EWM RDS V7.93 May 2016 English
SAP Extended Warehouse Management integration with S/4 HANA rapiddeployment solution: Software and Delivery Requirements Document Revisions 0 SAP SE Dietmar-Hopp-Allee 16 69190 Walldorf Germany
1 2
Date
SAP Best Practices
Software and Delivery Requirements
Copyright © 2016 SAP SE or an SAP affiliate company. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an SAP affiliate company. SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries. Please see http://global.sap.com/corporate-en/legal/copyright/index.epx#trademark for additional trademark information and notices. Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors. National product specifications may vary. These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP SE or its affiliated companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP SE or SAP affiliate company products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty. In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this document or any related presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated companies’ strategy and possible future developments, products, and/or platform directions and functionality are all subject to change and may be changed by SAP SE or its affiliated companies at any time for any reason without notice. The information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or functionality. All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of their dates, and they should not be relied upon in making purchasing decisions.
© SAP SE
Public
Page 2 of 11
SAP Best Practices
Software and Delivery Requirements
Icons Icon
Meaning Caution Example Note Recommendation Syntax External Process Business Process Alternative/Decision Choice
Typographic Conventions Type Style Description Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options. Cross-references to other documentation. Example text
Emphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXT
Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.
Example text
Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.
EXAMPLE TEXT Keys
on the keyboard, for example, function keys (such as F2) or the ENTER
key. Example text
Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.
Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.
© SAP SE
Public
Page 3 of 11
SAP Best Practices
Software and Delivery Requirements
Table of Contents Contents 1 Purpose of the Document.............................................................................................................. 5 2 General Project Prerequisites ....................................................................................................... 5 3 Technical Requirements................................................................................................................ 5 3.1 Software Product Versions.................................................................................................. 6 3.2 SAP Notes ........................................................................................................................... 6 3.2.1 General Information ........................................................................................................ 6 3.2.2 SAP Notes in SAP EWM................................................................................................. 6 3.2.3 SAP Notes in SAP S/4HANA .......................................................................................... 7 3.3 SAP Solution Manager and SAP Solution Manager Content Add-On ................................ 7 3.4 SAP Best Practices Solution Builder and Activation Content Add-On ................................ 8 3.5 Active Business Functions .................................................................................................. 9 3.6 Software Landscape Diagram ........................................................................................... 10 3.7 Connectivity ....................................................................................................................... 10 3.8 Roles and Authorizations .................................................................................................. 11
© SAP SE
Public
Page 4 of 11
SAP Best Practices
Software and Delivery Requirements
1 Purpose of the Document This document contains information to:
Validate that key prerequisites such as software products and versions match the customer situation
Check that all prerequisites for a customer implementation are in place
Check that correct content, tools and skills are in place before the project starts The document lists different kinds of requirements on package level if they are valid for all scope items included in the package. For requirements valid for certain scope items only, these scope items are mentioned. The document contains pre-requisites only, not the procedures to meet them. For how-to information (e.g. how to find the download area) please refer to the configuration guides.
2 General Project Prerequisites The following prerequisites need to be in place before an implementation project can start. Prerequisite
Responsibility
Kick off and workshop dates, location and attendees agreed
Customer
Customer team allocated with correct skills and training in place
Customer
Project sponsors and stakeholder identified
Customer
Hardware fully commissioned
Customer
Software licenses in place
Customer
Infrastructure team can respond to requests quickly enough e.g. CSS notes, BW content, patches, user requests, authorization changes and transports
Customer
User interfaces agreed e.g. SAPGUI, Netweaver Business Client or Portal
Customer
Remote access is in place for SAP consultants and SAP Active Global Support
Customer
Decision made whether pre-assembled delivery will be used
Customer
Decision made whether SAP Best Practices Solution Builder will be used to activate content.
Customer
Decision made whether Solution Manager will be used. Solution Manager set up with any relevant templates.
Customer
Tool for project repository and collaboration agreed
Customer
Test management tool agreed
Customer
3 Technical Requirements This section contains technical requirements in different areas. For each requirement, the relevance for scope items of the package is provided. The following processes need to be in place in the SAP S/4HANA before the EWM RDS V7.93 is implemented.
BD9 Sell from Stock
© SAP SE
Public
Page 5 of 11
SAP Best Practices
Software and Delivery Requirements
J45 Procurement of Direct Materials BJ5 Make-to-Stock Production - Discrete Manufacturing (optional, only required if the Advanced Production Integration process is in scope)
3.1 Software Product Versions The following software products and versions are required: Product SAP Extended Warehouse Management SAP S/4HANA ON-PREMISE SAP NETWEAVER
SAP SCM ENHANCE PACKAGE
Product Version SAP EWM 9.3 (SP03)
Components
SAP Solution Manager Logical Component
Comments
Relevance
SCMEWM
EXT_WAREHOUSE_MGMT93_ STANDALONE
All Scope Items
SAP S/4HANA ON-PREMISE 1511 SAP NETWEAVER 7.4 (SP13)
S4CORE
S4HANAOP_Suite_Server
All Scope Items
SAP_BASIS
Not required
Required for option ‘EWM on SAP NW 7.40’ (option 2)
All Scope Items
EHP3 FOR SAP SCM 7.0 (SP11)
SCM_BASIS
Not required
Required for option ‘EWM on SAP SCM’ (option 1)
All Scope Items
All the software component versions and Support Package Stacks mentioned above are the ones based on which the SAP EWM Integration with SAP S/4HANA rapid deployment solution has been developed. Implementing this RDS solution on different software versions is possible but certain errors may occur.
3.2 SAP Notes 3.2.1 General Information The following SAP Notes give general information on the SAP S/4HANA and its integration with SAP Supply Chain Management applications: SAP Note No 2238445
Content
Comments
Integration of Supply Chain Management Applications to SAP S/4HANA, on-premise edition
Relevance All processes
3.2.2 SAP Notes in SAP EWM The following SAP Notes need to be considered in your SAP EWM system:
© SAP SE
Public
Page 6 of 11
SAP Best Practices
Software and Delivery Requirements
Content
Comments
Relevance
2287935
/SCWM/MON_MAINT: Dump during save
This error could occur when saving a customized warehouse monitor tree
All processes
2260904
Error during SCRAP QM decision
Errors could occur when entering ‘scrap’ as the usage decision in the QM process
2185040
Error Message when replicate PSA: In SAP EWM, when replicating a PSA from SAP ERP to SAP EWM, error message "error updating mapping of PSA" shows. However the PSA has been copied successfully.
This error could have been caused by the PSA having a description in more than one languages
1849731
Problems with the search in EWM
1988201
dump DYN_CALL_METH_CLASS_NOT_FOUND when starting a Webdynpro Application
2206877
Solution Builder (BP-SOLBLD 70VA) Hotfixes 001
SAP Note No
1CV – Customer Returns with Quality Inspection
1D7 – SAP EWM Advanced Production Integration
All processes When using NWBC for running processes, short dump might occur
All outbound processes with the Shipping Cockpit for TU processing, and 1D7 – SAP EWM Advanced Production Integration Automated solution activation using the Solution Builder
3.2.3 SAP Notes in SAP S/4HANA The following SAP Notes must be implemented in your SAP S/4HANA system: SAP Note No 2287971
Content
Comments
Relevance Automated solution activation using the Solution Builder
Language Selection Correction for language dependet field generation
3.3 SAP Solution Manager and SAP Solution Manager Content Add-On For the implementation of the solution package, SAP Solution Manager is recommended.
© SAP SE
Public
Page 7 of 11
SAP Best Practices
Product SAP Solution Manager
Software and Delivery Requirements Product Version
Comments
SAP Solution Manager 7.0 Enhancement Package 1 SP18 or higher - Or SAP Solution Manager 7.1 SP01 or higher - Or SAP Solution Manager 7.1 on HANA (ST 712) SP00 or higher
If using SAP Solution Manager 7.0 with SP below 24, see SAP Note 1579267.
For SAP rapid-deployment solutions, implementation content is available in SAP Solution Manager templates. The SAP Solution Manager template for this solution package is in the ST-RDS 100 content add-on. You can download the latest available ST-RDS 100 content add-on from SAP Software Download Center on SAP Service Marketplace at support.sap.com/swdc. For more information about downloading and installing ST-RDS 100 content add-ons, see SAP Note 1726649 and SAP Note 1686668 respectively. In the ST-RDS 100 content add-on, access the template in the following way:
If you have SAP Solution Manager 7.1 SP04 or lower, select the template ID and template name in the table below.
If you have SAP Solution Manager 7.1 SP05 or higher, select the solution package name(s) in the table below.
Template ID and Template Name
RDS_EWM_EWM93V7 - SAP Extended Warehouse Management RDS_V7
Solution Package Name(s)
SAP Extended Warehouse Management RDS_V7
While this RDS solution is released on May 13, 2016, the above-mentioned Solution Manager Template will be released on July 18, 2016.
3.4 SAP Best Practices Solution Builder and Activation Content Add-On For tool-supported, automated activation of the solution package, SAP Best Practices solution builder is recommended. Product SAP Best Practices solution builder
© SAP SE
Product Version
Comments
BP-SOLBLD 70Vx
Add-on for the implementation tool (only necessary to be implemented in a system where content activation shall be done using the Solution Builder (i.e. Sandbox or Development System).
Always use the latest available version as outlined in SAP Note 1301301 Release Strategy for SAP Best Practices Package ABAP Add-ons.
Public
Page 8 of 11
SAP Best Practices
Software and Delivery Requirements
The following content is required: Product SAP Best Practices Configuration Content (for SAP NetWeaver)
Product Version BP-CANW 740Vx Always use the latest available versions as outlined in SAP Note 1301301 Release Strategy for SAP Best Practices Package ABAP Add-ons.
Components as tested BP-CANW
Comments
Relevance
Add-ons containing configuration content (only necessary to be implemented in the system which is used for the initial content activation, i.e. Sandbox or Development System).
All Scope Items
3.5 Active Business Functions Functionality in this solution package requires certain business functions to be active in the SAP landscape. These business functions need to be activated:
© SAP SE
Public
Page 9 of 11
SAP Best Practices
Software and Delivery Requirements
Business Function
Description
S/4HANA
LOG_LE_INTEGRATION
LE, Extended Warehouse Management Integration
S/4HANA
LOG_PP_EWM_MAN
EWM Integration into Manufacturing
1D7 – SAP EWM Advanced Production Integration
S/4HANA
LOG_PP_EWM_MAN_2
EWM Integration into Manufacturing 2
1D7 – SAP EWM Advanced Production Integration
EWM
SCM_EWM_FND
EWM, Essential Foundation Functions
All Scope Items
EWM
SCM_EWM_MEAN
EWM, Additional GTINs (EANs/UPCs) for Product
All Scope Items
Product
Relevance All Scope Items
3.6 Software Landscape Diagram SAP Extended Warehouse Management rapid-deployment solution Deployment Options
The RDS is released for the following SAP EWM deployment options Options for EWM integrated with SAP S/4HANA
RFC
SAP S/4HANA OP 1511
EhP3 for SAP SCM 7.0
SAP EWM as add-on with SAP SCM 7.03 Manual or automated configuration of EWM building blocks
RFC Option 2
Option 1
SAP NETWEAVER 7.4 Manual or automated configuration of ERP building blocks Automated deployment of ERP building blocks via Solution Builder in SAP EWM
SAP EWM as add-on with SAP NW 7.40 Manual or automated configuration of EWM building blocks
Internal
© 2012 SAP AG. All rights reserved.
‹#›
This diagram is an abstract view of the system landscape, to explain where work is done in an implementation project. It is not a specification that describes all the technical details of a real system landscape.
3.7 Connectivity The following connectivity is required:
© SAP SE
Public
Page 10 of 11
SAP Best Practices
Software and Delivery Requirements System
Comments
RFC Connection
SAP S/4HANA
Connection created in SAP S/4HANA, and the destination is SAP EWM
RFC Connection
SAP EWM
Connection created in SAP EWM, and the destination is SAP S/4HANA
Trusted RFC Connection
SAP EWM
Connection created in SAP EWM, and the destination is SAP S/4HANA. The trusting system is SAP S/4HANA. *
Connection type
* This trusted RFC connection is required only if the Solution Builder is used for automated activation. For details on the trusted RFC connection creation, please refer to the Quick Guide for EWM RDS V7.93.
3.8 Roles and Authorizations The following authorizations are required: System
Comments
S_RFCACL
SAP S/4HANA
This authorization object needs to be assigned to users in SAP ERP when logging on SAP EWM via trusted RFC connection.
/SCWM/EXPERT
SAP EWM
This role is required for displaying NWBC menus when using the Shipping Cockpit (SCO) in outbound processes and staging functionalities in the Advanced Production Integration process.
Authorization/R ole
© SAP SE
Public
Page 11 of 11