, 379 Fiscal year 82, 228, 379 Formula Indicator 170 Key 169, 172 Other 171 Processing 169 Setup 168 Teardown 170
558
I Information system Cost Object Controlling 500 Detailed report 497, 501, 514 Hierarchy structure 502 Line item report 501, 516 Management reporting 516 Material document 501 Material group 501 Object comparison 497 Period-end processing 502 Product Cost Planning 497 Product group 503 Summarization analysis 502 Summarization hierarchy 506 In-house production 32 Initial cost planning 357 Initial cost split 223 Insurance contributions 215, 223 Integrated Planning 27, 39, 46, 459 Internal Activity allocation 58 Order 52 Settlement 58
167.book Seite 559 Dienstag, 4. November 2008 12:12 12
Index
Internal profits 136, 138, 223 Inventory 375 Beginning 137 Cumulative 137 Movement 120, 376, 377 Inventory goods movement 59 Inventory valuation 220, 235, 325 Invoice receipt 122
J Joint production 98 Process 112
L Labor 224 Labor allocation 381 Last price change 129 Legal profits 222 Legal valuation 138 Lengths of breaks 165 Line item report 516 Posting date range 517 Source document 518 Lock indicator 85 Logistics Master data 205 Long-Term Planning 27, 30, 39, 44, 81 Activity quantities 37 Indicator 32 Parameters 32 Purchasing data 35 Scenario 35 Transfer control 39 Lot size data 94 Lot size variance 111 Lot-size range 176
M Main cost component structure 236, 244 Make-to-order 460 Manual costs 312 Manufacturing costs 27
Manufacturing order 58, 367 Mark up 223 Market price 140 Marketing decisions 214 Masking 235 Master Data Statistical Key Figure 542 Master data 51, 391, 459 Activity type 76 Controlling 51, 89, 213 Cost center 65 Cost element 51, 57 Errors 334 Logistics 51, 205, 213 Material 51, 213 Statistical key figure 87 Material availability 91, 96 Material document 388 Material ledger 123, 124, 132, 137, 223, 477 Activate 479 Activated indicator 134 Actual BOM 478 Actual costing 132, 484 Actual costing run 487 Actual price 478 Additional local currencies 481 Assign currency types 480 Assign plants 487 Assign types 484 Company code currency 488 Company code currency type 482 Consolidated inventory report 131 Cumulative price differences 487 Currencies 131 Currency and valuation profiles 482 Document 478, 486 Documents 132 Exchange rate differences 132 Finished products 487 Foreign currencies 478 Global company 131 Goods movements 478 Historical exchange rates 478 Inventory reporting 486 Legal valuation 482
559
167.book Seite 560 Dienstag, 4. November 2008 12:12 12
Index
Material ledger (cont.) Legal valuation approach 486 Material consumption 132, 478 Multi-level price determination 488 Multiple currencies 478 Multiple valuations 131 One currency type 486 Period-end processing 486 Periodic unit price 132, 478, 488 Price determination 134 Price difference account 487 Procurement process 486 Purchase price differences 488 Purchased materials 487 Single-level price determination 487 Subassemblies 487 Transaction-based price determination 478 Transfer pricing 131 Types 484 Valuation approaches 131, 484 Valuations 478 Variance 478 Material master 91, 130, 149, 259, 361 Accounting 1 125 Accounting 2 138 Costing 1 97, 102 Costing 2 115 Lot size data 94 MRP 1 92, 474 MRP 2 95, 474 MRP 4 98 Views 91 Material number 106 Material origin checkbox 106 Material price analysis Button 135 Category 135, 486 Price determination structure 135 Screen 135 Transaction document 135, 486 Material requirements planning 91 View 91 Material type 377 FERT 149 HALB 149
560
Material type (cont.) ROH 149 Materials Management 235 MM period 123 Moving average price 121, 122, 124, 127 MRP 44, 81, 146 Activity quantities 38 Long-term 34, 37 Operative 32, 36
N NC machine 109 Net ID indicator 95 New product 118 No update 143 Number series 58 Numbering logic 58
O Obsolete material 93 Operating concern 28 Operation 158 Cost element 182 External 181 Final 387 First 183 Material components 183 Milestone 163 Net price 182 Overview 385 Purchasing info record 181 Setup time 168 Subcontract 181 Operation scrap 533 Operations manager 216, 224, 241 Optimum lot-sizing procedure 95 Order status 434 Delivered 434 Technically complete 434 Order type 370 Ordering costs 95 Organizational unit 235, 237
167.book Seite 561 Dienstag, 4. November 2008 12:12 12
Index
Origin group 104, 214, 225, 265 Create 226 Key 226 Original transaction 389 Outline agreement 262 Overhead 104, 155 Accuracy 105 Activity type 207 Actual cost 212 Calculation base 104 Collective calculation 392 Configuration 392 Controlling area currency 394 Cost 207 Date-dependant 210 Detail lists indicator 393 Dialog display indicator 393 Fiscal year 393 Group 104 Individual calculation 392 Maintenance 105 Messages 393 Object currency 394 Parameters 393 Period 393 Plan cost 212 Rate 209 Receivers 393 Secondary cost element 394 Selection screen 392, 393 Senders 393 System implementation 393 Overhead cost center 58 Overhead rate 58
P PA transfer structure 457 Accounting indicator 452, 455 Assignment lines 450 Cost element 451 Cost element group 451 Fixed amount 453 Overveiw screen 449 Production variances 450, 452 Value field 449
PA transfer structure (cont.) Variable amount 453 Variance category 452 Variance reporting 450 Parallel processing 340 Partial costing 293 Partner Cost component split 256 View 257 Partner version 255 Direct partner 255 Partner 255 Pass on lot size indicator 102 Payroll 56, 381 Period 132 MM 123 Tabs 132 Period-end processing 58, 459 Overhead 391 Periodic unit price 125, 135, 137 Plan Activity 45 Activity price 44, 45 Activity quantity 43, 44 Activity rate 27, 56 Cost center 27, 41 Data 27 Primary cost 40 Production 27, 29, 37 Reconciled 82 Reconciliation 44, 81, 82, 85 Sales 27, 29, 30 Plan reconciliation Execute 45 Planned Price 1 118 Price 2 118 Price 3 118 Prices 117 Planned order 32, 37 Planner profile 84 Planning Data 41 Layout 40 Level 28 Package 28
561
167.book Seite 562 Dienstag, 4. November 2008 12:12 12
Index
Planning (cont.) Report parameters 41 Run 34 Scenario 32, 35 Table 32 Planning scenario Field 35 Planning strategy 460 Planning variance 535 Planning version 228 Plant 61, 127, 138, 235, 238 Plant-specific material status 93 Valid from date 94 Policies and procedures 119 Pooled capacity 166 Possible entries Account assignment category 444 Activity type category 78 Activity type price indicator 80 Additive costs 312 Base 495 BOM status 289 BOM usage 150, 285 Calculation base 233, 254 Comparison value 494 Condition types 265 Confirmation 163 Control key 161 Cost center 445 Cost component view 232 Cost element category 54, 58 Costing 462 Costing sheets 276 Dependent requirements 101 External processing 163, 273 Hierarchy levels 509 Material master price 495 Material valuation strategy 259 Order type 193 Parameter origin 169 Pass on lot size 305 Preliminary cost estimate status 196 Price determination 134 Procurement type 96 Product group type 503 Purchasing info record 182
562
Possible entries (cont.) Purchasing info record strategy 261 Quotation in purchasing 272 Reference cost estimates 301 Relevancy to costing 277 Requirements type 460 Results analysis methods 409 Rounding for component quants 290 Scheduling type 384 Selection method 99 Special procurement type 474 Strategy sequence 145 Subcontracting strategy 271 Task list type 109, 292 Transfer control 295, 299 Unit cost estimate category 359 Valuation view 270 Posting origin 51 Predistribution of fixed costs 82 Preliminary cost estimate 349, 469 Controlling level 352 Cost estimate button 350 Costing data tab 355 Costing variant 353 Costs button 350 Create 350 Create collectively 196 Create individual 196 Lower-level materials 354 Mass processing 355 Messages 355 Most recent 350 Planning variance 349 Product cost collector 349 Production process 349, 352 Production variance 349 Production version 349, 352 Quantity structure 352 Strategy sequence 353 Transfer control 352 Valuate WIP and scrap 355 Preliminary costing 367, 375 Preliminary valuation price 134 Previous Period 130 Planned price 117
167.book Seite 563 Dienstag, 4. November 2008 12:12 12
Index
Previous (cont.) Price 129 Year 130 Price Accuracy 124, 182, 525, 536 Activity 215, 228, 325 Actual 125, 137, 325 Analyzed 141 Calculate activity 217, 229 Calculation 228 Change document 333 Change material button 143 Commercial 138, 235 Compare market 141 Comparison 142 Comparison button 141 Control 121, 122, 137 Control field 127 Future 127, 128, 138 Last change 129 Lowest 141 Lowest purchase order 141 Market 140, 142 Market valuation 143 Moving average 121, 122, 127 New 142 Periodic unit 135, 136, 137 Planned 117, 128, 326 Preliminary valuation 134, 137 Previous 129 Purchase 215, 223, 325, 334 Purchasing info record 334 Rapidly changing 125 Release 129 Stability 122 Standard 122, 125, 127, 128, 129, 137, 140, 235, 236 Tax 138, 143, 235 Transfer 136, 138, 223 Unit 112, 124, 182, 330, 536 Update button 143 Valuation 137 Vendor 310 Price determination 124, 134 Possible entries 134 Single-/Multilevel 134
Price determination (cont.) Transaction-based 134 Price difference 61, 117 Account 122 Price markup 266 Pricing 234 Primary cost element 375, 379 Primary cost planning 41 Primary credit 379 Procurement Changing methods 51 External 223 Procurement process 486 Procurement type 96 Both 97 External procurement 96 In-house production 96 Possible entries 96 Special 97 Product Modified 361 New 361 Product Cost Planning 19 Product cost collector 52, 58, 184, 367, 379, 513 Activity prices 189 Advantages 185 Automatic accounting assignment 196 BOM 198 Business area 187 Business processes 194 Characteristics 193, 197 Company code 192 Controlling level 193, 198 Costing lot size 199 Costing sheet 189, 190 Costing variant 187 Costs 185, 197 Data tab 186 Description 191 Detailed analysis 388 Detailed reports 197 Efficiency 185 External number 194 Functional area 194
563
167.book Seite 564 Dienstag, 4. November 2008 12:12 12
Index
Product cost collector (cont.) Goods receipt 184 Header 191 Information system performance 185 Inventory 184 Last change 194 Manufacturing orders 195 Material 192, 198 Multiple periods 185 Order type 190, 193 Order-related manufacturing 184 Overhead key 191 Periodic actual costs 184 Planning plant 198 Preliminary cost estimate 187, 188, 196 Procurement alternative 199 Production environment 185 Production line 198 Production orders 185 Production plant 198 Production process 193, 197 Production version 193, 195, 198 Profit center 186 Range of materials 192 Reconciliation 185 Repetitive manufacturing 184 Results analysis key 191 Routing 198 Settlement profile 193 Settlement rule 196 Standard reports 184 System status 194 Valuation variant 188 Value of scrap 191 Variance 185 Variance key 191 Vendor quotation 188 Work in process 185 Product Cost Controlling 146, 150, 158, 174, 244, 459 Product Cost Planning 51, 127, 491 Product development phase 118 Product drilldown report 502 Configuration 503 Cumulative 506
564
Product drilldown report (cont.) Data collection 504 Material groups 504 Periodic 506 Product hierarchies 504 Run 505 Variance 506 Production 119 BOM 109 Order 32 Plan 27 Quantity 111 Startup 134 Step 109 Version 110, 113 Production campaign 169 Production line 158 Production order 377, 379 Control data 369 Costing sheet 371 Costing variant 370 Create 382 Credit 373 Default values 370 Determine plan costs 371 Goods issue 372 Goods issue to 377 Order type 370 Overhead key 371 Plan costs 370 Release 385 Results analysis key 371 Scrap 371 Secondary credit 380 Settlement 380 Valuation variant 370 Variance key 371 Production order list 369 Production output account 379 Production process 207 Production routing 56 Production variance 537, 543 Production version 110, 113, 289 Apportionment structure 114 Basic data 113 Bill of material 114
167.book Seite 565 Dienstag, 4. November 2008 12:12 12
Index
Production version (cont.) Details 113 Overview 113 Planning data 113 Planning levels 113 Profit and loss account 395, 545 Profit center 71, 222, 223 Dummy 71, 187 Product cost collector 186 Responsible manager 187 Profit Center Accounting 71, 107, 186, 187 Activate 71, 187 Profitability Analysis 27, 70, 214, 234, 237, 380, 503 Profitability analysis 540 Project System 52 Purchase order 141, 262 Price 36 Quantity 36 Value 35, 36 Purchase price Estimated 118 Purchase price difference (PPV) 122 Purchase quantity 111 Purchase requisition 32 Purchasing 118, 119 Department 37 Purchasing info record 31, 118, 141, 149, 182, 200, 259, 263, 271, 310, 325 Category 202, 275 Changes 205 Conditions 182 Consignment 203 Current 34 Current price 310 Discounts 202 Effective price 202 Gross price 202, 204, 262 Last purchase order 183, 263 Multiple vendor quotations 202 Net price 202, 262 Pipeline 203 Price condition 203, 204 Purchase price 200 Purchase price variance 205
Purchasing info record (cont.) Purchasing conditions 202, 262 Purchasing organization 202 Purchasing organization data 1 200 Scales 204 Selection criteria 200 Source list 272 Standard 203 Subcontract 474 Subcontracting 203 Supplements 202 Surcharges 202 Updated 34 Validity dates 204 Validity periods 205 Vendor 200 Purchasing information system 34, 39, 46
Q Quantity Capacity 43 Quantity structure 107, 226, 239, 424 Data 102 Existing 361 Quantity structure control 283 BOM 291 BOM application 284 Routing 291 SAP standard 283
R Rate-based planning 113 Raw materials 149, 215, 377 Real posting 61 Reference operation set 292 Reference variant 299 Additive costs 302 Material components 301 Miscellaneous 301 Overview 299 Quantity structure 298 Revaluation 301 Strategy sequence 300
565
167.book Seite 566 Dienstag, 4. November 2008 12:12 12
Index
Reference variant (cont.) Transfer control 299 Release 146, 385 Repetitive manufacturing 113, 184 Reporting requirements 232 Reports product drilldown 537 Request for quotation 34 Requirements Activated planned independent 36 Activity 37, 39 Dependent 32, 34 Future 36 Future purchasing 34, 36 Individual 305 Planned independent 31, 32, 47 Production capacity 30 Scheduled activity 31, 39 Requirements class 461 Assembly processing 464 Automatic planning 465 Condition type 464 Configuration 462 Costing 462 Costing ID 462 Costing method 463 Costing sheet 463 Costing variant 463 Functional area 468 Results analysis key 468 Sales order costing 465 Settlement profile 467 Valuation 466 Requirements type 460 Possible entries 460 Reset 143 Results analysis Configuration 408 COS 408 Expert mode 409 Method 409 Revenue 408 Simplified mode 409 Status Control 409 Valuation method 408
566
Results analysis key 396 Default value 397 Results analysis version Advanced functionality 397 Cost elements button 398 Define 397 Documentation 399 Expert settings 397 Extended control button 398 Relevant to settlement 397 Settlement rule 397 Technical cost element 398 Transfer to financial accounting 398 Revenue 55 Revenue type 70, 194 ROH 149 Rough-cut planning 114 Routing 27, 113, 173 Base quantity 179 Company code 176 Component allocation 183 Costing relevancy 180 External processing 181 External vendor 181 General data 180 Group 175 Header 174, 175 Material assignment 177 Material components 183 Non-value-added 180 Operation details 174, 179 Operation overview 177 Operation scrap 180 Plant 176 Price unit 182 Purchase order 181 Selection 291 Selection ID 292 Selection screen 174 Standard value 179 Subcontract 181 Type 292 Unit of measure 179
167.book Seite 567 Dienstag, 4. November 2008 12:12 12
Index
S Sales Manager 27 Plan 27 Quantity 27 Sales and Distribution 234 Sales and Operations Planning 27, 29, 44, 81 Sales deduction 55 Sales order Cost estimate 469 Costing indicator 469 Line item 460 Non-valuated inventory 471 Procurement tab 460 Profit margin 469 Stock 469 Valuated inventory 468, 469 Variance analysis 473 Sales order controlling Configuration 460 Sales order costing 112, 408, 459 Period-end processing 468 Sales order item 234 Sales organization 126 Sales revenue 234 Scheduled activity 45, 86 Scheduled activity quantity 39, 44 Scheduling Backwards 384 Basic dates 384 Detailed 384 Forwards 384 Manufacturing orders 167 Rough-cut 384 Type 384 Scheduling agreement 262 Scrap Assembly 95 Component 102 input 526 output 524, 533 Production statistics 95 Selection ID 292
Selection method 99 By explosion date 100 By order quantity 99 By production version 100 Only by production version 100 Possible entries 99 Settlement 435, 540 Actual costs 437 Allocation structure 436, 440 Amount 439 Basic list 455 Configuration 435, 454 Control parameters 435 Cost element 441 Cost of sales 437 Current period 434 Detail list indicator 455 Distribution rules 435 Largest amounts 455 Message analysis 455 Order type 435 PA transfer structure 436 Parameters 455 Period-end closing 454, 456 Posting period 455 Product cost collector 455 Profile 435 Reconcile 456 Selection screen 455 Transaction data 455 Type 434 Settlement profile 457 Can be settled 438 Default values 438 Deletion flag 438 Distribution rules 440 Document type 440 Equivalence numbers 439 Indicators 438 Not for settlement 438 Order balance 438 Other parameters 440 PA transfer structure 449 Percentage costs 439 Profitability analysis 439 Residence time 440
567
167.book Seite 568 Dienstag, 4. November 2008 12:12 12
Index
Settlement profile (cont.) Settlement rule 438 Source structure 447 To be settled in full 437 Valid receivers 440 Settlement rule 115 Account assignment category 444 Distribution rule 439 Settlement receiver 445 Setup time 111 Simulative planned orders 34 Simultaneous costing 388, 389 Source 142 Source document 389 Source structure Accounting indicator 448 Assignments 448 Cost element 448 Distribution rule 447 Earned profits 448 Good will 448 Incurred costs 448 Joint products 447 Overview screen 447 Sales volume 448 Settlement procedure 447 Simultaneous production 447 Source 448 Warranty 448 Special procurement type 97, 313 Costing 110 Maintain 111 Possible entries 474 Split valuation 121 Standard activity time 173 Standard cost estimate 27, 51, 125, 157, 325 BOM 329 Calculation 327 Costed multilevel BOM 329 Costing data tab 243, 326 Costing lot size 327 Costing variant 326 Costing version 327 Costs based on field 330 Create 116, 326, 349
568
Standard cost estimate (cont.) Current 116 Default dates 327 Finish date 328 Future 116 Mark 116, 326, 331 Material 326 Overwrite 332 Plant 326 PPC1 326 Previous 116 Production version 329 Quantity structure date 328 Release 117, 325, 326, 332 Release button 332 Routing 329 Save 116 Start date 328 Transfer control 327 Update frequency 51 Valuation date 328 Variance calculation 328 Standard hierarchy 65 Maintenance 67 Node 66 Standard price 122, 125, 127, 128, 375 Current 333 Existing 334 Future 333 Proposed 332 Update 327 Statistical key figure 88 Employees 88 Fixed value 88 Long-distance calls 88 Name 88 Total value 88 Tracing factor 87 Unit of measure 88 Statistical posting 61, 72 Status selection profile 509 Stock account 124 Stock transfers 313 Strategy sequence 145 Subcontracting 473 Component quantity 477
167.book Seite 569 Dienstag, 4. November 2008 12:12 12
Index
Subcontracting (cont.) Components 475 Consumption posting 477 External processing 477 Goods receipt 477 Item category 475 Monitor stocks 475 Purchase order 474 Purchasing info record 474 Special procurement type 474 Stock 476 Summarization hierarchy Alternate hierarchy 513 Configuration 507, 508 Data collection 507, 511, 514 Data scope 508 Exception rules 514 Hierarchy levels 507, 509 Hierarchy node 511 Levels 507 Performance 512 Status selection profile 509 Total variance 507 Summarized reporting 491
T Table T030 379 Target cost Version 0 417, 423 version 0 542 Version 1 418, 424 Version 2 418, 424 Target cost analysis 60 Target cost version 421, 422 Target costs 417 Task list 175 Description 292 Group 109 Group counter 176 Lot-size range 176 Status 176, 292 Type 109, 292 Usage 176 Task list type Possible entries 109
Teardown time 170 Template 74 Activity and business process allocation 74 Case scenario 74 Formula planning 74 Formulas 74 Functions 74 Receiver object 74 Sender object 74 Volume 74 Time series icon 36 Total Stock 127 Value 127 Total labor 224 Total variance 543 Transactional data Actual 55, 77 Plan 55, 77 Transfer control 39, 294 Collective requirements 296 Costing type 296 Costing version 296 Current period 296 Fiscal year 295 Individual requirements 296 PC01 298 Periods 296 SAP standard 294 Single plant 294 Strategy sequence 295 Valuation variant 296 Transfer costing data 235 Transfer pricing 131, 138 Transfer structure 227, 228, 229, 237 Turnaround time 118
U Under/over absorption 543 Unit Output 85 Unit cost estimate Category 359 Copy existing structure 362
569
167.book Seite 570 Dienstag, 4. November 2008 12:12 12
Index
Unit cost estimate (cont.) Cost element 361 Item 359 Item total price 360 Item total value 360 Production phase 363 Quantity 360 Resource 360 Unit costing 106, 307 Unit of measure Alternative 93 Base 93, 384 Conversion factor 384 Update inventory valuation 116
V Valid from 128 Valuated goods receipt 433 Valuation 46, 132, 134 Approach 136, 138 Category 121 Current 125 Data 119, 130, 134 Group 136, 138 Header record 121 Inventory 139, 220, 223, 235 Inventory report 144 Legal 136, 138 Multiple 223 Price 137 Strategy 122 Type 121 Update inventory 116 Variant 105, 215 Valuation area 63 Valuation class 120, 377 Project stock 121 Sales order stock 120 Valuation methods 408 Valuation variant 215, 246, 257, 367, 544 Activity price 266, 267 Activity types 266 Actual price for period 267 Additive costs 259, 266
570
Valuation variant (cont.) Average plan price 267 Component materials 259 Costing sheet 188, 275 Delivery costs 262 Effective price 262 External processing 273 Finished material overhead 276 Freight 264 Gross price 261 Insurance 264 Material valuation 190, 259 Miscellaneous 278 Moving average price 190 Net price 262 Origin group 264 Overhead 275 Overview 257 Planned 190 Plant 258 Price factors 277 Purchase order 260 Purchasing 260 Purchasing info record 260 Raw material overhead 276 SAP standard 257 Strategy sequence 259, 266 Subcontract material overhead 276 Subcontracting 271, 273 Subcontracting indicator 275 Valuation variant for scrap 423 Value fields 435 Variable costs 83 Variance 325, 385, 434 Analysis 325, 388 Calculation 51, 380, 425, 429 Categories 435 categories 545 Category 417, 420, 425, 433, 434 Column 431 Configuration 418 Cost center 44 Cost elements button 431 Cumulative 433 Define keys 418 Detail list indicator 430
167.book Seite 571 Dienstag, 4. November 2008 12:12 12
Index
Variance (cont.) Formula for calculating 431 Input 426 Input price 426 Input quantity 426 Large 431 Lot size 327, 428 Messages 430 Mixed-price 427 Order status 428 Output 427 Output price 427 Planning 418, 424 planning 535 Production 418, 424, 449 production 537, 543 Relevant to settlement 417 Remaining 420, 428 Remaining input 426 Resource-usage 426 Scrap 420, 428, 433 Sequence 434 Sort on columns 430 Summarized reporting 430 Target costs button 432 Test run indicator 430 Total 380, 417, 423 Unfavorable 431 Variants 420 Variance analysis 27, 41 Variance key 106 Default for plants 420 Define 418 Scrap indicator 419 Write line items 419 Variance variants 420 Variant products 287 Vendor External 182 Quotation 149 Vendor quotation 31, 36, 118 Version 35, 38, 41, 43, 228 Fiscal year 270 Legal valuation 270 Planning 228
Version info Structure 35 Volume 74
W WIP at target 402 With quantity structure checkbox 105 Work center 37, 158, 381 Activity type 172 Activity unit 172 Actual activity quantities 161 Alternative activity description 172 Backflush checkbox 160 Basic data 159 Capacity 164, 168 Capacity category 165 Capacity planning 160 CAPP 173 Category 159 Change 158 Company code 172 Confirmation 160 Control key 161, 181 Cost center 171 Costing 160, 171, 173 Default values 161, 179 Display 158 Factory calendar 165 Formula key 168 Formula parameter 168 Iterative process 161 Key word 160 Labor 160 Labor capacity 165 Lengths of breaks 165 Load 47 Low-value parts 160 Machine 160 Machine capacity 165 Material component 160 Other formula 171 Parameter definition 168 Parameter details 168 Parameter origin 169 Parameter user-defined 169 Performance efficiency rate 160
571
167.book Seite 572 Dienstag, 4. November 2008 12:12 12
Index
Work center (cont.) Plant 172 Processing formula 169 Production personnel 170 Reference indicator 164, 172 Rule for maintenance 160 Scheduling 167 Setup 160 Setup formula 168 Shifts 165 Standard value 160, 164, 168 Standard value key 160 Teardown formula 170 Technical data 173 Unit of measure 164 Validity period 172 Work in process 434, 545 Actual 400 Assign a valuation variant 403 Assign line IDs 407 Calculation 411, 416 Cancel 395, 416, 434 Cannot be capitalized 405 Capitalization 397 Capitalize costs 397 Change 414 Configuration 395 Confirmed yield 415 Control tab 396 Cost component 407 Cost element 404 Cost estimate 401 Costing run 401 Costs 395 Data tab 396 Define line IDs 404 Define posting rules 407 Delivered to inventory 395 Financial accounts 408 Goods receipt quantity 415
572
Work in process (cont.) Incomplete assemblies 395 Inventory 395 Masked cost center 405 Masked cost element 404 Operation 415 Option to capitalize 405 Order status 400, 416 Period-end processing 395 Preliminary cost estimate 401, 411 Product cost by order 416 Production costs 395 RA category 408 Repetitive manufacturing 402 Requirement to capitalize 404 Reserves 404 Results analysis key 396 Results analysis version 397 Routing 401 Routing structure 401 Settlement 407 Source cost elements 404 Standard cost estimate 401 Target 400 Technically complete 416 Unrealized costs 404 Valuation methods 400 Valuation variant 401 Variance 402 Variance analysis 412 WIP explanation button 414 Workflow 119
Y Yield quantity 387
Z Zero Balance 380