Cyber Security: Protecting against AttackersFull description
Report of cyber crimeFull description
test
a report on nuclear power plant
technical seminar report
Full description
A technical report I made in 2012 about a bridge truss design.Full description
Building technical reportFull description
Technical Report on Global WarmingFull description
Full description
AISE report Report no 13. Steel DesignDescripción completa
Safety Instrumented Functions (SIF) -Safety Integrity Level (SIL) Evaluation Techniques Part 3: Determining the SIL of a SIF VIA Fault Tree Analysis
This file is a technical report for a graduation project. The project aims at providing a structural system design for a 13-story reinforced concrete building. Static and Dynamic analyses are inclu...
Full description
Full description
Full description
Full description
Placement
scope will cover the provision of Topside Control systems – MCS, SPCU, UPS and HPU; while the Subsea systems will cover provisions for umbilical systems, foundations structures, steel and electrical flying leads. Cascade and Chinook:
The Petrobras America Inc. Cascade & Chinook drill centers are
located in 8,100ft and 8,800ft water depth, respectively, in the Gulf of Mexico. The current development plan assumes a phased development incorporating an initial Phase I production for about one year, followed by Phase II production of an additional four years and then subsequent full field development. The full field development includes up to 24 production trees, 4 production manifolds and 2 subsea boosting pumps. In Phases I and II the wells will be tied back to a floating production, storage and offloading (FPSO) facility, for Phase III a production platform should replace the FPSO
. The Project was executed by a multidisciplinary team of engineers which included Process, Piping, Structures, Mechanical and Control (E&I) System Engineers. The Subsea Engineering team had the responsibility of providing the following services:
Subsea Structures
Signal, Power and Hydraulic Analysis
Umbilical System
Christmas Trees and Manifold & tie-in Systems
Subsea Electrical Distribution and Subsea Control Systems
Topside Equipment - Hydraulic Power Unit, UPS, Electrical Power Unit and Master Control Station
Cathodic Protection System
Since these projects were green field projects, data required was basically the environmental conditions and the site survey plan of the proposed facility. The actual project execution work was carried out based on clients’ specifications, international standards and company procedures.
The following are some of the deliverables produced by Subsea Control team on the project:
Functional Design Basis
Functional Specifications for MCS, SPCU, ULM, UPS and SCM