Item
Procedure
Project information (20 points)
Overall Network Planning Master Plan (100 points)
Project plan (50 points)
Assignment interface (10 points) Working system (10 points) Risk analysis (10 points)
Area (point, line and plane) scenarios division (20 points)
Tender document traffic model analysis (16 points) RF Nominal Planning Verification (100 points)
Tender document capacity requirement analysis (16 points)
Verification (100 points)
Tender document coverage requirement analysis (18 points) Network quality (KPI) acceptance methods and standard analysis (18 points) Risk analysis (12 points) Cluster definition (20 points) Test route (20 points) Cluster Definition&KPI (100 points) KPI (60 points)
Network Preplanning CheckList CheckList
Project background and scale (5 points) Coverage area and capacity distribution (10 points) Wireless networking structure (5 points) Project planning, structure optimization, and list of key posts (10 points) Project progress plan, key points, and time points (12 points) Key point plan outpout report (10 points) HR plan (Assignment based on areas is required for a big project) (10 p Project tools and vehicle plan (Assignment based on areas is required for a big project)(8 points) Cooperation party, Huawei and customer working interface (10 points) Routine working system (5 points) Project management system (5 points) Project risk analysis (10 points) Dense urban area division (divide the range and dimension of specific area, and understand the terrain structure and traffic distribution). (4 points) Urban area division (divide the range and dimension of specific area, and understand the terrain structure and traffic distribution). (4 points) Suburban area division (divide the range and dimension of specific area, and understand the terrain structure and traffic distribution). (4 points) Rural area division (divide the range and dimension of specific area, and understand the terrain structure and traffic distribution). (4 points) Other service area division (such as major areas, transport artery and indoors, divide the range and dimension of specific area, and understand the terrain structure and traffic distribution). (4 points) Analyze and understand voice service traffic models in different scenarios. (6 points) Analyze and understand data service traffic model in different scenarios(6 points) Analyze and understand other auxiliary service models in different scenarios. (4 points) Analyze and understand the overall capacity requirement analysis of tender document,and the voice and data service capacity division requirements in different scenarios. (8 points) Understand the capacity calculation process and output requirement of the tender document. (8 points)
Analyze and understand the overall coverage requirement analysis of tender document and coverage probability requirement in different scenarios. (9 points) Understand the coverage calculation process and output requirement of
Analyze the KPI requirement and risk on voice and data services from t
Analyze the technical risk of the project. (12 points) Project Cluster division and definition principle. (20 points)
Cluster DT route. (20 points) Cluster route-based DT indexes. (10 points) DT index test methods (long call, short call and MS location). (10 point Traffic statistics index and evaluation methods. (20 points) Traffic statistics index definition formula. (20 points)
ork Preplanning CheckList Project owner:
Evaluation basis
Output requirement
Clarify and understand deeply the project Clarify and understand deeply the project Clarify and understand deeply the project Be rational and support the project Conform to the requirement of project te Conform to the requirement of project te Conform to the requirement of project te
RNP&O Project Plan Report(Master Plan)
Conform to the requirement of project te Clarity and conform to the requirement of Conform to the requirement of project te Conform to the requirement of project te Completeness and deepness Analyis and clarity Analyis and clarity Analyis and clarity Analyis and clarity Analyis and clarity Analyis and clarity Analyis and clarity Analyis and clarity Analyis and clarity
Analyis and clarity
RF Nominal Planning Verfication Report
Analyis and clarity
Analyis and clarity
Analyis and clarity
Completeness and deepness Completeness and clarity Cluster Definition Report Completeness and clarity Completeness and clarity Completeness and clarity Completeness and clarity Completeness and clarity
Detail RNP&O Acceptance test standard and method
Item
Procedure
CW Test (100 points)
Site selection (20 points) Data processing (50 points) Verification (30 points)
MI collection and analysis (100 points)
Information collection and analysis (100 points)
RF Survey (100 points)
Survey principle (60 points)
Survey report (40 points) Site selection (30 points) Interference measurement (100 points)
Test method (70 points)
Analysis of drive test and dialing test for existing network (30 points) Existing Network Evaluation (Swap Project) (100 points)
Existing network performance analysis (40 points)
Analysis of the operation of the existing network equipments (30 points)
Network Evaluation (Swap Project) (100 points) Analysis of the operation of the existing network equipments (30 points)
Capacity planning analysis (20 points)
Coverage planning analysis (20 points)
Frequency plannng analysis (10 points)
Practical planning (100 points) Parameter planning analysis (10 points)
Practical planning (100 points) Parameter planning analysis (10 points)
Device and special requirement analysis (20 points)
Network emulation and adjustment (20 points)
Network Planning CheckList CheckList
Evaluation basis
Principles of site selection and definition of clutter type (10 points) Actual number of selected sites for each clutter type (10 points) Original data of model correction (20 points) Process of model correction and final results (30 points)
The landform of the selected sit Completeness? Be consistent wi Availability and completeness Rationality
Verify the corrected model in actual drive test (30 points)
Accuracy
Collect the information about key areas, such as business hall, hightraffic area, government building, commercial area, VIP’s residence and office, and hospital. (30 points)
Completeness
Communicated with customers on their expectation, coverage and Communicate completely. capacity requirement, and key areas. (30 points) Investigate existing networks and competitors’ networks in key areas. (2Completeness Predict the traffic distribution in coverage areas based on customers’ r Completeness and rationality Consider key areas coverage and hotspot coverage during the site selection. (10 points) Consider rational BTS distribution principle during site selection (10 points) Make good use of original site during the site selection. (10 points) Consider the height during site selection. (10 points) Consider the blockings (including mircowave blocking) during the site selection (10 points) Consider the electromagnetism environment during the site selection. (10 points) Guide the engineering installation and describe the problems that must Represent survey principle. (20 points) Site selection. (15 points) Sampling ratio. (15 points) Test time period. (10 points) DT and designated test modes (10 points) Test bandwidth (10 points) Detail the electrical measurement data and test the areas with interference and provide the processing suggestions. (40 points)
Rationality Rationality Rationality Rationality Rationality Rationality Guidance and clarity Clarity Completeness Reflect electromagnetism backg Rationality Rationality Rationality Rationality
Perform drive test and dialing test have been for the total network (including street); Provide the record and report for detailed information of the drive test and dialing test. (15 points)
Completeness and rationality
Find out the areas with coverage problem, abnormal index, and user complaint and test the areas. (15 points)
Completeness and rationality
Analyze the traffic statistics has been analyzed in detail according to customers’ requirements on KPI or according to the KPI requirements Completeness and rationality specified in Huawei half-month report. (20 points) Define traffic statistics formulas used in the existing network. (20 points) Check the current BTS (installation equipment, antenna feeder performance, and equipment alarming). (10 points)
Clarity and correctness Clarity and correctness
Analyze the indexes about carrier power and combiner loss of the Clarity and correctness current network. (10 points) The RNP&RNO parameters of the current network have been Clarity and correctness thoroughly checked and analyzed (10 points) Analyze the overall capacity requirement of tender document in detail. ( Rationality and secnarios-base Analyze the traffic distribution in different scenarios in detail. (2 points) Consistency Consider the location area division and paging capacity. (2 points)
Deduction based on formula.
Consider the channel configuration strategy (TCH, SDCCH, CCCH configuration mode, and data service channel). (2 points)
Rationality
Consider the traffic balancing strategy of dual-band network. (2 points) Rationality Select the BTS type in different secnarios based on capacity requiremenRationality and precaution Provide the detailed result of capacity planning (including BTS quantity, and TRX quantity in different scenarios. (3 points)
Rationality and precaution
Consider the effect on capacity planning from the technologies (half rate, compact reuse, and AMR). (2 points)
Rationality
Consider future capacity expansion (2 points)
Rationality
Understand the coverage probability requirements in different scenarios.Rationality and correctness Consider the coverage parameters in different scenarios (sucn as the Rationality RACH minimum access level). (2 points) Consider the BTS power requiremets in different scenarios. (3 points)
Rationality
Detail the link budgets in different scenarios. (4 points)
Rationality
Provide the detailed results of coverage planning (BTS quantity, carrier quantity, combiner selection, PBU, and TMA in different scenarios). (4 points) Consider future capacity expansion. (3 points) Plan the frequency based on the bands provided by the customers. (2 points) Perform the BSIC planning and intra-frequency intra-BSIC check. (1 point) Consider the difference of frequency planning between BCCH and TCH. (1 point) Whether the frequency reuse modes meet the capacity quality requirement (1 point) Select and design the frequency hopping parameters have been designed and selected (1 point) Consider the frequency reuse modes in different scenarios. (2 points) Whether there are channel numbers reserved for future use (1 point) Perform C/I emulation analysis(1 point)
Rationality Rationality Rationality Rationality Rationality Rationality and secnarios-base Accuracy and consistency Use CW calibration model Completeness and reflect the future conditions of network Rationality
Perform the engineering parameter planning (including BTS location, antenna azimuth, tilt, and mounted height) (2 points)
Rationality
Perform the LAC planning and CI planning. (1 point)
Rationality and precaution
Perform the adjacent cell planning (1 point) Plan power control parameters. (1 point) Plan access parameters. (1 point)
Plan handover parameters. (1 point) Plan data service performance parameters. (2 points) Plan other network perforance parameters (including paging, channel management, cell selection and reselection, and cell attribute parameters). (1 point) Formulate the principles of RF planning (including RF engineering parameters, antenna type, and coverage capacity). (2 points) Use different BTS devices to implment the optimization networking (including macro-BTS, micro-BTS, ominidirectional BTS and directional BTS). (2 points) Consider the adoptation of different types of antennas to implement flexible networking (including directional antenna, omnidirectional antenna, electrically controlled antenna, and antenn with different gains and electrical tilts). (2 points) Consider the repeater or micro-BTS for special coverage areas (2 points) Provide other special solution requirements (including indoor coverage, high-level building coverage, and metro coverage, tunnel coverage, and sea surface coverage) (3 points) Use special technologies (including half rate, IUO, EMLPP, AMR, EFR, 6-cell, Co-BCCH, dual-timeslot,co-antenna feeder, and trunking) (2 points) The devices support the freuencies provided by customers and provide sufficient protection bands. (2 points) Consider the inter-system problems, such as inter-system handover and roaming. (1 point) Consider the inter-system mutual interference and antenna-feeder isolation. (2 points) Consider the collocation with partners. Because the device performance and parameter configuration are different, the negotiation is requried. It helps improve the running quality and user feelings of overall network (2 points) Set longitude and latitude of the BTS, antenna data (including antenna type, antenna gain, antenna height, azimuth angle, and title angle), Accuracy and consistency feeder loss, and power (3 points) Propagation model (4 points)
Use CW calibration model
Coverage and C/I emulation (4 points)
Completeness and reflect the future conditions of network
Traffic distribution based on MI information (3 points)
Rationality
Layout of the BTS addresses based on MI information (3 points)
Rationality
Analysis of emulation result and qualified KPI (3 points)
Rationality and precaution
CheckList Project owner:
Output requirement
CW Test Report
MI Collection and analysis Report
Radio survey summary table;Engineering parameter table
Interference Measurment Report
Existing Network Evaluation Report(Benchmark Report)
Existing Network Evaluation Report(Benchmark Report)
Network Planning Report; Simulation Plots;Network parameter design report
Network Planning Report; Simulation Plots;Network parameter design report
Item
Procedure
Antenna installation quality check (25 points)
Antenna feeder installation quality check (25 points) Site Audit(report inspection ratio 100%; On field spot check ratio BTS RF installation qualitiy check (20 points) 5%)
Baseband installation quality check (15 points)
BSC alarm analysis and quality check (15 points)
Single site verification (40 points) Network Cutover (100 points)
Cutover scheme
DT analysis ( 30 points) Neighbor cell planning (20 points)
Drive Test (100 points)
Drive Test (100 points)
Coverage parameter adjustment (30 points)
DT optimization report (20 points)
Existing network load analysis (5 points)
Traffic statistics analysis
BSC alarm analysis (5 points) Load related parameters adjustment suggestions (5 points) Access/Paging parameters optimization (10 points)
KPI Opt. (100 points)
Handover parameters check and optimization (10 points) Power control parameters check and optimization (5 points)
Data service common optimization parameters optimization (10 points)
Data service common optimization parameters optimization (10 points)
BTS common parameters check and optimization (10 points) Other common parameters optimization (10 points) System performance optimization (10 points) Complaints collection (10 points)
Network Optimization CheckList CheckList
Evaluation basis
Antenna is mounted based on planning suggestions (mounted height, Coverage ratio and report time azimuth and tilt angle). (15 points) Installed antenna parameters are consistent with engineering Coverage ratio and report time parameters summary. (15 points) Check the BTS installation quality through RSSI and all the RSSI Coverage ratio and report time installation checking indexes are normal. (10 points) SWR test is conducted for BTS antenna feeder system and the SWR is normal. Each BTS has SWR testing record and BSC has no SWR alarm. (10 points) BTS antenna feeder connectors are secure. (5 points) Check the BTS installation quality through RSSI and all the RSSI installation checking indexes are normal. (6 points) Execute BTS Rx power tracing command to trace the Rx powers of all the BTSs and BTS Rx power is normal. (6 points) BSC has no RF components connection alarm. (4 points) BTS RF components connection is secure. (4 points) BSC has no baseband frame board alarm. (5 points) All the BCKM boards work normally and 8 satellites are blocked. (5 points) All the boards operate normally. (5 points) No Abis connection or blinking alarm (5 points) No board operation alarm. (5 points) BSC clock board operates normally. (5 points) Check engineering parameters (antenna parameters and snapshoot) (8 points) Check network parameters (SID/NID,PN, neighbor configuration and system parameters) (8 points) Rx DT and rationality analysis (8 points) Rx_Qual DT and rationality analysis (8 points)
Coverage ratio and report time Coverage ratio and report time Coverage ratio and report time Coverage ratio and report time Coverage ratio and report time Coverage ratio and report time Coverage ratio and report time Coverage ratio and report time Coverage ratio and report time Coverage ratio and report time Coverage ratio and report time Coverage ratio and report time Attached pictures and problem Completeness Rationality
Call access, call drop, handoff and voice quality analysis (8 points)
Rationality
Assign manpower, vehicle and tools (10 points)
Rationality and customer satisf
Specific test plan (20 points)
Rationality and completeness
Cooperate with the engineers of product side (10 points)
Rationality
Risk analysis and mitigation measures (20 points)
Rationality and completeness
Conduct a detailed DT (including streets) for the overall network, and Completeness and typical anal output detailed DT record and analysis report. (15 points) Rx, Tx, Ec/Io and FER of overall network are normal. If some indexes Completeness and typical anal in an area are abnormal, output an analysis report. (15 points) Conduct a systematical neighbor optimization based on actual network Completeness,timeliness and topology, DT result and customer complaints. (20 points)
Adjust the antenna parameters of the area with problems and output the analysis report. After the parameters are adjusted, make a comparsion and output an analysis report. (15 points)
Completeness,timeliness and
Adjust the pilot power coverage parameters of the area with problems and output the analysis report. After the parameters are adjustment, Completeness,timeliness and make a comparsion and output the analysis report (15 points) Update in time all the adjustment parameters to engineering Completeness and timeliness parameter summary. (5 points) Troubleshoot in time the engineering quality problems found during the Completeness and timeliness DT. (5 points) Output DT optimization report. (10 points)
Completeness and timeliness
According to the traffic statistics, analyze in details existing network load distribution and filter the cells with problems. (2 points)
Systematicness
Consider the future netowrk expansion. (2 points)
Systematicness
Collect network load related complaints from the customer. (1 point)
Systematicness
In the BSC performance statistics, main indexes (access success rate, call drop rate, congestion rate, handoff success rate and paging Systematicness success rate) are normal. (3 points) In the BTS performance statistics, sector indexes of each BTS (access success rate, call drop rate, congestion rate and handoff success rate) Systematicness are normal. (3 points) In the BTS power control statistics, sector indexes (FER,EbNt,RSSI,and POWR) are normal. (2 points) In the BTS channel statistics, BTS load is normal. (2 points) No Abis connection or blinking alarm (2 points) No board operation status alarm (2 points)
Systematicness Systematicness Systematicness Systematicness
BSC clock board operates normally. (1 point)
Systematicness
Adjustment of traffic control parameters is rational (dualband network strategy, load switch, CRO, CRH, and layer-vevel priority setup) (5 points)
Systematicness
Adjustment of basic paging and access parameters (access grant reserved blocks, frames coding between the same paging, extended Systematicness transmission gaps, maximum retransmission times, random access error threshold, and paging times) (5 points) Adjustment of coverage parameters of problematic areas is conducted (RACH minimum access level and MS minimum received level grade, Systematicness and so on) (5 points) Adjustment of basic handover parameters (minimum downlink power of handover candidate cells, various handover thresholds, handover Systematicness hysteresis, and handover switch) (5 points) Adjustment of basic power control parameters (MS maximum transmit power, downlink/uplink power increment/decrement level threshold, Systematicness downlink/uplink power increment/decrement quality threshold, and power increment/decrement step) (5 points) Knowing the QoS, throughput, delay, and reliability of data services of Systematicness the serving network (2 points) Knowing the types of data services of the serving network (WAP, Systematicness MMS, EMAIL, WWW, and so on) (2 points) Knowing the major problems of data services of the serving network (2 Systematicness points)
Cell reselection parameter CRH is proper (1 point) Dynamic/Static PDCH allocation strategy is proper (1 point) PCU-related parameters is proper (1 point) Record the optimimzation parameters (1 point)
Systematicness
Adjustment of basic call drop parameters (SACCH multi-frame number, radio link invalid counter, T200, T3101, and T3109) (10 points)
Systematicness
Adjustment parameters for special function application (half-rate, concentric circle, AMR, extended cell, 2G-to-3G interoperation) (5 points) Adjustment of other parameters (T3212, the second generation of channel, dynamic adjustment of SDCCH) (5 points) Optimize the abnormal indexes and analyze the causes. (5 points) Output system performance optimization analysis report. (5 points)
Systematicness Systematicness Systematicness
Collect the complaints and analyze and filter the information. (5 points) Timeliness, systematicness and Hanndle the complaints one by one and output processing reports. (5 points)
Timeliness, systematicness and
CheckList Project owner:
Output requirement
Engineering Parameter Table (Update weekly)
Single site verification Report
Cutover Scheme (RNP Part)
Cluster Drive test data & analysis report
Cluster Drive test data & analysis report
Traffic statistics analysis Report;Worst Cell analysis Report;Alarm analysis Report
CDD Parameter modify analysis report,
CDD Parameter modify analysis report,
Trouble Shooting Technical problem solution report;Customer complaint record Table; Problem investigation report
Network Quality Monito
Item
Procedure
CheckList
Collect and upload the data to Asia-Pacifc data monitoring center as required. (10 points) Feed back the improvement based on results (10 points) Network Collect complaints and analyze and filter the information.(10 points) User complaints collection KPI Handle the complaints and provide corresponding reports. (30 points) Monitorin (20 points) g Reflect the network trend. (12 points) (100 Troubleshoot problems list and analysis report (12 points) pionts) Monitoring Summary Outstanding issues analysis (8 points) (50 points) Network risks and expansion suggestions (8 points) Introduction to Huawei local employee training (10 points) Data collection (20 points)
uality Monitoring CheckList Project owner:
Evaluation basis
Timeliness and Completeness
Output requirement
KPI daily/Weekly performance monitoring Report Timeliness Timeliness,systematicness and c Trouble Shooting Technical problem solution report;Customer complaint record Table; Problem Timeliness, systematicness and investigation report Systematicness Completeness and systematicne Systematicness Monitoring Summary Report Systematicness Systematicness
Othe Item
Routine Work (100 points)
Procedure
CheckList
Progress (15 points) Weekly Help (15 points) Report Risks (20 points) (70 points) Problems and troubshooting suggestions (20 points)
Meeting (Customer and internal) meeting minutes (15 points) minutes and FAX Replies to customer in the format of FAX and filed (15 points) (30 points) Training Training Training plan (40 poins) Training methods (40 points) (100 (100 points) points) Trainee skills analysis (20 points) Project Project Project summary (40 points) Summary Summary Problme analysis and suggestions (30 points) (100 (100 points) points) Summary of project participants (30 points)
Other CheckList Evaluation basis
Completeness Systematicness Systematicness Systematicness Timeliness and Timeliness and r Completeness an Regularity Completeness an Completeness an Completeness an Completeness an
Other CheckList Project owner:
Output requirement
Project Weekly Report
Meeting Minute, FAX
Training Report
Project Summary Report