Software development Life cycle,waterfall model,spiral model.. verification validation hybrid model agile model, types of testing , STLC, writing test cases
Testing Tools for BeginnersFull description
Testing and Commissioning of Grp Water Tank
Deskripsi lengkap
form for
Full description
Testing and Commissioning of Grp Water TankFull description
basketball
SOP For Duct Leak TestingFull description
Excel in soil testing
Descripción: Well step test
Testing for language teachers Hughes.pdf
RD procedure
This manual is very useful for conducting various laboratory tests on soil as per Indian Standards (IS Bureau).Full description
Using Ozone for Water Treatment - ASHRAE - 98Full description
of Gl azed Ex t er i o r Wal l y s em s Prese resent nte ed by by:: “Creating Better Building Envelopes”
A m y Peev Am Peevey ey B r o m , PE Jerry Ab Abe end ndro roth th,, RRC
Performance Testin Quality Assurance/Quality Control
es ng
Performance Testin Quality Assurance/Quality Control
es ng
Per f o r m an c e Tes t i n g
Pre Pre--construction mock mock--up • Purpose: testing is performed to attempt to simulate asasbuilt field conditions for the evaluation of the performance and constructability of an exterior wall system • Standards:
ASTM E 283 “Standard Test Method for Determining Rate of ” ASTM E 331: “Standard Test Method for Water Penetration...” (Static Pressure) AAMA 501.1: “Standard Test Method for Water Penetration...” (Dynamic Pressure) “ Transmittance and Condensation Resistance…”
Mock--up scope and shop drawings Mock Laboratory mockmock-up construction &
observations of installation Mock--up testing Mock Retesting (as required) Reporting Incor oration of modifications into the field
erection shop drawings
Size: • Typically at least 2 stories high by two units wide Scope: • which exceed published test data • Incor orate ad acent finishes conditions to ensure construction and configuration • sunshades, etc. where possible
Mock--Up Construction and Mock bservations
• Contractor to provide same superintendent and/or foreman at mockmock -up that will be in field • Construction can be performance and aesthetic
Mock--u Construction Observations Mock • Attendees Attendees should include Owner, General Contractor, Subcontractor, Architect, etc. • Opportunity to observe nonnon-visible portions of system • Confirm construction in conformance with shop
pre-test Contractor may perform pre• so that any modifications made to obtain passing results are documented • • • • • • • •
Air Air Infiltration (ASTM E283) Static Water Penetration (ASTM E331) Dynamic Water Penetration (AAMA 501.1, ASTM E 547) Structural Uniform Loading by Static Pressure (ASTM E330) Maintenance Equipment Testing (100% of design load) Static Water Penetration (ASTM E331) Structural Uniform Proof Load Test (ASTM E330) Maintenance Equipment Proof Load Testing (150% of design oa • Other tests: sill dam testing, redundant sealant testing, etc.
Mock -Up Corrections/ MockModifications
specimen are allowed on shop drawings require retest
correc ons an mo reported by test lab
ca ons are o e
All modifications are to be incorporated
into shop drawings and field construction
Mock--u Mock
Testin
Static Water Testin
Structural Uniform Testin
Structural Uniform Testin
ualit Control Testin
Field Testing • Purpose: Testing of installed assemblies to evaluate the performance and quality of the work installed. It is desirable to per orm throughout construction so that quality at each . • Standards: “ Testing of Newly Installed Fenestration Products”.
ASTM E1105: “Standard Test Method for Field Determination of Water Penetration of Installed…” (Static Pressure)
Pre--installation meeting Pre ee
e
Performing of field testing Corrections / Modifications (as necessary) Retestin
as re uired
Reporting
erection shop drawings Additional testing (many Architects require additional testing if field tests fail)
Scope: Type of testing, test location, test size, and • Type: • Water Penetration: ASTM E1105 • Air Air Infiltration: ASTM E 283
Water nozzle: AAMA 501.2
• Location: Typically selected by A/E or Consultant • Size: Typically one floor level by two units high • Frequency:
Recommended: 10%, 25%, 50%, 75% and 90%.
Typical targets targets:: 10%, 50%, and 75%
• Air Air Infiltration (ASTM E 783) • Static Water Penetration ASTM E 1105 • Water Nozzle Testing (AAMA 501.2) • Other tests: sill dam testin AAMA 502 redundant sealant testing, etc.
Field Testing Corrections/ Modifications
on shop drawings require all previous future work to incorporate modifications All corrections and modifications are to be All modifications are to be incorporated
n o s op raw ngs an
e
cons ruc on
Field Static Water Penetration Testing
Water Level
Plugged Weep at Exterior
Diagnostic Testing
Purpose: Testing of installed assemblies to determine
. Standard Guidelines: • AAMA AAMA 511: “Voluntar Guideline for Forensic Water Penetration Testing” • ASTM ASTM E 2128: “Standard Guide for Evaluating Water Leakage of Building Walls”
Standards: • AAMA AAMA 501.2 “QA and Diagnostic Water Leakage Field Check of …” • AAMA AAMA 502502-08: “Voluntary Specification for Field Testing of Newly Installed Fenestration Products”. •
: an ar es e o Water Penetration of Installed…” (Static Pressure)
or
e
e erm na on o
Diagnostic Evaluation Process Evaluation of Design Concept