REFERANCE. CONCLUSION. STATUS ADVANTAGES & DISADVANTAGES. VARIOUS FACTOR VARIOUS TYPES WORKING BLOCK DIAGRAM&IT’S COMPONANTS.
one of the power plant cycle type
Description complète
it is very simple to represent your training experience..
sequential operations explanation of power plant start up
Full description
Tells about gas turbine
Combined Cycle Power Plant Main Process Diagram
Combined Cycle Power Plant Main Process Diagram
Full description
COMM OF CCPP
Full description
Deskripsi lengkap
Full description
Full description
Descrição completa
Full description
DESIGN OF A 515 MW COMBINED CYCLE GAS TURBINE POWER PLANT
A Design Project Presented to Dr. Michael A. Aloria College of Engineering, Architecture, Fine Arts and Computing Sciences
Gov. Pablo Borbon Campus II Alangilan, Batangas City
In Partial Fulfillment of the Requirements for the Power Plant Design – ME 558
By: ALCANTARA, HENDERSON P. GARCIA, RENATO JR. P. MAGBOO, MICHAEL JOSEPH G. MAGBOO, REGINALD D. ME - 522
March 2008
ii
ACKNOWLEDGEMENT We wish to thank our instructor in ME 558, Dr. Michael A. Aloria for his entire support to finish this design project in Power Plant Design, to our parents for their financial support for the completion of this task, to all our friends who gave us their time to assist us on this design project. We gratefully acknowledge the kindness of the all staffs of Batangas II Electric
Cooperative,
Inc.
(BATELEC
II),
Transmission
Corporation
(TRANSCO), KEPCO Ilijan Corporation, and First Gas Power Corporation for giving us the data and information regarding the daily load or electricity consumption of Batangas Province and some important details such as the economic aspect and management plan of their company. We would like also to thank our co – students for sharing their ideas regarding with our topic in the design project. Most of all, to our God Almighty who have given us the strength and determination and made us keep our faith to finally accomplish this design project.
iii
LIST OF TABLES Table
Title
Page no.
1
Major Equipment – Specification
28
2
Design Specifications of Compressor
29
3
Design Specifications of Combustor
29
4
Design Specifications of Gas Turbine
29
5
Design Specifications of HRSG
29
6
Design Specifications of Steam Turbine
30
7
Design Specifications of Condenser
30
8
Design Specifications of Smoke Stack
30
9
Equipment Cost Specification
34
10
Equipment Cost for the Set Up
34
11
Miscellaneous Cost
35
12
Operating Cost Percentage Analysis
36
13
Summary of Operating Expenses
59
14
Power Generation Price and Revenue for 19 years
61
iv
LIST OF FIGURES Figure 1
Title Combined Cycle Gas Turbine
Page no. 22
Power Plant Schematic Diagram 2
Diagram of a Typical Spray Condenser
22
3
Modular Heat recovery Steam Generator
23
4
Power Generation Gas Turbine
23
5
Diagram of a Typical Water-Cooled Surface Condenser
6
Sample Set up of a Combined Cycle Gas Turbine Power Plant
7
54
Temperature – Entropy Diagram of the Steam side of the Combined Cycle.
10
45
Schematic Diagram of the Steam side of the Combined Cycle.of the Combined Cycle
9
25
Schematic Diagram of the Steam side of the Combined Cycle
8
24
55
Detailed Flow Diagram of the Combined Cycle Gas Turbine Power Plant.