Geotechnical Engineering The Geologists Act 2008 and Its Impact on Practising Engineers
APPLICATION •
Bridge Abutment • Land Reclaimation • Housing Development & Temporary Embankment • Other Civil Engineering Application
APPLICA APPLIC ATION •
Slope Protection • Embankment Stabilization • Housing & Road Project • Other Civil Engineering Application
Our Tedds trial will change your world. Tedds will automate your structural calculations and transform the way you work. You can:
You will:
Use a broad library of calculations
Save time & increase prot
Write your own calculations
Reduce calculation errors
Work within Microsoft Word
Improve consistency
Produce transparent output
Reduce overheads
Archive documents electronically
Enhance QA processes
Receive new calculations regularly
See Tedds online
Geotechnical Engineering
DIMENSION PUBLISHING SDN. BHD. (449732-T)
The Geologists Act 2008 and Its Impact on Practising Engineers
CONTENTS
>ĞǀĞůϭϴͲϬϭͲϬϯ͕W:yͲ,D^ŚĂŚdŽǁĞƌ͕ ͘ EŽϭϲ͕WĞƌƐŝĂƌĂŶĂƌĂƚ͕ ͘ ϰϲϬϱϬWĞƚĂůŝŶŐ:ĂLJĂ ͕ DĂůĂLJƐŝĂ ͕ ^ĞůĂŶŐŽƌĂƌƵůŚƐĂŶ ͗ ͗ dĞůн;ϲϬϯͿϳϰϵϯϭϬϰϵ&Ădž н;ϲϬϯͿϳϰϵϯϭϬϰϳ ͬ ͗ ͘ ͬ ͲŵĂŝůŝŶĨŽΛĚŝŵĞŶƐŝŽŶƉƵďůŝƐŚŝŶŐ ĐŽŵ ͗ ͗ ͘ ͘ tĞďƐŝƚĞŚƩƉǁǁǁĚŝŵĞŶƐŝŽŶƉƵďůŝƐŚŝŶŐĐŽŵ
Photos courtesy of Ir. Liew Shaw Shong. Top: Powerhouse at Bakun Dam, Sarawak, Lower left: Soil nailing at Sg. Buloh, Selangor, Lower right: Rock slope at Kajang, Selangor.
ŚĂŝƌŵĂŶ ZKZdDZhZ ͬ KWƵďůŝƐŚĞƌ WdZ/<>hE'
[email protected]
'ĞŶĞƌĂůDĂŶĂŐĞƌ ^,/Z>zd,D
[email protected]
ĚŝƚŽƌ Z/<
COVER NOTE
[email protected]
Geotechnical Challenge: Geologists Act 2008 and the
ƌĞĂƟǀĞWƌŽĚƵĐƟŽŶDĂŶĂŐĞƌ >^/t>/
[email protected]
Development of Geotechnical Engineering .......................................................... 5 COVER STORY
'ƌĂƉŚŝĐĞƐŝŐŶĞƌ E>,D
The Geologists Act 2008 and Its Impact on Practising Engineers ........................... 6
[email protected]
ĚǀĞƌƟƐŝŶŐdžĞĐƵƟǀĞ >//,E
FEATURE ARTICLE
[email protected]
Talk on Centrifuge and Numerical Investigation of Pi le Performance Subjected to Stress Relief due to Deep Excavation by Prof. Charles Ng ......... 12
ĚǀĞƌƟƐŝŶŐdžĞĐƵƟǀĞ D^zW masaki@dimensionpublishing.com
ENGINEERING DIGEST
21
ĐĐŽƵŶƚƐĐƵŵĚŵŝŶdžĞĐƵƟǀĞ ^,ZKE>
SAFE TEA TIME
[email protected] ͗ &ŽƌĂĚǀĞƌƟƐĞŵĞŶƚƉůĂĐĞŵĞŶƚƐĂŶĚƐƵďƐĐƌŝƉƟŽŶƐ͕ƉůĞĂƐĞĐŽŶƚĂĐƚ DIMENSION PUBLISHING SDN. BHD. (449732-T)
͗ ͘ Ăƚн;ϲϬϯͿϳϰϵϯϭϬϰϵ͕ŽƌͲŵĂŝůŝŶĨŽΛĚŝŵĞŶƐŝŽŶƉƵďůŝƐŚŝŶŐĐŽŵ
Link-me-in ............................................................................................................... 22 FORUMS One-Day Workshop on Soil Parameters – Interpretation for Design ...................... 24
^ƵďƐĐƌŝƉƟŽŶĞƉĂƌƚŵĞŶƚ ͗ ͘ ͲŵĂŝůƐƵďƐĐƌŝƉƟŽŶΛĚŝŵĞŶƐŝŽŶƉƵďůŝƐŚŝŶŐĐŽŵ
7DONRQ*URXQG,PSURYHPHQWIRU(OHFWUL»HG'RXEOH7UDFN3URMHFW ........................ 25
WƌŝŶƚĞĚďLJ
A Lecture on Landslides: Physical and Numerical Modelling
Talk on Consolidation Settlement ........................................................................... 28 of Large Gound Movements ............................................................................... 30
HOFFSET PRINTING SDN. BHD. ΈϲϲϳϭϬϲͳsΉ ͬ
͘ EŽϭ͕:ĂůĂŶdW<ϭϲ͕dĂŵĂŶWĞƌŝŶĚƵƐƚƌŝĂŶ<ŝŶƌĂƌĂ͕ ͘ ϰϳϭϴϬWƵĐŚŽŶŐ ͕ DĂůĂLJƐŝĂ ͕ ^ĞůĂŶŐŽƌĂƌƵůŚƐĂŶ ͗ ͗ dĞůн;ϲϬϯͿϴϬϳϱϳϮϮϮ&Ădžн;ϲϬϯͿϴϬϳϱϳϯϯϯ
International Symposium on Intelligent Transport System Research ..................... 32 The 7th Malaysian C hem-E-Car Competition 2012 ............................................... 34 Tree Planting Community Project by IEM and ENSEARCH ................................. 39
DĂŝůĞƌ
IEM Annual Golf Competition 2012 ........................................................................ 40
WZ&dD/>^Zs/^ ϭϰ:ĂůĂŶd^Ϯ͕dĂŵĂŶWĞƌŝŶĚƵƐƚƌŝĂŶ^ƵŶŐĂŝƵůŽŚ͕ ͘ ^ƵŶŐĂŝƵůŽŚ ͕ ^ĞůĂŶŐŽƌĂƌƵůŚƐĂŶ͕DĂůĂLJƐŝĂ ͗ dĞůн;ϲϬϯͿϲϭϱϲϱϮϴϴ
JURUTERA MONTHLY CIRCULATION: 25,000 COPIES ͗ ^ƵďŵŝƐƐŝŽŶŽƌƉůĂĐĞŵĞŶƚŽĨĂƌƟĐůĞƐŝŶ:hZhdZĐŽƵůĚďĞŵĂĚĞƚŽƚŚĞͲ
ŚŝĞĨĚŝƚŽƌ d,/E^d/dhd/KEK&E'/EZ^ D>z^/ ĂŶŐƵŶĂŶ/ŶŐĞŶŝĞƵƌ͕ͬ ͘ ͘ >ŽƚƐϲϬΘϲϮ͕:ĂůĂŶϱϮϰ͕WKŽdžϮϮϯ;:ĂůĂŶ^ƵůƚĂŶͿ͕ ͘ ϰϲϳϮϬWĞƚĂůŝŶŐ:ĂLJĂ ͕ ^ĞůĂŶŐŽƌ ͬ ͗ ͗ dĞůн;ϲϬϯͿϳϵϲϴϰϬϬϭ ϰϬϬϮ&Ădžн;ϲϬϯͿϳϵϱϳϳϲϳϴ ͗ ͬ͘ ͘ ͘ ͘ ͲŵĂŝůƉƵďΛŝĞŵͬŽƌŐŵLJŽƌƐĞĐΛŝĞŵŽƌŐŵLJ ͗ ͗ ͘ ͘ ͘ /DtĞďƐŝƚĞŚƩƉǁǁǁŵLJŝĞŵŽƌŐŵLJ ,
,
ΞϮϬϭϮ͕dŚĞ/ŶƐƟƚƵƟŽŶŽĨŶŐŝŶĞĞƌƐ ͕ DĂůĂLJƐŝĂ;/DͿĂŶĚ ͘ ͘ ŝŵĞŶƐŝŽŶWƵďůŝƐŚŝŶŐ^ĚŶŚĚ
PUBLICATION DISCLAIMER
dŚĞƉƵďůŝĐĂƟŽŶŚĂƐďĞĞŶĐŽŵƉŝůĞĚďLJďŽƚŚ/DĂŶĚŝŵĞŶƐŝŽŶǁŝƚŚŐƌĞĂƚĐĂƌĞ ĂŶĚƚŚĞLJĚŝƐĐůĂŝŵĂŶLJĚƵƚLJƚŽŝŶǀĞƐƟŐĂƚĞĂŶLJƉƌŽĚƵĐƚƐ͕ƉƌŽĐĞƐƐ͕ƐĞƌǀŝĐĞƐ͕ĚĞƐŝŐŶƐ ͘ ĂŶĚƚŚĞůŝŬĞǁŚŝĐŚŵĂLJďĞĚĞƐĐƌŝďĞĚŝŶƚŚŝƐƉƵďůŝĐĂƟŽŶdŚĞĂƉƉĞĂƌĂŶĐĞŽĨĂŶLJ ŝŶĨŽƌŵĂƟŽŶ ŝŶ ƚŚŝƐ ƉƵďůŝĐĂƟŽŶ ĚŽĞƐ ŶŽƚ ŶĞĐĞƐƐĂƌŝůLJ ĐŽŶƐƟƚƵƚĞ ĞŶĚŽƌƐĞŵĞŶƚ ͘ ďLJ /D ĂŶĚ ŝŵĞŶƐŝŽŶ dŚĞƌĞ ŝƐ ŶŽ ŐƵĂƌĂŶƚĞĞ ƚŚĂƚ ƚŚĞ ŝŶĨŽƌŵĂƟŽŶ ŝŶ ƚŚŝƐ ͘ ƉƵďůŝĐĂƟŽŶ ŝƐĨƌĞĞ ĨƌŽŵ ĞƌƌŽƌƐ /D ĂŶĚ ŝŵĞŶƐŝŽŶĚŽ ŶŽƚ ŶĞĐĞƐƐĂƌŝůLJĂŐƌĞĞ ͘ ǁŝƚŚƚŚĞƐƚĂƚĞŵĞŶƚŽƌƚŚĞŽƉŝŶŝŽŶĞdžƉƌĞƐƐƐĞĚŝŶƚŚŝƐƉƵďůŝĐĂƟŽŶ
The Malaysian Feed-In Tariff .................................................................................. 44 IEM SNAPSHOTS
48
GLOBE TREKKING In the Shadow of the Matterhorn ............................................................................ 49 PINK PAGE Professional Interview ............................................................................................ 50 BLUE PAGES Membership List ..................................................................................................... 51 Building Fund List ................................................................................................... 52 IEM Diary of Events ................................................................................................ 52
ͬ WZKWK^&hdhZd,D^ϮϬϭϮϮϬϭϯ November 2012 International Focus: AFEO Mid-Term Meeting 2012 and Going Global
December 2012 Women Engineers Make the Difference
COPYRIGHT
:hZhdZƵůůĞƟŶŽĨ/DŝƐƚŚĞŽĸĐŝĂůŵĂŐĂnjŝŶĞŽĨdŚĞ/ŶƐƟƚƵƟŽŶŽĨŶŐŝŶĞĞƌƐ͕ ͘ ͘ DĂůĂLJƐŝĂ;/DͿĂŶĚŝƐƉƵďůŝƐŚĞĚďLJŝŵĞŶƐŝŽŶWƵďůŝƐŚŝŶŐ^ĚŶŚĚdŚĞ/ŶƐƟƚƵƟŽŶ ͘ ĂŶĚƚŚĞWƵďůŝƐŚĞƌƌĞƚĂŝŶƚŚĞĐŽƉLJƌŝŐŚƚŽǀĞƌĂůůŵĂƚĞƌŝĂůƐƉƵďůŝƐŚĞĚŝŶƚŚĞŵĂŐĂnjŝŶĞ EŽƉĂƌƚŽĨƚŚŝƐŵĂŐĂnjŝŶĞŵĂLJďĞƌĞƉƌŽĚƵĐĞĚĂŶĚƚƌĂŶƐŵŝƩĞĚŝŶĂŶLJĨŽƌŵŽƌƐƚŽƌĞĚ ŝŶĂŶLJƌĞƚƌŝĞǀĂůƐLJƐƚĞŵŽĨĂŶLJŶĂƚƵƌĞǁŝƚŚŽƵƚƚŚĞƉƌŝŽƌǁƌŝƩĞŶƉĞƌŵŝƐƐŝŽŶŽĨ/D ͘ ĂŶĚƚŚĞWƵďůŝƐŚĞƌ
January 2013 Agricultural and Food Engineering
October 2012
JURUTERA |
3
COVER NOTE
JURUTE
Geotechnical Challenge: Geologists Act 2008 and the Development of Geotechnical Engineering
EƵŵďĞƌϭϬ͕KĐƚŽďĞƌϮϬϭϮ /DZĞŐŝƐƚĞƌĞĚŽŶϭDĂLJϭϵϱϵ ͬ ͬ D:>/^'/^^/ϮϬϭϮϮϬϭϯΈ/DKhE/>^^^/KEϮϬϭϮ ϮϬϭϯΉ YANG DIPERTUA / PRESIDENT: ͘ /ƌŚĞŶ<ŝŵ<ŝĞŽŶŐ͕sŝŶĐĞŶƚ
by Ir. Liew Shaw Shong Chairman, Geotechnical Engineering Technical Division, IEM
TIMBALAN YANG DIPERTUA / DEPUTY PRESIDENT: ͘ /ƌŚŽŽ<ŽŬĞŶŐ NAIB YANG DIPERTUA / VICE PRESIDENTS: ͘ ͘ ͘ ͘ ͘͘ ͘ ͘ /ƌWŚŽŶŐ͕zŚŐĂƚŽ͛/ƌ>ŝŵŚŽǁ,ŽĐŬ͕/ƌWƌŽĨƌtĂŶDĂŚŵŽŽĚďŝŶtĂŶďĚƵůDĂũŝĚ͕ ͘ ͘ ͘ ͘ ͘ ͘ ͘ /ƌzŝŵ,ŽŶtĂ͕/ƌWƌŽĨƌZƵƐůĂŶďŝŶ,ĂƐƐĂŶ͕zŚŐĂƚŽ͛/ƌƌ^ĞŽ<ŝĂŶ,Ăǁ͕ŶĚLJ͕/ƌdĂŶ zĞĂŶŚŝŶ SETIAUSAHA KEHORMAT / HONORARY SECRETARY: ͘ ͘ /ƌWƌŽĨƌŚŝĂŶŐŚŽŽŶŐ>ƵŝŶ͕:ĞīƌĞLJ BENDAHARI KEHORMAT / HONORARY TREASURER: ͘ ͘ /ƌWƌŽĨƌ>ĞĞdĞĂŶŐ^ŚƵŝ WAKIL AWAM / CIVIL REP RESENTATIVE: ͬ ͘ /ƌ'ƵŶĂƐĂŐĂƌĂŶĂů<ƌŝƐƚŶĂŶ WAKIL MEKANIKAL / MECHANICAL REPRESENTATIVE: ͘ ͘ ͘ ͘ ͘ ͘ zŚŐĂƚŽΖ>ƚ'ĞŶ/ƌ/ƐŵĂŝůďŝŶ^ĂŵŝŽŶ;ZƚĚͿ WAKIL ELEKTRIK / ELECTRICAL REPR ESENTATIVE: ͘ ͘ ͘ /ƌDŽŚĚŵĂŶďŝŶ,ũ/ĚƌŝƐ WAKIL STRUKTUR / STRUCTURAL REPRESE NTATIVE: ͘ /ƌzĂŵdĞŽŶŐ^ŝĂŶ WAKIL KIMIA / CHEMICAL REPRESENTATIVE: ͘ ͘ /ƌWƌŽĨƌďĚƵůnjŝnjďŝŶďĚƵůZĂŵĂŶ
͗ t>>/Eͳ>/E/^W>/Eͬ ZWZ^Edd/sdKKd,Z/^/W>/E^ ͘ ͘ ͘ /ƌƐƐŽĐWƌŽĨƌŚĞŽŶŐ<ƵĂŶzĞǁ WAKIL MULTIMEDIA / MULTIMEDIA REPRESENTATIVE: ͘ ͘ /ƌEŽŽƌ/njŝĚĚŝŶďĚƵůůĂŚďŝŶ,ũ'ŚĂnjĂůŝ AHLI MAJL IS / COUN CIL M EMBER S: ͘ ͘ ͘ ͘ ͘ ͘ /ƌƐƐŽĐWƌŽĨƌDĂƌůŝŶĚĂďŝŶƟďĚDĂůĞŬ͕/ƌĂŝŶƵĚĚŝŶďŝŶDŽŚĂŵŵĂĚ͕/ƌ>Ăŝ<ŽŶŐWŚŽŽŝ͕ ͘ ͘ ͘ ͘ ͘ ͘ ĂǀŝĚ͕zŚŐĂƚŽ͛/ƌŚĞĞ^ŚŝdŽŶŐ͕:ŽŚŶ͕/ƌ'ŽƉĂůEĂƌŝĂŶ<ƵƩLJ͕ Vacant ͕zŚŐ&ŝƌƐƚĚŵŝƌĂů ͘ ͘ ͘ ͘ ͘ ͘ ͘ ĂƚŽ͛/ƌ,ũŚŵĂĚDƵƌĂĚďŝŶ,ũKŵĂƌ;ZƚĚͿ͕/ƌEŐ^ŚŝƵzƵĞŶ͕ĂǀŝĚ͕/ƌ<ŝŵ<ĞŬ^ĞŽŶŐ͕/ƌ ͘ ͘ ͘ ͘ ŚŽŶŐŚĞǁ&ĂŶ͕/ƌƌdĂŶ<ƵĂŶŐ>ĞŽŶŐ͕/ƌ>ĂƵzƵŬDĂ͕:ƵŶĞ͕/ƌƌEŽƌůŝĚĂďŝŶƵŶŝLJĂŵŝŶ͕/ƌ ͘ ͘ ͘ ͘ ͘ ͛ /ƐŚĂŬďŝŶďĚƵůZĂŚŵĂŶ͕/ƌ,ŽŽŚŽŽŶ^ĞĂŶ͕zŚŐĂƚŽ/ƌ^ĂŵƐƵĚĚŝŶďŝŶ/ƐŵĂŝů͕/ƌ>ĞĞŽŽŶ ͘ ͘ ͘ ͘ ͘ ͘ ŚŽŶŐ͕/ƌdƵzŽŶŐŶŐ͕/ƌ>Ăŝ^njĞŚŝŶŐ͕/ƌ>ĞĞtĞŶŐKŶŶ͕/ƌzĂƉ^ŽŽŶ,ŽĞ͕/ƌ>ŝdŚĂŶŐ&Ăŝ͕/ƌ ͘ ͘ ͘ :ƵĂƌĞƐZŝnjĂůďŝŶďĚƵů,ĂŵŝĚ͕/ƌƌEŽƌĂnjŵĂŶďŝŶDŽŚĂŵĂĚEŽŽƌ͕/ƌůůŝĂƐďŝŶ^ĂŝĚŝŶ͕ŶŐƌƌ DŽŬsĞĞ,ŽŽŶŐ͕:ŝŵŵLJ ͗ ,>/D :>/ ^ͬKhE />DD Z^ΈzW WK/Ed DEdΉ ͘ ͘ ͘ ͘ ͘ ͘ ͘ zŚŐĂƚŽ͛/ƌ,ũDŽŚĂŵĂĚďŝŶ,ũ,ƵƐŝŶ͕/ƌďĚƵů'ŚĂŶŝďŝŶ,ĂƐŚŝŵ ͕ /ƌďĚƵůůĂŚďŝŶ/ƐŶŝŶ BEKAS YANG DIPERTUA TERAKHIR / IMMEDIATE PAST PRESIDENT: ͘ ͘ ͘ ͘ zŚŐĐĂĚĞŵŝĐŝĂŶĂƚŽΖ/ƌWƌŽĨƌŚƵĂŚ,ĞĂŶdĞŝŬ BEKAS YANG DIPERTUA / PAST PRESIDENTS: ͘ ͘ ͘ ͘ ͘ ͘ ͘ zŚŐĂƚŽΖ/ƌWĂŶŐ>ĞŽŶŐ,ŽŽŶ͕zŚŐĐĂĚĞŵŝĐŝĂŶĂƚŽΖ/ƌ;ƌͿ,ũŚŵĂĚĂŝĚĞĞďŝŶ>ĂŝĚŝŶ͕ ͘ ͘ ͘ ͘ ͘ ͘ ͘ ͘ ͘ /ƌƌ'ƵĞ^ĞĞ^Ğǁ͕zŚŐĂƚƵŬ/ƌWƌŽĨƌKǁŚĞĞ^ŚĞŶŐ͕zŚŐĂƚŽΖWĂĚƵŬĂ/ƌWƌŽĨ;ƌͿ <ĞŝnjƌƵůďŝŶďĚƵůůĂŚ PENGERUSI CAWANGAN / BRANCH CHAIRMAN: ͘ ͘ ϭWƵůĂƵWŝŶĂŶŐʹ/ƌEŐ^ŝŶŚŝĞ ͘ ͘ Ϯ^ĞůĂƚĂŶʹ/ƌ>ĞĞ>ŽŬĞ,Ăŝ͕ĂǀŝĚ ͘ ͘ ϯWĞƌĂŬʹ/ƌŚĂŶ,ŽŽŶŐDƵŶ ͘ ͘ ϰ<ĞĚĂŚͲWĞƌůŝƐʹ/ƌ,ŽƌdĞŬ>ŝƉ ͘ ͘ ϱEĞŐĞƌŝ^ĞŵďŝůĂŶʹ/ƌDŽŚĂŵŵĞĚEŽŽƌďŝŶďƵ,ĂƐƐĂŶ ͘ ͘ ͘ ϲ<ĞůĂŶƚĂŶʹ/ƌ,ũ^LJĞĚďĚƵůZĂŚŵĂŶďŝŶ^LJĞĚďĚƵůůĂŚ ͘ ͘ ͘ ϳdĞƌĞŶŐŐĂŶƵʹ/ƌDŽŚĚnjŵŝďŝŶůŝ ͘ ͘ ϴDĞůĂŬĂʹ/ƌsĞůůĂŶsĞŶŐŽΛWĞƌƵŵĂů ͘ ͘ ϵ^ĂƌĂǁĂŬʹ/ƌdĂŶ<ŚŝŽŬŚƵŶ͕ůĂŶ ͘ ͘ ϭϬ^ĂďĂŚʹ/ƌ>ŽŚŽŶŐŚŝƵŶ ͘ ͘ ϭϭDŝƌŝʹ/ƌ'ŽŚ^ŽŽŶŽŽŶ ͘ ͘ ϭϮWĂŚĂŶŐʹ/ƌdƵĂŶ,ĂũŝŚŵĂĚ<ĂŵĂů<ƵŶũŝ AHLI JAWATANKUASA INF ORMAS I DAN P ENERB ITAN / STANDING ON INFORMATION AND PUBLICATIONS 2012/2013: ͬ COMMITTEE ͗ ͘ ͘ ͘ WĞŶŐĞƌƵƐŝŚĂŝƌŵĂŶ zŚŐĂƚŽ͛/ƌƌ^ĞŽ<ŝĂŶ,Ăǁ͕ŶĚLJ ͬ ͗ ͘ EĂŝďWĞŶŐĞƌƵƐŝsŝĐĞŚĂŝƌŵĂŶ/ƌ>Ăŝ<ŽŶŐWŚŽŽŝ͕ĂǀŝĚ ͬ ͗ ͘ ^ĞƟĂƵƐĂŚĂ^ĞĐƌĞƚĂƌLJ/ƌ>ĂƵdĂŝKŶŶ ͘ ͬ ͗ ͘ <ĞƚƵĂWĞŶŐĂƌĂŶŐŚŝĞĨĚŝƚŽƌ/ƌWƌŽĨƌ>ĞĞ^njĞtĞŝ ͬ ͗ ͘ WĞŶŐĂƌĂŶŐƵůĞƟŶƵůůĞƟŶĚŝƚŽƌ /ƌ KŶŐ'ƵĂŶ,ŽĐŬ ͬ ͘ ͗ ͘ WĞŶŐĂƌĂŶŐWƌŝŶƐŝƉĂů:ƵƌŶĂůWƌŝŶĐŝƉĂů:ŽƵƌŶĂůĚŝƚŽƌ/ƌWƌŽĨƌďĚƵů<ĂƌŝŵďŝŶDŝƌĂƐĂ ͬ ͗ ͘ ͘ ͘ ͘ WĞŶŐĞƌƵƐŝWĞƌƉƵƐƚĂŬĂĂŶ >ŝďƌĂƌLJŚĂŝƌŵĂŶ/ƌDDďƵĐŬĞƌ ͬ ͘ ͘ ͘ ͗ ͘ ͘ ͘ ŚůŝͲŚůŝŽŵŵŝƩĞĞDĞŵďĞƌƐ/ƌWƌŽĨƌ>ĞĞ^njĞtĞŝ͕/ƌƐƐŽĐWƌŽĨƌDĂƌůŝŶĚĂďƚďĚƵů ͘ ͘ ͘ ͘ ͘ ͘ DĂůĞŬ͕/ƌzĞĞdŚŝĞŶ^ĞŶŐ͕/ƌdƵzŽŶŐŶŐ͕/ƌŚŝŶDĞĞWŽŽŶ͕ĂƚŽ͛/ƌWƌŽĨƌDŽŚĚ^ĂůĞŚďŝŶ ͘ ͘ ͘ ͘ ͘ ͘ ͘ :ĂĂĨĂƌ͕/ƌ,ũ>ŽŽŬ<ĞŵĂŶďŝŶ^ĂŚĂƌŝ͕zŚŐĂƚƵŬ/ƌWƌŽĨƌKǁŚĞĞ^ŚĞŶŐ͕/ƌŚĞŽŶŐ>ŽŽŶŐ ͘ ͘ ͘ ͘ ͘ <ǁŽŶŐ͕ůůĞŶ͕ŶŐƌƌzĞŽŚ,ĂŬ<ŽŽŶ͕zŚŐĂƚŽ/ƌ,ũďĚƵůZĂƐŚŝĚďŝŶDĂŝĚŝŶ ͚ ͗ /D^ĞĐƌĞƚĂƌŝĂƚWĂŵĞůĂ:ŝƚĂď
THE INSTITUTION OF ENGINEERS, MALAYSIA
ͬ ͘͘ ĂŶŐƵŶĂŶ/ŶŐĞŶŝĞƵƌ͕>ŽƚƐϲϬΘϲϮ͕:ĂůĂŶϱϮϰ͕WKŽdžϮϮϯ͕;:ĂůĂŶ^ƵůƚĂŶͿ͕ ͘ ϰϲϳϮϬWĞƚĂůŝŶŐ:ĂLJĂ ͬ ͕ ^ĞůĂŶŐŽƌĂƌƵůŚƐĂŶ ͗ ͗ͬ dĞůϲϬϯͲϳϵϲϴϰϬϬϭϰϬϬϮ&ĂdžϲϬϯͲϳϵϱϳϳϲϳϴ ͬ ͗ ͘ ͘ ͗ ͗ ͘ ͘ ͘ ͲŵĂŝůƐĞĐΛŝĞŵŽƌŐŵLJ,ŽŵĞƉĂŐĞŚƩƉǁǁǁŵLJŝĞŵŽƌŐŵLJ
GEOLOGISTS ŚĂǀĞ ƚƌĂĚŝƟŽŶĂůůLJ ďĞĞŶ ǁŽƌŬŝŶŐ ĂƐ ĂƉƉůŝĞĚ ƐĐŝĞŶƟƐƚƐŝŶ ƚŚĞĮĞůĚŽĨ ĞĂƌƚŚ ƐĐŝĞŶĐĞĂŶĚ ŝŶ ƚŚĞĞdžƉůŽƌĂƟŽŶ ŽĨ ŶĂƚƵƌĂů ƌĞƐŽƵƌĐĞƐ͕ ƉƌŽǀŝĚŝŶŐ ƌĞŵĂƌŬĂďůLJ ǀĂůƵĂďůĞ ŝŶƉƵƚƐ ƚŽ ƚŚĞ ŵŝŶŝŶŐ ĞŶŐŝŶĞĞƌĨŽƌ ƚŚĞ ĞdžƚƌĂĐƟŽŶ ŽĨ ŵŝŶĞƌĂůƐ ĂŶĚ ŽƚŚĞƌŐĞŽͲ ͘ ƌĞƐŽƵƌĐĞƐŶŐŝŶĞĞƌŝŶŐŐĞŽůŽŐLJŝƐĂƐƉĞĐŝĂůŝƐĞĚĚŝǀŝƐŝŽŶŽĨŐĞŽůŽŐLJ ǁŚĞƌĞ ƚŚĞĞŶŐŝŶĞĞƌŝŶŐ ŐĞŽůŽŐŝƐƚƐĂƌĞ ƚƌĂŝŶĞĚƚŽ ǁŽƌŬ ǁŝƚŚ Đŝǀŝů ĞŶŐŝŶĞĞƌƐ͕ĂƌĐŚŝƚĞĐƚƐ͕ĚĞǀĞůŽƉĞƌƐĂŶĚƉůĂŶŶĞƌƐŝŶŝŶǀĞƐƟŐĂƟŶŐĂŶĚ ŝĚĞŶƟĨLJŝŶŐ ŐĞŽůŽŐŝĐĂů ĨĂĐƚŽƌƐƚŚĂƚ ĐŽƵůĚ ĂīĞĐƚƚŚĞ ĚĞǀĞůŽƉŵĞŶƚ ĨƌŽŵ ƚŚĞ ĂƐƉĞĐƚƐ ŽĨ ĚĞƐŝŐŶ͕ ĐŽŶƐƚƌƵĐƟŽŶ͕ ŽƉĞƌĂƟŽŶ ĂŶĚ ͘ ŵĂŝŶƚĞŶĂŶĐĞŽĨĞŶŐŝŶĞĞƌĞĚǁŽƌŬƐ /Ŷ ƚŚĞ ĞĂƌůLJ ƚǁĞŶƟĞƚŚ ĐĞŶƚƵƌLJ ͕ ƚŚĞ ĞŵĞƌŐĞŶĐĞ ŽĨ ŵŽĚĞƌŶ ŐĞŽƚĞĐŚŶŝĐĂůĞŶŐŝŶĞĞƌŝŶŐĂƐĂƐƉĞĐŝĂůŝƐĞĚďƌĂŶĐŚŽĨĐŝǀŝůĞŶŐŝŶĞĞƌŝŶŐ ƐƚĂƌƚĞĚ ĂƌŽƵŶĚ ƚŚĞ ƐĂŵĞ ƟŵĞ ĂƐ ƚŚĞ ĚĞǀĞůŽƉŵĞŶƚ ŽĨ ŵŽĚĞƌŶ ͘ ƐŽŝůĂŶĚ ƌŽĐŬ ŵĞĐŚĂŶŝĐƐ /Ŷ ƚŚĞƚƌĂŝŶŝŶŐ ŽĨ Đŝǀŝů Žƌ ŐĞŽƚĞĐŚŶŝĐĂů ĞŶŐŝŶĞĞƌƐ͕ ŐĞŶĞƌĂů ŐĞŽůŽŐLJ ŝƐ ŝŶĐůƵĚĞĚ ŝŶ ƚŚĞ ĐƵƌƌŝĐƵůƵŵ ĂƐ ĂŶ ͘ ƵŶĚĞƌůLJŝŶŐŬŶŽǁůĞĚŐĞŽĨŐĞŽůŽŐLJŝƐĞƐƐĞŶƟĂů /ŶƚŚĞƉĂƐƚ͕ƚŚĞƚǁŽƉƌŽĨĞƐƐŝŽŶƐŚĂǀĞďĞĞŶĐŽůůĂďŽƌĂƟŶŐŝŶĐŝǀŝů ĞŶŐŝŶĞĞƌŝŶŐƉƌŽũĞĐƚƐǁŚŝĐŚƌĞƋƵŝƌĞŐĞŽůŽŐŝĐĂůŝŶƉƵƚƐďƵƚƚŚĞƐĐŽƉĞ ͘ ŽĨƐƵĐŚŝŶƉƵƚƐŝƐƐƉĞĐŝĮĞĚďLJƚŚĞĞŶŐŝŶĞĞƌhůƟŵĂƚĞůLJ͕ƚŚĞĐŝǀŝůŽƌ ŐĞŽƚĞĐŚŶŝĐĂůĞŶŐŝŶĞĞƌŝƐƉƌŽĨĞƐƐŝŽŶĂůůLJƌĞƐƉŽŶƐŝďůĞĨŽƌƚŚĞŽǀĞƌĂůů ͘ ĚĞƐŝŐŶŽĨ ƚŚĞǁŽƌŬƐ tŝƚŚ ƚŚĞĞŶĂĐƚŵĞŶƚŽĨ ƚŚĞ'ĞŽůŽŐŝƐƚƐĐƚ ϮϬϬϴ;ŚĞƌĞŝŶĂŌĞƌƌĞĨĞƌƌĞĚƚŽĂƐ ͞ƚŚĞĐƚͿ͕ƚŚĞƌĞŚĂǀĞďĞĞŶƐŽŵĞ ͟ ĐŽŶĐĞƌŶƐĂŶĚĐŽŶĨƵƐŝŽŶĂŵŽŶŐƐƚĞŶŐŝŶĞĞƌƐŽǀĞƌƚŚĞĐŽŶƐĞƋƵĞŶĐĞƐ ͗ ŽĨƚŚĞĐƚ͕ǁŚŝĐŚŝŶĐůƵĚĞ ĂͿ
dŚĞ ƉŽƚĞŶƟĂů ĞŶĐƌŽĂĐŚŵĞŶƚŝŶƚŽƚŚĞĞŶŐŝŶĞĞƌ͛ƐƚƌĂĚŝƟŽŶĂů ĂƌĞĂƐ ŽĨ ǁŽƌŬ͕ ƐƵĐŚ ĂƐ ŵŝŶŝŶŐ͕ ŐƌŽƵŶĚǁĂƚĞƌ ƌĞƐŽƵƌĐĞƐ͕ ͘ ƚƵŶŶĞůůŝŶŐ͕ĚĂŵĞŶŐŝŶĞĞƌŝŶŐĂŶĚŚŝůůƐůŽƉĞĚĞǀĞůŽƉŵĞŶƚ
ďͿ
dŚĞ ŝŶǀŽůǀĞŵĞŶƚ ŽĨ ƵŶƋƵĂůŝĮĞĚ ŐĞŽůŽŐŝƐƚƐ ŝŶ ĞŶŐŝŶĞĞƌŝŶŐ ͘ ǁŽƌŬƐ KŶůLJ ĞŶŐŝŶĞĞƌŝŶŐ ŐĞŽůŽŐŝƐƚƐ ǁŚŽ ŚĂǀĞ ƌĞĐĞŝǀĞĚ ĂƉƉƌŽƉƌŝĂƚĞƚƌĂŝŶŝŶŐĂƌĞĐĂƉĂďůĞŽĨĂĚǀŝƐŝŶŐĂŶĚŚŝŐŚůŝŐŚƟŶŐ ƚŚĞƉŽƚĞŶƟĂůŐĞŽͲŚĂnjĂƌĚƐ ƚŽƚŚĞ ĞŶŐŝŶĞĞƌ ǁŚŽǁŽƵůĚƚŚĞŶ ĚĞĐŝĚĞŽŶƚŚĞĮŶĂůĚŝƌĞĐƟŽŶŝŶĚĞƐŝŐŶƉůĂŶŶŝŶŐ͕ĚĞƚĂŝůŝŶŐĂŶĚ ͘ ƉƌŽũĞĐƚŝŵƉůĞŵĞŶƚĂƟŽŶ
ĐͿ
dŚĞ ŝŵƉŽƐŝƟŽŶ ŽĨ ŵĂŶĚĂƚŽƌLJ ƌĞƋƵŝƌĞŵĞŶƚƐ ďLJ ůŽĐĂů ͘ ĂƵƚŚŽƌŝƟĞƐ ĨŽƌ ŐĞŽůŽŐŝĐĂů ŝŶƉƵƚƐ /ĚĞŶƟĨLJŝŶŐ ƚŚĞ ŶĞĞĚ ƚŽ ĂĐƋƵŝƌĞŐĞŽůŽŐŝĐĂůƐĞƌǀŝĐĞƐƐŚĂůůďĞďLJĂƉƌŽĨĞƐƐŝŽŶĂůĞŶŐŝŶĞĞƌ ͘ ŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚ^ĞĐƟŽŶϮϳ;ϲͿŽĨƚŚĞĐƚ,ĞŶĐĞ͕ƚŚĞƌĞŝƐ Ă ŶĞĞĚ ƚŽŝŶĐƌĞĂƐĞ ĂǁĂƌĞŶĞƐƐĂŵŽŶŐƐƚ ůŽĐĂů ĂƵƚŚŽƌŝƟĞƐ ŽĨ ƐƵĐŚ ĂƉƌŽǀŝƐŝŽŶ͕ǁŚĞŶĚĞůŝŶĞĂƟŶŐƚŚĞĂƉƉƌŽǀĂůƉƌŽĐĞƐƐŽĨ ͘ ĚĞǀĞůŽƉŵĞŶƚƉůĂŶŶŝŶŐ
ĚͿ
dŚĞĂďƐĞŶĐĞŽĨĂŶLJƉƌŽǀŝƐŝŽŶŝŶƚŚĞĐƚƚŚĂƚƐƉĞĐŝĮĐĂůůLJĂůůŽǁƐ ĞŶŐŝŶĞĞƌƐ ǁŝƚŚ ƌĞůĞǀĂŶƚ ƋƵĂůŝĮĐĂƟŽŶƐ ĂŶĚ ƚŚĞ ĂƉƉƌŽƉƌŝĂƚĞ ͘ ĞdžƉĞƌŝĞŶĐĞƚŽƉĞƌĨŽƌŵŐĞŽůŽŐŝĐĂůƌĞůĂƚĞĚƉƌĂĐƟĐĞƐ
ĞͿ
dŚĞ ĂďƐĞŶĐĞŽĨ ƉƌŽĨĞƐƐŝŽŶĂůůŝĂďŝůŝƚLJ ƚŽďĞ ĂƩĂĐŚĞĚ ƚŽƚŚĞ ƉƌŽĨĞƐƐŝŽŶĂů ǁŽƌŬ ƉĞƌĨŽƌŵĞĚ ďLJ Ă ŐĞŽůŽŐŝƐƚ ƚŽ ƐĂĨĞŐƵĂƌĚ ͘ ƉƵďůŝĐƐĂĨĞƚLJ
dŚƵƐ͕ƚŚĞĞŶŐŝŶĞĞƌŝŶŐĨƌĂƚĞƌŶŝƚLJƐŚŽƵůĚĐůŽƐĞůLJĨŽůůŽǁƵƉǁŝƚŚƚŚĞ ĨŽƌŵƵůĂƟŽŶŽĨƚŚĞƌĞŐƵůĂƟŽŶƐŝŶĂĐĐŽƌĚĂŶĐĞƚŽƚŚĞĐƚƚŽĞŶƐƵƌĞ ͘ ƚŚĞĂďŽǀĞŝƐƐƵĞƐĂƌĞƉƌŽƉĞƌůLJĂĚĚƌĞƐƐĞĚ
October 2012
JURUTERA |
5
COVER STORY
The Geologists Act 2008 and Its Impact on Practising Engineers by Ir. Yee Thien Seng
INTRODUCTION
SCOPE OF GEOLOGICAL SERVICES
Subsequent to the establishment of the Geologists Act 2008 (hereinafter referred to as “The Act”) on 27 August 2008, several issues of concern have emerged amongst practising engineers, especially in terms of professional responsibility and accountability. This is taken in view of the fact that the provisions of the Act seem to offer stout protection to the geological fraternity. To address these issues of concern, the Geotechnical Engineering Technical Division had recently organised a forum on the Act at the Tan Sri Professor Chin Fung Kee Auditorium, Wisma IEM. The forum was chaired and moderated by Ir. Dr Chin Yaw Ming, a former Committee Member of the IEM Geotechnical Engineering Technical Division. There were four (4) the panellists in this forum, namely Ir. Dr Ooi Teik Aun, Chairman of IEM Consulting Engineers Special Interest Group and Committee Member of IEM Geotechnical Engineering Technical Division and Consultant, Ir. Dr Mohd. Farid bin Hj. Ahmad, Chairman of IEM Tunneling and Underground Space Technical Division and Consultant, Ir. Dr Abdul Majid bin Dato’ Abu Kassim, Immediate Former President of the Association of Consulting Engineers Malaysia and Consultant, and Mr. Seet Chin Peng, Vice-President of the Institute of Geology Malaysia. They have brought forward several interesting opinions related to the grey area created by the provisions of the Act.
,U 'U 2RL »UVW SURYLGHG D TXLFN RYHUYLHZ RI ²JHRORJLFDO services’ as listed in the Act which would pose some VLJQL»FDQW LPSDFWV RQ WKH ZRUN RI HQJLQHHUV +H DOVR highlighted some of his personal experiences on them, which include the following: i. Feasibility studies; ii. Planning; iii. Geological surveying; iv. Implementing, commissioning, operation, maintenance and management of geological survey works or projects; v. Any other services approved by the Board. He cautioned that the provisions are very wide in coverage and, although the Act does declare that none of its provisions should be construed as permitting geologists to practise engineering under the Registration of Engineers Act 1967 (REA), they would inevitably have led to numerous instances of geologists encroaching into the engineer’s areas of work. In planning, such practices are condoned by Local Authorities which require the inputs of geologists as a FRQGLWLRQWREHIXO»OOHGGXULQJWKHSURFHVVLQJRIVXEPLVVLRQV for approval of development schemes in spite of Clause 27(6) in the Act which clearly stipulates that it is not mandatory to have geological services for the practice of
The forum panellists from left to right: Ir. Dr Chin Yaw Ming (moderator), Ir. Dr Abdul Majid bin Dato’ Abu Kassim, Ir. Dr Mohd. Farid bin Hj. Ahmad, Mr. Seet Chin Peng and Ir. Dr O oi Teik Aun
6
| JURUTERA
October 2012
(Continued on page 8)
COVER STORY
engineering unless so requested by a professional engineer. Thus, in the course of providing their inputs, it would be GLI»FXOWIRUJHRORJLVWVWRWRWDOO\DYRLGPDNLQJFRPPHQWVRQ the engineering aspects of the work, and this could lead to an infringement of the REA. $V LOOXVWUDWHG LQ )LJXUH ,U 'U 2RL VKRZHG WKH ¼RZ process practised by some Local Authorities in receiving applications for Planning Approval for new hill slope developments, where the Jabatan Mineral dan Geosains Malaysia (JMG) approval of construction suitability on WKH EDVLV RI ²WHUUDLQ PDSSLQJ IRU ODQG FODVVL»FDWLRQ³ DQG prescribed policy guidelines prevails over all other technical departments’ or professionals’ opinions.
THE NEED TO SAFEGUARD PUBLIC INTERESTS According to Ir. Dr Ooi, the Act as well as the constitution of the Board of Geologists do not have the necessary
safeguards to protect public interests, and appear to have been formulated to preserve the interests of geologists. Ir. Dr Ooi also highlighted that the Act empowers an inspector to apply for a magistrate’s warrant authorising him to enter and search the premises, as and when there is suspicion that an offence under the Act is being or has been committed, or in connection with any business carried on any premises. $VHULRXVSHQDOW\RIXSWRD50»QHRUDSULVRQWHUP of up to one year, or both, may be imposed on any person who obstructs or impedes an inspector in the exercise of his duties. A similar penalty may also be imposed on any person found to have employed a person not registered under the Act to render any geological services. Further, any person found impersonating a registered geologist or DUHJLVWHUHGSUDFWLWLRQHUXQGHUWKH$FWFDQEH»QHGXSWR RM20,000 or imprisoned for up to two years, or both. He cautioned that engineers working on dams, tunnels and
Figure 1: Flow Chart for Approval of New Hill Site Developments
8
| JURUTERA
October 2012
COVER STORY
hillslope development projects can unwittingly commit DFWLRQVWKDWWUDQVJUHVVLQWRWKH»HOGVJD]HWWHGIRUJHRORJLVWV and thereby fall foul of the Act.
GEOLOGISTS AND ARCHIVED LANDSLIDES Ir. Dr Ooi then pointed out that the geologic fraternity enjoyed considerable media coverage following the occurrences of a number of highly dramatic landslides in recent times, starting with the Highland Towers collapse in 1993, which helped to trigger the creation of the Board of Geologists. However, he also pointed out that all those landslides were simply the consequence of poor engineering and construction practices and had little connection whatsoever with geology. Instead, Ir. Dr Ooi revealed that in 2003 a large rock slope collapse within the reserve of the New Klang Valley tolled expressway actually had gone through an extensive geological study during its design; and yet it had failed to avert the collapse of the slope which resulted in the closure of the affected section of the expressway for several months. Ir. Dr Ooi also provided towards the end of his presentation a short account of the one-day Seminar on Hill Site Development organised by the Board of Engineers Malaysia on 14 February 2009 along with the activities that followed. This included the updating of the IEM Position Paper on Hill Site Development in the same year.
DIFFERENTIATING GEOLOGICAL SCIENCE FROM ENGINEERING ,U 'U 0RKG )DULG EULH¼\ UHFDSSHG WKH VDOLHQW SURYLVLRQV in the Act presented earlier by Ir. Dr Ooi Teik Aun. He highlighted that the Act allows any person, irrespective of DFDGHPLFTXDOL»FDWLRQZKRKDVEHHQSUDFWLVLQJRUFDUU\LQJ RQEXVLQHVVLQDQ\RIWKH»HOGVRIJHRORJ\EHIRUHLWVJD]HWWH date, to continue doing so provided he registers as a practitioner under the Act within twelve months from that date. Ir. Dr Mohd. Farid noted that the Board of Geologists essentially could accept any individuals as registered practitioners of geology, whether or not they possess a university degree in geology, so long as these individuals ZHUHZRUNLQJDVJHRORJLVWVSULRUWRWKHJD]HWWHGDWH He also shared his experience in encountering cases whereby the geologists were required to prepare feasibility study reports for housing and condominium development projects. Ir. Dr Mohd. Farid remarked on the minor roles the geologists had, and yet their inputs were made to carry such great weight in the planning approval process by Local Councils. He also highlighted the limited nature of geological inputs in tunneling work and as a result the geologists employed in these project sites were trained to do geotechnical engineering work instead.
Ir. Dr Mohd. Farid then presented side-by-side comparisons of the university course contents for mining engineers and geologists. He commented that mining engineers work on processes culminating with the extraction of mineral resources from sources in the JURXQG IRU GRZQVWUHDP DSSOLFDWLRQV \HW WKH »HOGV RI geology listed in the Act cover many areas of their work. Whilst the geology course dealt with minerals in a clearly qualitative or descriptive manner, the mining engineers have to cover the same with very rigorous mathematics, reinforcing the treatment of the subject with engineering material science and engineering mechanics. It is such quantitative evaluations by mining engineers that make possible meaningful conclusions, and this holds true for all other disciplines of engineering. Ir. Dr Mohd. Farid also warned fellow engineers that based on the manner in which the Act has been formulated, there lies the possibility that engineers may be charged with practising unlicensed geology in future given the rising trend in Malaysia towards a litigious society.
ORIGINAL OBJECTIVE OF REGULATING GEOLOGICAL PRACTICE According to Mr. Seet, the work on the Act started in the 1980’s and has taken 28 years to accomplish; yet its main objective is to regulate the geological profession and its practice. The Highland Towers collapse was an initiating factor in its creation. He also emphasised that the Act was not intended to intrude into the engineers’ domain. Although LWOLVWHGHQJLQHHULQJJHRORJ\DVRQHRILWV»HOGVLWLVPRUH concerned with geological projects. However, now that geologists have gotten involved in engineering projects, it could only mean that they have strayed from the Act’s intended objectives. Feasibility studies for housing development or construction projects do not constitute geological projects. Geological projects include feasibility studies for mineral exploration and for mine operations. He explained that the Act recognises an individual who has been doing geological work before the Act was enforced, although he may not possess a university degree in geology. Through registration as a Registered Practitioner, he is permitted by the Act to continue working as before. However, Mr. Seet said that a non-geologist foreigner who undertakes geological work in this country would not be permitted under the Act to practise once his term has expired. He explained that this was aimed at protecting the livelihood of local geologists and practitioners. 0U6HHW»UPO\FODUL»HGWKDWLWZDVQHYHUWKHLQWHQWLRQ of the Act to require an engineer’s report to be signed by a registered geologist. However, it does require a contractors’ geological report submitted to the engineer to be signed by
October 2012
JURUTERA |
9
COVER STORY
a registered geologist. Mr. Seet added that the Act has been worded in very generic terms for ease of administration but its enforcement is intended to be made in conjunction with the accompanying Regulations to the Act. The Regulations ZKLFKZRXOG VSHFL»FDOO\ GH»QH WKH SURYLVLRQV RI WKH$FW however, have yet to be released.
THE REGULATIONS AND ABSENCE OF PROFESSIONAL LIABILITY Ir. Dr Abdul Majid observed that there are a number of similarities between the Act and the REA. He said that it was encouraging to learn from Mr. Seet that the vague wordings LQWKH$FWZRXOGEHFODUL»HGLQWKH5HJXODWLRQV,U'U$EGXO 0DMLGQRWHGWKDWWKH5HJXODWLRQVKDGEHHQ»QDOLVHGEHIRUH consultations with the Board of Engineers. He also pointed out the Act does not contain provisions that offer public representation on the Board of Geologists and there are no indications that the purpose of the Act is to protect and safeguard the publi c’s interests. Ir. Dr Abdul Majid also highlighted that there is no professional liability attached to the geological profession, unlike in the case of engineers where the Uniform Building %\/DZVVSHFL»FDOO\UHTXLUHDSURIHVVLRQDOHQJLQHHUWR EH WKH6XEPLWWLQJ3HUVRQRU4XDOL»HG3HUVRQDQGWKDWKHVKDOO be held responsible and liable for his work.
QUESTION AND ANSWER SESSION Ir. Dr Chin opened the session by asking Mr. Seet if engineers should register under the Act. Mr. Seet replied that only a person trained in geological sciences could do so. But their degrees would have to be recognised as admissible by the Board of Geologists before registration can be permitted. At the moment, as the Board of Geologists has yet to be established, registration is not possible. In response to a question from Ir. Mohd. Jamil b. Ali on the availability of professional geological companies, Mr. Seet explained that the Act does not register companies. It will only register individuals who are practising geologists. Currently, there are no registered geologists in the country since the Board of Geologists has yet to be established. Ir. Dr Majid reiterated that, unlike in the case of engineers, WKHUH LVQR HQDEOLQJ ²$FW³ WKDW PDNHVLW D UHTXLUHPHQW WR procure the services of registered geologists. Currently, the Local Authorities are imposing the requirement for geological services through their own procedures in addition to their respective local by-laws. Ir. Look Keman Sahari commented from his personal experience that mining engineers received considerable education in geology to the point of making them more than
10
| JURUTERA
October 2012
KDOIJHRORJLVWV0LQLQJHQJLQHHUVVKRXOGKDYHQRGLI»FXOWLHV working with geologists in the course of their work, and appealed to engineers and geologists to co-operate with each other. Subsequently, Ir. Dr Abdul Majid opined that an engineer has to recognise the limits of his own capability and not to practise beyond those limits, but to enlist the necessary assistance from individuals with the relevant expertise. This is in line with professional ethics. He suggested that there have been numerous instances of failures in constructed works resulting from incompetent and negligent acts by engineers and this situation has allowed others to claim SRVVHVVLRQRIFDSDELOLWLHVWKDWWDNHDZD\VSHFL»FUROHVIURP the engineers. Mr. Ng Chak Ngoon, a practising geologist, described an example of a geological report which mentioned the existence of non-existent minerals and made a mining company suffer business losses to justify the Act regulating against unauthorised practice. He then asked about the number of geotechnical engineers who have been charged in court for the many landslides that have been reported. Ir. Dr Ooi cited the case of the Highland Towers collapse where a structural engineer was made liable for certifying as-built drainage plans that he did not design nor supervise. Ir. Yee Thien Seng added that no geotechnical engineer had been charged so far as none had been involved in DQ\RIWKRVHHYHQWVDVWKH6XEPLWWLQJ3HUVRQRU4XDOL»HG Person, although engineers have certainly been charged and found liable in other cases. Ir. Dr Abdul Majid recounted a case where a consulting engineer was successfully sued for negligent conduct, though not under the REA. Mr. Seet also explained that the Act would protect employees from being forced against their will by their employers to sign geological reports. Meanwhile, an engineer from Dewan Bandaraya Kuala Lumpur (DBKL) talked about the receipt of unreliable site investigation reports by her department and revealed DBKL’s practice of requiring geologists to review geotechnical engineering reports. She also considered this practice unusual, which was agreed by the panellists as well. Mr. Ng Chak Ngoon likened the way the Act was being used by the Local Authorities (which require the services of geologists in applications for development approval) as a form of Development Tax since the services provide QR YDOXHDGGHG EHQH»W WR WKH SURSRVHG SURMHFWV7R WKLV another practising geologist, Mr. Tan Boon Kong, pointed out that the Local Authorities’ requirement for geological evaluations is a condition imposed by JMG and not a requirement of the Act.
FEATURE
Talk on Centrifuge and Numerical Investigation of Pile Performance Subjected to Stress Relief due to Deep Excavation by Prof. Charles Ng IT was an honour for Geotechnical Engineering Technical Division (GETD) of the Institution of Engineers, Malaysia (IEM) to have Prof. Charles W. W. Ng from the Hong Kong University of Science & Technology (HKUST) deliver a technical talk at Tan Sri Prof. Chin Fung Kee Auditorium, Wisma IEM, recently in conjunction with the 23rd GETD Annual General Meeting. The talk was chaired by Ir. Liew Shaw Shong, the present technical division Chairman. The talk had received an overwhelming response with an audience of 115 participants. The presentation started with a brief introduction of the geotechnical testing facilities in HKUST and was followed by a talk on the fundamental principles of geotechnical centrifuge modelling with schematic illustration on how rotating a test sample would generate a linearly increasing centrifuge stress within the test sample and enable the study of soil behaviours (dilative below critical state line and contractive above critical state line) as shown in Figure 1.
Figure 1: F undamental principles of centrifuge modelling
The following is a summary of the four principal applications of centrifuge technology: a) Modelling of Prototypes such as slopes, piles, tunnels, excavations, geo-environmental and earthquakeinduced problems, and consolidation settlements; b) Investigation of New Phenomena such as explosions, plate tectonics, liquefaction problems, and contaminant transports; c) Parametric Studies such as bearing capacity of footings on slopes, and laterally loaded pile groups; and d) Calibration of Numerical Models and Methods which shows the implication of a good match between the 12
| JURUTERA
October 2012
by Ir. Liew Shaw Shong
FRPSXWHU QXPHULFDO PRGHOOLQJ DQG »HOGREVHUYDWLRQV that subsequently raises the following questions: :KHWKHUWKH DSSURSULDWHQXPHULFDO PRGHO VLPXODWLRQ procedure or model parameters are being used? :KHWKHUDFRQYHUJHGVROXWLRQLVIRXQG" ,VRXUXQGHUVWDQGLQJRIWKHPHFKDQLFDOEHKDYLRXUV and mechanism improved? With the uncertainties in the ground conditions (such as non-homogeneity of the sub-soils, existence of crossDQLVRWURS\ SHUFKHG JURXQGZDWHU WDEOH FRHI»FLHQW RI lateral earth pressure at rest, zero displacement boundary, permeability and degree of saturation in sub-soils, etc.), which might not be fully captured in the numerical model, the good matching result would be highly possible due to mere coincidence bearing no true value to the problem. Hence, the direct calibration of numerical modelling to DFWXDO »HOG REVHUYDWLRQV FRXOG EH D GDQJHURXV SUDFWLFH However, physical model test using a 1g prototype model and centrifuge model test with known boundary conditions and ground conditions could be constructed to simulate the actual site conditions and verify both the numerical PRGHOOLQJDQGDOVRWKHDFWXDO»HOGREVHUYDWLRQIURPFDVH KLVWRU\WKXV»OOLQJXSWKHPLVVLQJOLQNEHWZHHQQXPHULFDO PRGHOOLQJDQG»HOGREVHUYDWLRQV
Figure 2: Representation of conventional load tests at ground level with pile sleeve and beneath deep basement, and pile group or pile raft in service below deep basement
In most piled foundation designs, it is very common to perform a static maintained load test at the ground level. If the project has a deep basement structure, a pile sleeve is usually provided along the pile shaft above the lowest basement level to prevent stress interaction from the embedded soils. However, the actual foundation piles with a deep basement often work underneath the basement structure to provide support to the columns. With the basement excavation, the actual stress in the subsoils embedding the piles below the basement would be reduced
FEATURE
as a result of stress relief. As such, the effect of stress relief on pile capacity and stiffness has seldom been examined when interpreting the static pile load test conducted at ground level well above the basement. Figure 2 illustrates the questionable representation of the conventional single test pile programme at ground level and at basement level to the actual pile working conditions. Following are some of the relevant clauses extracted IURP(XURFRGH%6(1 RQ SLOHYHUL»FDWLRQ tests: Clause 7.4.1 (1) – The design shall be based on one of the following approaches: – the results of static load test ; – empirical, analytical calculation methods, dynamic load test whose validity has been demonstrated by static load tests; – the observed performance of a comparable pile foundation. Clause 7.5.1 (4) – If pile load test is to be carried out, it shall normally be located where the most adverse ground conditions are believed to occur. This series of centrifuge model tests aim to: a) Study the capacity of single piles with and without stress relief due to basement excavation; b) Understand and quantify the governing mechanisms for shaft resistance of pile in both non-dilatant and dilatant soils; and c) ,QYHVWLJDWH WKH FDSDFLW\ HI»FLHQF\ DQG IDLOXUH mechanism of 3x3 pile group with stress relief.
In order to characterise the soil-structure interface, normalised roughness (Rn = Rmax/D50) as shown in Figure 3 , it is used to determine the two possible failure mechanisms at the soil-structure interface (Fioravante, 2002) as stated below: If Rn < 0.02: non-dilatant interface – particle sliding along the interface; If Rn > 0.10: dilatants interface – failure happens within a shear band in the soil.
pile installation. Sometimes, a pile sleeve is introduced to eliminate interference of soil friction above the actual pile cut-off level. b) Single pile subjected to stress relief due to excavation. c) Elevated pile group (3x3) with stress relief and no contact between the pile cap and the soil platform for load transfer other than the piles. d) Pile group (3x3) with stress relief, but the pile cap is in contact with soil platform enabling load transfer from pile cap to the soil platform.
Figure 4: Response of soil-structure interface
Figure 5 visualises the above-mentioned testing programme with smooth pile shaft simulating low friction pile in nondilatant soils and rough pile shaft interface simulating high friction pile in dilatant soils. To increase the pile-soil interface roughness, the pile shaft surface was coated with epoxy and sand grains.
Figure 3: Normalised roughness, R n (Kishida & Uesugi, 1987)
The photographic visualisation of two response types at soil-structure interface is illustrated in Figure 4. To research the effect of the stress relief on pile capacity, four scenarios of the pile load testing condition as summarised below were explored in order to compare their performance: a) Single pile tested at ground level prior to excavation resembling most of the conventional load tests, which are conveniently implemented at site before production
Figure 5: Test Programme of Centrifuge Model Testing
Roughness of pile-soil interface encourages rolling of soil particles over each other re-arranging themselves to a less compact state, hence, presenting a dilative behaviour of soil in shearing. The soil dilation within the shear band (Continued on page 15) October 2012
JURUTERA |
13
R IVO B INA S DN . B HD . Providing Precast Solutions to Bridge and Wall Engineering
Concrete Arch
Concrete Arch
eas d i T S A C R E P n o d l i u w e b
Concrete Retaining Wall
Concrete Sheetpile
Head Office:
Lot 5127, Batu 6, Jalan Kenangan, Off Jalan Meru, 41050 Klang, Selangor Darul Ehsan. Tel: 603-3392 8113 Fax: 603-3392 9113 Mobile: 012-306 1813, 019-668 1369 E-mail:
[email protected] East Coast Office: B-2, Tingkat Satu, Lorong Sg. Isap Jaya 1, Perkampungan Sg. Isap Jaya, 25150 Kuantan, Pahang Darul Makmur. Tel: 09-536 3430 Fax: 09-536 3431 Mobile: 012-921 8110 / 013-437 4799 Email:
[email protected]
FEATURE
will induce additional effective stress, which increases the frictional resistance when subject to shearing as presented in Figure 6. To verify the soil dilatancy at the pile-soil interface, PRGL»H PRG L»HG G GLU GLUHFW HFW VKH VKHDU DU ER[ WHV WHVWV WV XVL XVLQJ QJ ERW ERWWRP WRP DOX DOXPLQ PLQLXP LXP plates with both smooth surface and epoxy coated with sand grains were carried out. Toyoura Toyoura sand was compacted with relative density of 65% as the model soil. The shearing test results in Figure 7 show comparison of stress ratio and the dilative displacement in the high friction surface and the low friction surface.
contained in the space modelling the basement. The setting up and testing procedures of the centrifuge tests for both a single pile tested prior to excavation as in the conventional load test, and a single pile subjected to stress relief due to excavation are illustrated in Figure 9. The amount of stress relief to the soil platform beneath the basement will EHHTXDOWRWKHFHQWULIXJHZHLJKWRIWKHKHDY\¼XLGGUDLQHG out. Loading of 100N (10kN in prototype based on scaling laws for force) was applied incrementally to the model pile GXULQJWKH¼LJKW
Figure 8: Typical test arrangement of instrumented pile group
)LJXUH0HDVXUHGSUR¿OHDQ )LJXUH0HDV XUHGSUR¿OHDQGPHFKDQLVPRISLO GPHFKDQLVPRISLOHVRLOLQWHUIDFH HVRLOLQWHUIDFH
Figure 9: Testing procedures for single pile tested prior to excavation and subjected to stress relief due to excavation
Figure 7: Direct shear box test simulating pile-soil interface
In preparing the 3x3 pile group model, a 20mm thick aluminium plate adapted to nine aluminium model piles of 16mm diameter was used with pile centre-to-centre spacing RI»YHWLPHVRISLOHGLDPHWHU$VWKHFDSVRLOVWLIIQHVVUDWLR krs, was larger than 25, the pile cap could be considered to be a rigid pile cap. The centre pile, corner pile and edge pile were equipped with instruments for load transfer measurement of pile axial load along the pile shaft with GLIIHUHQWLPSRVHGORDGLQ¼LJKW)LJXUHVKRZVWKH[SLOH JURXSWHVWFRQ»JXUDWLRQ In this series of centrifuge model testing, the effect of H[FDYDWLRQZDVVLPXODWHGE\GUDLQLQJRXWRIWKHKHDY\¼XLG
Figure 10 shows the comparison of load-settlement curves for the single pile in a non-dilatant soil with pile sleeve (without stress relief) and with stress relief due to 20m deep excavation. Considering two failure criteria suggested by Ng et al. (pile load at settlement of 0.045D+0.5(PL)/(AE)) and Eurocode 7 (pile load at settlement of 10% of pile diameter), the measured pile capacity with stress relief was 20% and 16% lower than that without stress relief corresponding to the two failure criteria respectively. respectively. $VIRUWKHPHDVXUHGSLOHD[LDOORDGSUR»OHVIRUVLQJOHSLOH with and without stress relief, it was observed that the pile with stress relief generally had lower overall pile capacity as shown in Figure 11. Similarly, the lower rate of reduction of axial load along the pile with stress relief was less than October 2012
JURUTERA |
15
FEATURE
the pile without stress relief, implying lower shaft resistance in the pile with stress relief, but more pile base resistance being mobilised in the pile with stress relief.
However, the performance of single pile in dilatant soils However, with stress relief in Figure 13 shows stiffer load-settlement curve leading to higher interpreted pile capacity based on WKHWZRIDLOXUHFULWHULD)URPWKHSLOHD[LDOORDGSUR»OHVLQ Figure 14, it is not surprising to observe the enhancing effect of pile shaft resistance in dilatant soils, even with the counteracting pile capacity reduction effect from the stress effect due to excavation. The increased effective normal stress around the pile shaft due to soil dilatancy during shearing has increased pile shaft resistance as evidenced E\DUDSLGUHGXFWLRQLQSLOHD[LDOORDGSUR»OHWKHULJKW»JXUH in Figure 14.
)LJXUH/RDGVHWWOHPHQWFXUYHRILQÀLJKWOR )LJXUH/RDGVHWWOHPHQWFXU YHRILQÀLJKWORDGWHVWV DGWHVWV on single pile in non-dilatant soils
)LJXUH/RDGVHWWOHPHQWFXUYHRILQÀLJKWOR )LJXUH/RDGVHWWOHPHQWFXUY HRILQÀLJKWORDGWHVWV DGWHVWV on single piles in dilatant soils
)LJXUH3LOHD[LDOOR )LJXUH 3LOHD[LDOORDGSUR¿OHRILQ DGSUR¿OHRILQÀLJKWORDGWHV ÀLJKWORDGWHVWV WV on single piles in non-dilatant soils
The excavation geometry (R/H) and ratio of excavation GHSWKWRSLOHOHQJWK+/KDYHVLJQL»FDQWLQ¼XHQFHLQSLOH capacity,, the higher in either of the parameters implies more capacity reduction in the pile capacity. For the tests conducted, the measured reduction in pile capacity was in good agreement with the FEM parametric study by Zheng, Diao and Ng (2011) as shown in Figure 12. )LJXUH3LOHD[LDOORDGSUR¿OHRILQÀLJKWOR )LJXUH3LOHD[LDOORDGSUR ¿OHRILQÀLJKWORDGWHVWV DGWHVWV on single piles in dilatant soils
Figure 12: Effect of excavation geometry and pile length
Figure 15 shows the interpreted unit shaft resistances mobilised at every instrumented segment of pile shaft with the two stress conditions (with and without stress relief). The soil dilatancy effect in the changes of effective normal stress appeared to be more dominant than the stress relief effect from excavation. When the soil dilates during shearing, the normal stress on the pile-soil interface does not remain constant. Three boundary conditions for the pile-soil interface and the resulting shear resistances are shown in Figure 16. To study this dilative behaviour, Discrete Element Method (DEM) numerical model with constant normal stiffness (Continued on page 18)
16
| JURUTERA
October 2012
Automate your daily structural engineering calculations
The essential design and drafting software for steel buildings
Structural Industry Partners
The ultimate design and detailing software for concrete buildings
FEATURE
(CNS) boundary condition was used to simulate the cavity expansion behaviour relating to the outward displacement ( ǻ\) of the pile-soil interface and the increase of normal stress ( ǻı¶n ) in a parametric study.
Comparisons of the computed theoretical unit shaft UHVLVWDQFH DQG SLOH D[LDO ORDG SUR»OH FRQVLGHULQJ WKH changes in effective normal stress to the measurements in WKHFHQWULIXJHWHVWUHVXOWVDVSUHVHQWHGLQ)LJXUHVDQG show reasonably good agreement.
Figure 15: Mobilisation of pile shaft resistance
Figure 18: Calculated and measured shaft resistances
Figure 16: Boundary conditions for dilative pile-soil interface
The numerical results with CNS boundary condition in Figure 17 revealed that the mobilised stress ratio curve with stress relief (initial normal stress of 400kPa unloaded to 100kPa prior to shearing) has a peak value of about 1.0 (at 2% shear strain) before softening to a stress ratio of 0.72 (at about 10% shear strain) as compared to the result without unloading. It is evident that the soil dilatancy effect overwhelms the stress relief effect resulting in consistently higher normal stress increase during the entire shearing process.
Figure 17: Effect of stress relief on pile-soil interface response
18
| JURUTERA
October 2012
Figure 19: Calculated and measured pile axial load distributions
)URP WKH DERYH »QGLQJV LW FDQ EH REVHUYHG WKDW D conventional pile load test in non-dilatant material is not conservative. Hence, the most adverse condition for load test as required in Eurocode 7 (BS EN 1997-1:2004 Clause 7.5.1) will occur at the end of excavation. If such test is not possible, a reduction in pile shaft resistance proportional to stress relief should be considered in the calculation. However, for pile in a dilatant material, the most adverse condition might occur, either prior to excavation or after it, due to two counteracting effects on changes in normal effective stress. Though there is a reduction in effective normal stress due to stress relief, the effective normal VWUHVVFDQLQFUHDVHVLJQL»FDQWO\DVDUHVXOWRIGLODWLRQGXULQJ VKHDULQJ ,Q WKLV FDVH LW LV VDIH WR LJQRUH WKH EHQH»FLDO increase of pile capacity due to soil dilatancy in design. Finally, the test results for pile capacity and observed failure mechanisms of elevated pile group subject to stress relief are presented in Figures 20, 21 and 22. Based on the failure criterion of pile settlement of 10% pile diameter as in Eurocode 7, Figure 20 shows the interpreted group pile capacity of 293MN, which is equivalent to 33MN per pile.
FEATURE
Comparing with single pile capacity of 45MN with stress UHOLHI FRQGLWLRQ LW ZDV GHGXFHG WKDW WKH JURXS HI»FLHQF\ is approximately 0.7. From the load-settlement curves of single pile and group piles, the single pile appears to have stiffer load settlement performance.
Figure 22: Derivation of pile group capacity and critical failure mechanism
)LJXUH,QÀLJKWORDGWHVWRQHOHYDWHGSLOHJURXSVXEMHFWHG to 20m deep excavation in dilatants soil
When examining the unit shaft resistance of the single pile and group piles in the separating soil embedment zones, namely upper half and lower half as shown in Figure 21, the unit shaft resistances of both single pile and group piles are consistently higher in the lower half and that of the single pile is always higher than that of the group piles for the corresponding soil embedment zones. Mobilised unit shaft resistance along the upper half of each pile is only about 40% of the single pile at settlement up to 15% of pile diameter in this study. The normalised shaft resistance in upper half tends to be fairly constant (about 0.4) with increasing normalised pile settlement whereas, for the lower half, the normalised shaft resistance shows increasing trend with increasing normalised pile settlement.
of Eurocode 7 to the pile group centrifuge test simulating the pile group test (which is usually not performed in normal piling engineering practice), the interpreted pile group capacity of 293MN is presented in Figure 20. In the normal pile group assessment from the result of single pile load test, there are two following practices suggested in Eurocode 7 (Clause 7.6.2.1(3)): a) Failure of the pile individually Assuming individual pile in the pile group has the same unit shaft and toe resistance as in the single pile, the computed pile group capacity would be 342MN (9 piles [01SLOHZKLFKRYHUHVWLPDWHVSLOHJURXSFDSDFLW\ by 17%. b) Failure of piles and the soil between them acting as a block Assuming the pile group block has the same shaft and toe resistance as for a single pile, the computed pile group capacity would be 1497MN, which overestimates the pile group capacity by about 400%. As the test shows lower pile group capacity than the computed group capacity, there is likely to be other mechanisms other than the two aforementioned extreme cases. Thus, the computed pile group capacity is not conservative and has to be used with care.
SUMMARY OF KEY FINDINGS a) Single pile in non-dilatant material: /LPLW VKDIW UHVLVWDQFH IJ p ı¶nWDQį 3LOHFDSDFLW\LVUHGXFHGE\ZKHQVXEMHFWHGWR stress relief of 20m deep excavation. Sometimes reduction in pile capacity may be up to 45%, depending on excavation geometry and pile length.
Figure 21: Mobilisation of pile shaft resistance of pile group
)LJXUHVKRZVWKHSLOHD[LDOORDGSUR»OHRIDVOHHYHG single pile (without excavation) at the interpreted pile load with the failure criterion of Eurocode 7 corresponding to a conventional load test result. With the same failure criterion
&RQYHQWLRQDOORDGWHVWLQQRQGLODWDQWVRLOVLVQRQ conservative (even with pile sleeve). – The most adverse condition for a load test is to conduct the load test at the bottom of basement after the excavation. – If this is not possible, reduction in shaft resistance proportional to stress relief should be considered for actual pile performance in service. b) Single pile in dilatant materials: /LPLW VKDIW UHVLVWDQFH IJ pı¶nǻı¶nWDQį October 2012
JURUTERA |
19
FEATURE
5HGXFWLRQ LQ ı¶n is proportional to stress relief, but the magnitude of ǻı¶n increases by 30% when subjected to stress relief of 300 kPa for the piles
7KHPRVWDGYHUVHFRQGLWLRQPD\RFFXUHLWKHUSULRU to excavation or after it, due to the two counteracting terms, namely the stress relief factor and the soil dilatancy during shearing: – Reduction in ı¶n due to stress relief should be considered – But also increase in ǻı¶n due to dilation and yields conservative result; may be ignored in design
During the Q&A session, there were active discussions IURPWKH¼RRURYHUWKHVXEMHFWPDWWHUDQGPXWXDOH[FKDQJH of opinions. The technical talk ended with the presentation of a memento to Prof. Charles Ng by the former Chairman of GETD, Ir. Mun Kwai Peng.
c) 3x3 pile group capacity and failure mechanism: %DVHGRQWKH VHWWOHPHQWFULWHULRQ RI'(XURFRGH 7): Measured capacity of the pile group = 293 MN VLQJOHSLOH01DQG*URXSHI»FLHQF\ 0RELOLVHGSLOH VKDIWUHVLVWDQFH DORQJXSSHUKDOI RI each pile is only 40% of the single pile at settlement up to 15% of pile diameter in this study 7KHWZRIDLOXUHPHFKDQLVPVE\(XURFRGH – Assuming individual pile failure, overestimates capacity by 17% – Assuming block failure, overestimates capacity by 400% 0HFKDQLVPVRWKHUWKDQWKH WZR H[WUHPHFDVHVH[LVW capacity may be lower than either case and is nonconservative.
1SUDOKU Centerpiece "1" Develop both sides of the brain with 1Sudoku by Mr. Lim Teck Guan Fill in the remaining 80 squares with single digits 1-9 such that there is no repeat of the digit in every Row, Column and Block of nine squares. The number at the top left hand corner of the dotted cage indicates the total for the digits that the cage encompasses. For tips on solving, visit www.1sudoku.com.my © Twin Tree Publishing (Solution is on page 50 of this issue.)
Former Chairman of GETD, Ir. Mun Kwai P eng presenting a memento to Prof. Charles Ng (from left to right: Ir. Mun Kwai Peng, Prof. Charles Ng and Ir. Liew Shaw Shong)
A Note of Appreciation: The author wishes to express his gratitude to P rof. Cha rles Ng for providing the presentation slides which have greatly helped in the preparation of this report, and also for the permission granted to upload the
presentation slides onto the IEM website for the reference by our members.
9
32
17
12
| JURUTERA
October 2012
3
17
17
20
13
13
12
10
1
11
19
22
21
22
8
12
9
10
14
8
11
22
20
12
19
9
ENGINEERING DIGEST
Construction Industry Sets RM120 Billion Target for 2013
Local Minds Challenged to Produce Made-in-Malaysia Robots
ĐĐŽƌĚŝŶŐ ƚŽ ƚŚĞ ŽŶƐƚƌƵĐƟŽŶ /ŶĚƵƐƚƌLJ ĞǀĞůŽƉŵĞŶƚ ŽĂƌĚ ;/Ϳ͕ ƚŚĞ ĐŽŶƐƚƌƵĐƟŽŶ ŝŶĚƵƐƚƌLJ ŝƐ ĞdžƉĞĐƚĞĚ ƚŽ ƐĞĐƵƌĞ ZDϭϮϬ ͘ ďŝůůŝŽŶǁŽƌƚŚŽĨƉƌŽũĞĐƚƐŶĞdžƚLJĞĂƌ/ƚƐ'ĞŶĞƌĂůDĂŶĂŐĞƌ;ŽƌƉŽƌĂƚĞ ŝǀŝƐŝŽŶͿ͕ ŚŵĂĚ Ɛƌŝ ďĚƵů ,ĂŵŝĚ ƐĂŝĚƚŚĞ ƉƌŽũĞĐƚƐ ǁŽƵůĚ ďĞ ͘ ŵĂŝŶůLJŝŶƚŚĞŽŝůĂŶĚŐĂƐĂŶĚƚƌĂŶƐƉŽƌƚĂƟŽŶƐĞĐƚŽƌƐ͞tĞĞƐƟŵĂƚĞ ƚŚĞWĞƚƌŽŶĂƐZĞĮŶĞƌLJĂŶĚWĞƚƌŽĐŚĞŵŝĐĂů/ŶƚĞŐƌĂƚĞĚĞǀĞůŽƉŵĞŶƚ ;ZĂƉŝĚͿƉƌŽũĞĐƚ ŝŶ WĞŶŐĞƌĂŶŐǁŝůů ďƌŝŶŐ ŝŶ ZDϲϬ ďŝůůŝŽŶ ĂŶĚƚŚĞ ͘ DĂƐƐZĂƉŝĚdƌĂŶƐŝƚƉƌŽũĞĐƚ͕ZDϰϬďŝůůŝŽŶ/ĨǁĞĂĚĚĂůůƚŚĞƐĞĂŶĚ ŽƚŚĞƌŽŶŐŽŝŶŐƉƌŽũĞĐƚƐ͕ŝƚǁŝůůĂĐĐƵŵƵůĂƚĞƚŽZDϭϮϬďŝůůŝŽŶ͕ƐĂŝĚ ͟ ŚŵĂĚ Ɛƌŝ ĂŌĞƌŚĞ ŽĸĐŝĂƚĞĚ ƚŚĞƐŽŌůĂƵŶĐŚŽĨ ĐŽďƵŝůĚϮϬϭϯ ͘ ŽŶďĞŚĂůĨŽĨ/ŚŝĞĨdžĞĐƵƟǀĞ͕ĂƚƵŬ^ƌŝƌ:ƵĚŝŶďĚƵů<Ăƌŝŵ
>ŽĐĂů ƐĐŝĞŶƟƐƚƐ͕ ĞŶŐŝŶĞĞƌƐ͕ ƌĞƐĞĂƌĐŚĞƌƐ ĂŶĚ ƉƌĂĐƟƟŽŶĞƌƐ ŚĂǀĞ ͘ ďĞĞŶĐŚĂůůĞŶŐĞĚƚŽƉƌŽĚƵĐĞŵĂĚĞͲŝŶͲDĂůĂLJƐŝĂƌŽďŽƚƐŚĂŝƌŵĂŶŽĨ͘ DĂůĂLJƐŝĂŶZŽďŽƟĐƐĂŶĚƵƚŽŵĂƟŽŶ/ŶƚĞƌĞƐƚ'ƌŽƵƉ;DzZ/'ͿWƌŽĨ ƌ/ƐŚŬĂŶĚĂƌĂŚĂƌŝŶƐĂŝĚƚŚĂƚƚŚĞƌŽďŽƟĐƐĂŶĚƐĞŶƐŽƌƐŝŶĚƵƐƚƌLJŚĂĚ ĂďƌŝŐŚƚĨƵƚƵƌĞĂƐƚŚĞ'ŽǀĞƌŶŵĞŶƚĂŶĚŝŶĚƵƐƚƌŝĞƐƐƚƌŽǀĞƚŽĞŶŚĂŶĐĞ ͘ ĞĸĐŝĞŶĐLJ͕ ŇĞdžŝďŝůŝƚLJĂŶĚ ŵŽďŝůŝƚLJ ZŽďŽƟĐƐ ĂŶĚ ĂƵƚŽŵĂƟŽŶ ǁĂƐ ŽŶĞŽĨ ƚŚĞŬĞLJ ŝŶŝƟĂƟǀĞƐƐĞƌŝŽƵƐůLJ ůŽŽŬĞĚŝŶƚŽƚŽ ŽǀĞƌĐŽŵĞƚŚĞ ͘ ƐŚŽƌƚĂŐĞ ŝŶ ƐŬŝůůĞĚ ŵĂŶƉŽǁĞƌ dŚĞ /ŶƚĞƌŶĂƟŽŶĂů ^LJŵƉŽƐŝƵŵ ŽŶ ZŽďŽƟĐƐĂŶĚ/ŶƚĞůůŝŐĞŶƚ^ĞŶƐŽƌ;/Z/^ͿϮϬϭϮǁĂƐŽƌŐĂŶŝƐĞĚďLJƚŚĞ &ĂĐƵůƚLJŽĨ DĞĐŚĂŶŝĐĂů ŶŐŝŶĞĞƌŝŶŐ͕hŶŝǀĞƌƐŝƟdĞŬŶŽůŽŐŝ DĂƌĂ ŝŶ ĐŽůůĂďŽƌĂƟŽŶǁŝƚŚDzZ/'͕ƚŚĞDĂůĂLJƐŝĂŶ^ŽĐŝĞƚLJĨŽƌŶŐŝŶĞĞƌŝŶŐ ĂŶĚdĞĐŚŶŽůŽŐLJ;DLJƐĞƚͿĂŶĚƚŚĞ'ƌĂĚƵĂƚĞ^ĐŚŽŽůŽĨ/ŶĨŽƌŵĂƟŽŶ ͘ ^ĐŝĞŶĐĞ͕EĂŐŽLJĂhŶŝǀĞƌƐŝƚLJ͕:ĂƉĂŶdŚĞƐLJŵƉŽƐŝƵŵƚŚĞŵĞĚ ͞^ŵĂƌƚ ^ĞŶƐŽƌƐ͕ ^ŵĂƌƚ ZŽďŽƚƐƉƌĞƐĞŶƚƐĂ ĐŽŵƉƌĞŚĞŶƐŝǀĞůĂŶĚƐĐĂƉĞ ŽĨ ͟ ƚŚĞƉƌŽŐƌĞƐƐŽĨƚŚĞϮϭƐƚĐĞŶƚƵƌLJǁŝƚŚƌŽďŽƟĐƐĂŶĚƐĞŶƐŽƌƐƉůĂLJŝŶŐ ͘ ĂƉŝǀŽƚĂůƌŽůĞŝŶƚŚĞĨƵƚƵƌĞƚĞĐŚŶŽůŽŐLJŽĨŵĂŶŬŝŶĚ/ƚĂŝŵĞĚƚŽďƌŝŶŐ ƚŽŐĞƚŚĞƌŝŶƚĞƌŶĂƟŽŶĂůĂŶĚůŽĐĂůƐĐŝĞŶƟƐƚƐ͕ĞŶŐŝŶĞĞƌƐ͕ƌĞƐĞĂƌĐŚĞƌƐ͕ ƉƌĂĐƟƟŽŶĞƌƐĂŶĚƐƚƵĚĞŶƚƐƚŽƉƌĞƐĞŶƚĂŶĚĚĞůŝďĞƌĂƚĞŽŶƚŚĞŝƌůĂƚĞƐƚ ƌĞƐĞĂƌĐŚ͕ĮŶĚŝŶŐƐ͕ŝĚĞĂƐ͕ĚĞǀĞůŽƉŵĞŶƚƐĂŶĚĂƉƉůŝĐĂƟŽŶƐƌĞůĂƚĞĚ ͘ ƚŽǀĂƌŝŽƵƐĂƐƉĞĐƚƐŽĨƌŽďŽƟĐƐĂŶĚƐĞŶƐŽƌƐ
dŚĞƐĞĐŽŶĚŚĂůĨ ŽĨƚŚĞ LJĞĂƌ ǁŽƵůĚ ƌĞŵĂŝŶďƵůůŝƐŚ ĂƐĂ ƌĞƐƵůƚŽĨ ͘ ƚŚĞϭϴϵйŐƌŽǁƚŚƌĞĐŽƌĚĞĚŝŶƚŚĞĮƌƐƚŚĂůĨ͕ĂŶĚƚŚĞƵƉƚƌĞŶĚǁĂƐ ͘ ĞdžƉĞĐƚĞĚƚŽĐŽŶƟŶƵĞŶĞdžƚLJĞĂƌ͘ /͕ŝŶĐŽŽƉĞƌĂƟŽŶǁŝƚŚhŶŝƚĞĚ ͘ ƵƐŝŶĞƐƐ DĞĚŝĂ ;DͿ ^ĚŶ ŚĚ ;hDͿ͕ ǁŝůů ďƌŝŶŐ ƚŽ DĂůĂLJƐŝĂ ĐŽďƵŝůĚϮϬϭϯ͕ ƚŚĞ ǁŽƌůĚ͛Ɛ ůĞĂĚŝŶŐĞǀĞŶƚ ĨŽƌƐƵƐƚĂŝŶĂďůĞ ĚĞƐŝŐŶ͕ ͘ ĐŽŶƐƚƌƵĐƟŽŶĂŶĚƚŚĞďƵŝůƚĞŶǀŝƌŽŶŵĞŶƚdŚĞĞǀĞŶƚǁŝůůŐĂƚŚĞƌƚŚĞ ĐŽŶƐƚƌƵĐƟŽŶĂŶĚďƵŝůĚŝŶŐŝŶĚƵƐƚƌLJƚŽƐŚŽǁĐĂƐĞƚŚĞŝƌůĂƚĞƐƚĚĞƐŝŐŶƐ͕ ĞƋƵŝƉŵĞŶƚ͕ŵĂƚĞƌŝĂůƐĂŶĚ ƚĞĐŚŶŽůŽŐLJŽŶ ƐƵƐƚĂŝŶĂďůĞ ďƵŝůĚŝŶŐƚŽ ͘ ƚŚĞƌĞŐŝŽŶĂůŵĂƌŬĞƚDĂůĂLJƐŝĂŝƐƚŚĞĮƌƐƚĐŽƵŶƚƌLJŝŶ^ŽƵƚŚͲĂƐƚƐŝĂ ͘ ƚŽŚŽƐƚƚŚĞĞǀĞŶƚ/ƚŝƐĂůƐŽƐƵƉƉŽƌƚĞĚďLJƚŚĞDŝŶŝƐƚƌLJŽĨtŽƌŬƐ ͘ ĂŶĚƚŚĞDŝŶŝƐƚƌLJŽĨŶĞƌŐLJ͕'ƌĞĞŶdĞĐŚŶŽůŽŐLJĂŶĚtĂƚĞƌĐŽďƵŝůĚ ϮϬϭϯDĂůĂLJƐŝĂǁŝůůďĞŚĞůĚĂƚƚŚĞWƵƚƌĂtŽƌůĚdƌĂĚĞĞŶƚƌĞ;WtdͿ ͘ ĨƌŽŵϭϳƚŽϭϵ^ĞƉƚĞŵďĞƌϮϬϭϯ (Sourced from The Star, 5 September 2012)
Weida Embarks on Green Project ͘ tĞŝĚĂ ;DͿ ŚĚ ŝƐ ďƵŝůĚŝŶŐ Ă ďŝŽŐĂƐ ƉůĂŶƚ ĨŽƌ ĂŶ ŝŶƚĞŐƌĂƚĞĚ ĐĞŶƚƌĂůŝƐĞĚ ƉŝŐ ĨĂƌŵ ŚĞƌĞ ƚŽ ƚƌĞĂƚ ǁĂƐƚĞ ĂŶĚ ƉƌŽĚƵĐĞ ďŝŽͲ ͘ ͘ ĞŶĞƌŐLJdŚĞĐŽŵƉĂŶLJŝƐ ĂůƐŽŝŶǀŽůǀĞĚŝŶ ƚŚĞĚĞƐŝŐŶŽĨƚŚĞ ƉůĂŶƚ ĐĐŽƌĚŝŶŐƚŽŚĂŝƌŵĂŶŽĨtĞŝĚĂ͕ĂƚƵŬ'ŽŽŝ,ŽĞ^ŽŽŶ͕ĂŶĚ'ƌŽƵƉ DĂŶĂŐŝŶŐ ŝƌĞĐƚŽƌ͕ ĂƚƵŬ >ĞĞ ŚŽŽŶ ŚŝŶ͕ ƚŚŝƐ ŐƌĞĞŶ ƉƌŽũĞĐƚ ŝƐ ŽŶĞŽĨ ƚŚĞůĂƌŐĞƐƚ ĂƉƉůŝĐĂƟŽŶƐ ŽĨ ďŝŽŐĂƐ ƉůĂŶƚ ƚĞĐŚŶŽůŽŐLJ ŝŶ ͘ ůŝǀĞƐƚŽĐŬĨĂƌŵŝŶŐ ŝŶDĂůĂLJƐŝĂ ďŝŽŐĂƐƉůĂŶƚŝƐ ĂŶĞīĞĐƟǀĞĂŶĚ ĞĸĐŝĞŶƚǁĂLJŽĨƚƌĞĂƟŶŐǁĂƐƚĞǁĂƚĞƌǁŝƚŚŚŝŐŚŽƌŐĂŶŝĐƉŽůůƵƚĂŶƚƐ ͘ ŝŶ ĂŶ ĞŶǀŝƌŽŶŵĞŶƚĂůůLJ ĨƌŝĞŶĚůLJ ŵĂŶŶĞƌ ĞƐŝĚĞƐ ƌĞĚƵĐŝŶŐ ǁĂƐƚĞ ĂŶĚ ŐƌĞĞŶŚŽƵƐĞ ŐĂƐ ĞŵŝƐƐŝŽŶƐ͕ ďŝŽŐĂƐ ŐĞŶĞƌĂƚĞĚ ĐĂŶ ďĞ ƵƐĞĚ ͘ ƚŽ ŐĞŶĞƌĂƚĞ ŐƌĞĞŶ ĞŶĞƌŐLJ ŝŶ ƚŚĞ ĨŽƌŵ ŽĨ ĞůĞĐƚƌŝĐŝƚLJ ĂŶĚ ŚĞĂƚ ůĞĐƚƌŝĐŝƚLJŐĞŶĞƌĂƚĞĚ ĐĂŶďĞ ƵƐĞĚ ŝŶƚĞƌŶĂůůLJ Žƌ ƵƉůŽĂĚĞĚƚŽ ƚŚĞ ͘ ƉŽǁĞƌŐƌŝĚ͕ŽīĞƌŝŶŐĂŶĂůƚĞƌŶĂƟǀĞĂŶĚƐƵƐƚĂŝŶĂďůĞĞŶĞƌŐLJƐŽƵƌĐĞ dŚĞLJĂĚĚĞĚ͕͞'ŽŝŶŐĨŽƌǁĂƌĚ͕ǁĞĨŽƌĞƐĞĞƚŚĞĂƉƉůŝĐĂƟŽŶŽĨďŝŽŐĂƐ ƉůĂŶƚƚĞĐŚŶŽůŽŐŝĞƐŝŶůŝǀĞƐƚŽĐŬĨĂƌŵŝŶŐĂƐǁĞůůĂƐŝŶƚŚĞƚƌĞĂƚŵĞŶƚ ŽĨƉĂůŵŽŝůŵŝůůĞŋƵĞŶƚǁŝůůĐŽŶƟŶƵĞƚŽŐĂŝŶƚƌĂĐƟŽŶŝŶĂŐƌĞĞŶĞƌ ͘ DĂůĂLJƐŝĂŝŽŐĂƐŐĞŶĞƌĂƚĞĚĨƌŽŵƚŚĞĨĞƌŵĞŶƚĂƟŽŶŽĨƉĂůŵŽŝůŵŝůů ͟ ĞŋƵĞŶƚĐŽƵůĚďĞƵƐĞĚƚŽĞŝƚŚĞƌĨƵĞůƚŚĞŵŝůů͛ƐďŽŝůĞƌ͕ŐĞŶĞƌĂƟŶŐ ĞůĞĐƚƌŝĐŝƚLJ ͕͘ Žƌ ĂƐ Ă ŚĞĂƚ ƐŽƵƌĐĞĨŽƌ ƚŚĞŵŝůů Žƌ ĂŶLJ ĚŽǁŶƐƚƌĞĂŵ ƉƌŽĐĞƐƐĞƐ͞KƵƌďŝŽŐĂƐƐŽůƵƟŽŶƐĂƌĞƚĂŝůŽƌĞĚƚŽŽƵƌĐůŝĞŶƚƐ͛ŶĞĞĚƐ ĂŶĚďĂƐĞĚŽŶƚŚĞƐĞƌǀŝĐĞƐǁŚŝĐŚǁĞƉƌŽǀŝĚĞ͕ŝŶĐůƵĚŝŶŐƚŚĞƐƚƵĚLJ ĂŶĚĚĞƐŝŐŶƉƌŽĐĞƐƐ͕ĐŽŶƐƚƌƵĐƟŽŶ͕ƚĞƐƟŶŐĂŶĚĐŽŵŵŝƐƐŝŽŶŝŶŐ͕ĂƐ ͘ ǁĞůůĂƐŽƉĞƌĂƟŽŶĂŶĚŵĂŝŶƚĞŶĂŶĐĞŽĨƚŚĞƉůĂŶƚtĞŝĚĂŝƐĂůĞĂĚŝŶŐ ͟ ƉƌŽǀŝĚĞƌ ŽĨ ŵŽĚĞƌŶ ĞŶǀŝƌŽŶŵĞŶƚĂůĞŶŐŝŶĞĞƌŝŶŐƐŽůƵƟŽŶƐ ŝŶ ƚŚĞ ĚĞƐŝŐŶ ĂŶĚ ĐŽŶƐƚƌƵĐƟŽŶ͕ ŽƉĞƌĂƟŽŶ ĂŶĚ ŵĂŝŶƚĞŶĂŶĐĞ ŽĨ ďŝŽŐĂƐ ƉůĂŶƚƐ͕ǁĂƚĞƌĂŶĚǁĂƐƚĞǁĂƚĞƌƚƌĞĂƚŵĞŶƚƉůĂŶƚƐ͕ƐŽůĂƌƉŚŽƚŽǀŽůƚĂŝĐ ͘ ĂŶĚŵŝŶŝŚLJĚƌŽƐLJƐƚĞŵŽĨƐƵƐƚĂŝŶĂďůĞĂŶĚĐůĞĂŶĞŶĞƌŐLJ (Sourced from The Star, 7 September 2012)
(Sourced from The Star, 5 September 2012)
6WXGHQWV:LQ,Q¿QHRQ$ZDUGV ŶŐŝŶĞĞƌŝŶŐ ƐƚƵĚĞŶƚƐ͕ ŚƵĂŚ <ŝŵ ŚŽŽŬ͕ Ϯϯ͕ ĂŶĚ KŶŐ ŚƵ Ŷ͕ Ϯϰ͕ǁĞƌĞƌĞĐĞŶƚůLJĂǁĂƌĚĞĚƚŚĞ/ŶĮŶĞŽŶǁĂƌĚƐďLJƚŚĞ&ĂĐƵůƚLJŽĨ ŶŐŝŶĞĞƌŝŶŐĂŶĚ'ƌĞĞŶdĞĐŚŶŽůŽŐLJ;&'dͿ ͕hŶŝǀĞƌƐŝƟdƵŶŬƵďĚƵů ͘ ZĂŚŵĂŶ;hdZͿŚƵĂŚ͕ǁŚŽǁŽŶƚŚĞĞƐƚůĞĐƚƌŽŶŝĐŶŐŝŶĞĞƌŝŶŐ ͘ ^ƚƵĚĞŶƚǁĂƌĚ͕ƚŽŽŬŚŽŵĞZDϯ͕ϬϬϬ^ŚĞĐŽŵƉůĞƚĞĚŚĞƌĂĐŚĞůŽƌ ŽĨ ŶŐŝŶĞĞƌŝŶŐ ;,ŽŶƐͿ ŝŶ ůĞĐƚƌŽŶŝĐ ŶŐŝŶĞĞƌŝŶŐ ǁŝƚŚ ĮƌƐƚ ĐůĂƐƐ ͘ ŚŽŶŽƵƌƐŝŶDĂLJDĞĂŶǁŚŝůĞ͕KŶŐ͛ƐĮŶĂůͲLJĞĂƌƉƌŽũĞĐƚǁŽŶƚŚĞĞƐƚ ůĞĐƚƌŽŶŝĐ ŶŐŝŶĞĞƌŝŶŐ &ŝŶĂů zĞĂƌ WƌŽũĞĐƚ ǁĂƌĚ͕ ƚŚƵƐ ƌĞĐĞŝǀŝŶŐ ͘ ZDϮ͕ϬϬϬdŚĞĐĞƌĞŵŽŶLJǁĂƐǁŝƚŶĞƐƐĞĚďLJ/ŶĮŶĞŽŶdĞĐŚŶŽůŽŐŝĞƐ ;<ƵůŝŵͿ^ĚŶŚĚ͕,ĞĂĚŽĨĞƉĂƌƚŵĞŶƚĂŶĚŝƌĞĐƚŽƌŽĨdĞĐŚŶŽůŽŐLJ͕ ƌŝĞǁĂůĚtŽůĨŐĂŶŐĂŶĚŝƚƐŝƌĞĐƚŽƌŽĨĞƉĂƌƚŵĞŶƚŽĨdĞĐŚŶŽůŽŐLJ͕ ͘ ͘ ͘ dĂŶ^ŽŽŶ<ĞŽŶŐůƐŽƉƌĞƐĞŶƚǁĞƌĞƚŚĞƉƌĞƐŝĚĞŶƚŽĨ hdZ͕zŚŐ ͘ ͘ ĐĂĚĞŵŝĐŝĂŶ ĂƚŽ͛/ƌWƌŽĨƌ ŚƵĂŚ ,ĞĂŶdĞŝŬ hdZ;ZĞƐĞĂƌĐŚ ͘ ͖ Θ ĞǀĞůŽƉŵĞŶƚ ŽŵŵĞƌĐŝĂůŝƐĂƟŽŶͿ͕ WƌŽĨ ƌ >ĞĞ ^njĞ tĞŝ ĂŶĚ ͖ ͘ ĞĂŶŽĨ&'dƌzĂƉsŽŽŝsŽŽŶ/ŶĮŶĞŽŶŚĂƐĂůƐŽƉĂƌƚŶĞƌĞĚǁŝƚŚ &'dƚŽŽƌŐĂŶŝƐĞƐƚƵĚĞŶƚƉůĂŶƚǀŝƐŝƚƐ͕ƚĂůŬƐ͕ƌĞĐƌƵŝƚŵĞŶƚ͕ŝŶƚĞƌŶƐŚŝƉ ͘ ĂƩĂĐŚŵĞŶƚĂŶĚŝŶĚƵƐƚƌLJĂĚǀŝƐŽƌLJ (Sourced from New Straits Times, 23 August 2012)
'LDORJ8QLW(QWHUV,QWR$JUHHPHQW ZLWK(QJLQHHUV ͘ ͘ ŝĂůŽŐΘ^ĚŶ ŚĚ͕ƚŚĞǁŚŽůůLJͲŽǁŶĞĚƐƵďƐŝĚŝĂƌLJŽĨŝĂůŽŐ'ƌŽƵƉ ͘ ŚĚŚĂƐĞŶƚĞƌĞĚŝŶƚŽĂŶĂŐƌĞĞŵĞŶƚǁŝƚŚĂŐƌŽƵƉŽĨƉƌŽĨĞƐƐŝŽŶĂů ĞŶŐŝŶĞĞƌƐ ƚŽ ƵŶĚĞƌƚĂŬĞ ĞŶŐŝŶĞĞƌŝŶŐ ĚĞƐŝŐŶ ŝŶ ƵƉƐƚƌĞĂŵ Žŝů ĂŶĚ ͘ ŐĂƐĂĐƟǀŝƟĞƐĐĐŽƌĚŝŶŐƚŽŝĂůŽŐ'ƌŽƵƉ͕ƚŚĞĞŶŐŝŶĞĞƌƐĂƌĞ:ĂŵĂů ͘ <ĂŵĂůƵĚŝŶ͕dĂŶ>ŝƉ>ĞŽŶŐ͕<ŚŽŽzĞǁŚŽŶŐĂŶĚDƵŶŝƌďƵĂŬĂƌ ƐƉĂƌƚ ŽĨ ƚŚĞ ĂŐƌĞĞŵĞŶƚ͕ ƚŚĞ ĞŶŐŝŶĞĞƌƐǁŝůů ĂĐƋƵŝƌĞ ƚŚĞĞŶƟƌĞ ĞƋƵŝƚLJŝŶƚĞƌĞƐƚ͕ƌĞƉƌĞƐĞŶƟŶŐϱϬϬ͕ϬϬϬŽƌĚŝŶĂƌLJƐŚĂƌĞƐŽĨZDϭĞĂĐŚ͕ ͘ ŝŶŝĂůŽŐŶŐŝŶĞĞƌŝŶŐĨƌŽŵŝĂůŽŐΘĨŽƌZDϱϬϬ͕ϬϬϬ (Sourced from The Star, 4 August 2012)
October 2012
JURUTERA |
21
SAFE TEA TIME
Link-me-in by Ir. Shum Keng Yan
RECENTLY, I met an acquaintance, who happens to be a regular follower of our Safe Tea Time column. This reader has given me a very good suggestion, which is to share the website links of the Environmental, Occupational Health and Safety (EHS) related agencies in Malaysia. Previously, Safe
Agency
22
Tea Time had shared with our readers the safety links of YDULRXV$VLD3DFL»FFRXQWULHVUHIHUWRDUWLFOHLQ-XQH issue, entitled “Where do we stand?”). Following are some of the recently collected web links of government (or government related) EHS-related sites:
Information
Web link
Department of Occupational Safety and Health
- Main site for Occupational Safety & Health - Legislation - License and Approvals - Competent Persons and Firms - Approved Personal Protective Equipment - Approved Training Centres - Continuous Education Programme (CEP)
http://www.dosh.gov.my
National Institute of Occupational Safety and Health
- Competency Training and Development - Consultation &HUWL»FDWLRQ - R&D and Laboratory
http://www.niosh.com.my
Atomic Energy Licensing Board
- Atomic Energy related - Licensing - Training
http://www.aelb.gov.my
Fire and Rescue Department
- Fire Safety - Legislation - Training
http://www.bomba.gov.my
C ivi l Defence Departm ent
- Disaster Operati on - Emergency Response - Training
http://www.civildefence.gov.my
Department of Environment
- Main site for Environmental related information - Legislation - License and Approvals - Contractors
http://www.doe.gov.my
Environment Institute of Malaysia
- Competency Training and Development &HUWL»HG(QYLURQPHQWDO3URIHVVLRQDO
http://www.doe.gov.my/eimas
Social Security Organisation
- Social Security - Employee Injury Insurance - Invalidity - Return to Work
http://www.perkeso.gov.my
Ministry of Works
- Public Works - Legislation
http://www.kkr.gov.my
Construction Industry Development Board
- Construction Industry - Training and Development - Green Card - Site Safety Supervisor - Contractor Continuous Development (CCD)
http://www.cidb.gov.my
| JURUTERA
October 2012
SAFE TEA TIME
Agency
Information
Web link
Ministry of Housing and Local Government
- Building and related Housing Services - Solid Waste Management Services - Uniform Building By-Laws - Other related legislation
http://www.kpkt.gov.my
Ministry of Energy, Green Technology and Water
- Main site for Energy, Green Technology and Water - Legislation
http://www.kettha.gov.my
Energy Commission
- Energy (Electricity and Gas) - Legislation &HUWL»FDWLRQV
http://www.st.gov.my
Sustainable Energy Development Authority
- Sustainable Energy - Legislation - Feed-in Tariff
http://www.seda.gov.my
Malaysia Green Technology
- Green Technology - Green Directory
http://www.greentechmalaysia.my
Pharmaceutical Services, Ministry of Health
- Medicine - Poisons - Legislation
http://www.pharmacy.gov.my
Food Safety and Quality Division, Ministry of Health
- Food Safety - Legislation
http://fsq.moh.gov.my
Department of Agriculture
- Pesticides - Licensing - Legislation
http://www.doa.gov.my
Marine Department
- Marine related matters - International Maritime Dangerous Goods - Legislation - Conventions - Training
http://www.marine.gov.my
Department of Civil Aviation
- Aviation related matters - Dangerous Goods Regulations - Legislation - Training - License
http://www.dca.gov.my
Road Safety Department
- Road Safety - Awareness and Promotion
http://www.panducermat.org.my
,WZDVDVXUSULVHWR»QGWKDWWKHUHDUHPRUH(+6UHODWHG sites than the main sites! By the way, I intend to publish a follow-up article in the IXWXUH $SDUW IURP WKDW , DP DOVR NHHQ RQ »QGLQJ WKRVH VSHFL»F ZHEVLWHV IRU \RXU VSHFLDOLVHG »HOGV ZLWK (+6 requirements.
However, should there be any changes made to the links by the time this article is published, do drop me a note on the broken link. Besides, I could have missed some of the useful links. If you are keen to share your additional links or would like to point out any changes to the above, just send an email to
[email protected] and you will be linked in.
Tip: Did you know that the providers of global regulatory updates also source most of their information from the local government
sites and industry groups? I suppose if you are running a region and your local country EHS heads are performing their job, you FDQFUHDWH\RXURZQFRPSDQ\³VUHJLRQDOUHJXODWRU\XSGDWHVVSHFL»FWR\RXUFRPSDQ\³VQHHGV,WVDYHVDORWRQWKHVXEVFULSWLRQ IHHVIRUDQRIIWKHVKHOISURGXFW6HODPDW+DUL5D\D+DML
October 2012
JURUTERA |
23
FORUM
One-Day Workshop on Soil Parameters – Interpretation for Design
by Engr. Richard Ong Hwa Tiam
GEOTECHNICAL ENGINEERING TECHNICAL DIVISION
THE One-Day Workshop on Soil Parameters – Interpretation for Design
was organised with the aim to provide engineers with practical knowledge to interpret geotechnical site investigation reports and make assessments on the data for the use in geotechnical engineering designs. The workshop was conducted at Tan Sri Prof. Chin Fung Kee Auditorium, Wisma IEM with an attendance of 66 participants. The speaker, Mike Dobie, kick-started the workshop by illustrating soil behaviour using the phenomenon which can be observed as one steps on DEHDFKDQGDGHPRQVWUDWLRQZLWKWZRERWWOHV»OOHGZLWKGU\DQGZHWVDQG respectively. He managed to get the participants’ attention, making the participants eager to know more about a number of important geotechnical concepts such as drained and undrained behaviour, soil shear strength and GLODWLRQSHUPHDELOLW\DQG¼RZLQVRLOV This was followed by a discussion on soil index properties with the emphasis on meticulous review of the site investigation report data, in order to check on the consistency and reliability of the soils being tested. Dobie commented that index property values are generally plentiful in geotechnical site investigation reports, so they are vital as a means of checking both consistency of the data and the results of other tests, such as soil shear strength. The second session of the workshop was on soil shear strength where Mike refreshed the participants’ knowledge on principle of effective stress and the appropriate shear strength to be used in design (i.e. drained or undrained shear strength). He also discussed about the procedure for measuring shear strength of soil using shear box test and triaxial test with highlights on the consequences from procedural error in testing. In the third session on soil consolidation properties, Dobie discussed about the procedures of measuring soil compressibility using oedometer test while guiding the participant through practical examples on the determination RIFRQVROLGDWLRQSURSHUWLHV7KH»QDOVHVVLRQRIWKHZRUNVKRSIRFXVHGRQ the application of some of the soil parameters and concepts discussed to VSHFL»FGHVLJQ VLWXDWLRQVLQFOXGLQJJURXQGLPSURYHPHQWE\ FRQVROLGDWLRQ and the arguments for drained versus undrained analysis. Throughout the workshop, real examples of soil data and parameters were used to illustrate the various concepts and points made. In some cases, these examples had been arranged as workshop examples for the participants to review and comment on. In other cases, some simple calculations were required. These examples had served to encourage critical assessment of geotechnical data, before making a decision as to how the data may be used in a design. Indeed, the workshop’s approach in dissecting the topic on interpretation of soil parameters for design had facilitated exchange of ideas during the question and answer session. All in all, the workshop had achieved its objective of imparting practical and useful information to the practising engineers. 24
| JURUTERA
October 2012
FORUM
Talk on Ground Improvement IRU(OHFWUL¿HG
Double Track Project
by Ir. Lee Peir Tien
GEOTECHNICAL ENGINEERING TECHNICAL DIVISION
THE HYHQLQJ WDONRQ *URXQG ,PSURYHPHQW IRU (OHFWUL»HG
Double Track Project from Alor Setar to Padang Besar was recently organised by the Geotechnical Engineering Technical Division (GETD) at the Tan Sri Prof. Chin Fung Kee Auditorium, Wisma IEM. The talk was delivered by Ir. EG Balakrishnan with an attendance of 65 participants. The speaker started his talk with an introduction to some GHWDLOV RI WKH (OHFWUL»HG 'RXEOH 7UDFN 3URMHFW IURP $ORU Setar to Padang Besar. He then showed the participants WKHSURSRVHGUDLOZD\DOLJQPHQWWKDWWUDYHUVHVWKURXJK¼DW ground from Alor Setar to Bukit Ketri, where soft ground is H[SHFWHGDVUH¼HFWHGLQWKH0DOD\VLD*HRORJLFDO0DS$IWHU Bukit Ketri, the railway alignment traverses through rolling ground. Subsequently, the speaker demonstrated how topography and land use could be utilised as an indication of the ground condition, which is a very powerful tool for desk study, especially to demarcate the areas of concern. Then, the speaker continued to explain to the audience the adopted design methodology for embankment over soft ground. He also presented the stringent settlement design criteria for the double track. He also highlighted the main considerations for selection of adopted ground treatment such as prefabricated vertical drains (PVD) with surcharge and other techniques. Towards the end of the talk, the speaker presented some settlement monitoring results of a constructed embankment where the recorded settlement was generally in line with WKHSUHGLFWHGVHWWOHPHQW+HDOVREULH¼\KLJKOLJKWHGDWULDO embankment with stone column as ground treatment. After an interactive Q&A session, a token of appreciation was presented to the speaker and the seminar ended with a big URXQGRIDSSODXVHIURPWKH¼RRU
NOMINATIONS PAPERS FOR COUNCIL ELECTION SESSION 2013/2014 A notice inviting nominations for the Election of Council Members for Session 2013/2014 will be posted on the IEM Notice Board and IEM website by 7th December 2012. These nomination IRUPVFDQDOVREHREWDLQHGIURPWKH,(06HFUHWDULDWRI¿FHRQ
and after 7th December 2012. Thank you. Dato’ Ir. Pang Leong Hoon (OHFWLRQ2I¿FHU,(0
October 2012
JURUTERA |
25
FORUM
Talk on Consolidation Settlement GEOTECHNICAL ENGINEERING TECHNICAL DIVISION
by Ir. Dr Chan Swee Huat and Ir. Yee Thien Seng
THE Geotechnical Engineering Technical Division had
recently organised an evening talk on “Consolidation Settlement” at the Tan Sri Prof. Chin Fung Kee Auditorium, Wisma IEM. The talk was delivered by Ir. Dr. Chan Swee Huat and a total of 51 participants had attended the talk. The speaker started his talk with an introduction to the geographical areas in Peninsular Malaysia found with soft soils. He then explained the three components of settlement, namely the immediate settlement, consolidation settlement and secondary compression settlement. In particular, the consolidation process the dissipation of excess pore water pressure with time and accompanied by volume change, was illustrated using a piston and spring analogy. The speaker then described and illustrated how the onedimensional consolidation test is performed to determine the compression parameters. It was highlighted that the VSHFL»FJUDYLW\RUSDUWLFOHGHQVLW\YDOXHRIVRLOLVLPSRUWDQW LQDFRQVROLGDWLRQWHVWDQGPXVWEHVSHFL»FDOO\PHDVXUHG QRW MXVW DVVXPHG VR WKDW WKH UHDOLVWLF FRQVROLGDWLRQ parameters can be obtained. The determination of pre-consolidation pressure using the Casagrande’s procedure and the determination of FRHI»FLHQW RI FRQVROLGDWLRQ XVLQJ WKH7D\ORU³V5RRW 7LPH PHWKRG )LJXUH DQG &DVDJUDQGH³V /RJ 7LPH PHWKRG )LJXUH ZHUH DOVR LOOXVWUDWHG LQ GHWDLO ,Q JHQHUDO WKH 7D\ORU³V5RRW7LPHPHWKRGLVRIWHQPRUHSRSXODUEHFDXVH of its simplicity and its lesser variation in determining the FRHI»FLHQWRIFRQVROLGDWLRQ
2QWKHRWKHUKDQGWKH&DVDJUDQGH³V/RJ7LPHPHWKRG requires a straight line to be drawn in the secondary compression region, which may require extended testing time for exhibition of clear secondary compression effect, DQGFDQEHGLI»FXOWEHFDXVHVHFRQGDU\FRPSUHVVLRQHIIHFW does not necessarily produce a straight li ne.
Figure 2: Casagrande’s Log Time method
The speaker subsequently demonstrated how the consolidation settlement can be calculated in the case of normally consolidated soils and over-consolidated soils. After detailed outline of the basis behind the Terzaghi’s one-dimensional consolidation theory and solution, the speaker discussed and demonstrated how the time rate of consolidation settlement can be estimated. Throughout the talk, example problems were regularly used for the demonstration of various calculations. $WWKHHQGRI WKH WDONWKHVSHDNHU ZDV »HOGHG ZLWKD QXPEHURITXHVWLRQVIURPWKHDXGLHQFH/DVWO\D WRNHQRI appreciation was presented to the speaker. The seminar HQGHGZLWKDELJURXQGRIDSSODXVHIURPWKH¼RRU MS EN 413 – MASONRY CEMENT Please be informed that the MS standards for cement would be mandatory upon the gazette of the amended CIDB Act. The Cement & Concrete Association of Malaysia (C&CA) as the appointed Standards Writing Organization (SWO) for cement standards in Malaysia, had reviewed and adopted the BS EN 413 as the new MS EN 413 for Masonry Cement. The old MS 794 for Masonry Cement will be superseded and replaced with the new MS EN 413 which is available for purchase at the SIRIM library.
Figure 1: Taylor’s Root Time method
For more information, please contact the C&CA Secretariat at 7492 1368 or
[email protected] .
28
| JURUTERA
October 2012
03-
FORUM
A Lecture on Landslides: Physical and Numerical Modelling of Large Ground Movements
by Ir. Dr Ooi Teik Aun and Engr. Dr Hisham Mohamad CONSULTING ENGINEERS SPECIAL INTEREST GROUP
PROF. Kenichi Soga of Cambridge University, United
Kingdom recently delivered a two-hour lecture to about 90 participants on “Landslides: Physical and Numerical Modelling of Large Ground Movements” at the Malakoff Auditorium, Wisma IEM in Petaling Jaya. The event was organised by CESIG, IEM and supported by UTM, GETD, TUSTD, ICE, SEAGS and AGSSEA. Prof. Soga began the lecture by showing the debris ¼RZ RI&RORUDGR LQ DQG WKH VXEPDULQH ODQGVOLGH in Hawaii in 2003. He then proceeded to show how the GHEULV¼RZDQGVXEPDULQHODQGVOLGHFRXOGEH PRGHOOHG using centrifuge and numerical methods. Landslides are known to cause loss of lives and property. It is also known that these landslides can move UDSLGO\VXFKDVLQGHEULV¼RZDQGWUDYHOORQJGLVWDQFHV The traditional way of evaluating the risk of landslide is by slope stability analysis and determining its Factor of Safety. However, this method does not assess the extent and speed of ground movements. Prof. Soga, using advanced computational and physical modelling, GHPRQVWUDWHGKRZWKHLQLWLDOVWDWHRI WKHVRLOLQ¼XHQFHV the movement of landslides. Initially, Prof. Soga presented some animations of large-scale model tests on sand embankment that failed from seepage in two different manners. The sand levee that was initially wet or damp failed rather abruptly and more extensive as compared to the dry embankment where gradual failure occurred near its toe. Submarine landslide is known to move massive volumes and can travel at distances of up to 400km with a surface gradient RIRQO\GHJUHH6XFKODQGVOLGHFDQFDXVHVLJQL»FDQW
30
| JURUTERA
October 2012
FORUM
GDPDJH WR WKH PDULQH HQYLURQPHQW DQG IDFLOLWLHVHJ VHDEHG SLSHOLQHV The key question in understanding submarine landslide impact is how to model the mass velocity and travelling distance correctly. To further elaborate on this, Prof. Soga presented the latest research work at Cambridge, using a mini-drum centrifuge to model the submarine ODQGVOLGH¼RZV$FWXDO¼RZYHORFLW\LQWKH»HOGFDQEHSUHGLFWHGDQGIDFWRUHG using suitable gravitational scaling laws. It should be noted that submarine ODQGVOLGHVDUHPRUHFRPSOLFDWHGWRPRGHOGXHWRWKHIDFWWKDWWKH¼RZLVDOVR affected by water entrainment, frontal shear and hydroplaning, basal shear, ¼RZWKLFNQHVVDQGZDWHUYLVFRVLW\ Advances in numerical methods to solve continuum problems were introduced in the second half of the lecture. While many audiences may be accustomed to the commercially available programmes such as Finite (OHPHQW 0HWKRG )(0 RU )LQLWH 'LIIHUHQFH 0HWKRG )'0 ZKLFK DUH all mesh-based techniques, conventional methods have limitations in simulating very large ground deformation. Particle or mesh-free methods, RULQWKLVFDVHFDOOHG0DWHULDO3RLQW0HWKRG030FDQEHXVHGWRPRGHO ODUJH JURXQG GHIRUPDWLRQ DQG VLPXODWH ODQGVOLGH ¼RZ &RPSOH[ 030 consolidation formulation was developed to couple the effect of multi-phase soil and water movements. The model can also include partially saturated ground conditions.
Prof. Soga delivering his lecture
Precast Concrete Products
,ŝŐŚƉƌĞĐŝƐŝŽŶĞŶŐŝŶĞĞƌŝŶŐ ƉƌŽĚƵĐƚƐƐƵĐŚĂƐƐĞŐŵĞŶƚĂů ďŽdžŐŝƌĚĞƌƐ͕ƚƵŶŶĞů ƐĞŐŵĞŶƚƐ͕ƌĂŝůǁĂLJƐůĞĞƉĞƌƐ͕ ͘ ƚƵƌŶŽƵƚďĞĂƌĞƌƐĂŶĚŽƚŚĞƌƐ
Prof. Soga with organising members
An intriguing note was made concerning experiments on levee failure, ZKHUH WKH PRGH RI IDLOXUH LV QRW RQO\ LQ¼XHQFHG E\ WKH VKHDU VWUHQJWK properties of the soil, but is also sensitive to the angle of dilation. Remarkably, the MPM method is able to replicate various types of landslide movements, that is, from gradual retrogressive sliding to a more catastrophic failure ODUJHUPDVVPRYHPHQWV In the case of modelling submarine landslides, water entrainment that DIIHFWVWKH¼RZYLVFRVLW\ZDVLQFOXGHGLQWKHFRQVWLWXWLYHPRGHO3URI6RJD also highlighted some examples of new opportunities of slope monitoring WHFKQLTXHXVLQJGLVWULEXWHGRSWLFDO»EUHVWUDLQVHQVLQJ7KHVHQVRULVNQRZQ DV%ULOORXLQ2SWLFDO7LPH'RPDLQ5H¼HFWRPHWU\%27'5DQGLVVDLGWREH FDSDEOHRI PHDVXULQJFRQWLQXRXVVWUDLQSUR»OHHJHYHU\ FPDORQJD VWDQGDUGNPORQJWHOHFRPPXQLFDWLRQRSWLFDOFDEOH $SDUW IURP WKDW VRPH »HOG LQVWUXPHQWDWLRQ UHDGLQJV FRQGXFWHG E\ Cambridge Geotechnical Research Group on slopes near a coastal area LQWKH8.ZHUHDOVRSUHVHQWHG$QLQWHUHVWLQJSRLQWWRQRWHLVWKDWWKH»EUH RSWLFV FDQ EHFRQ»JXUHG LQWR YDULRXV W\SHVRI VHQVRUV GHSHQGLQJ RQLWV applications. For example, for slope monitoring purposes, it can be used to monitor lateral displacements similar to an inclinometer, measure axial strain in soil nails and detect subsurface shallow movement of an embankment. 6XUSULVLQJO\ WKH VXEMHFW RI »HOG LQVWUXPHQWDWLRQ XVLQJ %27'5 GUHZ WKH largest interest among the audience during the question and answer session. ,QGHHGWKLVOHFWXUHKDVJUHDWO\EHQH»WHGDOOWKHSDUWLFLSDQWV
EASTERN PRETECH (MALAYSIA) SDN. BHD. ͬ ͘ Ϯϴ͕:ĂůĂŶϳϭϬϴ͕dĂŵĂŶ^ŐĞƐŝ͕ ͘ ϱϳϭϬϬ<ƵĂůĂ>ƵŵƉƵƌ ͗ dĞůнϲϬϯͲϳϵϴϬϮϳϮϴ ͗ &ĂdžнϲϬϯͲϳϵϴϬϱϲϲϮ ͘ ͘ ͘ ǁǁǁĞƉŵƐďĐŽŵŵLJ We are ISO9001, ISO14001 and OHSAS18001 Certified
October 2012
JURUTERA |
31
FORUM
International Symposium on Intelligent Transport System Research HIGHWAY AND TRANSPORTATION ENGINEERING TECHN ICAL DIVISION
by Engr. Assistant Professor Dr Khoo Hooi Ling
THE Highway and Transportation Engineering Technical
Division of Institution of Engineers, Malaysia (IEM) recently organised a one-day international symposium on Intelligent Transport System (ITS) at the Armada Hotel in Petaling Jaya. The symposium was attended by 70 participants. The seminar was co-organised with ITS Centre, the University of Tokyo, Japan. It was supported by ITS Malaysia, ITS Japan, Transportation Science Society Malaysia (TSSM) and Universiti Tunku Abdul Rahman (UTAR). A total of 14 speakers from local universities and abroad presented papers on various research projects on ITS. The symposium commenced with opening remarks from the President of the IEM, Ir. Vincent Chen Kim Kieong; the Director of ITS Centre, Institute of Industrial Science of the University of Tokyo, Japan, Professor Dr Yoshihiro Suda; the President of ITS Japan, Mr. Hajime Amano; and last but not least, the President of ITS Malaysia, Dato’ Ir. Hj. Mohamad bin Husin.
IEM President, Ir. Vincent Chen Kim Kieong
Director of ITS Centre, Institute of Industrial Science of the University of Tokyo, Japan Prof. Dr Yoshihiro Suda
President of ITS Japan, Mr. Hajime Amano
President of ITS Malaysia, Dato’ Ir. Hj. Mohamad bin Husin
The seminar was divided into four sessions, delivering YDULRXVWRSLFVRQ,76QDPHO\,76LQQRYDWLRQ,76IRUWUDI»F management, ITS in vehicle control as well as image processing and ITS sustainability.
32
| JURUTERA
October 2012
Some of the participants of the symposium
In the ITS Innovation session, Prof. Mohamed Rehan bin Karim from University of Malaya presented his recent GHYHORSPHQWRI DZHLJKLQPRWLRQ:,0GHYLFHIRUWUDI»F GDWD FROOHFWLRQ DQG PRQLWRULQJ 7KH EHQH»WV RI WKH :,0 include its simple installation feature, its ability to detect YDULRXVFODVVL»FDWLRQVDQGSDUDPHWHUVRIYHKLFOHVDQGLWV suitability for a wide range of road-related applications. Meanwhile, Associate Professor Hiroshi Makino presented his research on infrastructure and vehicle cooperative system in Japan. He stressed that a well-integrated V\VWHP LV QHFHVVDU\ IRU HI»FLHQW WUDI»F PDQDJHPHQW WR PLWLJDWH WUDI»F FRQJHVWLRQ LQ FLWLHV 3URI -DVRQ &KDQJ from Taiwan highlighted his innovative research in web and cloud taxi services. He demonstrated to the participants that smart taxi services could be provided to users through proper utilisation of internet technology. The proposed system could enhance security in the taxi industry as well as reducing the empty rate of taxi services. ,QWKH,76IRU7UDI»F0DQDJHPHQWVHVVLRQ3URI$KPDG Farhan Mohd Sadullah from University Science Malaysia presented an overview of ITS development in Malaysia. He highlighted the practical issues and challenges in ITS implementation. He urged that there is an urgent need for the experts to learn from past lessons in determining the future strategies. Prof. Masao Kuwahara from Tohoku University presented the application of ITS sensing devices used for data collection. He showed that quality data is a SUHUHTXLVLWH IRU DFFXUDWH DQDO\VLV WKDW DOORZV HI»FLHQW WUDI»FPDQDJHPHQWWREHGHYHORSHG
FORUM
Precast Concrete Building Systems (l-r) Prof. Dr Jason Chang, Ir. Prof. Mohamed Rehan Bin karim, Ir. K.Gunasagaran and Assoc. Prof. Hiroshi Makino
(l-r) Ir. Richard Wong, Prof Dr Ahmad Farhan Mohd. Sadullah, Prof. Dr Toshio Yoshii, Prof. Dr Masao Kuwahara and Prof. Dr Edward Chung
Prof. Toshio Yoshii from Ehime University presented a development of an area metering control method using the macroscopic fundamental diagram. ,WVDOJRULWKPDLPVWRNHHSWKHDJJUHJDWHGWUDI»FGHQVLW\DWWKHSURSHUOHYHO ZKLFKUHVXOWVLQ KLJKHU ¼RZ LQWKH V\VWHPWR UH¼HFW WKH WUDYHO WLPH PRUH accurately. Prof. Edward Chung from Queensland University of Technology, Australia, demonstrated to the participants the utilisation of Bluetooth technology in a travel time study. The sensitivity analysis illustrated that the accuracy of the data collected is dependent on the relationship between travel time and duration (i.e. time for an active Bluetooth device to pass through the Bluetooth scanner detection zone ). In the Vehicle Control and Image Processing session, Associate Professor Dr Yong Haur Tay from UTAR presented the potential applications of Android in ITS. He depicted that Android can be used as the information dissemination and data acquisition device. Besides, it is a low-cost solution for various high-end ITS applications. Subsequently, Prof. Katsushi Ikeuchi from the University of Tokyo presented an idea of a four-dimensional virtual city. Based on current setting, the system would allow one to render the past and predict the future development in a city. Prof. Riza Atiq Rahmat from National University RI 0DOD\VLD 8.0 SUHVHQWHG KLV »QGLQJV RQ UHVHDUFK LQ WUDQVSRUW management system. He showed the participants the development of a UHVSRQVLYH WUDI»F VLJQDO V\VWHP DQG WKH DSSOLFDWLRQ RI QDQRPDWHULDOV LQ weigh-in-motion devices. He mentioned that street lighting posts can be SDLQWHG ZLWKQDQRPDWHULDOVWR EHFRPHHI»FLHQWSKRWRYROWDLFHPLWWHUV7KH session continued with Prof. Yoshihiro Suda from the University of Tokyo, who presented a paper on sustainable transport. Prof. Yoshihiro Suda also shared with the participants the various ITS strategies that could reduce energy consumption. In the last session, on Sustainability in ITS, Prof. Takashi Oguchi from University of Tokyo highlighted challenges that involve electric vehicles. The critical issue in promoting electric vehicles is to ensure that the battery power is long enough to support the users’ travel activities. As such, proper modeling of transport planning is needed to predict users’ activities. Assistant Professor Dr Sungjoon Hong from University of Tokyo highlighted the framework developed to evaluate carbon dioxide reduction. The proposed framework consists of a micro-simulation model for carbon dioxide emission which has been calibrated and validated properly. Finally, Prof. Sorawit Narupiti introduced the ITS research activities by Chulalongkorn University, Thailand. There are various on-going research initiatives in the university which involve multi-disciplinary experts. The seminar had provided a platform for experts to discuss the emerging issues and challenges of ITS deployment. It is anticipated that further collaboration among local and international experts would be established. The seminar ended with the concluding remarks made by Engr. Assistant Professor Dr Hooi Ling Khoo (UTAR), who also took the opportunity to thank the secretariat, the co-organisers, and all the participants for their support.
,ŽůůŽǁĐŽƌĞƐůĂďƐ͕ƉůĂŶŬƐ͕ ƉƌĞĐĂƐƚĐŽůƵŵŶƐΘďĞĂŵƐ͕ ƉƌĞĐĂƐƚǁĂůůƐ͕ƉƌĞĐĂƐƚ ƐƚĂŝƌĐĂƐĞƐ͕ĂŶĚŽƚŚĞƌ ĐƵƐƚŽŵŝnjĞĚƐƚƌƵĐƚƵƌĂů ͘ ĐŽŶĐƌĞƚĞƉƌŽĚƵĐƚƐ
EASTERN PRETECH (MALAYSIA) SDN. BHD. ͬ ͘ Ϯϴ͕:ĂůĂŶϳϭϬϴ͕dĂŵĂŶ^ŐĞƐŝ͕ ͘ ϱϳϭϬϬ<ƵĂůĂ>ƵŵƉƵƌ ͗ dĞůнϲϬϯͲϳϵϴϬϮϳϮϴ ͗ &ĂdžнϲϬϯͲϳϵϴϬϱϲϲϮ ͘ ͘ ͘ ǁǁǁĞƉŵƐďĐŽŵŵLJ We are ISO9001, ISO14001 and OHSAS18001 Certified
October 2012
JURUTERA |
33
FORUM
The 7th Malaysian Chem-E-Car Competition 2012 CHEMICAL ENGINEERING TECHNICAL DIVISION by Ir. Mohamad Fadzil bin Adnan @ Nan
THE Chemical Engineering Technical Division (CETD)
successfully organised the 7th Chem-e-Car Competition in collaboration with Universiti Malaysia Sabah (UMS) in Kota Kinabalu. The teams from Universiti Sains Malaysia (USM) managed to garner the two top spots. The car of Ziolite WHDPZKLFKPDQDJHGWRVWRSZLWKLQFPIURPWKH»QLVKLQJ line was a clear champion while the second team of USM, the Challengers, beat the team from Army Academy of the Republic of China (A.A. ROC) by a mere 1cm, securing the second placing in the competition. A.A. ROC took part in the Malaysian Chem-E-Car FRPSHWLWLRQ IRU WKH »UVW WLPH DQG ZDV HODWHG ZLWK WKHLU performance which was ahead of 30 teams (amongst 12 Malaysian universities and 3 foreign universities). A total of 33 teams participated in the competition setting another remarkable achievement despite the holding of WKHFRPSHWLWLRQLQ6DEDKIRUWKH»UVWWLPH7KH&KDOOHQJHUV team from USM and Brave team from Army Academy ROC DOVRWRRN»UVWDQGVHFRQGSODFLQJVLQWKHSRVWHUFRPSHWLWLRQ while t-Moment from UMS, the host university, won the third place. This year’s competition further boosted the recognition of the competition as a stage for undergraduates to showcase their prowess in engineering design and innovation. The competition emphasized on the participants’ creativity in maximising performance of a model car powered by a self-built chemical or fuel cell as its propulsion system. The power required to drive the model car must be generated or converted from chemical energy. Taking the cue from current worldwide educational trends which emphasize on outcome and continuous learning, the competition seeks to equip future engineers to play an essential role in the development and progress of their countries. Promoting teamwork as one of the major elements, the competition also attempts to promote cooperation between different disciplines by allowing undergraduates from other disciplines to join the team. Experience gained in the competition would be valuable in preparation for their professional careers. The model car competition focuses on accuracy, testing WKHDELOLW\RIWKHPRGHOFDUWRWUDYHUVHDVSHFL»HGGLVWDQFH EHWZHHQPDQGPZKLOVWFDUU\LQJDVSHFL»FORDGRI water (100ml – 500ml). By revealing the load and distance
34
| JURUTERA
October 2012
only about an hour prior to the start of the competition, and having different loads and distances for the two attempts for each model car, the competition further tested the participants’ ability to calibrate their model cars on the spot DQGLQFXOFDWHG¼H[LELOLW\DQGDGDSWDELOLW\LQWKHVWXGHQWV7KH model car that comes to a stop nearest to the designated line or distance would be declared the winner. Out of the 33 teams in this year’s competition, there were two teams from Universiti Gajah Mada and one from Institut Teknologi Sepuluh Nopember of Indonesia. The National University of Singapore returned to the competition after a one year lapse with two teams, while the Army Academy RIWKH5HSXEOLFRI&KLQDZDVWKH»QDOIRUHLJQSDUWLFLSDWLQJ team. The 7th competition was one of the most successfully organised competitions and the Chemical Engineering Technical Division owes this success to the contributions and support from lecturers and students of UMS as well as the IEM Organising Committee. The teams, despite the intense competition, demonstrated superb sportsmanship by supporting each other. The winner of the car competition received a cash prize of RM3,000 while the second and third placed teams received cash prizes of RM2,000 and RM1,000 respectively. The results of the competition are presented in the table on page 35.
FORUM
Table 1: Results of the competition No
Team Name
Best of Two
1
Ziolite (USM)
0.02
2
Challengers (USM)
0.12
3
A. A. ROC (Army Academy ROC)
0.13
4
ZEPHYR (UMS)
0.19
5
RED LEXUS (UKM)
0.24
6 t-moment (UMS)
0.25
7
Spe-k-tronics (IT SN)
0.55
8
Subali II (UGM)
0.56
9
Fast 4 (UTP)
0.59
10
UNSHAKEN (NUS)
0.9
11
Vector 2.0 (MICET)
0.95
12
Cross Team (UTAR)
1.47
13
Brave (Army Academy ROC)
1.64
14
Rogayah Yippie (MICET)
1.79
15
Sugriwa II (UGM)
1.9
16
DAS AUTO (UKM)
1.95
17
Vermi Energizer 2.0 (UTP)
2.15
18
BUMBLE BEE (UKM)
2.57
19
Elechem (USM)
2.93
20
Turbang (NUS)
3.13
21
InnoChem (UTAR)
3.31
22
KUDA BELANG (UiTM)
4.66
23
EXQUISITE (UNITEN)
4.68
24
MM’s Car (UMP)
4.7
25
ALPHA (UM)
5.26
26
Going Merry (TATiUC)
5.54
27
FURION (UMS)
6.42
28
Strikeforce (UMS)
6.74
29
Chem Troll-E-d (UTAR)
8.78
30
First Generation (UM)
10.24
31
The Chequered Flag (SEGi)
11.01
32
The Pro’s (Curtin Sarawak)
11.33
33
CHEMIST 221 (UiTM)
13.42
The poster competition, held in the afternoon after the model car competition, was aimed at encouraging undergraduates to speak in public and to polish their presentation skills. Participants were given 10 minutes to present their model cars and to describe the propulsion system, as well as the innovative and creative ideas they have adopted in areas such as WKHSURSXOVLRQV\VWHPVDIHW\HQYLURQPHQWDOIHDWXUHVHI»FLHQF\DQGRYHUDOO performance. Assessment was made based on the following criteria: a) Description of the chemical reaction/ power source/ stopping mechanism (20%) b) Design creativity and unique features of the vehicle (20%) c) Environmental and safety features (20%) d) Economic aspects (20%) e) Quality of the poster and team member presentations (20%).
Prefabricated Unit Bathrooms dƌĂŶƐĨĞƌƌŝŶŐƚĞĚŝŽƵƐ ͬ ƚŽŝůĞƚďĂƚŚƌŽŽŵǁŽƌŬƐĂƚƐŝƚĞ ƚŽĂĐŽŶƚƌŽůůĞĚĨĂĐƚŽƌLJ ĞŶǀŝƌŽŶŵĞŶƚďLJƉƌĞͲ ͘ ĨĂďƌŝĐĂƚŝŽŶĞƐŝŐŶĂŶĚ ƐƉĞĐŝĨŝĐĂƚŝŽŶĂƌĞĐƵƐƚŽŵŝnjĞĚƚŽ ͘ ƌĞƋƵŝƌĞŵĞŶƚƐ
EASTERN PRETECH (MALAYSIA) SDN. BHD. ͬ ͘ Ϯϴ͕:ĂůĂŶϳϭϬϴ͕dĂŵĂŶ^ŐĞƐŝ͕ ͘ ϱϳϭϬϬ<ƵĂůĂ>ƵŵƉƵƌ ͗ dĞůнϲϬϯͲϳϵϴϬϮϳϮϴ ͗ &ĂdžнϲϬϯͲϳϵϴϬϱϲϲϮ ͘ ͘ ͘ ǁǁǁĞƉŵƐďĐŽŵŵLJ We are ISO9001, ISO14001 and OHSAS18001 Certified
October 2012
JURUTERA |
35
FORUM
STEEL FIBER
LAFARGE CONCRETE (MALAYSIA) SDN BHD 2, Jalan Kilang, 46050 Petaling Jaya, Selangor Darul Ehsan, Malaysia. Tel : (603) 7787 2000 Fax : (603) 7781 7675 / 7787 2129 www.lafarge.com.my
36
| JURUTERA
October 2012
(95483-H)
UMS also hosted a pre-competition dinner, where engineering students from UMS put up a superb performance of songs, dances and martial arts that awed the audience. The performance clearly put an end to the dull and boring “stereotyped” image of engineering students. ,(0 9LFH 3UHVLGHQW ,U 3( &KRQJ RI»FLDWHG WKH opening ceremony accompanied by the Vice-Chancellor of UMS, Y.Bhg. Brig. Jen. Prof. Datuk Seri Panglima Dr Kamaruzaman Hj. Ampon, and the Dean of UMS School of Engineering and Information Technology, Assoc. Prof. Dr 5RVDODP6DUEDWO\ 'U5RVDODPDOVR RI»FLDWHGWKH FORVLQJ ceremony and presented the prizes to the winners of the competition. The Organising Committee wishes to take this opportunity to thank and congratulate Universiti Malaysia Sabah for putting up a great show, its hospitality and its cooperative spirit by being a very good host. UMS had mobilised more than 60 students, 20 lecturers, and other support staff to organise the event from arrangement of food to accommodation and logistics. The Organising Committee also wishes to express its gratitude to the judges, the IEM Secretariat and others for making the event a success. The competition has indeed gained a lot of exposure as well as created tremendous interest in the institutions of higher learning, resulting in a number of them stepping forward to indicate their interest in hosting the next competition. After evaluating the proposals from various institutions, the CETD had selected Taylor’s University to be the host for the upcoming 8th Malaysian Chem-E-Car competition which is scheduled to be held in April 2013.
Interested to join our Seminar ? Enquiries & Registration Fax
. . Website : http://www.jambatankedua.com.my/webv1/ : http://www.llm.gov.my
: (+603) 2084 5089
*Registration closing date : 23 November 2012
&3'+2856 $33529(' /DXQFKLQJRIQRV 6HJPHQWDO%R[*LUGHUV &RQVWUXFWLRQRI&DEOH6WD\HG%ULGJH 4XDOLW\$VVXUDQFHDQG4XDOLW\&RQWURO0HDVXUHVLQ&RQVWUXFWLRQ &RVW(IIHFWLYH&RQVWUXFWLRQRI/DQG([SUHVVZD\IRU0LQLPDO6HWWOHPHQW
<%'$72·6(5,6+$=,0$1$%80$1625 0,1,67(52):25.60$/$<6,$ -2,17/<25*$1,6('%<
MALAYSIAN HIGHWAY AUTHORITY (LLM)
6833257('%<
JAMBATAN KEDUA SDN. BHD. (JKSB)
ROAD ENGINEERING ASSOCIATION OF MALAYSIA (REAM)
THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATIONS (CIHT)
MINISTRY OF WORKS MALAYSIA
FORUM
Tree Planting Community Project by IEM and ENSEARCH
by Engr. Vivekasugha Alif Gunaalan and Engr. Ameirul Azraie Mustadza
YOUNG ENGINEERS SECTION, IEM
THE Young Engineers Section (YES) of The Institution of Engineers,
Malaysia (IEM) recently organised a tree planting community project at Taman Botani Negara, Shah Alam. This project which is a continuation of various community projects had been organised by YES with the aim of “Giving Back to Society and Nature”. The project was jointly organised by Environmental Management & Research Association of Malaysia (ENSEARCH), which is also a non-governmental organisation (NGO) that serves as a platform to raise awareness about the environment and to strive in making environmental management as a way of l ife in Malaysia.
Ir. Choo Kok Beng having a word with the Organising Committee before the opening ceremony
The opening ceremony was performed by Ir. Choo Kok Beng, Deputy President of IEM together with Ir. Ellias Saidin, Vice President of ENSEARCH, E\ SODQWLQJ WKH »UVW WUHH DV D V\PEROLF JHVWXUH 7KLV SURMHFW UHFHLYHG D favourable response with the participation of about 60 people, including Senior Members of IEM, Committee Members of YES, graduate engineers, lawyers from the KL bar and students of Universiti Tenaga Nasional and Universiti Teknologi Mara. A total of 190 trees were successfully planted along the hil ly route at Taman Botani Negara, Shah Alam. The trees planted comprised various local fruit species native to our country. Not only has this activity increased the number of trees in our country, but it has also increased the income of natives, since all seedlings were purchased from the indigenous community through ENSEARCH. Each of the seedlings was taken as “adopted seedlings” by various organisations and individuals. This project will increase awareness amongst young professionals in our country about the importance of an individual’s responsibility towards society and the environment. October 2012
JURUTERA |
39
FORUM
IEM Annual Golf Competition 2012 MECHANICAL ENGINEERING TECHNICAL DIVISION
by Ir. Noor Hisham bin Yahaya
A total of 94 IEM members and guests took part in the IEM 2012 Annual Golf Tournament organised by the Mechanical Engineering Technical Division (METD). The event was recently held at the Bangi Golf Resort. The main objective in organising this annual golf tournament is for fellow engineers to socialise with each other as well as with corporate players within the engineering fraternity. This year, the organiser also took the opportunity to raise funds for Wisma IEM. The shotgun starting event teed off on time at 8.00 a.m. as planned despite a heavy downpour of rain from Petaling Jaya to Bangi at early dawn. However, surprisingly, the weather at the Bangi Golf Course was lovely with cloudy blue skies, without rain. The mode of play for the tournament was Stableford System-36, which does not require players to declare their latest handicap based on handicap of the day. Each player
Advanced air nozzle technology Replacing open pipe installations with Silvent compressed air nozzles normally means: 50% 30%
Golfers getting ready to start the tournament
Some of the golfers in action during the tournament
plays on an individual basis and, to avoid slow play, the player is required to pick up the ball and proceed to the next hole if the Stableford points cannot be attained. Ir. Mohd. Nor Alias emerged as the champion with a score of 38 net, out-driving the other golfers to win himself the Ir. Tan Sri Abu Zarim Challenge Trophy and a much VRXJKWDIWHUPRELOHSKRQH7KH»UVWUXQQHUXSZDV,U+M Baharin who won a 1-hp air-conditioner with his score of 37, followed by the second runner-up Ir. Loy TW who also scored 37 and received a digital camera. For the non-members/sponsors category, the winner was Mr. Ho Kam Hoong who obtained a score of 39, and won a 1-hp air conditioner, while the second runner up, Mr. Lau Kok Yin, won a golf bag with his score of 38. The second runner up for this category, Mr. Lee Chok Kai, won a digital camera as well after scoring 38. A lot of lovely prizes were given out to the winners from 4th to 10th placing. However, the best of them all was the “Hole-in-One” prize which was a 2-hp air conditioner, but none of the players managed to win it. There were also Novelty Prizes for the Longest Drive, Nearest to the Pin and Nearest to the Line as well as the Bull’s Eye category. No one managed to win the Bull’s Eye and the amount of RM1,260 collected was donated to the IEM Building Fund. The prizes were given away by Y.B. Senator Dato’ Ir. Donald Lim Siang Chai who was also the guest of honour at
For more information, please contact: Ck Wong 012-6695954 Gwen Lee 012-5758277 Kejuruteraan Semangat Maju Sdn Bhd 9 Jalan USJ 10/1D, Taipan 47620 Subang Jaya, Selangor
40
| JURUTERA
October 2012
Lunch and prize giving ceremony after the golf game
Y.B.Senator Dato’ Donald Lim in his speech had pledged to contribute RM100,000 for Wisma IEM Building Fund
FORUM
METD contributions of RM20,000 towards the Wisma IEM Building Funds
Champion of the IEM Golf Tournament
the luncheon attended by the IEM President, Ir. Vincent Chen Kim Kieong, Ir. Noor Hisham bin Yahaya, the golf convener and the organiser of the event, and Ir. Gopal Narian Kutty who was the “emcee” for the prize presentation ceremony. The prizes of the competition were electrical appliances combined with golf products which were different from the prizes offered in the previous years. The IEM and the organisers of the event would like to thank all the sponsors of the Golf Competition for their donations. The Organising Committee wishes to thank the following sponsors for their golf goodies and contributions: 1. ACSON Sdn. Bhd. 2. IMZ Sdn. Bhd. (Mitsubishi) 3. Dimension Publishing Sdn. Bhd. 4. Nehemiah Reinforced Soil Sdn. Bhd. 5. Boehringer Ingelheim (M) Sdn. Bhd. 6. Topaire Sales & Services Sdn. Bhd. 7. Tenaga Nasional Berhad. At the end of the prize-giving ceremony, the organisers of the Golf Competition, Mechanical Engineering Technical Division (METD) presented a cheque of RM20,000 to the IEM President as the contribution from the proceeds of the golf tournament towards the IEM Building Fund for Wisma IEM. In his speech, the President thanked the Technical Division for their hard work. Subsequent to this, Y.B. Senator Dato’ Donald Lim pledged a donation of RM100,000 to the IEM Building Fund. Y.B. hoped that his gesture will entice more IEM members to come forward to generously donate to the IEM Building Fund. Y.B. felt that with the membership of over 25,000 members the remaining loan of RM6 million should be easily settled if each member could donate to the fund. Results of the scores are as follows: IEM Member Category Winner
Handicap
Score
9
38
Ir. Hj Baharin
10
37
Ir. Loy TW
15
37
Ir. Nik Aries
8
36
Ir. David Tan SK
15
36
Ir. Khalid Hassan
19
36
Ir. Khairul Anuar
23
36
Ir. Gopal Narian Kutty
18
35
Ir. Cha Hong Kam
19
35
Ir. Noor Hisham Yahaya
24
35
Ir. Mohd Nor Alias
October 2012
JURUTERA |
41
FORUM Non-IEM Member Category Winner
Handicap
Score
Mr. Ho Kam Hoong
14
39
Mr. Lau Kok Yin
12
38
Mr. Lee Chok Kai
13
38
Mr. Peter Tan
14
38
En. Mohd. Hanapi
14
38
Mr. Ong Kiat Lee
15
38
En. Mohd Noor
8
37
En. Anuar Hamid
11
37
En. Wan Rasdi
14
37
En. S M Salim
14
37
The winners of the Novelties are as follows: Winner
Handicap
Score
Nearest to the Pin Hole 2
Mr. Jeffrey Low
14
210 cm
Hole 11
En. Mohd Seehan
17
70 cm
Nearest to the Line Hole 3
Mr. Bernie Ooi
24
200 cm
Hole 13
Mr. Che Wei Li
24
1 mm on the line
Longest Drive Hole 5
Mr. David Chan
16
277 m
Hole 14
En. Wan Shah
18
363 m
The Organising Committee wishes to express its sincere gratitude and thanks to all sponsors, participants and the secretariat staff who made this a successful event in the calendar of IEM.
ANNOUNCEMENT – NON IEM EVENTS 20 to 22 November 2012
/ŶƚĞƌŶĂƟŽŶĂů&ŝƌĞŽŶĨĞƌĞŶĐĞŶĚdžŚŝďŝƟŽŶDĂůĂLJƐŝĂ 2012
sĞŶƵĞ ͗<>ŽŶǀĞŶƟŽŶĞŶƚƌĞ KƌŐĂŶŝƐĞƌƐ ͗&ŝƌĞĂŶĚZĞƐĐƵĞĞƉĂƌƚŵĞŶƚDĂůĂLJƐŝĂ͕/ŶƐƟƚƵƟŽŶ ŽĨ &ŝƌĞ ŶŐŝŶĞĞƌƐ h< ;DĂůĂLJƐŝĂ ƌĂŶĐŚͿ ĂŶĚ ƚŚĞ DĂůĂLJƐŝĂŶ &ŝƌĞ WƌŽƚĞĐƟŽŶ ƐƐŽĐŝĂƟŽŶ ŵĂŝů ͗
[email protected]
ϭϲƚŽϭϵĞĐĞŵďĞƌϮϬϭϮ ŽŶĨĞƌĞŶĐĞŽĨƚŚĞ^E&ĞĚĞƌĂƟŽŶŽĨŶŐŝŶĞĞƌŝŶŐ KƌŐĂŶŝnjĂƟŽŶƐϮϬϭϮ;&KϯϬͿ ͗ dŚĞŵĞ ĚǀĂŶƚĂŐĞŽĨ/ŶƚĞŐƌĂƟŽŶŽĨŶŐŝŶĞĞƌŝŶŐ^ĞƌǀŝĐĞƐĨŽƌ >ĞĂƐƚĞǀĞůŽƉĞĚ^EDĞŵďĞƌŽƵŶƚƌŝĞƐ sĞŶƵĞ ͗WŚŶŽŵ WĞŶŚ ͕ ĂŵďŽĚŝĂ ͘ ŵĂŝů ͗
[email protected] ;Dƌ^ŽƚŚ^ŽƉĂŶŚĂͿ tĞďƐŝƚĞ ͗ www.bec.gov.kh
ϴƚŽϭϭDĂLJϮϬϭϯ ^ĞĐŽŶĚ&/WŽŶǀĞŶƟŽŶϮϬϭϯ ͗ ͗ dŚĞŵĞ ŶŐŝŶĞĞƌŝŶŐ/ŶŝƟĂƟǀĞƐĨŽƌ^ƵƐƚĂŝŶĂďůĞĞǀĞůŽƉŵĞŶƚ /ŶƚĞŐƌĂƟŶŐ/ŶŶŽǀĂƟŽŶĂŶĚƚŚŝĐƐ sĞŶƵĞ ͗,ŽƚĞůdĂũ<ƌŝƐŚŶĂ /ŶĚŝĂ ͕ ,LJĚĞƌĂďĂĚ ͘ ͕ ͘ ŵĂŝů ͗ ŝĞŝŶĚŝĂĨĞŝĂƉϮϬϭϯΛŐŵĂŝůĐŽŵ
42
| JURUTERA
October 2012
FORUM
The Malaysian Feed-In Tariff ELECTRICAL ENGINEERING TECHNICAL DIVISION by Ir. Chong Chew Fan
EVER since the enforcement of Renewable Energy Act 2011, Feed-in Tariff has become a popular topic amongst the engineers and the public community. The Electrical Engineering Technical Division (EETD) of the Institution of Engineers, Malaysia (IEM) and Institution of Engineering and Technology (IET) Malaysia Network recently conducted a talk entitled, ‘The Malaysian Feed-In Tariff’ at the Tan Sri Prof. Chin Fung Kee Auditorium, Wisma IEM. This technical talk was presented by Ir. Ali Askar bin 6KHU0RKDPDGZKRLVFXUUHQWO\WKH&KLHI2SHUDWLQJ2I»FHU (COO) of Sustainable Energy Development Authority Malaysia (SEDA) which is given the task to administer and manage the implementation of the feed-in tariff mechanism. The talk was attended by a total of 65 participants who come from various backgrounds. ,U$OL$VNDUVWDUWHGWKHWDONE\SURYLGLQJWKHGH»QLWLRQRI Renewable Energy (RE) and introducing some of the RE available such as wind, ocean, solar, water, biomass, tidal and geothermal to the participants. Ir. Ali Askar then provided the background of the RE development in Malaysia which started with the launching of the Small Renewable Energy Power Programme (SREP) on 11 May 2001. Under the SREP programme, the small RE power generation plants are allowed to sell the electricity to the Utility Company through the Distribution Grid System based on direct negotiated rate on a “willing seller, willing buyer” and “take and pay” basis. Under the SREP programme, the utilisation of all types of RE including biomass, municipal waste, solar, mini-hydro and wind are allowed. Malaysian Building Integrated Photovoltaic (MBIPV) Project was introduced by Pusat Tenaga Malaysia (PTM) which is currently known as Malaysian Green Technology Corporation to focus on the market development for BIPV technology with the implementation of Suria 1000 project where a Government subsidy was provided for roof-top PV installation based on a bidding system until year 2010. He explained that under the 8th Malaysian Plan, RE has EHHQLGHQWL»HGDVWKHWK)XHOIRU0DOD\VLDDQGUHSUHVHQWV 5% of the energy mix. Different RE capacity targets were included in the 9th and 10th Malaysian Plans. Ir. Ali Askar also described the development of the Government Policies on RE which started since the approval of the National Renewable Energy Policy & Action Plans by the Government of Malaysia on 2nd April 2010 until the RE Act was enforced in 1st Dec 2011. 44
| JURUTERA
October 2012
He highlighted the three options which have been LGHQWL»HGWRSURPRWH5(EHIRUHWKHIHHGLQWDULIILVVHOHFWHG namely: i. The subsidies through the previous Suria 1000 Project; ii. The Renewable Portfolio Standards which is popular in the United States of America (USA) but was found to be less successful compare to Feed-in Tariff (FiT); and iii. The Feed-in Tariff where small independent producers can sell their generated energy to the Utility at a JXDUDQWHHGSULFHDQGIRUD»[HGWHUPZKLFKLVSRSXODULQ Germany, China, Japan and Europe. Ir. Ali Askar also highlighted the national RE targets which are as follows: Year
Cumulative RE Capacity
RE Power Mix (vs. Peak Demand)
Cumulative CO2 avoided
2011
73 MW
0.5%
0.3 mt
2015
985 MW
6%
11.1 mt
2020
2,080 MW
11%
42.2 mt
2030
4,000 MW
17%
145.1 mt
He explained that the tenth Entry Point Project (EPP) on Solar Power Capacity Initiative under the Oil, Gas and Energy National Key Economic Area (NKEA) provides the following target of solar power capacity: Year
Solar Power Capacity (Cumulative)
RE Capacity (Cumulative)
RE Capacity Mix
2011
20 MW
219 MW
1%
2015
295 MW
1,275 MW
7%
2020
1,250 MW
3,140 MW
14%
2030
3,100 MW
7,088 MW
25%
He also highlighted that the Feed-in Tariff (FiT) has been introduced to achieve the numerous targets on RE. FiT KDV EHHQ GH»QHG DVD PHFKDQLVP WKDW DOORZV HOHFWULFLW\ that is produced from indigenous RE resources to be VROGWR3RZHU8WLOLWLHVDWD»[HGSUHPLXPSULFHDQGIRUD VSHFL»FGXUDWLRQ7KLVZLOOSURYLGHDFRQGXFLYHDQGVHFXUHG LQYHVWPHQWHQYLURQPHQWIRUWKH5(GHYHORSHUVDQG»QDQFLDO institutions.
FORUM
Ir. Ali Askar also explained that Malaysia uses a legal instrument for FiT implementation via RE Act 2011, which includes the following: i. Access to the Power Grid is guaranteed since the Utilities are legally obliged to accept all electricity generated by RE private producers; ii. An FiT rate which is high enough to produce Return on ,QYHVWPHQW52,DQGUHDVRQDEOHSUR»W iii. The RE Fund which was established under the RE Act 2011 will be used to pay for the FiT rates and to guarantee payment over the contract period. The source of the RE Fund is 1% collection from the consumers’ electricity bills, as decided by Government of Malaysia in June 2011; and iv. SEDA has been entrusted to implement the FiT. +HDOVREULH¼\ZHQWWKURXJKVRPHLPSRUWDQWVHFWLRQVDQG clauses in the Renewable Energy Act 2011, namely the: i. Section 4: Eligibility for participation in Feed-In-Tariff system – RE installation 30MW (or such higher installed capacity as may be approved by the Minister) ii. Section 14: Priority of purchase and distribution iii. Section 16: Payment of Feed-In Tariff iv. Section 17: Degression of Feed-In Tariff v. Section 23: Renewable Energy Fund. Besides the RE Act 2011, Ir. Ali Askar also mentioned the relevant subsidiary legislations on RE to the participants. Year
Subsequently, he further elaborated on the FiT Schedules for various RE namely Biogas, Biomass, Small Hydropower DQG6RODU39ZKLFKDUHPDGHDYDLODEOHDW6('$2I»FLDO Web Portal. He also presented the planned annual RE Quota for 2012-2014 and the FiT quota as of 30th June 2012. The details are illustrated i n Table 1 and 2. $V WKH &22 RI 6('$ ,U $OL $VNDU EULH¼\ H[SODLQHG the online application process of FiT using the SEDA Web Portal, beginning from the RE developer account creation up to the application of RE quota. He also shared with the participants the problems faced by FiT, such as: i. The non-user friendly issue of the e-FiT; ii. The excessive demand for solar PV quota; iii. The lack of interest in other technologies; and iv. The slow action by Tenaga Nasional Berhad (TNB) in processing the interconnection facilities and signing of REPPAs. He also pointed out that SEDA is encouraging the research and development (R&D) in all RE technologies associated with potential resources in Malaysia which is currently not included in the FiT. Those RE technologies include geothermal, wind, tidal, wave and ocean thermal. ,U$OL$VNDUWKHQRSHQHGWKH¼RRUWRDOLYHO\4$VHVVLRQ during which he engaged with members of the audience at a personal level. Before he bode farewell, the speaker was presented with a memento by Ir. Chong Chew Fan on behalf of EETD and IET Malaysia Network, as a token of appreciation.
Biogas
Biogas – Sewage
Biomass
Solid-Waste
Small Hydro
Solar PV < 1 MW
Solar PV > 1 MW
Total
MW
MW
MW
MW
MW
MW
MW
MW
2011/2012
20
10
60
20
30
10
40
190
2013
20
10
50
30
30
10
40
190
Table 1: Planned Annual RE Quota for period 2012-2014
Available MW installed capacity for FiT Application
2012/H1
2012/H2
2013/H1
2013/H2
2014/H1
2014/H2
MW
MW
MW
MW
MW
MW
Biogas
10
4.47
10
7.63
10
TBA
%LRJDV/DQG»OO6HZDJH
0
0.88
0
5
5
TBA
Biomass
8.81
5.58
6.62
4.63
25
TBA
Biomass (Solid Waste)
3.71
10
15
13.82
15
TBA
Small Hydro
3.10
12.02
4.67
6.04
21.86
TBA
Individual (< 12 kW)
0
0
0.12
2.18
2.49
TBA
Non-individual (< 0.5 MW)
0
0
0
0
0
TBA
Non-individual (> 0.5 MW)
0
0
0
0
0
TBA
Solar PV
Table 2: FiT quota as at 30th June 2012
October 2012
JURUTERA |
45
NEW
Choose Power InRoads for Transportation Design ®
Image courtesy of M.J. Engineering and Land Surveying Import data from any source – ASCII, LandXML, GPS, survey, LiDAR, point cloud, DEMs, and more.
Integrated design tools simplify complex projects, reduce design time, and ensure accurate 3D information.
Time-Tested for Integrated Project Delivery For three decades, engineering firms and transportation agencies have depended on InRoads for interchange, roundabout, and corridor design, survey data reduction, site development, bridge modeling, sanitary and storm water network design, and production of construction staking reports. Now available as a standalone product, Power InRoads includes all the powerful capabilities of MicroStation®, along with dynamic 3D modeling functionality, complete mapping tools, and design automation to integrate all project phases, teams, and locations – ensuring your designs are ready for construction, operation, and rehabilitation.
www.bentley.com/structural www.bentley.com/jurutera © 2012 Bentley Systems, Incorporated. Bentley, the “B” logo, MicroStation, and Power InRoads are either registered or unregistered trademarks or service marks of Bentley Systems, Incorporated or one of its direct or indirect wholly-owned subsidiaries. Other brands and product names are trademarks of their respective owners.
Immersive modeling eliminates design errors, decreases project costs, and allows upload to machine control.
Contact Us! Malaysia Tel: +603 2054 7000 Fax: + 603 2054 7020 For Singapore Tel: +65 66926570 Fax: +65 66926571
IEM SNAPSHOTS
The President of the Organising Committee of the Engineers Association of Timor Leste, Mr. Armando de Almeida and the President of the Accounting Association of Timor Leste, Mr. Apolinario Guterres paid a courtesy visit to IEM on 20th June 2012. The delegation sought assistance and guidance from IEM on formulating a work plan on the range of activities as an association, covering issues such as membership, internal organisational and professional development as well as assessment of the standard of existing tertiary educational programmes in Timor Leste.
2Q WK -XO\ WKH &RQIHGHUDWLRQ RI 6FLHQW L¿ F DQG Technological Associations in Malaysia (COSTAM) led by its President, Prof. Ir. Dr Ruslan Hassan (who is also an IEM Vice President) had a meeting with Y.B. Datuk Seri Panglima Dr Maximus Johnity Ongkili, Minister of Science, Technology and ,QQRYDWLRQ0267,DW KLVRI¿FH LQ 3XWUDMD\D7KH PHHWLQJ ZDV to discuss on the issue of ‘Lack of Students Studying Science’ which is the current situation in the country.
The Annual Hari Raya Gathering Dinner was hosted by the Young Engineers Section (YES) of IEM on 5th September 2012. The guests included members of the IEM Council, Executive Committee, Standing Committees, Technical Divisions, YES volunteers and, last but not least, IEM Secretariat.
Chairman of YES, Engr. Mah Way Shang
IEM Council Member, Ir. K. Gunasagaran and IEM Executive Director, Ir. Cheang Kok Meng
Guests mingling and enjoying the Raya buffet spread
48
| JURUTERA
October 2012
IEM Secretariat
GLOBE TREKKING
In the Shadow of the Matterhorn by Ir. Chin Mee Poon
IN August 2011, my wife and I spent 10 days trekking in the
Swiss Alps. There were six other Malaysians in the group. We started from Chamonix, a famous French ski resort at the foot of Mont Blanc, the highest peak of the Alps. We would normally start our daily trek from a valley, where we would scale a mountain slope to reach a pass, and then descend into the next valley to put up for the night in a guest house located in a quaint little village, while enjoying the spectacular scenery on the way. Trekking in the Alps was an exhilarating experience. The villages nestling in the valleys that we were fortunate enough to visit are actually connected to one another by vehicular roads. Thus, one can quite easily visit all of them by car and still have a good time enjoying the mountain views from ground level. However, we had chosen to trek over the mountains to have a better appreciation of the beauty of the Swiss Alps from different angles. On the ninth day of our trekking, we reached Zermatt around noon. Zermatt is a very charming town located at the foot of the Matterhorn and by far, it is the most famous one amongst the Alpine peaks. Its shape is easily recognisable as most people would have seen an image of it somewhere.
,»UVWJRWWRNQRZWKH0DWWHUKRUQIURPDFLJDUHWWHER[ when I was still a young boy, but that cigarette brand was no longer in the market. The common name of this 4,478m high peak actually comes from two German words, Matte, which means “meadow”, and Horn, which implies “peak”. The Matterhorn’s Italian name is Monte Cervino and its French name, Mont Cervin. The Matterhorn was one of the last great Alpine SHDNVWREHVFDOHGDQGLWV»UVWDVFHQWLQPDUNHGWKH end of the golden age of alpinism. Some of us trekked in the shadow of the Matterhorn on the last day of our trek. We had a fantastic view of the Matterhorn as we moved along the mountainside separated from the peak by a river valley. Zermatt is a famous resort town for mountaineering and VNLLQJ,WVSHUPDQHQWSRSXODWLRQRIDERXWSHRSOHPD\ be outnumbered several folds by tourists during the peak seasons. Nevertheless, the many beautifully-decorated buildings lining its main street make the place very pleasurable to stroll in. Zermatt is also the western terminus for the Glacier Express rail service connecting St. Moritz to the Matterhorn – Gotthard Bahn (MGB), one of the 8 scenic train routes in Switzerland.
October 2012
JURUTERA |
49
PROFESSIONAL INTERVIEW
Date: 10 September 2012 To All Members,
CANDIDATES APPROVED TO SIT FOR YEAR 2012 PROFESSIONAL INTERVIEW The following candidates have been approved to sit for the Professional Interview for 2012. ͘ /ŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚLJůĂǁƐϯϵ͕ƚŚĞƵŶĚĞƌŵĞŶƟŽŶĞĚŶĂŵĞƐĂƌĞƉƵďůŝƐŚĞĚĂƐŚĂǀŝŶŐĂƉƉůŝĞĚĨŽƌŵĞŵďĞƌƐŚŝƉŽĨƚŚĞ/ŶƐƟƚƵƟŽŶ͕ƐƵďũĞĐƚ to passing the year 2012 Professional Interview. /ĨĂŶLJŽƌƉŽƌĂƚĞDĞŵďĞƌŽĨƚŚĞ/ŶƐƟƚƵƟŽŶŚĂƐĂŶLJƌĞĂƐŽŶĂƐƚŽǁŚLJĂŶLJŽĨƚŚĞĐĂŶĚŝĚĂƚĞƐŝƐŶŽƚĂĮƚĂŶĚƉƌŽƉĞƌƉĞƌƐŽŶĨŽƌĞůĞĐƟŽŶ͕ ͘ ŚĞƐŚŽƵůĚĐŽŵŵƵŶŝĐĂƚĞŝŶ ǁƌŝƟŶŐƚŽ ƚŚĞ,ŽŶŽƌĂƌLJ^ĞĐƌĞƚĂƌLJ^ƵĐŚĐŽŵŵƵŶŝĐĂƟŽŶ ƐŚŽƵůĚďĞ ůŽĚŐĞĚ A MONTH from the date of ͘ ƉƵďůŝĐĂƟŽŶ ͘ ͘ /ƌWƌŽĨƌ:ĞīƌĞLJŚŝĂŶŐŚŽŽŶŐ>ƵŝŶ Honorary Secretary,
dŚĞ/ŶƐƟƚƵƟŽŶŽĨŶŐŝŶĞĞƌƐ ͕DĂůĂLJƐŝĂ ͬ ^ĞƐƐŝŽŶϮϬϭϮϮϬϭϯ NEW APPLICANTS Name
TRANSFER APPLICANTS
4XDOL¿FDWLRQV
0¶VKLS Name 1R
CHEMICAL ENGINEERING EESAN MARKANDU A/L KANAGASABAI
BE HONS (BIRMINGHAM) (CHEMICAL, 2001)
CIVIL ENGINEERING MOHD SHAHRIL BIN MOHD
BE (HONS) (UPM) (CIVIL, 2002)
M OK YEW CHEO NG
BSc (A LABA MA) (C IVI L, 20 01 )
MONITHA A/P ANTHONISAMY
BE HONS (USM) (CIVIL, 2004)
CHEMICAL ENGINEERING
BE HONS (UTM) (CIVIL, 2005) MSc (NATIONAL UNIVERSITY OF SINGAPORE) (CIVIL, 2011)
ELECTRICAL ENGINEERING MOHD GHAZALI BIN SHAARI
BE HONS (UTM) (ELECTRICAL, 2001) MSc (UTM) (ELECTRICALPOWER, 2009)
Name
4XDOL¿FDWLRQV
ELECTRONIC ENGINEERING
CHO KAI SHIN
BE HONS (UMS) (CHEMICAL, 2004)
2 67 66
SAI FUL KADA R BIN SAIFUDDIN
4 24 38
M OH D A ZA HA R B IN MOHD ARIFF
BSC (ARIZONA) (CHEMICAL, 1996)
4 84 99
Z AM AN I B IN MD SA NI B E H ON S ( US M) (ELECTRICAL & ELECTRONIC, 2000) MSC (ELECTRICAL & ELECTRONIC, 2009)
CIVIL ENGINEERING B EG UM I RD AWAT I BINTI DOWLAD RAHUMAN
BSC HONS (U TM) (CIVIL, 2001) MSC (UPM) (HIGHWAY & TRANSPORT, 2006)
1 99 53
CH E BAKA R BIN CHE SOH
BE (HONS) (UPM) (CIVIL,1999)
4 41 32
CH EW WAN CH IU
27103
BE HONS (UTM) (ELECTRICAL, 2000)
MECHANICAL ENGINEERING 2 09 22
I STA S FA HR UR RA ZI BIN NUSYIRWAN
BE HO NS (A DEL AID E) (CIVIL & STRUCTURAL, 2006)
BE (HONS) (UTM) (AERONAUTICS, 1996) ME (UTM) (MECHANICAL, 1999)
3 63 04
CHIN CHING WEI
BE (HONS) (USM) (CIVIL, 2007)
K HA IR UL S AL LE H BIN MOHAMED SAHARI
BE HONS (MASEDA, JAPAN) (MECHANICAL, 2000)
49421
KU SIM AIK
41147
KENNEDY @ MOHAMMAD ALFATIH BIN SARNANG
BE HONS (UiTM) (CIVIL, 2009)
BE HONS (UTM) (MECHANICAL, 2009)
2 43 86
L AU CH UAN G BI NG
B E H ON S ( UM ) (MECHANICAL, 2002)
MOHD HAFIDZ BIN JAMIL
BE (HONS) (UM) (ELECTRICAL,2004)
SAFRI BIN IBRAHIM
BE HONS (UiTM) (ELECTRICAL, 2004)
22258
LEE WEI THIAM
BE HONS (UNITEN) (ELECTRICAL POWER, 2002)
BE HONS (L EEDS) (CIVIL, 1999)
2 25 33
SANJAY KRISHNA A/L KRISHNAN
M AT HE N K UM AR A/ L RAMACHENDRAM
BE (UNITEN) (MECHANICAL, 2005)
27563
TING LEE YUNG
BE HONS (UMS) (CIVIL, 2006)
25541
BE HONS (KUiTTHO) (MECHANICAL, 2006)
1 94 06
W ON G KI M CHE N @ DICKSON WONG
BE HONS (NEWCASTLE) (CIVIL, 1998)
MOHAMED MOHIDEEN BIN A. JAMAL MOHAMED
2 16 72
S YE D F AD ZI L B IN SYED MOHAMED
BE HONS (PAISLEY) (MECHANICAL, 1992)
ELECTRONIC ENGINEERING IRYANI BINTI MOHAMED RAWI
BE HONS (UTM) (ELECTRICALTELECOMMUNICATION, 2002)
LAU KEAN HONG
BE HONS (MONASH) (ELECTRICAL & COMPUTER SYSTEMS, 1996)
ELECTRICAL ENGINEERING 29041
CHAN KAR MUN
BE HONS (MALAYA) (ELECTRICAL, 2006)
24231
FAIZAL BIN MOHD DOM
BE HONS (UNITEN) (ELETRICAL & ELECTRONIC, 2001) MSC (UTM) (ELECTRICALPOWER, 2009)
4 39 09
J AF NI BI N A LI AS @ SULONG
BE HONS (UTM) (ELECTRICAL, 2000)
2 97 38
L EE CHOO YO NG
POS TGR AD DI P ( EC) (2 00 9) ME (UTM) (ELECTRICAL, 2008)
MATERIAL ENGINEERING SALINA BINTI BUDIN
BE (HONS) (USM) (MATERIAL, 1993) MSc (USM) (MECHANICAL, 2003) PhD (USM) (2011)
MECHANICAL ENGINEERING CHEW TZE SEANG
BE HONS (UNITEN) (MECHANICAL , 2007)
MOHD SAFAR BIN MAHFODZ
BE HONS (UNITEN) (MECHANICAL , 2002)
MUHAMMAD SHAZWAN BIN ZAKARYA
BSc (CARNEGIE MELLON) (MECHANICAL, 2001)
NORZELAWATI BINTI ASMUIN
BE HONS (UKM) (MECHANICAL & MATERIALS, 1994) MSc (UPM) (AEROSPACE, 2000)
Solution for 1Sudoku published on page 20 of this issue. 32
17
2 7
12
1 17
13
8
12
8
6
3
5
9
4 20
4
6
5
7
8
1
3
6
2
8
9 3
50
TRANSFER APPLICANTS 0¶VKLS 1R
45348
2 80 44
WONG SIONG ING, RITA
4XDOL¿FDWLRQV
9
4 5
13
8
14
9
7
1
8
2
3
2
5
9
9
4
1
1 7
| JURUTERA
21
11
3
6 3
22
8 10
6
2
4
1
1
2
10
12
5 7
19
5
6
6 7 11
8 3
4
9
3
1
7
8
5
6
9
2
19
4
9
October 2012
2 07 02
NO R IRWAN BIN AHMAT NOR
BE (HONS) (UTM) (CIVIL, 1999)
ANNOUNCEMENT – NON IEM EVENTS 5 – 6 December 2013
/ŶƚĞƌŶĂƟŽŶĂů^LJŵƉŽƐŝƵŵŽŶĚǀĂŶĐĞƐŝŶ&ŽƵŶĚĂƟŽŶŶŐŝŶĞĞƌŝŶŐ;/^&Ϳʹ ĂůůĨŽƌWĂƉĞƌƐ Venue: Singapore ͘ ͘ Submission of abstracts: ǁǁǁŝƐĂĨĞϮϬϭϯƐŐ
4
2
1
8 7
3
9
17
9
22
12
4
2 22
3 8
5
5
6
7
9
WATER RESOURCES ENGINEERING
ϳʹϵ:ĂŶƵĂƌLJϮϬϭϰ &ŽƵƌƚŚ/ŶƚĞƌŶĂƟŽŶĂůŽŶĨĞƌĞŶĐĞŽŶ/ŶĚƵƐƚƌŝĂůŶŐŝŶĞĞƌŝŶŐĂŶĚKƉĞƌĂƟŽŶƐ DĂŶĂŐĞŵĞŶƚ;/KDͿʹĂůůĨŽƌWĂƉĞƌƐ ͗ sĞŶƵĞ'ƌĂŶĚ,LJĂƩĂůŝ,ŽƚĞůʹEƵƐĂƵĂĞĂĐŚZĞƐŽƌƚΘ^ƉĂ͕Ăůŝ͕/ŶĚŽŶĞƐŝĂ Conference Website: www.iieom.org ͬ ͘ ͬ ͘ Submit full paper/abstract online: ǁǁǁdžĐĚƐLJƐƚĞŵĐŽŵŝĞŽŵ Submission Deadline: April 30, 2013
MEMBERSHIP ͘
Note:dŚŝƐŝƐĂĐŽŶƟŶƵĂƟŽŶŽĨƚŚĞůŝƐƚǁŚŝĐŚǁĂƐĮƌƐƚƉƵďůŝƐŚĞĚŽŶƉĂŐĞϱϮŽĨƚŚĞ^ĞƉƚĞŵďĞƌϮϬϭϮŝƐƐƵĞ
ADMISSION TO THE GRADE OF GRADUATE
ADMISSION TO THE GRADE OF GRADUATE
ADMISSION TO THE GRADE OF GRADUATE
0¶VKLS1R
0¶VKLS1R
Name
4XDOL¿FDWLRQV
0¶VKLS1R
Name
4XDOL¿FDWLRQV
54063
MOHD SYARIFUDDIN BIN MOHD
B.E.HONS.(USM) (MECHANICAL, 00)
53763
WAN FAIRUZ BIN WAN YUSOF
B.E.HONS.(UTEM) (MECHANICAL, 06)
Name
4XDOL¿FDWLRQV
MECHANICAL ENGINEERING 53722
LEE CHAI HOON
B.E.HONS.(UNITEN) (MECHANICAL, 02)
54049
B.E.HONS.(MALAYA) (MECHANICAL, 10)
B.E.HONS.(UTM) (MECHANICAL, 06)
WANG WEN JIANG
LIAN YEE CHENG
MOHD SYUKRI BIN HASSIM
54062
54098
B.E.HONS.(UTAR) (MECHANICAL, 11)
53764
B.E.HONS.(MALAYA) (MECHANICAL, 07)
B.E.HONS.(UTM) (MECHANICAL, 04)
WONG JUN HAO
LIEW LUI YUE
MUHAMAD ASNURI BIN KAROJI
54044
52543
B.E.HONS.(MMU) (MECHANICAL, 10)
54046
LIM MEI LING
B.E.HONS.(UNITEN) (MECHANICAL, 11)
MUHAMAD FALIQ BIN B.E.HONS.(UTEM) MOHAMAD NAZER (MECHANICAL AUTOMOTIVE, 11)
53687
54055
WONG YOONG LUNG
B.SC.(SAGINAW VALLEY STATE, USA) (MECHANICAL, 03)
54059
LOONG SEE MING
B.E.HONS.(MALAYA) (MECHANICAL, 00) ME (MALAYA) (MANUFACTURING, 08)
54103
MUHAMAD RIDZUAN BIN JEMAAT
B.E.HONS.(UTP) (MECHANICAL, 11)
53795
YEO WEI HONG
B.E.HONS.(UNITEN) (MECHANICAL, 08)
52472
MUHAMMAD AZRI BIN ISMAIL
B.E.HONS. (MELBOURNE) (MECHANICAL, 10)
52473
YUSRI BIN YUSOF
B.SC.HONS.(UTM) (MECHANICAL, 97)
54048
ZAHIR BIN HASIM
B.E.HONS.(UTM) (MECHANICALMANUFACTURING, 99)
53772
ZAINI BIN AHMAD
B.E.HONS.(UTM) (MECHANICAL, 02)
M. RAJA KUMAR A/L S. MURUGASAMPILLAY
B.E.HONS. (NEWCASTLE UPON TYNE) (MECHANICAL, 92)
53806
MUHAMMAD FAIQ BIN MOHD ROZI
B.E.HONS.(UTM) (MECHANICAL, 04)
53770
MUHAMMAD FARIZI BIN SAULIUS
B.E.HONS.(UNITEN) (MECHANICAL, 11)
54096
MAISARAH BINTI LUTFI
B.E.HONS.(UTM) (MECAHANICAL, 08)
52504
B.E.HONS.(USM) (MECHANICAL, 10)
52534
MARSHAL BIN ANTHONY
MUHAMMAD HAFIZUL HAFIZ BIN ABD HALIM
52559
NG CHEE FONG
B.E.HONS.(UPM) (MECHANICAL, 08)
52516
NOORHAZELINDA BINTI MOHD. SALLEH
B.E.HONS.(UTM) (MECHANICAL, 11)
54037
B.E.HONS.(UTM) (MECHANICAL AERONAUTICS, 04)
53689
MOHAMAD AZRI BIN KAMARULBAHRIN
B.E.HONS.(MONASH) (MECHANICAL, 10)
53731
MOHAMMAD AL BUKHARI BIN MARZUKI
M.E.(STRATHCLYDE) (MECHANICAL, 11)
MOHAMMAD AZRUL BIN AHMAD
B.E.HONS.(UTM) (MECHANICALTEKNOLOGI MARIN, 06)
52508
53783
NORADILA BINTI ABDUL LATIF
B.E.HONS.(UTHM) (MECHANICAL, 10)
53718
NORIZWAN BIN JURAIMI
B.E.HONS.(UTHM) (MECHANICAL, 09)
53733
NORLAILA BINTI RAMLAN
B.E.(GANNON) (MECHANICAL, 92)
MECHATRONICS ENGINEERING 53716
ANATI AQILAH BINTI ABDUL RAHMAN
54095
CHANG CHEE PANG, TOMMY
B.E.HONS.(UNIMAP) (MECHATRONIC, 10)
53762
MOHAMAD SABRI BIN ABDULLAH
B.E.HONS.(UNIMAP) (MECHATRONICS, 08)
53692
TIEW SENN, JUSTIN
B.E.HONS. (MELBOURNE) (MECHATRONICS, 10)
54053
WONG KA PAU
B.E.HONS.(UCSI) (MECHATRONIC, 11)
54052
WONG YING QIAN
B.E.HONS.(UCSI) (MECHATRONIC, 11)
52489
MOHAMMAD FAEIZ BIN ISMAIL
B.E.HONS.(UiTM) (MECHANICAL, 06)
54047
54060
MOHAMMAD KHALIL BIN ROSLI
B.E.HONS.(UKM) MECHANICAL, 08)
NORRAZMAN ZAIHA BIN ZAINOL
B.E.HONS.(MALAYA) (MECHANICAL, 02)
54108
54040
MOHD AMIN BIN KASSEBULLAH
B.E.HONS.(UTM) (MECHANICAL AUTOMOTIVE, 05)
NUR HAFIZ BIN MOHD AZMI
DIPL.-ING. (WISSENSCHAFTEN) (MECHANICAL, 11)
52468
54100
MOHD ARIFDIN BIN AB MAJID
B.E.(NAGASAKI) (MECHANICAL, 07)
NUR HAZWANI BINTI MOKHTAR
B.E.(SHIBAURA) (MECHANICAL, 08) MSC(UTM) (MECHANICAL, 11)
53720
MOHD AZRIN BIN HUSIN
B.E.HONS.(UTM) (MECHANICAL, 12)
54097
OON CHEEN SEAN
B.E.HONS.(UNIMAP) (MECHANICAL, 10)
53765
MOHD FAIRUZ BIN MOHD SALEH
B.E.HONS.(UTM) (MECHANICAL, 07)
53721
52569
MOHD FARID BIN OMAR
B.E.HONS.(UTP) (MECHANICAL, 10)
54099
PHUAH KOK SUN
B.E.HONS.(MALAYA) (MECHANICAL, 09)
54056
MOHD HAFIEZ BIN MOHD NAFIAH
B.E.HONS.(UTM) (MECHANICAL, 08)
54042
RASYIDI BIN MOHD TAHIR
B.E.HONS.(KUiTTHO) (MECHANICAL, 06)
52538
MOHD HAFIS BIN SULAIMAN
B.E.HONS.(UTM) (MECHANICAL, 09) MSC (UTM) (MECHANICAL, 11)
52519
SHAFIZAL BIN MAT
B.E.HONS.(UiTM) (MECHANICAL,05)
0¶VKLS1R 54107
52486
MOHD HANIS BIN AMRAN
B.E.HONS.(UTHM) (MECHANICAL, 11)
52502
MOHD IDZUAN BIN MOHD YUSUFF
B.E.HONS.(MALAYA) (MECHANICAL, 09)
53794
MOHD JUZAIRI AZMIR BIN ATAN @ ABDULLAH
52528
B.E.HONS.(UTM) (MECHANICAL, 11)
MOHD KHAIRULNIZAM BIN KASRON
B.E.HONS.(UTM) (MECHANICALTEKNOLOGI MARIN, 05)
52548
MOHD NASHRIQ BIN ZULKEFLE
B.E.HONS.(UTP) (MECHANICAL, 10)
54057
MOHD NAZRULLAH BIN LIAS
B.E.HONS.(UPNM) MECHANICAL, 11)
52537
MOHD RIDZUAN BIN MOHD JAMIR
B.E.HONS.(UTM) (MECHANICAL, 09)
OSMAN BIN ABD MOIN
B.E.HONS.(UTM) (MECHANICAL, 11)
53768
SHAHRUL AZHAR BIN MUSTAFFA
B.E.HONS.(UKM) (MECHANICAL, 08)
53766
SITI LINORIZAH BINTI MOHD KAMBALI
B.E.HONS.(UTM) (MECHANICAL, 07)
54061
SYARIFAH NUR AQIDA BINTI SYED AHMAD
PRODUCTION ENGINEERING 53976
TAN JIE
B.E.HONS.(UNITEN) (MECHANICAL, 08)
52478
TAN SUH YONG
B.SC.(TEXAS TECH) (MECHANICAL, 93)
52493
TANG CHUN KIT
B.E.HONS.(UTAR) (MECHANICAL, 10)
54054
TEO KUI THENG, JONATHAN
B.E.(NANYANG) (MECHANICAL, 96)
52549
THIRUPATHI CHELVAM A/L POOTHAN MOOKAIAH
B.E.HONS.(USM) (MECHANICAL, 04)
MUHAMMAD HAFIZUL BIN AZIZ
DIP.ING. (FACHHOCHSCHULE ROSENHEIM) (PRODUCTION, 07)
STRUCTURAL ENGINEERING 54050
TAHA MOHAMMED JASSAM
B.SC.(AL-ANBAR, IRAQ) (CIVIL, 03) ME (UKM) (CIVIL, 10)
ADMISSION TO THE GRADE OF INCORPORATED MEMBER Name
4XDOL¿FDWLRQV
ELECTROMECHANICAL ENGINEERING
B.SC.HONS.(UTM) (MECHANICAL, 02)
54043
B.E.HONS.(UIAM) (MECHATRONICS, 11)
LOGESWARAN JOTHI
B.SC.HONS. (SOUTHERN PACIFIC) (E’TROMECHANICAL, 07)
ADMISSION TO THE GRADE OF ASSOCIATE MEMBER 0¶VKLS1R
Name
4XDOL¿FDWLRQV
ELECTRICAL ENGINEERING 54106
POH CHIA CHUN @ SIMON
H.ND. (HERTFORDSHIRE) (ELECTRICAL, 02)
MECHATRONICS ENGINEERING 54105
CHEW HAN SIONG
DIP.(TAR COLL) (MECHATRONICS, 03)
CONTRIBUTIONS TO WISMA IEM BUILDING FUND 50IURP,(00HPEHUVDQG&RPPLWWHHV 50IURP3ULYDWH2UJDQLVDWLRQV
727$/50 ($127+(550,61(('(') dŚĞ/ŶƐƟƚƵƟŽŶǁŽƵůĚůŝŬĞƚŽƚŚĂŶŬĂůůĐŽŶƚƌŝďƵƚŽƌƐĨŽƌĚŽŶĂƟŶŐŐĞŶĞƌŽƵƐůLJƚŽǁĂƌĚƐƚŚĞ/DƵŝůĚŝŶŐ&ƵŶĚ
,>Wh^dKWZKs/ddZ^Zs/^dKzKhETOd,&hdhZ'EZd/KE ;dŚĞĚŽŶĂƟŽŶůŝƐƚƚŽƚŚĞtŝƐŵĂ/DƵŝůĚŝŶŐ&ƵŶĚŝƐƉƵďůŝƐŚĞĚŽŶƉĂŐĞϱϮͿ
October 2012
JURUTERA |
51
BUILDING FUND 54th Announcement DONATION LIST TO THE WISMA IEM BUILDING FUND WWW.CHINT.COM
&+,17(/(&75,&³0RUH7KDQ3RZHU
WWW.ASTRONERGY.COM
͘ dŚĞ/ŶƐƟƚƵƟŽŶǁŽƵůĚůŝŬĞƚŽƚŚĂŶŬĂůůĐŽŶƚƌŝďƵƚŽƌƐĨŽƌĚŽŶĂƟŶŐƚŽǁĂƌĚƐƚŚĞtŝƐŵĂ/DƵŝůĚŝŶŐ&ƵŶĚ ͬ DĞŵďĞƌƐĂŶĚƌĞĂĚĞƌƐǁŚŽǁŝƐŚƚŽĚŽŶĂƚĞĐĂŶĚŽƐŽďLJĚŽǁŶůŽĂĚŝŶŐƚŚĞĨŽƌŵĨƌŽŵƚŚĞ/DǁĞďƐŝƚĞĂƚ ͬ ͬ ͗ ͘ ͘ ͘ ͘ ŚƩƉǁǁǁŵLJŝĞŵŽƌŐŵLJŽƌĐŽŶƚĂĐƚƚŚĞ/D^ĞĐƌĞƚĂƌŝĂƚĂƚнϲϬϯͲϳϵϲϴϰϬϬϭϱϱϭϴĨŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶ The list of the contributors as at 31 August 2012 are shown as in table below. 12
0(0 12
DETAILS
12
0(0 12
DETAILS
1
13636
KAMAL BHAREEN BIN EMBONG
26
11938
ONG CHING LOON
2
23785
TAN SEE WEI
27
25276
MUHAMMAD FARID BIN ZULKIPLI
3
16576
MOHD ZAIM BIN ABD. HAMID
28
06290
PAZANON BIN AZIZ
4
18910
HARUN BIN ABDUL RAHMAN
29
30635
MEHERON A/L SELOWARA JOO
5
01366
NG LAM SHEN
30
15859
NG LIN HONG @ PAUL NG
6
12274
TAN KIM TIANG
31
06409
CHEONG CHEE HOONG
7
08590
SAKIM BIN ROSDI
32
13969
CHEW SHENG JYE
8
48507
TAQIUDDIN AHMAD KENDONG
33
14341
YAP CHOON KIAT
9
07935
AB. RAHIM BIN ABU HASAN
34
17391
GOH KHENG HAU
10
18934
MD. AZMAN BIN HUSSIN
35
37038
CHAN YEW FAH
11
4 75 41
S YAH ID UDD IN BI N MI SBA HUL MUN IR
36
24817
12
39976
MOHD FAIZ BIN A. SAMAD
AMIRUL ZIZI BIN UDA NOOR ABDUL KARIM
13
34571
FAM THEN SIONG
37
52316
HONG WAI ONN
38
12969
MOHAMAD BIN EMBONG
39
20014
POH HEON KHOON
40
04610
WONG SOON HIIK
41
21166
SIVARAMAN A/L RUKUMANGATHA RAJAH
42
19079
ENG SIEW CHEE
43
19210
ONG THIAM LING
44
09010
LEONG SANG KHIM
45
18621
ROSLI BIN MOHAMAD APPANDI
46
13845
CHONG WEI YU
47
06836
OOI LEAN HOCK
48
09499
TAN CHIN NYAN
14 15 16
A Leading Global Photovoltaic Manufacturer Provide Quality Products From Solar Modules to Solar Street Light
35608 20927 49441
ADNAN BIN HASSAN CHENG KHIE CHIEH ZULZAMRI BIN KOSNAN
17
16178
SAHARI BIN OTHMAN
18
28363
NAZRI BIN AMINUDIN
19
04961
ASOK KUMAR S/O HARILAL HIRA PATEL
20 21 22 23
2 5867 04923 3 0245 20425
TRIDJATMIKA BIN JITNO WIDODO TAN YONG LONG MOHD SHAHAR BIN SULAIMAN JUNAIDI BIN JAMALUDDIN
24
37979
TAN TEE GIAP
25
2 711 7
T ENG KU REZ AAF FEND I BI N T EN GKU MOHAMED
IEM DIARY OF EVENTS
͘ <ŝŶĚůLJŶŽƚĞƚŚĂƚƚŚĞƐĐŚĞĚƵůĞĚĞǀĞŶƚƐďĞůŽǁĂƌĞƐƵďũĞĐƚƚŽĐŚĂŶŐĞWůĞĂƐĞǀŝƐŝƚƚŚĞ/D ͘ ͘ ͘ ͘ ǁĞďƐŝƚĞĂƚǁǁǁŵLJŝĞŵŽƌŐŵLJĨŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚĞƵƉĐŽŵŝŶŐĞǀĞŶƚƐ
^ƵďͲŽŵŵŝƩĞĞŽŶtŽŵĞŶŶŐŝŶĞĞƌƐ ϯEŽǀĞŵďĞƌϮϬϭϮ;^ĂƚƵƌĚĂLJͿ KŶĞͲĂLJtŽƌŬƐŚŽƉŽŶdƌĂŶƐĨŽƌŵŝŶŐŶŐĞƌĨŽƌ^ĞůĨŵƉŽǁĞƌŵĞŶƚ ͬ ͗ ;WWWϲŚƌƐͿ ͘ ͘ ͘ ͘ ͘ ͘ dŝŵĞ ͗ϵϬϬĂŵƚŽϱϬϬƉŵ sĞŶƵĞ ͗tŝƐŵĂ/D
THE BIGGEST LV COMPONENTS
5HJLVWUDWLRQ)HHV
1RUPDO 2IÀLQH
2QOLQH
IEM Member
RM350
RM300
IEM G&S Member
RM250
RM200
Non IEM Member
RM450
RM400
MANUFACTURER IN CHINA AND REGISTERED UNDER SHANGHAI ST OCK E XCHANGE (REG: 601877 )
ŝǀŝůĂŶĚ^ƚƌƵĐƚƵƌĂůŶŐŝŶĞĞƌŝŶŐdĞĐŚŶŝĐĂůŝǀŝƐŝŽŶ ϱΘϲEŽǀĞŵďĞƌϮϬϭϮ;DŽŶĚĂLJΘdƵĞƐĚĂLJͿ ^ĞƋƵĞůƚŽdǁŽͲĂLJŽƵƌƐĞŽŶŶĂůLJƐŝƐĂŶĚĞƐŝŐŶƚŽϴĞŵLJƐƟĮĞĚ ͬ ͗ ;WWWϭϯŚƌƐͿ ͘ ͘ ͘ ͘ ͘ ͘ dŝŵĞ ͗ϵϬϬĂŵƚŽϱϯϬƉŵ sĞŶƵĞ ͗,ŽƚĞůƌŵĂĚĂ͕ Petaling Jaya
5HJLVWUDWLRQ)HHV
1RUPDO 2IÀLQH
2QOLQH
IEM Student Member
RM350
RM300
IEM Graduate Member
RM600
RM550
IEM Corporate Member
RM1,000
RM900
Non IEM Member
RM1,500
RM1,300
ŚĞŵŝĐĂůŶŐŝŶĞĞƌŝŶŐdĞĐŚŶŝĐĂůŝǀŝƐŝŽŶ ϮϭEŽǀĞŵďĞƌϮϬϭϮ;tĞĚŶĞƐĚĂLJͿ
ALPHA AUTOMATION(SEL) SDN BHD(Reg. : 372711 ) ALPHA CHINT SWITCHES S/B (Reg. : 952175) 5, Jalan Pemberita U1/49, Temasya Industrial Park, Glenmarie, 40150 Shah Alam, Selangor, Malaysia. Tel: +603-5569 3698 Fax: +603-5569 4099 Email:
[email protected]
52
| JURUTERA
October 2012
ͬ ͗ KŶĞͲĚĂLJŽƵƌƐĞŽŶWůĂƐƟĐƐĨŽƌƵƚŽŵŽƟǀĞƉƉůŝĐĂƟŽŶƐ;WWWϲŚƌƐͿ ͘ ͘ ͘ ͘ ͘ ͘ dŝŵĞ ͗ϵϬϬĂŵƚŽϱϬϬƉŵ sĞŶƵĞ ͗tŝƐŵĂ/D
5HJLVWUDWLRQ)HHV
1RUPDO 2IÀLQH
2QOLQH
IEM Student Member
RM80
RM50
IEM Graduate Member
RM280
RM250
IEM Corporate Member
RM380
RM350
Non IEM Member
RM700
RM650
IEM Use Only
IEM SPECIALIST REGISTER FORM
Date received: Remarks:
1. PERSONAL DETAILS NAME:
(please use capital letters for surname)
IEM MEMBERSHIP NO:
GRADE:
P.ENG NO:
DATE:
NOTE: Kindly attach a photocopy of your MEMBERSHIP CARD to this Form 2. ENGINEERING CONSULTANCY PRACTICE (ECP) CONTACT DETAILS ECP NAME:
TELEPHONE:
ADDRESS:
FAX: MOBILE: EMAIL:
POSTCODE:
STATE:
3. ACADEMIC QUALIFICATIONS FIRST DEGREE / UNIVERSITY / DISCIPLINE:
DATE OF GRADUATION:
POST GRADUATE DEGREE / UNIVERSITY / DISCIPLINE:
DATE OF GRADUATION:
OTHER PROFESSIONAL AFFILIATION / REGISTRATION: 4. REGISTRATION FOR SUBMISSION (select only 1 preferred category for registration purpose) Please tick: (
)
P eriod of E xperience
Civil (Passive Fire Protection) P osition of Responsibility
Months
Mechanical (Active Fire Protection)
1DWXUHRISURMHFWVLWVVLJQL¿FDQFH\RXUIXQFWLRQVUHVSRQVLELOLWLHVDFKLHYHPHQWV practical innovations, original application of theory
Total number of Months
5. DECLARATION All statements of facts in my report and as summarised in the tables of this Registration Form are true.
Signature:
Date:
(Note: A photocopy of this form is acceptable. Fax to +603 7957 7678 or email to
[email protected])
Unit B-08-15, Gateway Kiaramas, No. 1 Jalan Desa Kiara, 549/'7':'2':36:7'2'>8/' "+2'= $/+94'3?".'/2'4*?!/4-'657+?./2/66/4+8?>'43'7?'2'>8/' '58?'6'4?4*54+8/'?./4'?'3(5*/'?:897'2/'
any building... anywhere steel is our strength With 55,000 projects located in 85 countries, Zamil Steel is the world’s leading manufacturer of steel buildings. Now Zamil Steel pushes the frontiers of building solutions to a new level of excellence, using cutting edge engineering and manufacturing capabilities. Combining the technical know-how of Pre Engineered Steel Buildings, Open Web Steel Joists and Structural Steel, we offer faster and more cost effective solutions for factories, high rise buildings, power-plants and virtually any type of steel building. For Total Building Solutions, contact Zamil Steel.
structural steel
pre-engineered steel buildings
open web steel joists www.zamilsteel.com.vn
Building Success
With Information Modeling for Multidisciplinary Building Teams Success from BIM that drives project and building performance – not just coordinated drawings. Success realized in buildings such as the Stone Towers in Cairo by Zaha Hadid. Success achieved through the analysis, simulation, and collaborative workflows uniquely possible using
Bentley’s AECOsim software and ProjectWise’s collaboration system of servers and services.
http://www.bentley.com/BnI
Malaysia: Tel: +603 2054 7000 | Fax: + 603 2054 7020 Singapore: Tel: +65 66926570 | Fax: +65 66926571
© 2012 Bentley Systems, Incorporated. Bentley, the “B” Bentley logo and ProjectWise are either registered or unregistered trademarks or service marks of Bentley Systems, Incorporated or one of its direct or indirect wholly owned subsidiaries. Other brands and product names are trademarks of their respective owners.
THANK YOU FOR YOUR SUPPORT HQTCFXGTVKUKPIKPVJG#UKC2CEKſE%QPHGTGPEG5QWXGPKT2TQITCOOG$QQM from Dimension Publishing Sdn. Bhd.
Alpha Automation (SEL) Sdn. Bhd.
Eng Beng Group Sdn. Bhd.
BBR Construction Systems (M) Sdn. Bhd.
Freyssinet PSC (M) Sdn. Bhd.
Giga Engineering & Construction Sdn. Bhd.
Eastern Pretech (Malaysia) Sdn. Bhd.
Gamuda Berhad
HCR Bridge Machinery (M) Sdn. Bhd.
R IVO B INA S DN . B HD . SPC INDUSTRIES SDN BHD RIVO BINA Sdn. Bhd.
UTRACON Structural Systems Sdn. Bhd.
SPC Industries Sdn. Bhd.
VSL Engineers (M) Sdn. Bhd.
Waiko Engineering Works Sdn. Bhd.