GROUNDING SYSTEM ............................................................................6
1.2.1 Arrangement of Wiring Copper rod ..........................................................6 1.2.2 Connection Copper rod to Main Grounding Bar (MGB) ...................................7 1.2.3 Connection Grounding at BTS Radio, Transmission and Rectifier to MGB ...........8 1.3
1.3.1 Installation Feeder Entry (height of feeder entry and dimension from base ........ floor of shelter (Inside view) ..................................................................9 1.3.2 Installation Feeder Entry (height of feeder entry and dimension from base ........ floor of shelter (Inside view) ................................................................ 10 1.3.3 Arrangement of Feeder Entry and Connection Grounding Arrester to Busbar ... 11 1.4
1.4.1 Connection Wiring Cable at the top BTS Radio.......................................... 12 1.4.2 Connection Wiring Board at BTS Radio Rack ............................................ 13 1.4.4 Connection Wiring Alarm and Traffic Cables at DDF External Alternative 1 ...... 14 1.4.5 Connection Wiring Alarm and Traffic Cables at DDF External Alternative 2 ...... 15 1.4.6 BTS Radio Installation (Side View) ......................................................... 16 1.5
POWER SUPPLY (RECTIFIER) ................................................................. 17
1.5.1 Connection Wiring Power Cable at Power Suply (Rectifier) .......................... 17 2
Installation Position Feeder Coaxial at Vertical Tray of Tower and Installation .... Feeder Clamp .................................................................................. 18
2.1.1 Installation Grounding Kit (at the top and bottom) .................................... 19 2.1.2 Installation Grounding Kit at Feeder Entry (Outdoor) ................................. 20 2.1.3 Installation Labelling, Wiring Jumper Cable and Grounding at Antenna........... 21 3
INSTALLATION ANTENNA TYPE APM 40.................................................... 22
3.1
Installation Antenna and Mounting Hardware Part 1................................... 22
3.2
Installation Antenna and Mounting Hardware Part 2................................... 23
3.3
Installation Antenna and Mounting Hardware Part 3................................... 24
3.4
Installation Antenna and Mounting Hardware Part 4................................... 25
3.5
Installation Antenna and Mounting Hardware Part 5................................... 26
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
2/33
8DK 02 05 04 01 00 PCZZA ED 00
4
GENERAL MATERIALS .......................................................................... 27
NA NB 10 c m HORIZONTAL TRAY Isolator Busbar GROUNDING KITS
SS Bolt M8 Cable Shoe
DETAIL BUSBAR AT HORIZONTAL TRAY & GROUNDING KIT
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
20/33
8DK 02 05 04 01 00 PCZZA ED 00
2.1.3 Installation Labelling, Wiring Jumper Cable and Grounding at Antenna
NB PA
QB NA
LABE L
LABE L T IE W R A P
T IE W R A P
F EE D ER C AB LE
T IE W R A P
F EE D E R C AB LE
NB PB QB NA PA QA
T IE W R A P G R O U N D IN G C A B L E
IS O L A TO R
G R O U N D IN G K IT A N T E N N A S E C T O R (B A C K T O B A C K ) (B A C K T O B A C K )
To TO WER M GB
IS O L A TO R
TRAY
LABE L
BUSBAR
TRAY
BUSBAR
G R O U N D IN G C A B L E
BUSBAR
D E T A IL B U S B A R A T V E R T IC A L T R A Y
NOTES : This is Temporary Standard, The New Standard is on going validation by ALU & XL APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
21/33
8DK 02 05 04 01 00 PCZZA ED 00
3
INSTALLATION ANTENNA TYPE APM40
3.1
Installation Antenna and Mounting Hardware Part 1
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
22/33
8DK 02 05 04 01 00 PCZZA ED 00
3.2
Installation Antenna and Mounting Hardware Part 2
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
23/33
8DK 02 05 04 01 00 PCZZA ED 00
3.3
Installation Antenna and Mounting Hardware Part 3
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
24/33
8DK 02 05 04 01 00 PCZZA ED 00
3.4
Installation Antenna and Mounting Hardware Part 4
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
25/33
8DK 02 05 04 01 00 PCZZA ED 00
3.5
Installation Antenna and Mounting Hardware Part 5
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
26/33
8DK 02 05 04 01 00 PCZZA ED 00
4
GENERAL MATERIALS
4.1
Feeder Entry :
Material from Steel grade ST 41 Dimension : 280 x 3 x 520
4.2
Heat Shrinkable Sleeve (Condom) :
Material from Rubber Raychem Code : 75/22 ER 3310
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
27/33
8DK 02 05 04 01 00 PCZZA ED 00
4.3
Cable Ties (Tie Wrap) Type CS-300X :
Code Material SIGMA TIES CS – 300X Dimension : 7.6 x 270 Function : Installation Outdoor (at Top Antenna)
4.4
Cable Ties (Tie wrap) Type CS-390L :
Code Material SIGMA TIES CS – 390L Dimension : 4.8 x 270 Function : Installation Indoor (at Jumper Cable)
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
28/33
8DK 02 05 04 01 00 PCZZA ED 00
4.5
Cable Ties (Tie wrap) CS 200L :
Code Material SIGMA TIES CS – 200L Dimension : 3.6 x 180 Function : Installation Indoor (at Alarm & PCM Cable)
4.6
Cable Ties (Tie wrap) CS 150 T :
Code Material SIGMA TIES CS – 150L Dimension : 3.6 x 140 Function : Installation Indoor (for Connection cable at top BTS radio)
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
29/33
8DK 02 05 04 01 00 PCZZA ED 00
4.7
Labelling :
Labelling, material from Acrilique Function : Label Identification
4.8
Connector :
Heat shrinkable sleeve
1/2 DIN Male
O-Ring
7/8 DIN Female CONNECTOR 7/8 RFS
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
30/33
8DK 02 05 04 01 00 PCZZA ED 00
4.9
HHD Cavity Anchor :
4.10
Cable Shoe 1x35mm
HHD CAVITY ANCHOR Specification Screw Ø5x45mm (Hilti) Function : Fixation for equipment, accessories and bracket cable tray at Gypsum wall.
4.11
Cable Shoe :
Protection Edge :
PROTECTION EDGE Specification from Rubber L2000mm
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
31/33
8DK 02 05 04 01 00 PCZZA ED 00
4.12 Clamp Copper rod (SIMEL CH 10.70) :
4.13
Clamp Copper rod (SIMEL BB 50- 80) :
APPROVALS ALU - QA
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL – QA
XL - RND
32/33
8DK 02 05 04 01 00 PCZZA ED 00
APPENDIX NA
RELEVANT DOCUMENTS AND WEB SITES # [1] [2]
Title of the document/web site Mounting HW APM40, Radio Frequency Systems Evolution A9100 BTS Installation Manual
Reference/Web link http://www.rfsworld.com/ 3BK 17226 0001 RJZZA Ed.09
ABBREVIATIONS AND ACRONYMS Wording ALU
Definition Alcatel-Lucent
DOCUMENT MANAGEMENT Location of the reference of this document (electronic copy): ISO9000\3.Work Instruction
HISTORY Short description of significant changes to previous edition: Edition Originated Effective Date Originator Date 00 15 Aug 07 01 Sept 07 Durmawel Sahara