By Gamers for Gamers July Issue of Snake Eyes Issue #9 War Gaming, miniatures, tournaments, game sales, reviews
ImagineFX - July 2014Full description
Descripción: beadwork magazine june-july 2014 pdf
Full description
Descripción completa
Full description
Premiere issue of Crypto Retailer Magazine. A "Who's Who of Bitcoin ATMs". See manufacturers and operators of these machines that change cash into digital cryptocurrency. If you like Bitcoin, you w...
Modern Machines
project management
t3 magazine
ejercicios de guitarra. técnica.
Descripción completa
A Real Dynamic Cyber Trust Model is an application that is proposed in order to distinguish the trust belief among the trustees who have been marketing in today's digital world by authenticated users. Though we are happy with the developing technolog
Delhi Schedule of Rates Civil - 2014Full description
: MULTIPARTY ACCESS CONTROL FOR ONLINE SOCIAL NETWORK
Schedule of Rates of LGED for DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ district. Bangladesh July 2015Full description
Schedule of Rates of LGED for DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ district. Bangladesh July 2015Full description
WECC Newly Approved Dynamic Model Implementation Schedule Version July 2014 NOTES: The purpose of this list is to provide general reference to WECC reporting requirements for submitting new dynamics modeling data due to adoption of new dynamic models or for replacing existing dynamics data due to the retirement of old dynamic models This list provides the implementation schedule for recently developed and newly approved WECC dynamic models models This list also provides the dynamics data re tirement schedule for models planned for removal from the WECC Approved Dynamics Dynamics Model Library REMTF Developed Phase 2 Generic Wind and Solar Models are intended to replace all exis ting wind/solar dynamic model model records Targeted for Removal from WECC Master Dynamics Data File and not approved status on the WECC Approved Approved Dynamic Model Library
SRWG Bassecase Implementation Begin Date 7/18/2014 with 2015 HS4-OP & 2015 LS1-OP
SRWG Basecase Implementation Completion Date 6/5/2015 with 2020-21 HW1
Used to represent distr ibution-connected ibution-connected small PV plants or multiple PV plants aggregated at a high voltage bus
Page 1 of 2
WECC Newly Approved Dynamic Model Implementation Schedule Version July 2014 NOTES: The purpose of this list i s to provide general reference to WECC reporting requirements for submitting new dynamics modeling data due to adoption of new dynamic models or for replacing existing dynamics data due to the retirement of old dynamic models This list provides the implementation schedule for recently developed and newly approved WECC dynamic models This list also provides the dynamics data ret irement schedule for models pl anned for removal from the WECC Approved Dynamics Model Library REMTF Developed Phase 2 Generic Wind and Solar Models are intended t o replace all existing wind/solar dynamic model records Targeted for Removal from WECC Master Dynamics Data File and not approved status on the WECC Approved Dynamic Model Library
UNAPPROVED WIND AND SOLAR POWER PLANT MODELS THAT REQUIRE REPLACEMENT WITH REMTF PHASE 2 WIND AND SOLAR MODELS Equipment Representation
not approved not approved not approved not approved not approved not approved not approved not approved not approved not approved not approved
7/18/2014 with 2015 HS4-OP & 2015 LS1OP
SRWG Basecase Implementation Completion Date
6/5/2015 with 2020-21 HW1
MVWG Library Removal Date
Comments
not approved for use in WECC
replace all existing r ecords with REMTF Phase 2 models replace all existing r ecords with REMTF Phase 2 models not approved to represent Type 1 wind generators; replace all exist ing records with REMTF Phase 2 models replace all existing r ecords with REMTF Phase 2 models replace all existing r ecords with REMTF Phase 2 models replace all existing r ecords with REMTF Phase 2 models replace all existing r ecords with REMTF Phase 2 models replace all existing r ecords with REMTF Phase 2 models replace all existing r ecords with REMTF Phase 2 models replace all existing r ecords with REMTF Phase 2 models synchronous generator models are not approved by MVWG to represent wind/solar projects; replace all exi sting records with REMTF Phase 2 models
RELAY MODELS Equipment Representation Voltage Protection Frequency Protection Curve based inverse time overcurrent rela Equation based inverse time overcurrent relay Curve based inverse time overcurrent relay Equation based inverse time overcurrent rela Curve based inverse time overcurrent relay Equation based inverse time overcurrent relay Curve based inverse time overcurrent rela Equation based inverse time overcurrent relay
Bus Voltage
GE PSLF
PTI PSS/E
PowerWorld
MVWG Approval Date
lhvrt lhfrt
VTGTPAT FRQTPAT
lhvrt lhfrt
approved 8/9/13 approved 8/9/13
locti
TIOCR1
locti, TIOCR1
>= 300 kV
approved 8/9/13 tiocrs locti
tiocrs TIOCR1
locti, TIOCR1
>= 200 kV tiocrs locti >= 100 kV tiocrs locti
approved 8/9/13
Due 9/11/2015 with 2016HS3-OP
tiocrs TIOCR1
approved 8/9/13 tiocrs
Data Submittal Required per WECC DPM Data Submittal Required per WECC DPM Data Submittal Required per WECC DPM Data Submittal Required per WECC DPM Data Submittal Required per WECC DPM Data Submittal Required per WECC DPM Data Submittal Required per WECC DPM
locti, TIOCR1
<= 100 kV tiocrs
Due 4/25/2014 with 2019-20HW1 Case
Due 9/12/2014 with 2015HS4-OP
locti, TIOCR1
Comments Data Submittal Optional - Can be used with any generator model Data Submittal Optional - Can be used with any generator model