OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATION Supply, install, test and commissioning Transformer comply to BS171 with final termination and all r elated accessories all in accordance with the drawings and specification. Transformers A
Transformer - 1 (1.5MVA, 22KV/0.4KV)
No
B
Transformer - 2 (1.5MVA, 22KV/0.4KV)
No
C
Transformer - 4 (1.5MVA, 22KV/0.4KV)
No
D
Transformer - 5 (1.5MVA, 22KV/0.4KV)
No
E
Transformer - 7 (1.5MVA, 22KV/0.4KV)
No
F
Transformer - 8 (1.5MVA, 22KV/0.4KV)
No
G
Transformer - 9 (1.5MVA, 22KV/0.4KV)
No
H
Transformer - 10 (1.5MVA, 22KV/0.4KV)
No
Supply, install, test and commissioning of Air circuit breaker complete with all necessary supports and connections; all in accordance with the drawings and specification. Air Circuit Breaker (ACB) for Transformers J
ACB - 1
No
K
ACB - 2
No
L
ACB - 4
No
M
ACB - 5
No
N
ACB - 7
No
P
ACB - 8
No
Q
ACB - 9
No
R
ACB - 10
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 1 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Main circuits Supply, install, test and commissioning bus bars including hangers, elbows, flanges, extensions, fire barriers, flunged end etc., complete with all necessary accessories; all in accordance with drawings and specification. Bus bar system TPN cast resin insulated copper bus bar with integral earth low impedance sandwich insulated type, related supports and final termination. Busbars A
800A bus bar
m
B
1000A bus bar
m
C
1250A bus bar
m
D
2500A bus bar
m
E
Allow for third party supervision, inspection and certification of busbars including thermography scanning tests
Item
Tap off units (IP54) with final termination as per drawings and specification Tap Off Units F
100A TPN MCCB 40KA
No
G
250A TPN MCCB 40KA
No
Supply and installation of chimney for the following areas as shown on the drawings and specification. Chimney H
Pump room at 31 level
I te m
UPS Supply, install, test and commissioning UPS comply to BS5490 (IP22) complete with all supports, earth continuity strip and all related accessories; all in accordance with the drawings and specification Uninterrupted power supply J
UPS for Obstruction Obstructi on light - 10KVA
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 2 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Main circuits Supply, install, test and commissioning bus bars including hangers, elbows, flanges, extensions, fire barriers, flunged end etc., complete with all necessary accessories; all in accordance with drawings and specification. Bus bar system TPN cast resin insulated copper bus bar with integral earth low impedance sandwich insulated type, related supports and final termination. Busbars A
800A bus bar
m
B
1000A bus bar
m
C
1250A bus bar
m
D
2500A bus bar
m
E
Allow for third party supervision, inspection and certification of busbars including thermography scanning tests
Item
Tap off units (IP54) with final termination as per drawings and specification Tap Off Units F
100A TPN MCCB 40KA
No
G
250A TPN MCCB 40KA
No
Supply and installation of chimney for the following areas as shown on the drawings and specification. Chimney H
Pump room at 31 level
I te m
UPS Supply, install, test and commissioning UPS comply to BS5490 (IP22) complete with all supports, earth continuity strip and all related accessories; all in accordance with the drawings and specification Uninterrupted power supply J
UPS for Obstruction Obstructi on light - 10KVA
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 2 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System Supply, Supply, install, testing, commissioning of LV Main distribution board complete with circuit breakers, capacitor bank with with harmonic filtration, KWHR meter, Interlock, CT meter; all in compliance with BSEN 60 4391 Form - 4 construction as per per drawings and specification. Low Voltage Main Distribution System A
LV MSB - 7
No
B
LV MSB - 8
No
C
LV MSB - 9
No
D
LV MSB - 10
No
E
EMSB - 2
No
Supply, install, test and commissioning of sub main distribution boards comply with BS5486, complete with circuit breakers; all in accordance with the drawings and specification. Sub - Main Distribution Board F
SB-1-0-7
No
G
SB-1-0-8
No
H
SB-1-0-9
No
J
SB-1-0-10
No
K
SB-1-0-11
No
L
SB-1-0-12
No
M
SB-1-0-13
No
N
SB-1-0-14
No
P
SB-1-0-15
No
Q
SB-1-0-16
No
R
SB-1-0-17
No
S
SB-1-0-18
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 3 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) A
SB-2-0-19
No
B
SB-2-0-20
No
C
SB-2-0-21
No
D
SB-2-0-22
No
E
SB-2-0-23
No
F
SB-2-0-24
No
G
SB-2-0-25
No
H
SB-2-0-26
No
J
SB-2-0-27
No
K
SB-2-0-28
No
L
SB-2-0-29
No
M
SB-2-0-30
No
N
SB-7-0-31
No
P
SB-7-0-32
No
Q
SB-7-0-33
No
R
SB-7-0-34
No
S
SB-7-0-35
No
T
SB-7-0-36
No
U
SB-7-0-37
No
V
SB-7-0-38
No
W
SB-7-0-39
No
X
SB-7-0-40
No
Y
SB-7-0-41
No
Z
SB-7-0-42
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 4 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) A
SB-7-0-43
No
B
SB-7-0-44
No
C
SB-7-0-45
No
D
SB-7-0-46
No
E
SB-8-0-47
No
F
SB-8-0-48
No
G
SB-8-0-49
No
H
SB-8-0-50
No
J
SB-8-0-51
No
K
SB-8-0-52
No
L
SB-8-0-53
No
M
SB-8-0-54
No
N
SB-8-0-55
No
P
SB-8-0-56
No
Q
SB-8-0-57
No
R
SB-8-0-58
No
S
SB-8-0-59
No
T
ESB-31-L
No
U
ESB-31-P
No
V
ESB-1-0-31-LIFT.1
No
W
ESB-1-0-31-LIFT.2
No
X
ESB-2-0-60-LIFT.1
No
Y
ESB-2-0-60-LIFT.2
No
Z
ESB-2-0-60-LIFT.3
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 5 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) Supply, install, test and commissioning the distribution boards complete with circuit breakers; all in accordance with the drawings and specification. Distribution Boards A
DB-EXTERNAL -1 W/P
No
B
DB-EXTERNAL -2 W/P
No
C
DB-EXTERNAL -3 W/P
No
D
DB-EXTERNAL -4 W/P
No
E
DB-5-0-7
No
F
DB-5-0-7-EXT
No
G
DB-5-0-9
No
H
DB-5-0-9-EXT
No
J
DB-5-0-11
No
K
DB-5-0-11-EXT
No
L
DB-5-0-13
No
M
DB-5-0-13-EXT
No
N
DB-5-0-15
No
P
DB-5-0-15-EXT
No
Q
DB-5-0-17
No
R
DB-5-0-17-EXT
No
S
DB-5-0-19
No
T
DB-5-0-19-EXT
No
U
DB-5-0-21
No
V
DB-5-0-21-EXT
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 6 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) A
DB-5-0-23
No
B
DB-5-0-23-EXT
No
C
DB-5-0-25
No
D
DB-5-0-25-EXT
No
E
DB-5-0-27
No
F
DB-5-0-27-EXT
No
G
DB-5-0-29
No
H
DB-5-0-29-EXT
No
J
DB-7-31-1
No
K
DB-7-31-2
No
L
DB-10-0-32
No
M
DB-10-0-32-EXT
No
N
DB-10-0-34
No
P
DB-10-0-34-EXT
No
Q
DB-10-0-36
No
R
DB-10-0-36-EXT
No
S
DB-10-0-38
No
T
DB-10-0-38-EXT
No
U
DB-10-0-40
No
V
DB-10-0-40-EXT
No
W
DB-10-0-42
No
X
DB-10-0-42-EXT
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 7 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) A
DB-10-0-44
No
B
DB-10-0-44-EXT
No
C
DB-10-0-46
No
D
DB-10-0-46-EXT
No
E
DB-10-0-48
No
F
DB-10-0-48-EXT
No
G
DB-10-0-50
No
H
DB-10-0-50-EXT
No
J
DB-10-0-52
No
K
DB-10-0-52-EXT
No
L
DB-10-0-54
No
M
DB-10-0-54-EXT
No
N
DB-10-0-56
No
P
DB-10-0-56-EXT
No
Q
DB-10-0-58
No
R
DB-10-0-58-EXT
No
S
DB - 8-O-59 - 1
No
T
DB-8-59-KITCHEN
No
U
DB-8-59-EXT.1
No
V
DB-8-59-EXT.2
No
W
DB-10-0-60
No
X
DB-10-0-60-EXT
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 8 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) Supply, Install, test and commissioning the motor control center complete with circuit breakers; all in accordance with the drawings and specification. Motor Control Center A
MCP-2-0-31-FIRE PUMP
No
B
MCP-0-7-1
No
C
MCP-0-8-1
No
D
MCP-0-9-1
No
E
MCP-0-10-1
No
F
MCP-0-11-1
No
G
MCP-0-12-1
No
H
MCP-0-13-1
No
J
MCP-0-14-1
No
K
MCP-0-15-1
No
L
MCP-0-16-1
No
M
MCP-0-17-1
No
N
MCP-0-18-1
No
P
MCP-0-19-1
No
Q
MCP-0-20-1
No
R
MCP-0-21-1
No
S
MCP-0-22-1
No
T
MCP-0-23-1
No
U
MCP-0-24-1
No
V
MCP-0-25-1
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 9 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) A
MCP-0-26-1
No
B
MCP-0-27-1
No
C
MCP-0-28-1
No
D
MCP-0-29-1
No
E
MCP-0-30-1
No
F
MCP-0-31-1
No
G
MCP-0-31-2
No
H
MCP-0-31-3
No
J
MCC-0-31-1
No
K
MCC-0-31-2
No
L
MCC-0-31-3
No
M
MCP-0-32-1
No
N
MCP-0-33-1
No
P
MCP-0-34-1
No
Q
MCP-0-35-1
No
R
MCP-0-36-1
No
S
MCP-0-37-1
No
T
MCP-0-38-1
No
U
MCP-0-39-1
No
V
MCP-0-40-1
No
W
MCP-0-41-1
No
X
MCP-0-42-1
No
Y
MCP-0-43-1
No
Z
MCP-0-44-1
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 10 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) MCP-0-45-1
No
A
MCP-0-46-1
No
B
MCP-0-47-1
No
C
MCP-0-48-1
No
D
MCP-0-49-1
No
E
MCP-0-50-1
No
F
MCP-0-51-1
No
G
MCP-0-52-1
No
H
MCP-0-53-1
No
J
MCP-0-54-1
No
K
MCP-0-55-1
No
L
MCP-0-56-1
No
M
MCP-0-57-1
No
N
MCP-0-58
No
P
MCP-0-58-1
No
Q
MCP-0-58-2
No
R
MCP-0-58-3
No
S
MCC-0-58-1
No
T
MCC-0-58-2
No
U
MCC-0-58-3
No
V
MCP-0-59-1
No
W
MCP-0-60-1
No
X
Allow for miscellaneous control wiring related to other equipments / systems
Item
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 11 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd)
Power Cable Supply, install, test and commissioning of power cable installation including lugs, glands, terminations and cable ties; all in accordance with the drawings and specification. A
4 sqmm /4C PVC/PVC+4sqmm /1C CPC
m
B
6 sqmm /4C PVC/PVC+6sqmm /1C CPC
m
C
6X6 sqmm /1C PVC/PVC+6sqmm /1C CPC
m
D
10 sqmm /4C PVC/PVC+10sqmm /1C CPC
m
E
6X10 sqmm /1C PVC/PVC+10sqmm /1C CPC
m
F
16 sqmm /4C PVC/PVC+16sqmm /1C CPC
m
G
25 sqmm /4C PVC/PVC + 16 sqmm/1C CPC
m
H
25 sqmm /4C XLPE/PVC+ 16sqmm /1C CPC
m
J
4X25 sqmm /1C PVC/PVC+16sqmm /1C CPC
m
K
6X25 sqmm /1C PVC/PVC+25sqmm /1C CPC
m
L
6X25 sqmm /1C XLPE/PVC+16sqmm /1C CPC
m
M
6X25 sqmm /4C PVC/PVC+50sqmm /1C CPC
m
N
70 sqmm /4C XLPE/PVC+35 sqmm /1C CPC
m
P
4 x 70 sqmm /1C XLPE/PVC+ 35sqmm /1C CPC
m
Q
6X70 sqmm /1C XLPE/PVC+35sqmm /1C CPC
m
R
4 x 95 sqmm /1C XLPE/PVC+ 50 sqmm /1C CPC
m
S
4 x 95 sqmm /4C XLPE/PVC+ 50sqmm /1C CPC
m
T
4 x 120 sqmm /4C XLPE/PVC+ 70sqmm /1C CPC
m
U
4 x 120 sqmm /1C XLPE/PVC+70sqmm /1C CPC
m
V
6X300 sqmm /1C XLPE/PVC+240sqmm /1C CPC
m
W
8 x 630 sqmm/1C XLPE/PVC+2 x 300 sqmm /1C CPC
m
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 12 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Power Cable (Fire rated ) Supply, install, test and commissioning power cables including termination to and from, glands, cable ties, lugs and related installation accessories; all in accordance with the drawings and specification. A
6 sqmm /4C Fire Rated Cable+6 sqmm /1C CPC
m
B
16 sqmm /4C Fire Rated Cable+16sqmm /1C CPC
m
C
25 sqmm /4C Fire Rated Cable+16sqmm /1C CPC
m
D
50 sqmm /4C Fire Rated Cable+25sqmm /1C CPC
m
E
F
G
H
J
4 x 95 sqmm /1C Fire Rated Cable+50 sqmm /1C CPC
4 x 150 sqmm/1C Fire Rated Cable+95 sqmm /1C CPC
8 x 300 sqmm/1C Fire Rated Cable+2 x 150 sqmm /1C CPC
4 x 400 sqmm /IC Fire Rated Cable+150 sqmm /1C CPC
4 x 500 sqmm/1C Fire Rated Cable+300 sqmm /1C CPC
m
m
m
m
m
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 13 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Disconnect switches Supply, install Isolators (IP65) complete with supports, lugs and other related accessories; all in accordance with drawings and specification. Isolators A
16A, TPN Isolator
No
B
16A, TPN Isolator (Weather proof)
No
C
16A, TPN Isolator (Explosion proof)
No
Containment Supply and install GI cable tray / Ladder comply with BS4678 and complete accessoires, supports, earth continuity strip etc., all in accordance with the drawings and specification. Cable Tray D
100mm HD GI Cable Tray
m
E
300mm HD GI Cable Tray
m
F
500mm HD GI Cable Tray
m
G
600mm HD GI Cable Tray
m
H
600 X 100mm HD GI Cable Tray
m
J
800 X 100mm HD GI Cable Tray
m
Cable Ladder K
2 X 1000mm HD GI Cable Ladder
m
Supply and install GI conduit complete with accessoires, supports, earth continuity strip etc., all in accordance with the drawings and specification. G.I Conduit L
40mm Dia GI conduit
m
M
50mm Dia GI conduit
m
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 14 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Small Power System Supply, install and test all associated works of power outlets comply with BS1363 including permanent wiring system and using Logic range finish to the respective system as per specification. Power outlets (Logic range) A
13A, 220V, 1 gang switched socket outlet
No
B
13A, 220V, 1 Gang switched socket outlet (W/P - IP65)
No
C
13A, 220V, 1 Gang switched socket outlet (for emergency portable lighting)
No
D
E
F
13A, 220V, 1 Gang switched socket outlet (for Hand dryer) 13A, 220V, 2 gang switched socket outlet (one gang mounted at high level / above ceiling)
No
No
15A, switched fused connection unit mounted above ceiling
No
G
20A, 3P, socket outlet
No
H
20A, 3P, socket outlet (W/P)
No
J
20A, 3P, socket outlet (explosion proof)
No
Supply, install and test all associated works of power outlets with permanent wiring system using Metal clad finish to the respective system as per drawings and specification. Power outlets (Metal clad range) K
13A, 220V, 2 Gang switched socket outlet
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 15 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Lighting system Supply and install the following lighting system comply with BS88, 1273 & 1461 includes fittings, ceiling rose, heat resistant flexible cable, lamps, electronic control gear, suspension, connection to permanent wiring system; all in accordance with the drawings and specification. General Lighting A
Type F1
No
B
Type F1 (W/P)
No
C
Type F2
No
D
Type F3
No
E
Type F3 EP
No
F
Type F9 (W/P)
No
G
Type 'O'
No
H
Medium intensity red light type C high intensity white light type A
No
Medium intensity red light type C
No
J
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 16 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Interior Decorative Lighting A
Type DL2
No
B
Type DL9
No
C
Type PR1
No
D
Type PR2
No
E
LED 1
m
F
Type COL1
m
G
Type FL14
No
H
Type FL21
No
J
Type FL28
No
K
Exit light
No
Switches Supply, install lighting switches comply to BS36376 with permanent wiring using Logic range finish to the respective lighting system as per drawings and specification. Lighting Switches (Logic range) L
10A, 1 gang, 1way DP light switch
No
M
10A, 1 gang, 1way SP light switch
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 17 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) Emergency Distribution System Supply, install, testing and commissioning the distribution boards complete with circuit breakers, final connection; all in accordance with the drawings and specification. Emergency Distribution Board A
EDB-1-0-7-L
No
B
EDB-1-0-8-P
No
C
EDB-1-0-9-L
No
D
EDB-1-0-10-P
No
E
EDB-1-0-11-L
No
F
EDB-1-0-12-P
No
G
EDB-1-0-13-L
No
H
EDB-1-0-14-P
No
J
EDB-1-0-15-L
No
K
EDB-1-0-16-P
No
L
EDB-1-0-17-L
No
M
EDB-1-0-18-P
No
N
EDB-1-0-19-L
No
P
EDB-1-0-20-P
No
Q
EDB-1-0-21-L
No
R
EDB-1-0-22-P
No
S
EDB-1-0-23-L
No
T
EDB-1-0-24-P
No
U
EDB-1-0-25-L
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 18 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) A
EDB-1-0-26-P
No
B
EDB-1-0-27-L
No
C
EDB-1-0-28-P
No
D
EDB-1-0-29-L
No
E
EDB-1-0-30-P
No
F
EDB-2-0-31-P
No
G
EDB-2-0-32-L
No
H
EDB-2-0-33-P
No
J
EDB-2-0-34-L
No
K
EDB-2-0-35-P
No
L
EDB-2-0-36-L
No
M
EDB-2-0-37-P
No
N
EDB-2-0-38-L
No
P
EDB-2-0-39-P
No
Q
EDB-2-0-40-L
No
R
EDB-2-0-41-P
No
S
EDB-2-0-42-L
No
T
EDB-2-0-43-P
No
U
EDB-2-0-44-L
No
V
EDB-2-0-45-P
No
W
EDB-2-0-46-L
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 19 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Distribution System (Cont'd) A
EDB-2-0-47-P
No
B
EDB-2-0-48-L
No
C
EDB-2-0-49-P
No
D
EDB-2-0-50-L
No
E
EDB-2-0-51-P
No
F
EDB-2-0-52-L
No
G
EDB-2-0-53-P
No
H
EDB-2-0-54-L
No
J
EDB-2-0-55-P
No
K
EDB-2-0-56-L
No
L
EDB-2-0-57-P
No
M
EDB-2-0-58-L
No
N
EDB-2-0-59-P
No
P
EDB-2-0-60-L
No
Emergency lighting Supply and install the following emergency lighting system includes ceiling rose, heat resistant flexible cable, lamps, control gear, suspension, final connection , connection to permanent wiring system; all in accordance with the drawings and specification. Q
Type E1
No
R
Type E2
No
S
Type E3
No
T
Type E3 (W/P)
No
U
Type E4
No
V
Type E5
No
W
Type EB
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 20 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) LOW CURRENT SYSTEM (Voice / Data system) Point wiring including permanent wiring system as per the approval from local authority; all in accordance with drawings and specification. A
Single gang RJ-45 outlet for voice
No
B
Single gang RJ-45 outlet for data
No
Accessories Supply, installation of accessories as per the drawings and specification. C
Single gang RJ-45 outlet for voive
No
D
Single gang RJ-45 outlet for data
No
Equipments Cabinet / Accessories Supply, install, test and commissioning of Telephone and data complete system provided approval from local authority; all in accordance with drawings and specification. E
Optical network unit
No
F
Fiber terminal box (FTB)
No
G
Patch panel c/w Optical converter (PP)
No
H
Patch panel - 5 pairs
No
J
Patch panel - 20 pairs
No
K
Stand alone type 19" equipment cabinet
No
L
Allow for supply and installtion of MDF, patch panels and all related cabinets, and installation accessories.
Item
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 21 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Voice and Data System (Cont'd) Structured Cabling Supply and install structure cabling complete with all terminations; all in accordance with the drawings and specificaiton. A
B
4 x 24mm single core, 62.5um GI TIA/EIA 568-N-3 standard FIBER OPTIC cable
m
CAT6 UTP cable
m
Containment Supply and install GI cable tray complete with accessoires, supports, earth continuity strip etc., all in accordance with the drawings and specification. Cable Tray C
200mm HD G.I. cable tray
m
D
2 x 600mm HD G.I. cable tray
m
E
800mm HD G.I. cable tray
m
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 22 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) SECURITY SYSTEM Supply, install, test and commissioning of closed circuit television system c/w permanent wiring system and other ancillaries; all in accordance with drawings and specification, but not necessarily limitted to the following; Closed Circuit Television System A
CCTV camera - Pan / Tilt / Zoom type, dome type
No
B
CCTV camera - Pan / Tilt type, dome type installation
No
C
Terminal control unit (TCU)
No
Supply, install, test and commissioning of Access & Guard tour monitoring system c/w containment, wiring and other ancillaries; all in accordance with drawings and specification. Guard Tour Monitoring System D
Guard tour (GT)
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 23 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) PUBLIC ADDRESS & BACKGROUND MUSIC SYSTEM Supply, install, test and commissioning of public address & background music system c/w permanent wiring system and other ancillaries; all in accordance with drawings and specification. A
Box speaker
No
B
Box speaker (Explotion proof)
No
C
Ceiling mounted loud speaker (surface type)
No
D
Column loud speaker
No
E
Column loud speaker (W/P)
No
F
Terminal box
No
G
Overriding relay
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 24 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) ANALOGUE ADDRESSIBLE FIRE ALARM SYSTEM Supply, install, test and commissioning the complete fire alarm system in compliance with BS5839 and local authorities (Abdudhabi for code and civil defence approval) including containment, cabling and other ancillaries; all in accordance with the drawings and specification. A
Addressable analogue smoke detector (concealed)
No
B
Addressable analogue duct smoke detector (concealed)
No
C
Addressable analogue heat detector with electronic sounder base (concealed).
No
D
Addressable analogue break glass unit
No
E
Addressable analogue sounder unit
No
F
Indicator lamp
No
G
Flow switch
No
H
Gas detector
No
J
Monitored stop valve
No
K
L
Addressable analogue fire alarm sub main control panel
No No
Addressable analogue annunciator panel Containment Supply and install GI cable tray complete with accessoires, supports, earth continuity strip etc., all in accordance with the drawin s and specification. Cable Tray
M
200mm GI cable tray
m
Fire Telephone Intercom System Supply, install, test and commissioning the complete fire intercom system in compliance with local authorities all including permanent wiring system and other ancillaries; all in accordance with the drawings and specification. N
Fire intercom unit with jack
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 25 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) EARTHING SYSTEM Supply, install, test and commissioning and maintain complete earthing system including equipontential and supplementary bonding, complete with all tapes, test links and cross bonding conductors; all in accordance with the drawings and specification. A
1C x 70mm2 Cu/PVC earth cable
m
B
Main earth bars (30mm x 5mm)
No
C
40 x 10mm Cu Earth terminal at LV panel 7 to LV 10 & SB 2
No
D
25 x 8mm Cu Earth terminal at LV room (31st Floor)
m
E
Allow for metal projection earting including masts, aerials, air condutor units, handrails, external metallic duct works and all mechanical equipments.
Item
LIGHTNING PROTECTION SYSTEM Supply, install, test and commissioning and maintain complete lightning protection system comply with BS 6651 including equipontential and supplementary bonding, complete with all tapes, test links and cross bonding conductors; all in accordance with the drawings and specification. F
25mm x 3mm Aluminium tape on roof
m
G
Earth bonding to reinforcement
No
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 26 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) SUNDRY / GENERAL ITEMS A
B
C
D
E
F
G
Allow for permits, fees, inspection associated with the electrical installation by utility and statutory authorities
Item
Allow for testing and commissioning and production of test certificates all in accordance with specification.
Item
Allow for all identification labels, plates, charts and identification of cable, trays, switches and the like all in accordance with specification
Item
Allow for preparing schedule of manufacturers recommended tools and spare parts for each piece of equipment.
Item
Allow for fire stopping in accordance with the drawings specification and local authorities requirements,
Item
Allow for instructing selected employer's personnel on all aspects of the operation of systems and equipment
Item
Allow for the provision of operating / maintenance manuals Item
H
J
Allow for providing shop, co-ordination and "as-built" drawings
Item
Allow for mock-up installation of Electrical accessories such as light fittings, switches, sockets etc., at Lift lobby, toilet & office area as per specification section 2 and drawings. Item
K
L
Option for contractor to provide two (2) years maintenance to all electrical systems.
Item
The contractor shall list here other items not included above but included in the Specifications and/or drawings and necessary for the complete and satisfactory completion of this section of the Works. Such items shall be deemed to be included unless specified. Item
………………………………………….
Carried to Collection
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 27 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Collection from
Page 01 Page 02 Page 03 Page 04 Page 05 Page 06 Page 07 Page 08 Page 09 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20
AED
CARRIED FORWARD
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 28 of 81
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
ELECTRICAL INSTALLATIONS (Cont'd) Collection
Brought forward Page 28 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27
AED
CARRIED TO SUMMARY
MEP Tower BOQ-sample.xls - ELECTRICAL WORK
Page 29 of 81
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS DOMESTIC COLD WATER SYSTEM Water Meters A
Water meters for individual operation including gate valves, non return valve, union couplings including hangers, stariner, supports and accessories; all in accordance with the drawings and specification.
No
Cold Water Pipe Works Cold water pipe using polypropylene pipe works including fitting, hangers, supports and related accessories; all in accordance with the detailed drawings and specification. For raw water B
15mm Diameter
m
C
20mm Diameter
m
D
25mm Diameter
m
E
32mm Diameter
m
F
40mm Diameter
m
G
50mm Diameter
m
H
65mm Diameter
m
J
80mm Diameter
m
K
100mm Diameter
m
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 30 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Domestic Cold Water System (Cont'd) For filtered water A
15mm Diameter
m
B
20mm Diameter
m
C
25mm Diameter
m
D
32mm Diameter
m
E
50mm Diameter
m
F
65mm Diameter
m
G
80mm Diameter
m
Cold water transfer pipe using high density polypropylene pipe works including fitting, hangers, supports and related accessories; all in accordance with the detailed drawings and specification. Cold water transfer pipe H
100mm Diameter
m
J
150mm Diameter
m
Boosted cold water supply K
40mm Diameter
m
L
50mm Diameter
m
M
65mm Diameter
m
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 31 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Accessories / Fittings Supply, install accessories / fittings using polypropylene pipe fittings with thermal fusion joints in connection with piping; all in accordance with drawings and specificaiton. Bends A
65mm Diameter
No
B
80mm Diameter
No
C
100mm Diameter
No
D
150mm Diameter
No
Couplers (PPR) E
65mm Diameter
No
F
80mm Diameter
No
G
100mm Diameter
No
Couplers (HDPE) H
65mm Diameter
No
J
100mm Diameter
No
K
150mm Diameter
No
Pex pipe with flexible hose and other r elated accessories all in accordance with the drawings and specification. Pex pipe L
15mm Diameter
m
M
20mm Diameter
m
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 32 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Domestic Cold Water System (Cont'd) Interior hose bib shall be brass body complete with shutt off valves in stainless steel box as per specification. Hose bib A
15mm Diameter
No
B
20mm Diameter
No
Install sanitaryware mixers complete with all related accessories and final connection, angle valve, flexible connection, support etc.; all in accordance with the drawings and specification. Sanitaryware mixers C
Wash basin mixer
No
D
Water closet hand sprayor
No
E
Urinal mixer
No
F
Kitchen sink
No
G
Janitor sink
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 33 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS Valves Supply and install valves including all related accessories and supports; all in accordance with the drawings and specification. Gate valve shall be copper alloy body comply to BS5154 A
15mm Diameter
No
B
20mm Diameter
No
C
25mm Diameter
No
D
32mm Diameter
No
E
40mm Diameter
No
Gate valve shall be iron body comply to BS5154 F
50mm Diameter
No
G
65mm Diameter
No
H
80mm Diameter
No
J
100mm Diameter
No
K
150mm Diameter
No
Float valve shall be of bronze body compy to BS1212. L
80mm Diameter
No
M
100mm Diameter
No
Foot valve N
80mm Diameter
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 34 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS Valves (Cont'd) Check valve shall be DZR brass body A
20mm Diameter
No
B
50mm Diameter
No
C
100mm Diameter
No
Blanked off connection with Isolating valve D
25mm Diameter
No
E
32mm Diameter
No
F
40mm Diameter
No
Pressure reducing valve station Supply and installation of pressure reducing valve station complete with all related accessories and final connection; all in accordance with the drawings and specification. For Raw water G
65mm Diameter
No
H
80mm Diameter
No
J
100mm Diameter
No
For Filter water K
25mm Diameter
No
L
32mm Diameter
No
M
50mm Diameter
No
N
65mm Diameter
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 35 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS Water Storage Tank Supply, install test and commissioning multimedia water tank including water filter with water multimedia filters, activated carbon, filter AG with overflow discharge connection, drain valves, internal piping and supports all in accordance with the drawings and specification. Multimedia water filter tank A
MMF-0-31-1 & 2 (1.3 - 8.6 bars)
No
B
MMF-0-58-1 & 2 (1.3 - 8.6 bars)
No
Supply, install test and commissioning water tank using Fiber glass reinforced plastic (FRP) including overflow discharge connection, drain with valves, vent pipe and internal piping; all in accordance with the drawings and specification Insulated filter water tank C
30m3 capacity water tank
No
Raw type water tank D E
F
60m3 water tank
No
125m3 water tank (80m3 for fire & 45m3 for domestic)
240m3 water tank (150m3 for fire & 90m3 for domestic)
No
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 36 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Pumps for Water Supply Installations. Pumps complete with starter control panel, wiring, connecting pipes, valves, pressure vessel, VSD, non return valves, strainer, flexible connection, pressure gauges, puddle flange, anti-vibration isolators & starters etc.; all in accordance with relevant drawings and specification. A
B
C
D
E
Domestic water transfer pump set - DTP-O-31-1 to 3 (2 duty,1 standby) pump with standard accessories 7.5l/s @ 1260kpa head
Set
Domestic water transfer pump set - DTP-O-31-4 & 5 (1 duty,1 standby) pump with standard accessories 5l/s @ 150kpa head
Set
Domestic water transfer pump set - DTP-O-58-1 & 2 (2 duty,1 standby) pump with standard accessories 5l/s @ 150kpa head each
Set
Water booster pump set- DBP-O-58-1&2 (1duty, 1standby) pump with standard accessories 1.3l/s @ 300kpa head with 1 no of hydro pnematic tank
Set
Water booster pump set- DBP-O-58-3 & 4 (1duty, 1standby) pump with standard accessories 2.8l/s @ 300kpa head with 1 no of hydro pheumatic tank.
Set
Heat exchanger pumps Supply, install, test and commissioning heat exchanger pumps with all related valves and final connection; all in accordance with the drawings and specification. F
HE-0-31-1 & 2 (4l/s @ 220Kpa)
Set
G
HE-0-58-3 & 4 (4l/s @ 220Kpa)
Set
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 37 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) SANITARY DRAINAGE Above ground drainage pipe to uPVC pipe comply as BS5255, BS4514 and fittings including supports, brackets, hangers; all in accordance with the drawings and specification. Above Ground Pipes A
32mm Diameter
m
B
40mm Diameter
m
C
50mm Diameter
m
D
80mm Diameter
m
E
100mm Diameter
m
F
150mm Diameter
m
G
200mm Diameter
m
Kitchen waste pipe shall be cast iron hubless pipe including supports, brackets, hangers; all in accordance with the drawings and specification. H
100mm Diameter
m
J
150mm Diameter
m
Install sanitarywares complete with all related fittings, flexible and final support etc.; all in accordance with the drawings and specification. Sanitaryware Installation K
Wash basin mixer
No
L
Water closet hand sprayor
No
M
Urinal mixer
No
N
Kitchen sink
No
P
Janitor sink
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 38 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Fittings Supply and installation of drainage fittings using cast iron hubless including connection to pipe lines comply to CSA B70 with all related accessories; all in accordance with the drawings and specification. Bends / Elbows A
80mm Diameter
No
B
100mm Diameter
No
C
150mm Diameter
No
D
200mm Diameter
No
Tees / Reducers E
80 x 80 x 80mm
No
F
100 x 100 x 80mm
No
G
100 x 100 x 100mm
No
H
150 x 150 x 100mm
No
J
150 x 150 x 150mm
No
K
200 x 200 x 200mm
No
Reducers L
150 x 100mm
No
Couplers M
80mm Diameter
No
N
100mm Diameter
No
P
150mm Diameter
No
Q
200mm Diameter
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 39 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Sanitary Drainage (Cont'd) Drainage accessories Sanitary drainage accessories complete with strainers and all related accessories; all in accordance with the drawings and specification. Floor drains are stainless steel with cover A
80mm Diameter
No
B
100mm Diameter
No
Floor traps are hopper top with heavy duty hinged stainless steel cover & frame. C
50mm Diameter
No
Velocity breaker D
80mm Diameter
No
E
100mm Diameter
No
F
150mm Diameter
No
G
200mm Diameter
No
Rodding Eye H
80mm Diameter
No
J
100mm Diameter
No
K
150mm Diameter
No
L
200mm Diameter
No
Vent cowl M
100mm Diameter
No
N
200mm Diameter
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 40 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Rain Water Pipe Works Rain water pipe using Polypropylene of high density polyethylene pipe inclduing supports, brackets, hangers; all in accordance with the detailed drawings and specification. Pipe works A
50mm Diameter
m
B
100mm Diameter
m
C
150mm Diameter
m
D
200mm Diameter
m
Fittings Supply and installation of rain water pipe fittings using polypropylene pipe fitting thermal fusion joint with all related accessories; all in accordance with the drawings and specification. Bends E
100mm Diameter
No
F
150mm Diameter
No
G
200mm Diameter
No
Tees / Reducers H
100 x 100 x 50mm
No
J
150 x 150 x 50mm
No
K
150 x 150 x 150mm
No
L
200 x 200 x 50mm
No
M
200 x 200 x 100mm
No
N
200 x 200 x 200mm
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 41 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Rain water pipe fittings (Cont'd) Couplers A
100mm Diameter
No
B
150mm Diameter
No
C
200mm Diameter
No
Rodding Eye D
100mm Diameter
No
E
150mm Diameter
No
F
200mm Diameter
No
Planter drain G
50mm Diameter
No
Rain water outlet / Roof drain Final connection & testing and commissioning to rain water pipe / roof drain incoordination with the rain water contractor. H
100mm Diameter
No
J
150mm Diameter
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 42 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) FIRE FIGHTING SYSTEM Sprinkler Pipes Fire fighting system pipe work with hot dip galvanized steel comply to ASTM A 53 grade A & B for wet risers, sprinkler risers including Abudhabi local defence approval and civil defence approvals etc. with pipe and fittings, suitable for working pressure; all in accordance with the detailed drawings and specification. A
25mm Diameter
m
B
32mm Diameter
m
C
40mm Diameter
m
D
50mm Diameter
m
E
65mm Diameter
m
F
80mm Diameter
m
G
100mm Diameter
m
H
100mm Diameter (Drain pipe)
m
J
150mm Diameter
m
K
200mm Diameter
m
L
250mm Diameter
m
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 43 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Fire Fighting System (Cont'd) Fittings Supply, install pipe fittings all in accordance with the drawings and specification Bends A
100mm Diameter
No
B
150mm Diameter
No
Tees / Reducers C
65 x 50 x 25mm
No
D
65 x 50 x 32mm
No
E
65 x 50 x 40mm
No
F
65 x 50 x 50mm
No
G
65 x 65 x 25mm
No
H
65 x 65 x 32mm
No
J
65 x 65 x 40mm
No
K
65 x 65 x 50mm
No
L
80 x 50 x 40mm
No
M
80 x 65 x 25mm
No
N
80 x 65 x 32mm
No
P
80 x 65 x 40mm
No
Q
80 x 65 x 50mm
No
R
80 x 80 x 25mm
No
S
80 x 80 x 32mm
No
T
80 x 80 x 40mm
No
U
80 x 80 x 50mm
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 44 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Fire Fighting System (Cont'd) A
100 x 80 x 25mm
No
B
100 x 80 x 32mm
No
C
100 x 80 x 40mm
No
D
100 x 80 x 50mm
No
E
100 x 80 x 80mm
No
F
100 x 100 x 25mm
No
G
100 x 100 x 32mm
No
H
100 x 100 x 40mm
No
J
100 x 100 x 50mm
No
K
100 x 100 x 80mm
No
L
100 x 100 x 100mm
No
M
100 x 100 x 150mm
No
N
150 x 100 x 32mm
No
P
150 x 100 x 40mm
No
Q
150 x 150 x 25mm
No
R
150 x 150 x 50mm
No
S
150 x 150 x 65mm
No
T
150 x 150 x 100mm
No
U
150 x 150 x 150mm
No
V
200 x 150 x 150mm
No
W
200 x 200 x 150mm
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 45 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Fire Fighting System (Cont'd) Sprinkler head quick response accessories Sprinkler heads shall be of NFPA 13 and UL listed A
Exposed sprinkler head
No
B
Concealed sprinkler head
No
C
Royal flush sprinkler head
No
D
Cut-off sprinkler head
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 46 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Fire Fighting System (Cont'd) Valves and Accessories Supply, install valves and accessories with all supports, with Iron gate bronze trim, rising stem, outside and yoke and victaulic coupling etc., all in compliance with NFPA and civil defence and shall be UL listed; all in accordance with the drawings and specification. Zone control Valve A
Flow switch
No
Motorized stop valve B
150mm Diameter
No
Gate valve C
32mm Diameter
No
D
100mm Diameter
No
E
150mm Diameter
No
F
200mm Diameter
No
Automatic air relief valve G
100mm Diameter
No
H
150mm Diameter
No
J
200mm Diameter
No
Sprinkler control valve K
32mm Diameter
No
L
100mm Diameter
No
M
150mm Diameter
No
N
200mm Diameter
No
P
250mm Diameter
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 47 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Fire Fighting System (Cont'd) Valves A
200mm Diameter (Isolating valve)
No
B
200mm Diameter (Throtting valve)
No
Strainer C
200mm Diameter
No
D
FLV
No
Supply, install pressure reducing station and accessories with all supports and PRV pressure gauge, strainer, double regulating valve etc., all in accordance with the drawings and specification. Pressure reducing station E
100mm Diameter
No
F
150mm Diameter
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 48 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Fire Fighting System (Cont'd) Accessories A
Wet riser landing valve, 150mm Diameter
No
B
Drain off valve, 100mm Diameter
No
C
Drain off valve, 150mm Diameter
No
D
Capped for tenant fitout
No
Fire Extinguisher E
CO2 fire extinguisher capacity - 5Kg
No
F
Dry powder fire extinguisher capacity - 4Kg
No
Fire hose cabinet
Fire hose cabinet includes landing valve with PRV, 40mm Dia, 40m length hose shut-off type nozzle, set of portable dry powder and CO2 fire extinguishers, automatic hose reel with lock shield valve, PRV (typical) with stainless steel back box and architrave suitable for surface mounting; all in accordance with the drawings and specification
G
Internal fire hose cabinet
No
H
External fire hose cabinet with extinguisher
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 49 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Fire Fighting System (Cont'd) Fire Pump Set Fire pump set complete with all piping, control panel inter connections, controls, emergency stop push button, and related accessories; all in accordance with NFPA standard, detailed drawings and specification. A
B
C
D
Fire electric pump (FWP-O-31-1), flow 63l/s, head 2050kpa, 2950rpm, 245KW (duty pump)
No
Fire disel pump (FWP-O-31-2), flow 63l/s, head 2050kpa, 2950rpm, (standby pump)
No
Fire Jockey pump (FWP-O-31-1), flow 1.2l/s, head 2100kpa, 1450rpm, 5.5kw.
No
Allow for other miscellaneous work in connection with other systems
Item
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 50 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Clean Agent Fire Suppression System (FM200) Supply, Install, test and commissioning clean agent fire suppression system complete with piping, control valve, cylinders including all necessary fittings, supports, all related accessories and fixing supports in compliance with NFPA and civil defence approval; all in accordance with the detailed drawings and specification. A
LV room at 31st floor level
Item
B
Allow for other miscellaneous work in connection with other systems
Item
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 51 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HEATING AND VENTILATION AIR CONDITIONING SYSTEM Duct Work Supply, install, test and commissioning galvanized steel (1.2mm thick) comply with DW/142 & 144 and SMACNA standard complete including supply of necessary supports, accoustic linings & tubing vanes, flexible connection, access doors and accessories; all in accordance with the drawings and specification A
Fresh air duct
m2
B
Supply air duct
m
C
Return air duct
m
D
Exhaust duct
m
E
Toilet exhaust air duct
m
F
Stair pressurization duct
m
G
Flexible duct - 250mm Dia
m
2
2
2
2
2
Supply, install non inflamable layer of fiberglass filament reinforced aluminium foil-backed blanket including all necessary fixing material; all in accordance with the drawings and specification 2
H
Fresh air duct
m
J
Supply air duct
m
K
Return air duct
m2
L
Exhaust duct
m2
M
Toilet exhaust air duct
m
N
Stair pressurization duct
m
2
2
2
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 52 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Supply, install, test and commissioning galvanized steel (1.6mm thick) comply with DW/142 & 144 and SMACNA standard complete including supply of necessary supports, accoustic linings & tubing vanes, flexible connection, access doors and accessories; all in accordance with the drawings and specification. 2
A
Fresh air duct (fire rated)
m
B
Supply air duct (fire rated)
m
C
Smoke exhaust duct
m
D
stair case pressurization duct (fire rated)
m
E
Kitchen exhaust air duct
m
2
2
2
2
Supply, install non inflamable layer of fiberglass filament reinforced aluminium foil-backed blanket including all necessary fixing material; all in accordance with the drawings and specification. F
Fresh air duct (fire rated)
m2
G
Supply air duct (fire rated)
m2
H
Smoke exhaust duct
m2
J
stair case pressurization duct (fire rated)
m
K
Kitchen exhaust air duct
m
2
2
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 53 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Fan coil units Supply and install, testing and commissioning of fan coil units with air vent, drain valve, test point, valves, gauges, flexible connections, motorized ON/OFF valves, thermostat, drain pan and r elated installation accessories; all in accordance with drawings and specification FCU's A
FCU-0-7 to 30-1
No
B
FCU-0-31-1
No
C
FCU-0-32 to 57-1
No
D
FCU-0-58-1
No
E
FCU-0-59-1
No
F
FCU-0-59-2
No
G
FCU-0-59-3
No
H
FCU-0-59-4
No
J
FCU-0-59-5
No
K
FCU-0-59-6
No
L
FCU-0-59-7
No
M
FCU-0-59-8
No
N
FCU-0-59-9
No
P
FCU-0-59-10
No
Q
FCU-0-59-11
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 54 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Split Units Supply and install, testing and commissioning of Split units complete with outdoor units, air vent, drain valve, test point, flexible connections, thermostat, drain pan and related installation accessories; all in accordance with drawings and specification. A
IU/OU-O-31-1
No
B
IU/OU-O-31-2
No
C
IU/OU-O-31-3
No
D
IU/OU-O-60-1
No
E
IU/OU-O-60-2
No
F
IU/OU-O-60-3
No
Air handling units Supply, install, test and commissioning of Air handling units including manual air vent, test points, valves, flexible connection, motiorized modulation valve and themometer, drain pan, viberation isolator and related installation accessories; all in accordance with the drawings and specification. AHU's G
AHU-O-7 to 29-1
No
H
AHU-O-7 to 29-2
No
J
AHU-O-30-1
No
K
AHU-O-30-2
No
L
AHU-O-31-1
No
M
AHU-O-31-2
No
N
AHU-O-31-3
No
P
AHU-O-31-4
No
Q
AHU-O-31-5
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 55 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Air handling units (Cont'd) A
AHU-O-31-6
No
B
AHU-O-31-7
No
C
AHU(HR)-O-31-1
No
D
AHU(HR)-O-31-2
No
E
AHU-O-32-1
No
F
AHU-O-32-2
No
G
AHU-O-33 to 56-1
No
H
AHU-O-33 to 56-2
No
J
AHU-O-57-1
No
K
AHU-O-57-2
No
L
AHU-O-58-1
No
M
AHU-O-58-2
No
N
AHU-O-58-3
No
P
AHU-O-58-4
No
Q
AHU-O-58-5
No
R
AHU(HR)-O-58-1
No
S
AHU-O-60-1
No
T
AHU-O-60-2
No
U
AHU-O-60-3
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 56 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Pre-cool air handling units Supply, install, test and commissioning of pre-cool air handling units including manual air vent, test points, valves, flexible connection, motiorized modulation valve and themometer, drain pan, viberation isolator and related installation accessories; all in accordance with the drawings and specification. A
PAHU-O-31-1
No
B
PAHU-O-31-2
No
C
PAHU-O-31-3
No
D
PAHU-O-31-4
No
E
PAHU-O-31-5
No
F
PAHU-O-58-1
No
G
PAHU-O-58-2
No
H
PAHU-O-58-3
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 57 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Fans Supply, install, test and commissioning fans complete with silencer, bell mouth, wire mesh; all in accordance with the drawings and specification. Extract air fan A
EAF-O-31-1
No
B
EAF-O-31-2
No
C
EAF-O-58-1
No
D
EAF-O-58-2
No
Toilet Extract fan E
TEAF-O-31-1
No
F
TEAF-O-31-2
No
G
TEAF-O-58-1
No
Supply air fan H
SAF-O-31-1
No
J
SAF-O-31-2
No
K
SAF-O-31-3
No
L
SAF-O-31-4
No
M
SAF-O-58-1
No
N
SAF-O-58-2
No
P
SAF-O-58-3
No
Q
SAF-O-58-4
No
Smoke extract fan R
SEF-O-31-1
No
S
SEF-O-31-2
No
T
SEF-O-58-1
No
U
SEF-O-58-2
No Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 58 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Stair case pressurization fan Supply, install, test and commissioning stair pressurization fan all in accordance with civil defence approval complete with silencer, bellmouth, wire mesh; all in accordance with the detailed drawings and specification. A
SPF-O-31-1
No
B
SPF-O-31-2
No
C
SPF-O-31-3
No
D
SPF-O-31-4
No
E
SPF-O-58-1
No
F
SPF-O-58-2
No
G
SPF-O-58-3
No
H
SPF-O-58-4
No
Variable air volume J
VAV-O-7 to 30-1 (250x200)
No
K
VAV-O-7 to 30-2 (300x250)
No
L
VAV-O-7 to 30-3 (350x300)
No
M
VAV-O-32 to 57-1 (250x200)
No
N
VAV-O-32 to 57-2 (300x250)
No
P
VAV-O-32 to 57-3 (350x300)
No
Q
VAV-O-58-1 (250x200)
No
R
VAV-O-58-2 (250x200)
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 59 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Grills Supply and Installation of duct grills comply with BS5750 and BS476 complete with installation accessories; all in accordance with the drawings and specification. Supply grille (Double deflection) A
200 x 200mm
No
B
400 x 200mm
No
C
900 x 350mm
No
D
1000 x 500mm
No
Supply grille (Fixed blade) E
250 x 200mm
No
F
500 x 750mm
No
G
1000 x 500mm
No
H
1250 x 1750mm
No
Eggcrate grille J
125 x 125 mm
No
K
150 x 150 mm
No
L
200 x 200 mm
No
M
450 x 450 mm
No
N
1000 x 350 mm
No
P
1250 x 400 mm
No
Q
1500 x 500 mm
No
R
2400 x 900 mm
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 60 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Diffuser Supply, install test and commissioning the supply and return air diffusers with dampers and of aluminium construction and related installation accessories; all in accordance with the schedule and specification.
Supply air diffuser with four way throw, square louvered A
450 x 450mm
No
1200mm length and 25mm each slot linear diffuser B
One slot diffuser
No
C
Three slot diffuser
No
Return air intake louvres D
4000 x 425mm
No
Dampers Supply, install, test and commissioning dampers consist of Galvanized steel complete with all related supports and accessories; all inaccordance with detailed drawings and specification Volume control dampers E
150 x 150mm
No
F
200 x 200mm
No
G
250 x 200 mm
No
H
300 x 300mm
No
J
500 x 500mm
No
K
500 x 750mm
No
L
1700 x 1000mm
No
M
200mm dia
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 61 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Dampers Supply, install, test and commissioning dampers consist of Galvanized steel complete with all related supports and accessories; all inaccordance with detailed drawings and specification Fire dampers A
125 x 125 mm
No
B
150 x 100mm
No
C
200 x 200 mm
No
D
250 x 200 mm
No
E
300 x 250 mm
No
F
350 x 300 mm
No
G
400 x 200 mm
No
H
450 x 450mm
No
J
800 x 500 mm
No
K
1000 x 500 mm
No
L
1500 x 400 mm
No
M
1900 x 1100 mm
No
N
2000 x 1000 mm
No
P
2400 x 500 mm
No
Q
2500 x 1250 mm
No
R
2500 x 1500 mm
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 62 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Motorized damper A
300 x 300 mm
No
B
500 x 500 mm
No
C
800 x 500 mm
No
D
1000 x 450 mm
No
E
1000 x 500 mm
No
F
1200 x 1000 mm
No
G
1250 x 450 mm
No
H
1500 x 400 mm
No
J
1500 x 1250 mm
No
K
1600 x 1100 mm
No
L
1700 x 1000 mm
No
M
1750 x 1250 mm
No
N
2000 x 800 mm
No
P
2000 x 1000 mm
No
Q
2400 x 500 mm
No
R
2500 x 1500 mm
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 63 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Motorized fire smoke damper A
1000 x 300 mm
No
B
1100 x 900 mm
No
C
1700 x 350 mm
No
D
2000 x 800 mm
No
E
2750 x 1250 mm
No
Sound Attenuator / Silencer of stainless steel construction F
3475 x 525mm
No
Constant air volume G
Constant air volume box (1200 l/s)
No
H
Constant air volume box (1600 l/s)
No
J
Constant air volume box (2100 l/s)
No
K
Constant air volume box (2300 l/s)
No
Duct detector Supply and installation of duct smoke detectors complete with all related accessories; all in accordance with the drawings and specification L
Duct smoke detector
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 64 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Chilled Water Pipe Work Supply, install, test and commissioning chilled water pipe work, schedule 40, black mild steel pipe to BS 1387 : 1985 complete with finishes, jacketing, fittings, test points, supports, hangers and related accessories; all in accordance with the drawings and specification. Piping to BS1387 steel heavy grade black, screwed threads A
25mm Diameter
m
B
32mm Diameter
m
C
40mm Diameter
m
D
50mm Diameter
m
Piping to BS1387 steel heavy grade black, welded joints, bevelled ends. E
65mm Diameter
m
F
80mm Diameter
m
G
100mm Diameter
m
H
125mm Diameter
m
J
150mm Diameter
m
K
200mm Diameter
m
L
250mm Diameter
m
M
300mm Diameter
m
N
350mm Diameter
m
P
400mm Diameter
m
Q
450mm Diameter
m
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 65 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Chilled water pipe work insulation Supply, install, test and commissioning chilled water pipe work insulation complete with phenolic foam including finishes and fastening, vapour barriers, sheating, adhesives and related accessories; all in accordance with the drawings and specification. A
450mm Diameter
m
Fittings Supply and install chilled water pipe fittings comply with BS143 and BS1246 including flanged welded to black steel and related accessories; all in accordance with the drawings and specification. Bends B
65mm Diameter
No
C
80mm Diameter
No
D
100mm Diameter
No
E
125mm Diameter
No
F
150mm Diameter
No
G
200mm Diameter
No
H
250mm Diameter
No
J
450mm Diameter
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 66 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Tee / Reducers A
80 x 80 x 65mm
No
B
80 x 80 x 50mm
No
C
100 x 65 x 65mm
No
D
125 x 80 x 65mm
No
E
125 x 80 x 100mm
No
F
150 x 150 x 65mm
No
G
150 x 80 x 80mm
No
H
150 x 150 x 65mm
No
J
100 x 80 x 50mm
No
K
100 x 100 x 40mm
No
L
100 x 100 x 80mm
No
M
150 x 150 x 25mm
No
N
150 x 150 x 40mm
No
P
150 x 150 x 50mm
No
Q
150 x 150 x 65mm
No
R
150 x 150 x 80mm
No
S
150 x 150 x 125mm
No
T
150 x 150 x 150mm
No
U
200 x 150 x 150mm
No
V
200 x 200 x 125mm
No
W
200 x 200 x 150mm
No
X
250 x 250 x 200mm
No
Y
450 x 450 x 150mm
No
Z
450 x 450 x 200mm
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 67 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Reducers A
100 x 80mm
No
B
80 x 40mm
No
C
80 x 50mm
No
D
200 x 80mm
No
E
200 x 125mm
No
F
250 x 80mm
No
G
250 x 100mm
No
H
250 x 125mm
No
J
250 x 200mm
No
Coupling K
65mm dia
No
L
80mm dia
No
M
100mm dia
No
N
125mm dia
No
P
150mm dia
No
Q
200mm dia
No
R
250mm dia
No
S
300mm dia
No
T
350mm dia
No
U
400mm dia
No
V
450mm dia
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 68 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Condensate drain pipe Supply and install condensate drain pipe with insulation comply with BS2871 complete with all related accessories and supports; all in accordance with the drawings and specification. Copper pipe A
15mm Diameter
m
B
25mm Diameter
m
C
32mm Diameter
m
uPVC pipe D
100mm Diameter
m
E
Allow for condensate drain insulation which necessary to prevent condensation
m
Fittings Supply and install condensate drain pipe fittings uPVC and all related accessories; all in accordance with the drawings and specification. Couplings F
100mm Diameter
No
Tee / Reducers G
100 x 100 x 25mm
No
H
100 x 100 x 32mm
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 69 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Valves and Accessories Supply, install valves and accessories with all supports, fixing and fittings; all in accordance with the detailed drawings and specification. Isolating Valves shall be bronze body comply with BS 5154 A
40mm Diameter
No
Isolating Valves shall be cast iron body comply with BS5150 B
100mm Diameter
No
C
250mm Diameter
No
Automatic air vent shall be bronze type D
32mm Diameter
No
450mm Diameter at 31st floor level E
Butterfly valve
No
F
Isolating valve
No
G
Temerature gauge
No
H
Pressure gauge
No
J
Y - Strainer
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 70 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Plate heat exchanger Supply, install liquid plate exchanger comply with ASHRAE, NEC standards and complete with necessary connection piping, valves, gauges, thermometers, strainers and accessories i ncluding supports, controls as per detailed drawings, schedule and specification. A
HE - O - 31 - 1 (3050KW)
No
B
HE - O - 31 - 2 (3050KW)
No
C
HE - O - 31 - 3 (3050KW)
No
D
HE - O - 31 - 4 (302KW)
No
E
HE - O - 31 - 5 (302KW)
No
F
HE - O - 58 - 1 (302KW)
No
G
HE - O - 58 - 2 (302KW)
No
Heat Recovery Pump Supply and installation of the heat recovery pumps complete with all necessary supports, compounents and accessories etc., all in accordance with the drawings and specification. H
HRP-O-31-1 of 4.5l/s @ 200kpa head
No
J
HRP-O-31-2 of 4.6l/s @ 200kpa head
No
K
HRP-O-58-1 of 5.9l/s @ 200kpa head
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 71 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) HVAC system (Cont'd) Chilled water pumps Supply, install, test and commissioning chilled water pumps complete with control panel valves, instruments, gauges, strainers etc., all in accordance accordance with the drawings and specification. Secondary chilled water pump of 89l/s @ 350kPa head at 31st floor level A
SCHW P-O-31-1 (Duty)
No
B
SCHW P-O-31-2 (Duty)
No
C
SCHW P-O-31-3 (Standby)
No
Carried to Collection
MEP Tower BOQ-sample.xls BOQ-sample.xls - MECHANICAL WORK
Page 72 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) GAS Installation NOTE: The LPG gas distribution network including fittings and accessories shall be in accordance with standard specificaiton The contractor is to include with in his pipe work rates for pipe-fittings and for providing tee connections with a standard intervals and end caps; all in accordance with the drawings and specificaiton. Pipes & fittings Supply and installation of Copper gas pipe including supply and installation of fittings. A
100mm Diameter
m
Gate valve shall be iron body comply with BS5154 B
100mm Diameter
No
Meters C
Gas meter
No
Blanked off connection with Isolating valve D
100mm Diameter
No
Accessories / Fittings Supply and installation of accessories / fittings all in accordance witih the drawings and specification. Bends E
150mm Diameter
No
Couplers F
100mm Diameter
No
Carried to Collection
MEP Tower BOQ-sample.xls BOQ-sample.xls - MECHANICAL WORK
Page 73 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Building Management System Supply, install permanent wiring system complete with termination and all related accessories; all in accordance with the schedule, drawings and specification. Containment and cabling Electrical A
MSB & EMSB
No
B
SD & ESB
No
C
MCP & MCC
No
D
DB & EDB
No
Control panels E
Sub alarm panel
No
Pumps F
Transfer water pumps
No
G
Booster pump
No
H
Fire fighting pump
No
J
Chilled water pumps
No
K
Heat recovery pumps
No
L
Plate heat exchanger
No
M
Water tank
No
N
Cold water meter
No
P
Gas system meter
No
Carried to Collection
MEP Tower BOQ-sample.xls BOQ-sample.xls - MECHANICAL WORK
Page 74 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Building Management System (Cont'd) HVAC system A
Exhaust air fan
No
B
Toilet extract fans
No
C
Supply air fans
No
D
Smoke extract fans
No
E
Constant volume box
No
F
Staircase pressurization fans
No
G
Variable air volume units
No
H
AHU's
No
J
PAHU's
No
K
FCU's
No
Carried to Collection
MEP Tower BOQ-sample.xls BOQ-sample.xls - MECHANICAL WORK
Page 75 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Building Management System (cont'd) Supply, install accessories as per the BMS point schedule complete with testing and commissioning of the system and all related accessories; all in accordance with the drawings and specification. Accessories / Equipments Electrical A
MSB & EMSB
No
B
SD & ESB
No
C
MCP & MCC
No
D
DB & EDB
No
Control panels E
Sub alarm panel
No
Pumps F
Transfer water pumps
No
G
Booster pump
No
H
Fire fighting pump
No
J
Chilled water pumps
No
K
Heat recovery pumps
No
L
Plate heat exchanger
No
M
Water tank
No
N
Cold water meter
No
P
Gas system meter
No
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 76 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Building Management System (Cont'd) HVAC system A
Exhaust air fan
No
B
Toilet extract fans
No
C
Supply air fans
No
D
Smoke extract fans
No
E
Constant volume box
No
F
Staircase pressurization fans
No
G
Variable air volume units
No
H
AHU's
No
J
PAHU's
No
K
FCU's
No
HVAC system Equipments L
Remote programmable unit
M
Allow for soft ware, f ield sensors, actuators, net controller, Management station central equipment and all related accessories etc., all in accordance with the specification and drawings.
No
Item
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 77 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) SUNDRY / GENERAL ITEMS A
B
C
D
E
F
G
H
J
K
Allow for permits, fees, inspection associated with the electrical installation by utility and statutory authorities
Item
Allow for testing and commissioning and production of third party test certificates
Item
Allow for all identification labels, plates, charts and identification of plant, equipment, pipes and the like all in accordance with specification
Item
Allow for preparing schedule of manufacturers recommended tools and spare parts for each piece of equipment.
Item
Allow for fire stopping in accordance with the drawings specification and local authorities requirements,
Item
Allow for instructing selected employer's personnel on all aspects of the operation of systems and equipment
Item
Allow for the provision of operating / maintenance manuals
Item
Allow for providing shop, co-ordination and "as-built" drawings
Item
Option for contractor to provide two (2) years maintenance to all electrical systems.
Item
The contractor shall list here other items not included above but included in the Specifications and/or drawings and necessary for the complete and satisfactory completion of this section of the Works. Such items shall be deemed to be included unless specified.
Item
………………………………………….
Carried to Collection
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 78 of 81
AED
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Collection
Page 01 Page 02 Page 03 Page 04 Page 05 Page 06 Page 07 Page 08 Page 09 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25
AED
CARRIED FORWARD
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 79 of 81
OFFICE TOWER TOWER WORKS BILL No: 2 - MECHANICAL WORK
Project Item Ref
Item Description
Unit
Rate
Amount in AED
MECHANICAL INSTALLATIONS (Cont'd) Collection
Brought forward Page 50 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49
AED
CARRIED TO SUMMARY
MEP Tower BOQ-sample.xls - MECHANICAL WORK
Page 80 of 81