Training Course
User Input Document
1
Prepared By SR
Training Course
2
Primavera Project Planner User Input Document Defining a project: File
New
Project Name Number/Version Project Title Company Name Planning Unit Workdays/week Project Start Project must finish by Decimal Places week starts on
First four numeric of your employee# Rev-0 Methanol Plant Training Project DESCON Engineering Limited Day 6 02-Jan-06 30-Jun-07 2 Monday
Note: All remaining information will be as default
User Input Document
Prepared By SR
Training Course
User Input Document
3
Prepared By SR
Training Course
Data
4
Activity Codes
Add following information Codes # 1 2 3 4
Name DISP ZONE AREA CCTR
Length 1 4 4 5
Description Discipline Zone Area Cost Center
Now • • •
select “DISP” System will ask for “Save structure edits” Press “yes”
Values : DISP Value C M E •
Description Civil Mechanical Elec Electr tric ical al & Inst Instru rume ment ntat atio ion n
Order 1 2 3
Select “ZONE”
Values : ZONE Value Z1 Z3 Z2 •
Description General Civil Works Utilities & Offsite Zone Process Zone
Order 1 2 3
Select “AREA”
Values : Area Value Z1A2 Z1A3
Description Pipe rack/Sleeper foundation Equipment Foundation
Order 1 2
Z1A1
Sub-Station Building Common Equipment Process main pipe rack Compressor feed gas treatment Sub Station Common Area Utility equipment cooling water Utility Sleeper Utility offsite pipe rack Utility equipment boiler Utility/Offsite Utility/Offsite
3 4 5 6 7 8 9 10 11 12 13
Z2A1 Z2A2 Z2A3 Z2A4 Z2A5 Z3A3 Z3A2 Z3A4 Z3A5 Z3A1
User Input Document
Prepared By SR
Training Course
•
5
Select “CCTR”
Values: CCTR Value 21120 21130 21210 21310 21410 21870 21525 21835 21840 21885 22120 22130 22140 22210 22220 22410 22520 23120 23130 23320 23330 23420 23530 23610 25320 25410 25510 25520 25620 25730 25820
Description Excavation Backfilling/Compaction Concrete Placement Form work Rebar fixing rack/sleeper Anchor bolts and embedded items Mortar Finishing Misc. Steel Protective coating/water proofing Flooring, doors, finishing etc. Structure Pipe support fabrication Pipe support erection Equipment installation Erection of equipment Insulation Painting of equipment Pipe fabrication CS Pipe erection CS Pipe fabrication SS Pipe erection SS PWHT NDT Hydro testing, cleaning flushing Cable trays and cover installation Light installation Cable laying Cable termination Field instrument installation Fabrication & Erection of supports Loop Test
Press “Close” button
User Input Document
Prepared By SR
Training Course
User Input Document
6
Prepared By SR
Training Course
7
Add Activities Activity id 0001 0011 0021 0031 0041 0051 0061 0071 0081 0091 0101 0111 0121 0131 0141 0151 0161 0171 0181 0191 0201 0211 0221 0231 0241 0251 0261 0271 0281 0291 0301 0311 0321 0331 0341 0351 0361 0371 0381 0391 0401 0411 0421 0431
Activity description PROJECT START EXCAVATION EXCAVATION REBAR FIXING RACK/SLEEPER CONCRETE PLACEMENT BACKFILLING AND COMPACTION COMPACTION MORTAR FININSHING RACK/SLEEPER FOUNDATION MISC. STEEL RACK/SLEEPER FOUNDATION PROTECTTIVE COATING/WATER PROOFING ANCHOR BOLTS AND EMBEDDED ITEMS EXCAVATION EXCAVATION REBAR FIXING EQUIP. CONCRETE PLACEMENT BACKFILLING & COMPACTION MORTAR FINISHING PROTECTIVE COATING/WATER PROOFING ANCHOR BOLTS/EMBEDDED ITEM DRAINAGE PIPE WORKS EXCAVATION EXCAVATION FORMWORK INSTALLATION & REMOVAL REBAR FIXING CONCRETE PLACEMENT Backfilling and compaction WATER PROOFING ROOFING SUB STATION FLOORING DOORS WINDOWS PIPING FABRICATION CS PIPING ERECTION ERECTION CS PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDROTESTING CLEANING FLUSHING NDT PIPING FABRICATION CS PIPING ERECTION ERECTION CS PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDROTESTING HYDROTESTING CLEANING FLUSHING NDT PIPING FABRICATION CS PIPING FABRICATION SS PIPING ERECTION ERECTION CS PIPING ERECTION SS PIPE SUPPORTS FABRICATION PIPE SUPPORT ERECTION
User Input Document
Original duration 0 76 70 68 84 56 70 50 64 55 82 84 75 75 70 75 60 40 82 83 77 84 27 26 50 40 72 131 111 130 86 150 70 131 102 131 120 139 98 32 115 113 104 140 Prepared By SR
Training Course
0441 0451 0461 0471 0481 0491 0501 0511 0521 0531 0541 0551 0561 0571 0581 0591 0601 0611 0621 0631 0641 0651 0661 0671 0681 0691 0701 0711 0721 0731 0741 0751 0761 0771 0781 0791 0801 0811 0821 0831 0841 0851 0861 0871 0881 0891 0901 0911
HYDROTESTING, CLEANING, FLUSHING ERECTION OF DUMP STEAM CONDENSOR ERECTION OF FLASHED STEAM CONDENSOR NDT PWHT INSULATION OF EQUIPMENT PIPING FABRICATION CS PIPING ERECTION ERECTION CS PIPING FABRICATION SS PIPING ERECTION SS PIPE SUPPORTS FABRICATION PIPE SUPPORT ERECTION ERECTION OF BOILER INSULATION OF EQUIPMENT HYDROTESTING, CLEANING, FLUSHING NDT PWHT STRUCTURE STRUCTURE FIELD INSTRUMENT INSTALLATION UTILITY FILED INSTRUMENT INSTALLATION OFFSITE CABLE TRAYS & COVERS INSTALLATION CABLE LAYING CABLE TERMINATION TERMINATION FABRICATION AND ERECTION OF SUPPORTS LOOP TEST STATIONARY EQUIPMENT INSTALLATION PIPING FABRICATION CS PIPING FABRICATION SS PIPING ERECTION ERECTION CS PIPING ERECTION SS PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDROTESTING HYDROTESTING CLEANING FLUSHING NDT ERECTION OF HEAVY ENDS CONDENSOR WEST SIDE ERECTION OF HEAVY ENDS CONDENSOR EAST SIDE INSULATION OF EQUIPMENT ERECTION OF WATER COOLER PIPING FABRICATION CS PIPING ERECTION ERECTION CS PIPING FABRICATION SS PIPING ERECTION SS ERECTION OF GAS COMPR/TURBINE PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDROTESTING HYDROTESTING CLEANING FLUSHING NDT PWHT
User Input Document
8 111 21 22 201 201 49 117 160 83 139 108 165 114 168 91 195 204 60 35 64 78 45 39 77 28 62 145 64 170 118 150 170 130 170 27 25 54 10 130 117 99 92 79 120 140 114 153 208 Prepared By SR
Training Course
0921 0931 0941 0951 0961 0971 0981 0991 1001
INSULATION OF EQUIPMENT CABLE TRAYS & COVERS INSTALLATION CABLE LAYING CABLE TERMINATION TERMINATION FABRICATION AND ERECTION OF SUPPORTS LIGHT INSTALLATION INSTALLATION INSULATION OF PIPE/MISC. EQPT PAINTING OF EQUIPMENT AND PIPING PROJECT COMPLETION
User Input Document
9 49 163 141 66 152 24 190 154 0
Prepared By SR
Training Course
User Input Document
10
Prepared By SR
Training Course
11
Assign Discipline,Zone,Area & CCTR to Activities Press F7, it will open activity form Select the activity one by one Assign “type” Assign Discipline, Zone, Area & CCTR from dropdown menu given at the bottom of form Press OK • • • •
•
ZONE = Z1 AREA = Z1A1
Activity id 0171 0181 0191 0201 0211 0221 0231 0241 0251
Activity description EXCAVATION FORMWORK INSTALLATION & REMOVAL REBAR FIXING CONCRETE PLACEMENT Backfilling and compaction WATER PROOFING ROOFING SUB STATION FLOORING DOORS WINDOWS
Type
Disp
Zone
Task Task Task Task Task Task Task Task Task
C C C C C C C C C
Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1
Area
CCTR
Z1A1 Z1A1 Z1A1 Z1A1 Z1A1 Z1A1 Z1A1 Z1A1 Z1A1
21120 21310 21410 21210 21130 21885 21885 21885 21885
AREA = Z1A2
0001 0011 0021 0031 0041 0051 0061 0071 0081
PROJECT START EXCAVATION REBAR FIXING RACK/SLEEPER CONCRETE PLACEMENT BACKFILLING AND COMPACTION MORTAR FININSHING RACK/SLEEPER FOUNDATION MISC. STEEL RACK/SLEEPER FOUNDATION PROTECTTIVE COATING/WATER PROOFING ANCHOR ANCH OR BOLTS AND EMBEDDED ITEMS
User Input Document
Start mile stone Task Task Task Task Task Task Task Task
C
Z1
Z1A2
C C C C
Z1 Z1 Z1 Z1
Z1A2 Z1A2 Z1A2 Z1A2
21120 21410 21210 21130
Z1
Z1A2
21525
Z1 Z1 Z1
Z1A2 Z1A2 Z1A2
21835 21840 21870
C C C C
Prepared By SR
Training Course
12
AREA = Z1A3
0091 0101 0111 0121 0131 0141 0151 0161
EXCAVATION REBAR FIXING EQUIP. CONCRETE PLACEMENT BACKFILLING & COMPACTION MORTAR FINISHING PROTECTIVE COATING/WATER PROOFING ANCHOR BOLTS/EMBEDDED ITEM DRAINAGE PIPE WORKS
User Input Document
Task Task Task Task Task Task Task Task
C C C C C C C C
Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1
Z1A3 Z1A3 Z1A3 Z1A3 Z1A3 Z1A3 Z1A3 Z1A3
21120 21410 21210 21130 21525 21840 21870 21885
Prepared By SR
Training Course
User Input Document
13
Prepared By SR
Training Course
14
ZONE = Z2 AREA = Z2A1
Activity id 0691
Activity description STATIONARY EQUIPMENT INSTALLATION
Type
Disp
Task
M
Zon e Z2
Task Task Task Task Task Task Task Task
M M M M M M M M
Task
M
Area
CCTR
Z2A1
22210
Z2 Z2 Z2 Z2 Z2 Z2 Z2 Z2
Z2A2 Z2A2 Z2A2 Z2A2 Z2A2 Z2A2 Z2A2 Z2A2
23120 23320 23130 23330 22130 22140 23610 23530
Z2
Z2A2
22210
Z2A2
22210
AREA = Z2A2
0701 0711 0721 0731 0741 0751 0761 0771 0781 0791 0801 0811
PIPING FABRICATION CS PIPING FABRICATION SS PIPING ERECTION CS PIPING ERECTION SS PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDROTESTING CLEANING FLUSHING NDT ERECTION OF HEAVY ENDS CONDENSOR WEST SIDE ERECTION OF HEAVY ENDS CONDENSOR EAST SIDE INSULATION OF EQUIPMENT ERECTION OF WATER COOLER
Task Task Task
M
Z2
M M
Z2 Z2
Z2A2 Z2A2
22410 22210
M M M M M M M M M M M
Z2 Z2 Z2 Z2 Z2 Z2 Z2 Z2 Z2 Z2 Z2
Z2A3 Z2A3 Z2A3 Z2A3 Z2A3 Z2A3 Z2A3 Z2A3 Z2A3 Z2A3 Z2A3
23120 23130 23320 23330 22220 22130 22140 23610 23530 23420 22410
AREA = Z2A3
0821 0831 0841 0851 0861 0871 0881 0891 0901 0911 0921
PIPING FABRICATION CS PIPING ERECTION CS PIPING FABRICATION SS PIPING ERECTION SS ERECTION OF GAS COMPR/TURBINE PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDROTESTING CLEANING FLUSHING NDT PWHT INSULATION OF EQUIPMENT
User Input Document
Task Task Task Task Task Task Task Task Task Task Task
Prepared By SR
Training Course
15
AREA = Z2A4
Activity id 0931 0941 0951 0961 0971
Disp Activity description CABLE TRAYS & COVERS INSTALLATION CABLE LAYING CABLE TERMINATION FABRICATION AND ERECTION OF SUPPORTS LIGHT INSTALLATION INSTALLATION
Type Task Task Task Task Task
E E E E E
Zon e Z2 Z2 Z2 Z2 Z2
Area Z2A4 Z2A4 Z2A4 Z2A4 Z2A4
CCTR 25320 25510 25520 25730 25410
M M
Z2 Z2
Z2A5 Z2A5
22410 22520
Z2
Z2A5
AREA = Z2A5
0981 0991
INSULATION OF PIPE/MISC. EQPT PAINTING OF EQUIPMENT AND PIPING
1001
PROJECT COMPLETION
User Input Document
Task Task Finish mile stone
Prepared By SR
Training Course
User Input Document
16
Prepared By SR
Training Course
17
ZONE = Z3 AREA = Z3A1 Activity id 0621 0631 0641 0651 0661 0671 0681
Disp Activity description FIELD INSTRUMENT INSTALLATION UTILITY FILED INSTRUMENT INSTALLATION OFFSITE CABLE TRAYS & COVERS INSTALLATION CABLE LAYING CABLE TERMINATION FABRICATION AND ERECTION OF SUPPORTS LOOP TEST
Type Task Task Task Task Task Task Task
E E E E E E E
Zon e Z3 Z3 Z3 Z3 Z3 Z3 Z3
Area
Task Task Task Task Task Task
M M M M M M
Z3 Z3 Z3 Z3 Z3 Z3
Z3A2 Z3A2 Z3A2 Z3A2 Z3A2 Z3A2
23120 23130 22130 22140 23610 23530
Task Task Task Task Task Task
M M M M M M
Z3 Z3 Z3 Z3 Z3 Z3
Z3A3 Z3A3 Z3A3 Z3A3 Z3A3 Z3A3
23120 23130 22130 22140 23610 23530
Z3A1 Z3A1 Z3A1 Z3A1 Z3A1 Z3A1 Z3A1
CCTR 25620 25620 25320 25510 25520 25730 25820
AREA = Z3A2
0321 0331 0341 0351 0361 0371
PIPING FABRICATION CS PIPING ERECTION CS PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDROTESTING CLEANING FLUSHING NDT
AREA = Z3A3
0261 0271 0281 0291 0301 0311
PIPING FABRICATION CS PIPING ERECTION CS PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDROTESTING CLEANING FLUSHING NDT
User Input Document
Prepared By SR
Training Course
18
AREA = Z3A4 Activity id 0381 0391 0401 0411 0421 0431 0441 0451 0461 0471 0481 0491
Disp Activity description PIPING FABRICATION CS PIPING FABRICATION SS PIPING ERECTION CS PIPING ERECTION SS PIPE SUPPORTS FABRICATION PIPE SUPPORT ERECTION HYDROTESTING, CLEANING, FLUSHING ERECTION OF DUMP STEAM CONDENSOR ERECTION OF FLASHED STEAM CONDENSOR NDT PWHT INSULATION OF EQUIPMENT
Type Task Task Task Task Task Task Task Task
M M M M M M M M M
Zon e Z3 Z3 Z3 Z3 Z3 Z3 Z3 Z3 Z3
Area Z3A4 Z3A4 Z3A4 Z3A4 Z3A4 Z3A4 Z3A4 Z3A4 Z3A4
CCTR 23120 23320 23130 23330 22130 22140 23610 22210
Task Task Task Task
M M M
Z3 Z3 Z3
Z3A4 Z3A4 Z3A4
22210 23530 23420 22410
Task Task Task Task Task Task Task Task Task Task Task Task
M M M M M M M M M M M M
Z3 Z3 Z3 Z3 Z3 Z3 Z3 Z3 Z3 Z3 Z3 Z3
Z3A5 Z3A5 Z3A5 Z3A5 Z3A5 Z3A5 Z3A5 Z3A5 Z3A5 Z3A5 Z3A5 Z3A5
23120 23130 23320 23330 22130 22140 22210 22410 23610 23530 23420 22120
AREA = Z3A5
0501 0511 0521 0531 0541 0551 0561 0571 0581 0591 0601 0611
PIPING FABRICATION CS PIPING ERECTION CS PIPING FABRICATION SS PIPING ERECTION SS PIPE SUPPORTS FABRICATION PIPE SUPPORT ERECTION ERECTION OF BOILER INSULATION OF EQUIPMENT HYDROTESTING, CLEANING, FLUSHING NDT PWHT STRUCTURE
User Input Document
Prepared By SR
Training Course
User Input Document
19
Prepared By SR
Training Course
20
Organize the Schedule Format
Organize
Group By Project Zone Area • •
Also Select the Background and text colour Press the button “Organize now”
User Input Document
Prepared By SR
Training Course
User Input Document
21
Prepared By SR
Training Course
22
Assign Relationship and Schedule
Select the activity Press “SUCC” Tab Select the successor activity Assign the Relationship Press “OK” Press F9 Press “Schedule now” Repeat above steps to assign each of the following relationship: • • • • • • •
Successor
Activity id 0001 0011
Activity Description
Activity id 0011 0261 0021 0091
PROJECT START EXCAVATION
0051 0061 0071
0071 0401 1001
PIPING ERECTION CS PROJECT COMPLETION
REBAR FIXING RACK/SLEEPER
0031 0061 0081
CONCRETE PLACEMENT
0041 0051 1001
0021
0031 0041
Activity description descript ion EXCAVATION PIPING FABRICATION CS REBAR FIXING RACK/SLEEPER EXCAVATION CONCRETE PLACEMENT MISC. STEEL RACK/SLEEPER FOUNDATION ANCHOR BOLTS AND EMBEDDED ITEMS BACKFILLING AND COMPACTION MORTAR FININSHING RACK/SLEEPER FOUNDATION PROJECT COMPLETION PROTECTTIVE COATING/WATER PROOFING
BACKFILLING AND COMPACTION MORTAR FININSHING RACK/SLEEPER FOUNDATION MISC. STEEL RACK/SLEEPER FOUNDATION PROTECTTIVE COATING/WATER
User Input Document
REL SS SS SS SS
Lag 0 0 10 30
SS SS SS
12 0 10
FF FF FS
6 4 0
SS
0
SS FS
20 0
Prepared By SR
3 2
0 0 0 3 1 1 8
1 0 0 0 6 4 6 - 2 - 0 0 1 0 8 0 1 1 4 0 0 0
8 0 0
S S S S S S S S S S
S F F S F S S S S S S S F S S S S F F F F F S F S F S S S F S F S F
S S S S F S
1
D
N O M
R E T
& N
F O N O
R S y
3 2
0 0 0 3 1 1 8
1 0 0 0 6 4 6 - 2 - 0 0 1 0 8 0 1 1 4 0 0 0
8 0 0
S S S S S S S S S S
S F F S F S S S S S S S F S S S S F F F F F S F S F S S S F S F S F
S S S S F S
1
T N E M E C A L P E T E R C N O C
R N E D T O M E T I A A T W T D N C E D E T S / A S N E K . E G P R B M P I M I P O N G T I M U E M P O N M A Q C E / U C I U W E A S Q H D E O C L T E N & S G P I F R P I E L N I G O N O Y I N O P V R T I N I O E I G O I X E B A F N S I T T N T F E R N A L O L R I N G C I L I A R A L A E O F T N E F V R O I T C D I T O A A C H T A T K M O C B N C E C R E N A O A S X E O N T T N A O R O R R R E R C A I S I B M E C D P P
1 1 1 3 7 0 0 1 1 0 0 0 e s r u o C g n i n i a r T
S M E T I D E D D E B M E D N A S T L O G B N R I F O O H O C R N P A
N O I T A V A C X E
1 8 0 0
1 9 0 0
1 1 1 5 1 1 0 0
. P I U Q E G N I X I F R A B E R 1 0 1 0
1 1 1 1 1 9 2 3 5 6 6 1 1 4 1 0 0 0 0 0
1 4 1 0
F O N & O I N T O S C T I T n T R E N N N A o N N N i E R O O E I O L O E t I I I c V E T M T L M a T T E E E A E p G E A S O C D L C L T L T C m N P N I W P A P S S o & A c F A N O L L M M I G P d O M B D S N N O P O K I O U N Y I N O O O C E C R X E n C S G I A T I S a R L T I T R A T T T E T O g P T G N W F A A E R n C N I S T L C C W V R R i l C O R E I R E L I l E R E i R A F O A C f E J O L R P J C J M T B P O N O R M B N k B S c T O O O E E O a A R O O O A R O R O U L N A F S P C P F R R C B W P R F D C I 1 1 1 0 1 0 0 1 0 1 0 1
T N E M E C A L P E T E R C N O C
N O I T C A P M O C & G N I L L I F K C A B
M E R T E I T D A E W D S / D G E K N B R I G T M O N A E I / W H O S E S I C T I L P N E O P I V F I B E T G N R G R C I A E F O A N T T O H I R O O C A O R R N R M P P A D
1 1 1 0
1 2 1 0
1 3 1 0
1 4 1 0
1 1 5 6 1 1 0 0
1 1 1 1 1 1 1 1 8 9 0 1 2 0 3 4 1 1 2 2 2 0 2 2 0 0 0 0 0 1 0 0
1 1 1 5 3 6 2 9 9 0 0 0
L A V O M E R & N O I T n T o N N i A O E t L c I L M a T A E p G A T C m I N T S o F S A c N G L I O B N K I U N P d n O R X E a O S I R T T O I P G F E g A W n N l R I V R R i l i E F A M A C f k T O C R B N c A X O E O a O E F R C B W R
G N I R O O L F
1 1 1 7 8 9 1 1 1 0 0 0
1 4 2 0
1 0 2 0
1 1 1 1 2 3 2 2 2 0 0 0
R S y B d e r a p e r P
t n e m u c o D t u p n I r e s U
4 2
6 2 6 2 6 0 6 6 0 0 0 6 0 5 2 0 2 1 0 0 2 - 1 0 0 0 5 0 0 3 2 - 5 0 0 0 2 1 0 1 5 1 2 - 3 1 0 0 1 S S S S S S S S S S S S S S S S S S S S S S S S S S S S S F S F S S S S F S S F F S S S S F S S F F S S S S S S F S S S F S M N A N N , , O I E O G O G G T T I I G N N N N N T I T A S N N I I I S A A S O O S C S N N I O D N C C N I N N C C N I N N S I C A A T T T I I E R A A O N S R O O O O S S S S S I I E E I I I S C R N E C T T N B N L L C H T O T T C B C B E C A O S E C S L E C E O L E C E E I O I I E I E C C R N A C R N L L N A T C R N L L T N F T N , , E L T N A F F A E O P P O E O P P A O S O A O O L P A I G G G G F I I T C I I T C I I T T T T C C N R T M M T R I I N R T M M N I N R T F M I T R I I T R I T I O R C O T O C O O C O R T O C O O R C O R C T T O C O C B E P S P E C C E P B S P E C C B E P B E S S P E R P E G P R T T R P A E G P R T T A R P A R E G E G P R N T A O N U E C C E U F T I N U E C C F E U F E T I N T I N U E I C F E U T I O O O O E G E E E E G G G G G G G G G G H S J J S H S J J S H R H S T T J N N S R S R S R S N N N N N N N N N H C I I E I E I I I E I I O O E I T D U E I O O T I D U D S E O P P P T D U E U P P P P P P P R I I I D Y L P I R R I I D I Y L P I R R I I I D I P I Y L Y L P I P I W R I P I P P P P P N H F P P P P P P N P H F P P P P P P P N P P H F H F P P P E 1 1 1 1 1 0 2 7 8 1 0 3 2 2 3 1 0 0 0 0 e s r u o C g n i n i a r T
1 1 1 1 1 1 1 1 1 0 9 7 0 0 3 4 7 8 3 2 2 0 0 3 3 3 3 0 0 0 1 1 0 0 0 0
S W O D N I W S R O O D
S C N O I T A C I R B A F G N I P I P
G N I H S U L N F O G I T N I N A I O C T N I S R C A C B E E L R C N A O F E G I T N T T R I C R T O O S E P P R P E E P U U T G S S O N E E R T I D P I P I P I Y D P P P H N
1 5 2 0
1 6 2 0
1 7 2 0
1 1 1 1 8 9 0 1 2 2 3 3 0 0 0 0
S C N O I T A C I R B A F G N I P I P 1 2 3 0
1 1 1 1 1 1 1 1 1 1 1 6 5 3 0 0 9 0 2 7 0 1 3 3 3 0 0 3 4 4 4 5 4 0 0 0 1 1 0 0 0 0 0 0
1 4 4 0
1 1 1 1 1 4 3 0 8 6 4 4 4 4 4 0 0 0 0 0
G N I H S U L N F O G I T N I N A I O C T N I S R C A C B E E L R C N A O F E G I T N T T R I C R T O O S E P P R P E E P U U T G S S O N E E R T I D P I P I P I Y D P P P H N
S C N O I T A C I R B A F G N I P I P
S S N O I T A C I R B A F G N I P I P
S C N O I T C E R E G N I P I P
G N I H S U N L F , O I M T G A N A N I O N E C I I T R T A S S B C E P S A E L M R C N F E , U O S G D I T N T T R I F C R T O O O S E P P R P E N E P O U U T I G S S O T N E E R C I D E P I P I P I Y R P P P H E
1 1 1 1 1 3 4 5 6 7 3 3 3 3 3 0 0 0 0 0
1 8 3 0
1 9 3 0
1 0 4 0
1 1 1 1 1 1 2 3 4 5 4 4 4 4 4 0 0 0 0 0
R S y B d e r a p e r P
t n e m u c o D t u p n I r e s U
5 2
R O S N E D N O C
e s r u o C g n i n i a r T
0 0 0 0 0 0 1 0 0 0 0
6 6 0 5 0 0 2 2 - 2 - 3 - 1 3 1 0 5 - 0 0 0 0 6 - 0
S S S S S S S S S S F F F F S S S S S S
S S S S S S S S S F S S S S S S S F F F S S S S F F F F F F F S F S
6 7 6 - 2
F O N N , , O I T T O G G I T N N T N N N A E E I I S C S C O M N I M N N N S R E N N N N C S I A A T P P R E I I I O I O I O N S N B R O I O I O R S E E S I C V E L U T T T C A S L E C U T T T E O O L O Q E E E I I C N C R N Q E E E I C D , , E L L L T N T F E L L L O N O A S O G E I O F P P P B & A G I F P P P A I T T C C N T I N R T O M M M F I T I O M M M S N N I O O R C R R O Y I T C T O C N O O O O E N O O O C C B E B P R A T I S S E S P E O C C C O C T T E G R E G P R I T T T N R A I U R A A T T A F E F P O T C T T N E T I N U E T C C C I L R T I T C C U A E E E G L C A O O C O I E E E E G G G G S H R H S L J T J J T L J J J C R P R S I N I N I N E T U L A N S I N U H U O O O I T O O O E R B S B P D U P D U E S R R R P S P P P I I I I D T A N A U Y L I Y L P I P I N R W R R R N P P P P I P P P N S C I F S H F P H F P P I P P P P E
Y T I T I L N T E U M U N G N O I I T R T Y T T S S A S A E N L E L T I L T E P L P D A L T O B O E S O I N O A L F I L C
1 1 1 1 1 1 1 1 1 1 9 0 0 0 0 1 2 4 9 1 4 0 0 0 7 5 5 5 5 6 0 1 1 1 0 0 0 0 0 0
1 8 6 0
1 1 1 2 8 5 6 6 6 0 0 0
G N I H N S O U I L T N F A , O L I T G L T N A N A N E I T O M N C I I S T A R R P N I E I S B C E U L S A E L T Q C R I E N N F E , O E S O G I T T B F M T R R F O I N U C O O O N T E R E P S R T N O E R P U S P O I E P T T T I N Y U U I A G S S T L O T C I T N E E C U R T H U D I L E D I R E L P Y D I P I P I R S W T I T N H N P S P P P E I F U
N O I T N A L O L I T A T A S L L N A I T S S R N E I V T O N E C M & U S R Y T A S R T N E I T E I D S L E F B L F A I F O C
1 1 1 1 1 1 1 1 1 3 4 5 6 7 8 9 0 1 5 5 5 5 5 5 5 6 6 0 0 0 0 0 0 0 0 0
1 1 1 1 4 7 8 3 6 6 5 5 0 0 0 0
M A E T T N S E M D P E I H U S Q A E L F F O F R O R N O O O S N S I O N I N T E T E A D C D T L N E N T H U S O R O D W N C E C N P I
S C N O I T A C I R B A F G N I P I P
S C N O I T C E R E G N I P I P
S S N O I T A C I R B A F G N I P I P
1 1 1 1 6 7 8 9 4 4 4 4 0 0 0 0
1 0 5 0
1 1 5 0
1 2 5 0
1 1 1 1 1 1 1 1 1 8 5 1 7 0 0 0 0 6 5 5 5 5 0 6 0 0 5 0 0 0 0 1 0 1 1 0
1 2 6 0
1 3 6 0
1 4 6 0
R S y B d e r a p e r P
t n e m u c o D t u p n I r e s U
6 2
6 8 0 6 3 8 0 0 2 6 6 7 6 0 0 0 0 7 2 1 0 0 3 4 - 4 1 0 0 0 0 0 0 0 0 1 2 0 0 2 - 3 S F S S S S S S S S S S S S S S S S S S S S S S S S S S S S F F S F F S S S S S S F S S S F F F F F F F S S S S F S R E N N L O S T O G I I G G N N O D E O T T N N N S I I O N E M S A S A I I C E R N N S N N N N N N N E S I C C A D P T O O I T E O O C S S I A A I I O O R Y S S I I I S I I I N V C N N R S U E N R E S E E E T T T T V T T C C S C T S O B B L S L L O O O O T Q T E E I I E I I N A N C C R N E E A S N F A C N F T C E N A T T T L L L L E L L E E O F O F E O P P A A & P P A A I O O A O P P G G H E F W I I I C T G I M T T N C C T T N N T T N T M M M M M M N I N I I I O F S F I R U R O O O C R R I C I O O O O R R C R M Y I T T O C O O O T C R I O N O E S S P E C C O C E B P S E T T R T A T C C B B E O N C R E G E G P R T T N S I R A P E G R R A T T A A R P S A E S T E T P O E T L C C F F E U E T I E O F U T I T I N T T N N N E L N I I C C C C U I L T L E E E A O O O T T E E E E E E G G G G G G G H R H S J J D L J J S R H G J J N N N S N R S D A L P L A C C S N N N N T T U I I I E I I E T D S I E S B O B S O O T I D U D U E I O O E N S E O O U P P P P P P P P P P P L A A D Y Y O D Y R R I I I I I I R R R R I I I I I R R I N O N L L N E P P P P P N H L F I C L C I P P P P P P N P H F H F P P P P E C I F P 1 1 1 3 6 8 6 6 6 0 0 0 e s r u o C g n i n i a r T
1 1 1 1 1 1 1 1 1 4 0 0 2 1 2 4 7 3 6 0 0 8 7 7 7 7 7 0 1 1 0 0 0 0 0 0
G N I Y A L E L B A C
N O I T A L L F A O T S N N O I I T T C N E E R M N E P O I I D U T N A A Q N E I N Y M I S T R R O E T T S A T A R E N C O T I O E I L R P P T B B P O A A A U O T C F S L S
1 5 6 0
1 6 6 0
1 7 6 0
1 1 8 9 6 6 0 0
1 6 7 0
1 1 1 1 1 6 5 2 0 0 7 7 7 0 0 0 0 0 1 1
1 1 1 1 1 1 1 1 1 9 0 1 0 0 3 4 7 0 7 8 8 0 0 8 8 8 9 0 0 0 1 1 0 0 0 0
S C N O I T A C I R B A F G N I P I P
S S N O I T A C I R B A F G N I P I P
S C N O I T C E R E G N I P I P
G N I H S U R L E N F L O G S S T I N O D D N T I N N E N E O A I O M C D E E N E I C T A D P I I R S R C E Y S Y S I S B E L V T V T U E Q T R C A S A S E N A E E E A A F E O H H E F W I T G T T N F W O I R R R F R F C O O T O O E P P S O O N O O N R P P E N S N S I E U U T I O O O N I N T I T E A T G S S O T E R C D C D L C N U I E E D T E N E N E S P I P I P I Y D R O R O N R P P P H N E C E C I E
1 0 7 0
1 1 7 0
1 2 7 0
1 1 1 1 1 3 4 5 6 7 7 7 7 7 7 0 0 0 0 0
1 8 7 0
1 9 7 0
1 1 0 1 8 8 0 0
R S y B d e r a p e r P
1 1 9 5 8 8 0 0
S C N O I T A C I R B A F G N I P I P
S S S N C O I N T O A I C T I C R E B R A E F G G N I N I P I P I P P
1 2 8 0
1 1 3 4 8 8 0 0
t n e m u c o D t u p n I r e s U
7 2
0 5 0 4 0 1 0 7 - 2 0 0 0 0 4 0 0 0 0 0 S S S S F F S S S S F F S S F S S F S S F F F F F S F F S F F F D N T . A G N N C T N E S S I O I N M I R N P N N N N E N M O O O E / A I T O M I O N V I C S E I I I E U E T T T O N T P T L Q C P O I O I E E E I I E E C E R N P L L L T T C L U L E O A & P Q P G F T I F P P P A N L S N M E M N T G M M M I O O L I R N M A O O F O T N O C N O O O I Y I S O P E O C C C Y R T A T C O C E G I P R I T T T A E S R A T G T T I N T U E T C C C L T I N T L C N C A S G A E E E E E E L E I E O H L L T J T G R S U N U T J J J L L T L A N J N I I H P O O O B B H B T O I D U S E O S S P G A R A I R Y L N P A A I W Q R I P R R I N E P P P C C L C I N P P P P H F I P P P I 1 1 1 1 9 2 8 3 8 9 8 8 0 0 0 0 e s r u o C g n i n i a r T
1 1 1 1 1 1 1 1 1 8 0 0 0 4 5 7 9 9 0 0 0 9 9 9 0 0 1 1 1 0 0 0
1 1 3 0 9 0 0 1
E N I B R U N T / O R I T N P A O M C I I T O S C R C S B E R N S A A F E O I G T T T F R R C O O E O P R N P P E I O U P U G T S S C N E E I E P P I R P I I P E P P
G N I H S U L F G N I N A E L C G N I T S E T O R D Y H
N O I T A L F L A O T N T S O N I N I T E S C M R E P I E N R U V O E N O Q O I I E C T D T N A F & A A L N O S G I N L N M Y A N A I R I S T Y O O T T I R A E S T T L T A R I N A E E E I C O T L L L L R P T U B B B B P H T H S G D W A A A U I N A N P I C C C F S L
1 1 1 1 5 6 7 8 8 8 8 8 0 0 0 0
1 9 8 0
1 1 1 1 1 1 0 1 2 3 4 5 9 9 9 9 9 9 0 0 0 0 0 0
1 6 9 0
1 7 9 0
R S y B d e r a p e r P
1 1 9 0 9 0 0 1 G N I P T I P P Q D E N . A C T S I N M E N / O M I E P T P I I E P U L Q P F E O M F N O O O C I T T G N C A I L T E J U I N O S A R N P P I 1 1 1 8 9 0 9 9 0 0 0 1
t n e m u c o D t u p n I r e s U
8 2
R S y B d e r a p e r P
e s r u o C g n i n i a r T
t n e m u c o D t u p n I r e s U
Training Course
User Input Document
29
Prepared By SR
Training Course
30
Apply Constraint
Select the activity Press “Constr” Tab Click at “Early Constraint” and give ”Start Date” Repeat above steps for each of following constraint:
• • •
Activity id 0861 0781 0321 0261 0451
User Input Document
Activity Description ERECTION OF GAS COMPR/TURBINE ERECTION OF HEAVY ENDS CONDENSOR WEST SIDE PIPING FABRICATION CS PIPING FABRICATION CS ERECTION OF DUMP STEAM CONDENSOR
Start Date 11-Aug-06 15-Jul-06 01-Feb-06 01-Feb-0 6 01-Feb-06 01-Feb-0 6 06-Jun-06 06-Jun- 06
Prepared By SR
Training Course
User Input Document
31
Prepared By SR
Training Course
32
Defining Resources in Resource Dictionary Data
Resources
Add following two resources: Resources 0QTY MH
Press the “close” button Assigning Resources to Activities • • • •
• •
Select Activity Press “RES” Tab Add both resources i.e. MH & 0QTY Against the row of “Budgeted quantity”: Add the values of MH & 0QTY as given below o Add the value of curve Press “OK”
Activity 0001 0011 0021 0031 0041 0051 0061 0071 0081 0081 0091 0091 0101 0111 0111 0121 0121 0131 0141 0151 0151 0161 0161 0171 0181 0181
MH PROJECT START EXCAVATION REBAR FIXING RACK/SLEEPER CONCRETE PLACEMENT BACKFILLING AND COMPACTION MORTAR FININSHING RACK/SLEEPER FOUNDATION MISC. STEEL RACK/SLEEPER FOUNDATION PROTECTTIVE COATING/WATER PROOFING ANCHO ANCHOR R BOLT BOLTS S AND AND EMBE EMBEDD DDED ED ITEM ITEMS S EXCA XCAVATI ATION REBAR FIXING EQUIP. CON CONCRET RETE PLAC LACEMEN MENT BACK ACKFILLI ILLIN NG & COMP OMPACTI CTION MORTAR FINISHING PROTECTIVE COATING/WATER PROOFING ANCH ANCHOR OR BOLT BOLTS/ S/EM EMBE BEDD DDED ED ITEM ITEM DRAI DRAINA NAGE GE PIPE PIPE WORK WORKS S EXCAVATION FORM ORMWOR WORK INS INSTALLA ALLAT TION ION & REM REMOVAL VAL
User Input Document
685 954 1,243.00 80
0QTY 0 1712.50 15.90 194.83 88.89
942
471.00
Curve 6 6 6 6 6 0
4,760.00 4,
9520.00
655 2,28 2,288. 8.00 00 5,71 5,713. 3.00 00 19,069.00 23,9 23,966 66..00 8,71 8,716. 6.00 00 2,504.00
1637.50 1830 1830.4 .40 0 1428 14282. 2.50 50 317.82 3756 3756..43 9684 9684..44 1252.00
3,,308.00 3 4,55 4,552. 2.00 00 2,50 2,500. 0.00 00 975 4,42 4,429. 9.00 00
8270.00 3641 3641.6 .60 0 1250 12500. 0.00 00 2437.50 805. 805.27 27
0 0 0 6 0 6 6 6 6 6 6 6 Prepared By SR
Training Course
0191 0201 0211 0211 0221 0231 0231 0241 241 0251 0261 0261 0271 0271 0281 0291 0301 0301 0311 0321 0321 0331 0331 0341 0351 0361 0361 0371 0381 0381 0391 0401 0401 0411 0421 0431 0441 0441 0451 0461 0471 0481 0491 0491 0501 0501 0511 0511 0521 0521 0531 0531 0541 0551 0561 0571 0571 0581 0581 0591 0601 0611 0621 0631
REBAR FIXING CONCRETE PLACEMENT Back Backfi fill llin ing g and and com compact pactiion WATER PROOFING ROO OOF FING ING SUB STA STATION FLOORING DOORS WINDOWS PIPIN IPING G FABRICA ICATION ION CS PIPIN IPING G ERECTI CTION CS PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDR YDROTE OTESTING CLEA LEANIN NING FLUSH LUSHIING NDT PIPIN IPING G FABRICA ICATION ION CS PIPI PIPING NG EREC ERECTI TION ON CS PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDR HYDROT OTES ESTI TING NG CLEA CLEANI NING NG FLUS FLUSHI HING NG NDT PIPIN IPING G FABRICA ICATION ION CS PIPING FABRICATION SS PIPIN IPING G ERECTI CTION CS PIPING ERECTION SS PIPE SUPPORTS FABRICATION PIPE SUPPORT ERECTION HYDR HYDROT OTES ESTI TING NG,, CLEA CLEANI NING NG,, FLUS FLUSHI HING NG ERECTION OF DUMP STEAM CONDENSOR ERECTION OF FLASHED STEAM CONDENSOR NDT PWHT INS INSULAT LATION OF EQUIP UIPMENT ENT PIPIN IPING G FABRICA ICATION ION CS PIPIN IPING G ERECTI CTION CS PIPIN IPING G FABRICA ICATION ION SS PIPI IPING ERECTI CTION SS PIPE SUPPORTS FABRICATION PIPE SUPPORT ERECTION ERECTION OF BOILER INS INSULAT LATION OF EQUIP UIPMENT ENT HYDR HYDROT OTES ESTI TING NG,, CLEA CLEANI NING NG,, FLUS FLUSHI HING NG NDT PWHT STRUCTURE FIELD INSTRUMENT INSTALLATION UTILITY FILED INSTRUMENT INSTALLATION OFFSITE
User Input Document
33 1,951.00 1,561.00 8,71 8,716. 6.00 00 390 1,17 1,171. 1.00 00 3,902.00 780 14,6 14,645 45..00 16, 16,981. 981.00 00 2,147.00 379 3,25 3,251. 1.10 10 1,115.00 5,76 5,763. 3.00 00 26,7 26,736 36.0 .00 0 6,596.00 1,963.00 20,1 20,109 09.0 .00 0 1,115.00 8,20 8,201. 1.00 00 1,146.00 14, 14,266. 266.00 00 4,003.00 1,963.00 346 6,32 6,325. 5.00 00
32.52 244.67 9684 9684..44 1950.00 5855 5855..00 19510.00 3900.00 7040 7040..87 7753 7753..88 7.02 7.02 706. 706.76 76 1858.33 2770 2770..67 1220 12208. 8.22 22 21.56 36.35 4371 4371.5 .52 2 1858.33 3942 3942..79 350.46 6514 6514..16 792.67 6.42 6.41 1375 1375.0 .00 0
5,220.00
168.39
6 6 6 6 6 6 6 6 6 6 6 6 6 0 6 6 6 6 6 6 6 6 6 6 6 6 6 6
1,107.00 937 714 7,02 7,028. 8.00 00 16,1 16,138 38..00 13, 13,851. 851.00 00 5,21 5,216. 6.00 00 8,33 8,336. 6.00 00 2,699.00 476 13,394.00 7,02 7,028. 8.00 00 7,18 7,185. 5.00 00 910 797 3,532.00
35.71 1561.67 1190.00 1464 1464.1 .17 7 7758 7758..65 6324 6324..66 1595 1595..11 1650 1650..69 8.82 8.81 432.06 1464 1464.1 .17 7 1561 1561.9 .96 6 1516.67 1328.33 54.34
1,565.00
558.93
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
3,186.00
1137.86 Prepared By SR
Training Course
0641 0641 0651 0661 0671 0681 0691 0691 0701 0701 0711 0711 0721 0721 0731 0731 0741 0751 0761 0761 0771 0781 0791 0801 0811 811 0821 0821 0831 0831 0841 0841 0851 0851 0861 0861 0871 0881 0891 0891 0901 0911 911 0921 0921 0931 0931 0941 0941 0951 0961 0971 0971 0981 0981 0991 0991 1001
CABL CABLE E TRA TRAYS & COVE COVERS RS INST INSTAL ALLA LATI TION ON CABLE LAYING CABLE TERMINATION FABRICATION AND ERECTION OF SUPPORTS LOOP TEST STAT STATIO IONA NARY RY EQUI EQUIPM PMEN ENT T INST INSTAL ALLA LATI TION ON PIPI PIPING NG FABR FABRIC ICAT ATIO ION N CS PIPIN IPING G FABRICA ICATION ION SS PIPI PIPING NG EREC ERECTI TION ON CS PIPI IPING ERECTI CTION SS PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDR HYDROT OTES ESTI TING NG CLEA CLEANI NING NG FLUS FLUSHI HING NG NDT ERECTION OF HEAVY ENDS CONDENSOR WEST SIDE ERECTION OF HEAVY ENDS CONDENSOR EAST SIDE INSULATION OF EQUIPMENT ERECTION OF WATER COOLER PIPI PIPING NG FABR FABRIC ICAT ATIO ION N CS PIPI PIPING NG EREC ERECTI TION ON CS PIPI IPING FABRICA ICATION ION SS PIPI IPING ERECTI CTION SS EREC RECTION ION OF GAS GAS COM COMPR/T R/TURB URBINE INE PIPE SUPPORT FABRICATION PIPE SUPPORT ERECTION HYDR YDROTE OTESTING CLEA LEANIN NING FLUSH LUSHIING NDT PWHT INS INSULAT LATION OF EQUIP UIPMENT ENT CABL CABLE E TRA TRAYS & COVE COVERS RS INST INSTAL ALLA LATI TION ON CABLE ABLE LAY LAYING ING CABLE TERMINATION FABRICATION AND ERECTION OF SUPPORTS LIG LIGHT INST NSTALLA LLATION ION INSU INSULA LATI TION ON OF PIPE PIPE/M /MIS ISC. C. EQPT EQPT PAI PAINT NTIN ING G OF EQUI EQUIPM PMEN ENT T AND AND PIPI PIPING NG PROJECT COMPLETION
User Input Document
34 7,80 7,805. 5.00 00 4,465.00 274
6504 6504.1 .17 7 9500.00 830.30
1,291.00 517 17,6 17,659 59.0 .00 0 23,8 23,800 00.0 .00 0 4,32 4,321. 1.00 00 64,2 64,290 90.0 .00 0 23, 23,505. 505.00 00 12,271.00 2,165.00 25,2 25,229 29.0 .00 0 1,115.00
2151.67 172.33 569. 569.65 65 1144 11442. 2.31 31 1321 1321..41 2935 29356. 6.16 16 4654 4654..46 40.10 40.09 5484 5484.5 .57 7 1858.33
26,116.00
842.45
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
26,116.00 2,289.00 7,592.00 32,7 32,748 48.0 .00 0 25,3 25,319 19.0 .00 0 14,8 14,816 16..00 23, 23,039. 039.00 00 10,8 10,811 11..00 9,510.00 1,678.00 2,78 2,786. 6.00 00 1,115.00 14,813.0 3.00 6,01 6,017. 7.00 00 8,39 8,395. 5.00 00 37,7 37,766 66..00 667
842.45 476.88 244. 44.90 1574 15744. 4.23 23 1156 11561. 1.19 19 4530 4530..89 4562 4562..18 245. 245.70 70 31.08 31.07 605. 605.65 65 1858.33 2468 4688.33 1253 1253.5 .54 4 6995 6995.8 .83 3 8035 80353. 3.19 19 2021.21
1,,365.00 1 3,41 3,417. 7.00 00 98,9 98,928 28.0 .00 0 8,49 8,491. 1.00 00
2275.00 2278 2278..00 2061 20610. 0.00 00 9434 9434.4 .44 4 0
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
Prepared By SR
Training Course
User Input Document
35
Prepared By SR
Training Course
Tools • • •
36
Graphic Report Resource and Cost Press “ADD” Press “ADD” to automatic number given to report In “Resource Selection ” tab: Profile If EQ
Low Value Resource MH
In “Content ” tab, Select Divided By=260 In “Date” tab: o End Date: 30-Jun-2007 Title Each: Month o Time Scale: Month o Press “OK ” Press “Run” View on screen – OK Continue---YES Histogram will be displayed
• •
• • • •
User Input Document
Prepared By SR