WELDING MATERIAL CONTROL PROCEDURE *note: this is the sample document d ocument for the related job only *author:
[email protected] [email protected] om TABLE OF CONTENTS
1. SCOPE 2. REFERENCE 3. RESPONSIBILITIES 3.1 SITE MANAGER 3.2 QC MANAGER 3.3 QA ENGINEER 3.4 QC INSPECTOR 4. WELDING MATERIAL CONTROL
1.0 SCOPE This procedure shall outline the control of welding materials in welding works for the EPCC of Two (2) Nos crude Storage Tank 2.0 REFERENCE 1) PTS 64.51.01.31 - STANDARD VERTICAL TANKS ERECTION & T ESTING (Section 6.5 – Welding Consumables) 2) IS/D-322 FIELD INSPECTION & TESTING PROCEDURE 3) IS/D-310 MATERIAL CONTROL PROCEDURE 4) KOBE / ESAB MANUFACTURE RECOMENDATION 3.0 RESPONSIBILITIES 3.1 Site Manager Shall be responsible for the full implementation of this procedure. He shall assign knowledgeable Material Controllers / Welding Foreman who will be able to distinguish all types welding consumables. 3.2 QC Manager Shall be responsible for ensuring that all personnel involved are indoctrinated and shall assign personnel to conduct monitoring and audits for compliance to this procedure. 3.3 QA Engineer Shall be responsible for Supervision of Inspection activities, monitoring and documenting inspection / monitoring activities. 3.4 QC Inspector Shall inspect welding material control on daily basis and document any deviation from this procedure.
4.0 WELDING MATERIAL CONTROL 4.1 All welding materials shall be received by the Material Controller / Welding Foreman. He shall check welding material condition, damage, material identification and batch / lot / heat / number. All welding materials received shall be accompanied by a n Inspection Certification form manufacturer or supplier . The QA Engineer shall review the manufacturers inspection certificates certificates for compliance to the specificationss and if acceptable sign and stamp “Issued For Construction specification Construction”. ”. The certificate shall be submitted to contractor for review 4.2 The Material Controller / Welding Foreman shall check that sufficient quantity is stored in baking / holding oven for daily use. The Material Controller / Welding Foreman shall issue as follows:
1. Issue electrodes by priority, a. re-baked electrodes b. first baked electrodes c. new electrodes 2. Check size and type of welding material to be issued 3. Issued maximum quantity of 5kg for each portable oven 4. For GTAW rods, original containers shall be issued. For stainless steels the container or welders quiver shall b e clearly marked by paint or colored tape with the same color identification as given by the consumable manufacturer. 5. Issue of portable oven marked with Welders no only to respective welders. 6. Issues of consumables are to be recorded on Consumable Issue Report. 4.3 The Material Controller / Welding Foreman shall monitor / check his w elder’s portable oven (quivers) are plugged to power source all the time. At the end of the day, he shall gather all quivers and take to the welding material control room. 4.4 After receiving all portable ovens the Material Controller / Welding Foreman shall place all segregated electrodes and place at top portion of baling oven and shall be issued first on the next day. Returned electrodes shall be re baked only once. There after they shall disposed of as scrap.