AUTHORITY SUBMISSION LIST No. 1.
Type of Approval Building plans
Authority
Authority’s Requirement
Local Council – Building department
Building plan submission guideline Forms Checklist Other relevant information*
Authority Submission
2.
Structural
Local Council – Engineering Dept
3.
Hoarding & signboard
Local Council – Building dept
Doc.Ref. : MAA/D&D/ASL
Building plans Acknowledged copy of submission letter of technical department (JKR, JPP(IWK), JPS, Bomba, Kesihatan) Submission fees (to be paid by client Blue Forms - Form A - Form B - Form C - Form D - Form E As – built drawings Inspection & Contribution Fee to be paid by client) CF Application
Authority’s Output Acknowledged copy of submission letter Endorsed building plans Letter of approval
Certificate of fitness
Structural submission guidelines Forms Checklist Other relevant information*
Structural & calculation drawings (to be submitted by C&S engineer)
Acknowledged copy of submission letter
‘Hoarding & Signboard’ submission guidelines Forms Checklist Other relevant information*
Hoarding & Signboard drawings Submission fees (to be paid by client)
Acknowledged copy of submission letter Endorsed hoarding & signboard drawings Letter of approval
Rev.No. : 0
Issue Date : 22 July 2006
Page : 1 of 3
AUTHORITY SUBMISSION LIST No. 4.
Type of Approval Permit for Temporary Building
Authority
Authority’s Requirement
Authority Submission
Authority’s Output
‘Temporary Building’ submission guidelines Forms Checklist Other relevant information
Temporary building drawings Submission fees (to be paid by client)
Acknowledged copy of submission letter Endorsed temporary building drawings Letter of approval
Earthworks guideline Forms Checklist Other relevant information*
Earthworks drawing to be submitted by C&S engineer Submission fees ( to be paid by client)
Acknowledge copy of submission letter Endorsed earthworks drawings Letter of approval
Local Council – Building dept
5.
Earthworks
Local Council – Engineering Dept
6.
Road & Infrastructure
Local Council – Engineering Dept
Road and Drain submission guideline Forms Checklist Other relevant information*
Road and Drain - drawing to be submitted by C&S engineer Submission fees ( to be paid by client) CF Application Contribution fee ( to be paid by client)
Acknowledge copy of submission letter Endorsed road & drain drawings Letter of approval. Confirmed date of inspection CF support letter
7.
Main Internal Roads and External Roads
‘Jabatan Kerja Raya’
Submission Forms Checklist Other relevant information*
Submission drawings (to be submitted by C&S engineer) Submission fees (to be paid by client) CF Application
Acknowledged copy of submission letter Endorsed drawings Letter of approval Confirmed date of inspection CF support letter
8.
Sewerage
‘Jabatan Perkhidmatan Pembentungan’ / IWK
‘Sewerage’ guideline (C&S engineer to submit) Forms Checklist
Sewerage drawings (to be submitted by C&S engineer Submission fees ( to be paid by client)
Acknowledge copy of submission letter Endorsed sewerage drawings Letter of approval Page : 2 of 3
Doc.Ref. : MAA/D&D/ASL
Rev.No. : 0
Issue Date : 22 July 2006
AUTHORITY SUBMISSION LIST No.
9.
10
Type of Approval
Authority
Authority’s Requirement
River & Water Channels / Detention Ponds
‘Jabatan Perparitan & Saliran (JPS)
Water supply (external)
Jabatan Bekalan Air (JBA), (PUAS), (LAP) or etc
Authority Submission
Authority’s Output
Other relevant information*
Submission guidelines (C&S) MASMA Requirements Forms Checklist Other relevant information*
Drainage and Detention Ponds drawings to be submitted by C&S Engineer Submission fees (to be paid by Client) CF Application
Acknowledge copy of submission letter Endorsed drawings Letter of approval
Submission guidelines Forms Checklist Other relevant information*
Water supply drawings (to be submitted by C&S engineer Submission fees ( to be paid by client)
Acknowledge copy of submission letter Endorsed drawings Letter of approval
CF Application As-built drawings forms Contribution fee (to be paid by client)
Confirm date of inspection CF CF support letter
CF Application PDC 1 PDC 3 PDC 5 PDC 7/8 Contribution fee (to be paid by client)
Confirm date of inspection CF CF support letter