Small and medium sized LNG for power plantFull description
Iluminación para cine. Manual
Full description
Iluminación para cine. Manual
A comprehensive guide to jazz arrangement and writingFull description
lightingFull description
BCOFull description
BS
wmsFull description
A Case Study on Lighting for Museums and GalleriesFull description
Full description
Descrição: Para estudiantes de cine y audiovisual
Export impact for goods - Model contracts for small firms Legal guidance for doing international business (Sách song ngữ) PHÒNG THƯƠNG MẠI VÀ CÔNG NGHIỆP VIỆT NAM - TRUNG TÂM WTO Trung tâm…Full description
Descripción: Macrame
Export impact for goods - Model contracts for small firms Legal guidance for doing international business (Sách song ngữ) PHÒNG THƯƠNG MẠI VÀ CÔNG NGHIỆP VIỆT NAM - TRUNG TÂM WTO Trung tâm Thươn...
vacum pumpFull description
Package for Hand and Power Tools.fv.DocFull description
This document help to evaluate the performance of small hydro power plants
Pearl GTL Project LINDE ENGINEERING
Shell Project No: HP-3000-QAT
Contractor Project No:
Project Document Number: T.4.318.621
Project Rev.: O
5887
Page 1 of 15
SUPPLIER/VENDOR DOCUMENTATION Purchase Order Number:
2MH127
Equipment Description:
N/A
Vendor/Supplier Name:
GAMA QATAR CO. W. L. L.
Document Title:
ITP FOR LIGHTING AND SMALL POWER (BUILDING)
Vendor/Supplier Doc Number:
GAM-ITP-QAC-GTL-049
Tag/Item Number(s):
SEE NEXT PAGE
Unit: SEE NEXT PAGE
Vendor/Supplier Code:
LOC470
Vendor/Supplier Revision: C
PCWBS: SEE NEXT PAGE Vendor/Supplier Checked By
Vendor/Supplier Prepared By
Vendor/Supplier Approved By
Initials / Signature
Initials / Signature
SM
KB
Initials / Signature
Vend/Supp Revision Date
AG
19.02.2009
Status of Submission (tick applicable box before submission) Final: Certified: As-Built:
For Review/Info: X
Purchaser signature below does not indicate responsibility or liability for accuracy or completeness of this document, nor does it alter any contractual terms or conditions or relieve the Supplier/Vendor of his contractual obligations.
PURCHASER AREA BELOW Contractor Contract Number:
PI – 092
Contractor Name:
Contractor Doc. No: GAMAC-0100-E-PC 1342
Review Code and Status
Code 1
No Comments. ACCEPTED. Work May Proceed.
Code 2
Comments As Noted. Incorporate Comments, Revise and Resubmit. Work May Proceed.
Code 3
REJECTED. Incorporate Comments, Revise and Resubmit. Work May NOT Proceed.
QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION
C
19.02.09
Issued For Company Comments
SM
KB
AG
ICC
B
19.02.09
Issued For Review
SM
KB
AG
IFR
A
19.02.09
Issued For Internal Review
SM
KB
AG
IIR
Date
Description
GAMA Rev. No.
Project Rev No.
Prepared Checked Approved By By By ORIGINATOR
Status
Document Title:
ITP FOR LIGHTING AND SMALL POWER (Building) LINDEGINEERING AG Document No.
Contractor
Gama Qatar Co. W. L. L.
LOC470 GAM
ITP
QAC
GTL
049
C
Org. Code
Doc. Type
Disc. Code
Geogr. Area
Seq. No
Rev. No
Project Document Number: T-4.318.621
Vendor Code
Rev No: O
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL- 049
C2 ASU Construction Works
ITP FOR LIGHTING AND SMALL POWER (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 19.02.2009
Rev. C
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
Manufacturer’s Technical data sheet, certificates, visual damage.
T-4.318.619
Manufacturer’s Technical data sheet, certificates, visual damage.
Site Engineer
GAM-QCR-QACGTL-079
R
R
I
R R
I
R R
GAM-QCR-QAC2.2
Small tools and equipment inspection
T.4.318.621 Rev. O
100%
Site Engineer
GTL-174 GAM-QCR-QACGTL-175 GAM-QCR-QACGTL-176
Page 4
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-049
C2 ASU Construction Works
ITP FOR LIGHTING AND SMALL POWER (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 19.02.2009 Rev. C A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
ITP FOR LIGHTING AND SMALL POWER (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 19.02.2009 Rev. C A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
4.0
4.1
4.2
Activity
Test Frequency
Reference Document
Acceptance Criteria
Responsible Party
T-4.318.616
DEP33.64.10.10 & As per project specification
Site Engineer
DEP33.64.10.10 & As per project specification
Site Engineer
DEP33.64.10.10 & As per project specification
Site Engineer
S
X
C
H
I
H
I
H
I
BUILDINGS LIGHTINGS
Lighting Fixture Installation
100 %
Junction box, switches & outlet installation
100 %
Testing of Cables
100 %
T-4.318.617
T-4.318.616 T-4.318.617
T-4.318.616 4.3
Verifying Documents
T-4.318.617
T.4.318.621 Rev-O
GAM-QCR-QACGTL-181
GAM-QCR-QACGTL-178
GAM-QCR-QACGTL-182
Page 6
A
C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY