Huawei LTE eNodeB Site Solution & Installation Key Point V1.4 2012-March 28 www.huawei.com
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
LTE Network Topology CONTENTS Chapter1: Site Solution Chapter2: Installation Key Point and Mistake
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 2
RRU Power Cable Solution
Power Cable: 3.3mm^2-2*12AWG
0~45m
DCDU-11B
RRU3232 < 45m
46~100m
DCDU-11B
3.3方直流 Power Cable: 8.2mm^2-2*8AWG
OCB
<1m
> 45m & <100m 46≤ RRU拉远距离≤ 100m
Notes:
If the power cable length(between RRU and DCDU) >100m, please contact Huawei Site Engineer for special solution。
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 3
RRU3232
BBU and DCDU install on the Transmission Cabinet
5
1) Power cable of RRU from Sector A connected Load 0; Power cable of another RRU connected to Load 1; Power cable of BBU connected to Load 6. 2) CPRI Fiber of RRU from Sector A connected to CPRI 0 on LBBP board; CPRI Fiber of another RRU connected to CPRI 1 on LBBP board. 3) Transmission Fiber connected to SFP 0; Transmission Ethernet Cable connected to GE/FE 0 4) CPRI Fiber should be tied with Hook & Loop Mechanical Fastener. 5) 1 U space should be reserved between BBU and DCDU. HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 4
Cable connection for RRU installed on Tower (Extended RET cable between two RCUs use 15m) RRU 0
RRU 1
-45 +45
-45 +45
-45 +45
15M Extended RET cable ANT0 ANT1 ANT2 ANT3
ANT0 ANT1
Sector A
Sector C
Sector B
ANT0 & ANT1 of RRU0 are connected to +45 & -45 port of sector A antenna; ANT2 & ANT3 of RRU0 are connected to +45 & -45 port of sector C antenna; ANT0 & ANT1 of RRU1 are connected to +45 & -45 port of sector B antenna. HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 5
RRU installed on Tower RRU0 is installed on the same pole with antenna of sector A; RRU1 is installed on the same pole with antenna of sector B. RRU and antenna can be installed as back to back. RRU can be installed on a pole near the pole for antenna. RRU should be grounded on tower.
Sector A
Sector B
HUAWEI TECHNOLOGIES CO., LTD.
Sector C
Huawei Confidential
Page 6
Cable connection for RRU installed on roof pole site (Extend RET cable between two RCUs use 30m)
-45 +45
-45 +45
-45 +45
Feeder 30M Extended RET cable
ANT0 ANT1 ANT2 ANT3
Sector 1
ANT0 ANT1
Sector 2
Sector 3
Make the feeder to be shortest when you choose Sector 1 and 2 to share one RRU When the distance between two sectors is longer than 12m, and shorter than 40m. Use the 7/8 feeder;
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 7
Cable connection for RRU installed on roof pole site (Extend RET cable between two RCUs use 50m)
-45 +45
0.5M RET cable
-45 +45
-45 +45
Feeder
ANT0 ANT1 ANT2 ANT3
50M Extended RET cable
ANT0 ANT1
Sector 1 Sector 2 Sector 3 SBT must connected to ANT0 of RRU. The feeder to be shortest when you choose Sector 1 and 2 to share one RRU When the distance between two sectors is longer than 12m, and shorter than 40m. Use the 7/8 feeder; When the distance between two sectors is longer than 40m, then use 13/8 feeder. HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 8
Cable connection inside RRU cabling cavity.
1
1) CPRI fiber is connected to CPRI 0; 2) The metal shield of RRU power cable should be cut and grounding on clip inside RRU cabling cavity; 3) The water plugs should be filled in the vacant troughs of the RRU cabling cavity.
2 3 HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 9
Antennas cable connection 1) 2) 3) 4)
RCU is connected to the TILT as the picture. +45 is the port 0 for antenna. - 45 is the port 1 for antenna. The vacant port of the antenna should be waterproofed. 5) The TILT cover of vacant port should be fasten.
1 2、3
5
4
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 10
Antennas Labeling
ANT_0A
ANT_0B
ANT_0C
ANT_1A
ANT_1B
ANT_1C
Sector A HUAWEI TECHNOLOGIES CO., LTD.
Sector B Huawei Confidential
Sector C Page 11
GPS installation GPS antenna is suggested to installed on the cable tray. Arrestor is not allowed to touch the cable ladder. The Arrestor should be grounded.
Arrestor GPS Antenna HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 12
RRU Label Rules
ANT_1B
ANT_0B
RRU 1
ANT_1C
ANT_0C
ANT_1A
ANT_0A
RRU 0
RRU Label Rules:
Sector: A 、B、C Path: 0、1、2、3
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 13
LTE Network Topology CONTENTS Chapter1: Site Solution Chapter2: Installation Key Point and Mistake
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 14
Safety belt and cap is extremely needed. Right
Wrong
Notes: Safety cap is needed for the working on the site. And the safety belt is needed for working on the tower or poles.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 15
Connect the power cable to the right port Right
Wrong
Notes: 1. Power cable of RRU0 should be connected to LOAD0, label with LTE PWR RRU0 2. Power cable of RRU1 should be connected to LOAD1, label with LTE PWR RRU1 3. BBU should be connected to LOAD6, label with PWR BBU PS: RRU0 is connected to the sector A antenna HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 16
Remove the shield of the power cable near connector Right
Wrong
Notes: The black shield of the power cable near the power connector of DCDU should be cut and tied up.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 17
The CPRI fiber should be tied. Right
Wrong
Notes: The CPRI fiber should be tied with Hook & Loop Mechanical Fastener. Don’t use cable tie.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 18
Put the redundant fiber on the Transmission Rack bottom Right
Wrong
Notes: The redundant fiber should be circled and put on the bottom of the transmission rack. Don’t put it outside the tower or on the cable tray.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 19
The heat-shrink tube is used and shrink well. Right
Wrong
Notes: The power cable should use the heat-shrink tube. And it should be done well.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 20
Ground the DCDU on the Transmission Cabin Right
Wrong
Notes: Ground the DCDU on the Transmission cabin. ( Use 6mm grounding cable. )
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 21
Installed the bracket assembly on the right direction Right
Wrong
Notes: Follow the label on the bracket assembly carefully. And make sure the bracket assembly of the RRU is installed on the right direction.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 22
The metal shield of RRU power cable is wrongly cut. Right
Wrong
Notes: The metal shield of RRU power cable should be cut and grounding on clip inside RRU cabling cavity. The metal shield can not be cut too long and it go outside the cabling cavity.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 23
The waterproof plugs are filled in the vacant troughs Right
Wrong
Notes: The water plugs should be filled in the vacant troughs of the RRU cabling cavity.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 24
The vacant RF ports of the RRU are waterproofed. Right
Wrong
Notes: Vacant RF ports of RRU are covered with waterproof caps and the caps are tightened.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 25
Labeling the Jumpers of the RRU with the correct Label Right
Wrong
Notes: Use Label ANT_0A and ANT_1A for Sector A; Use Label ANT_0B and ANT_1B for Sector B; Use Label ANT_0C and ANT_1C for Sector C. HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 26
The vacant RF ports of the antenna are waterproofed. Right
Wrong
Notes: Vacant RF ports of antenna are covered with waterproof caps and the caps are tightened.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 27
The RF cable of GPS can’t be circled. Right
Wrong
GPS_0
Notes: The redundancy RF cable of GPS should be cut. Don’t circle it if it is too long.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 28
Remove the oil paint of the tower for grounding point Right
Wrong
Notes: Oil paint of tower is not removed on earth grounding point. electric ability surge protection will be decreased.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 29
The power cable are grounded beside the Roxtec Right
Wrong
Notes: The power cables of the RRU should be grounded by the grounding clip on the grounding bat before routed into the Roxtec.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 30
The power cable should be grounded in the OCB. Right
Wrong
Notes: The metal shield of the power cable should be grounded inside the OCB.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 31
BBU and DCDU should be fixed with screws. Right
Wrong
Notes: BBU and DCDU should be fixed with screws. Cable ties is forbidden to use for fixing equipment.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 32
OCB should be grounded Right
Wrong
Notes: The OCB should be grounded.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 33
The waterproof cover of OCB should be fasten. Right
Wrong
Notes:
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 34
Keep the environment of the site neat and clean Right
Wrong
Notes: Keep the environment of the site neat and clean. Don’t leave any boxes, cables, bottles… inside and outside the shelter. Take all the garbage away the site.