SOAL-SOAL LATIHAN 1. Jelaskan mengapa air yang mengandung garam chlorida dan sulfat tidak boleh digunakan untuk membuat adukan beton ? 2. Jelaskan syarat-syarat air yang dapat digunakan un…Full description
Measuring Nitration, Oxidation and Sulfation
Oxidation of Toluene by Potassium Permanganate
The process described in this project is The Formox Process. It includes the following topics: Complete mass and energy balance of the process, cost estimation, plant and site layout, desig…Deskripsi lengkap
The process described in this project is The Formox Process. It includes the following topics: Complete mass and energy balance of the process, cost estimation, plant and site layout, design of es...Full description
Descripción completa
The process described in this project is The Formox Process. It includes the following topics: Complete mass and energy balance of the process, cost estimation, plant and site layout, design of es...Full description
The process described in this project is The Formox Process. It includes the following topics: Complete mass and energy balance of the process, cost estimation, plant and site layout, desig…Full description
Tanjung Jati B Training OXIDATION AIR
OPERATIONS OXID OX IDA A TI TION ON AIR A IR
Tanjung Jati B Training
OPERATIONS OXID OX IDA A TI TION ON AIR A IR
Tanjung Jati B Training
PT Cen t r al J av a Po w er Tanju njung ng Ja J ati B Units 1 & 2 Flu lue e Ga Gas De Desu sulf lfur uriza izati tion on (F (FG GD) Sys ystem tem
Absorber Area
Dewatering Area
Reagent Preparation Area
Limestone Jetty And Conveyor
Tanjung Jati B Training
FGD Operations Oxidation Air There are three (3) 100% capacity Oxidation Air Blowers, one dedicated to each Absorber and one as a spare or standby blower. Oxidation Air functions to minimize the buildup of solids within the Absorber Module by converting Calcium Sulfite (CaSO3) to Calcium Sulfate (CaSO4).
Tanjung Jati B Training
FGD Operations Oxidation Air ●
Gas to Sorbent (Limestone Slurry) Reaction
CaCO3 + SO2 + H2O → CaSO3 • 1/2H2O + CO2 Calcium Carbonate (In Limestone)
UNIT-1 ABSORBER UNIT-1 RECIRCULATION PUMPS UNIT-2 ABSORBER UNIT-2 RECIRCULATION PUMPS FILTER FEED TANK ME WASH WATER TANK PROCESS WATER TANK VACUUM FILTERS OXIDATION AIR BLOWERS LIMESTONE SLURRY TANK LIMESTONE SILO “A” LIMESTONE SILO “B” LS BUCKET ELEVATOR & RAMP STACK
2
PIPE RACK “A”
5 6
8
14 7
9
3
4
PIPE RACK “B”
BURIED SEAWATER TERMINAL POINT 11 YARD PIPING 10
13 12
Tanjung Jati B Training
FGD Operations Oxidation Air
OXIDATION AIR BLOWERS Tanjung Jati B Training
FGD Operations Oxidation Air For the proper operation of an Absorber Module, one (1) Oxidation Air Blower is required. Therefore, when two Absorber Modules are in service two blowers will be running and the third blower is used for standby if one blower were to trip.
Tanjung Jati B Training
FGD Operations Oxidation Air
Each Oxidation Air Blower has its own dedicated Lube Oil Unit which provides the necessary lubrication for the Gear Increaser . A single Programmable Logic Controller (PLC) provides control and protection for all three Blowers. The DCS, which interfaces with the PLC, has the capability to start and stop a given Blower.
Tanjung Jati B Training
FGD Operations Oxidation Air To Unit-1 Absorber
A
Lube Oil Skid
To Unit-2 Absorber
B
Lube Oil Skid
C
Lube Oil Skid
PLC OXIDATION AIR BLOWERS Tanjung Jati B Training
FGD Operations FGD Start-Up Each Absorber has a dedicated Blower. Here is the arrangement… Blower A: Blower B: Blower C:
Unit-1 Absorber only Unit-1 or Unit-2 Absorber (or standby) Unit-2 Absorber only
Tanjung Jati B Training
FGD Operations Oxidation Air
We have already discussed the start-up of an Oxidation Blower, so let’s have a short review regarding start-up then shutdown. You will recall that an Oxidation Air Blower can be started and stopped from the DCS or the local PLC.
Tanjung Jati B Training
FGD Operations Oxidation Air You will recall there are two different start-up scenarios… • Reaction Tank Level below the OA Headers • Reaction Tank Level above the OA Headers
Tanjung Jati B Training
FGD Operations Oxidation Air
OA HEADER ELEVATION -PIPE SIZING
TEMPERATURE ELEMENT
3.5 METERS
1/2”
HUMIDIFICATION (SERVICE WATER)
12”
FROM OXIDATION AIR BLOWER
6” ABSORBER MODULE
FLUSH WATER (PROCESS WATER)
= Manual Valve
Tanjung Jati B Training
FGD Operations Oxidation Air Reaction Tank Level is below OA Headers… • OA Blower can & should be started prior to increasing the Reaction Tank Level above the OA Header elevation. • This assumes that the OA Blower was shutdown after the Reaction Tank Level went below the OA Header elevation (during an extended shutdown of the Absorber). • Remember, an OA Blower cannot be started unless the Absorber Vent or Absorber Outlet Damper is open. Tanjung Jati B Training
FGD Operations Oxidation Air Reaction Tank Level is above OA Headers… • The OA Headers and piping must be flushed prior to starting a Blower. • The Air Isolation Valve must be closed prior to opening the Flush Water Isolation Valve. • Both the Flush Valve & Air Isolation Valve are located near the Absorber Module. • Remember, these valves are manually operated and have no position limit switches. Tanjung Jati B Training
FGD Operations Oxidation Air FLUSHING OA PIPING & HEADER
TEMPERATURE ELEMENT
MANUAL FLUSH VALVE
3.5 METERS
MANUAL CONTROL VALVE
MANUAL ISOL.VALVE
HUMIDIFICATION (SERVICE WATER) FROM OXIDATION AIR BLOWER FLUSH WATER (PROCESS WATER)
ABSORBER MODULE
Tanjung Jati B Training
FGD Operations Oxidation Air
Prior to starting any Oxidation Air Blower be sure to walk down and inspect the entire system. Be sure there is cooling water available for the Blower Bearings and Lube Oil Unit.
Tanjung Jati B Training
FGD Operations Oxidation Air ATM
INLET SILENCER
BLOWOFF SILENCER
CROSSOVER TIE VALVE
TO ABSORBER-1
BLOWOFF VALVE
DISCHARGE VALVE
OUTLET SILENCER
INLET FILTER ATM
INLET VALVE
CLOSED CIRCUIT COOLING WATER
A OXIDATION AIR BLOWER
LUBE OIL SKID
STARTING BLOWER “A” FOR UNIT-1 ABSORBER
Tanjung Jati B Training
FGD Operations Oxidation Air After an Oxidation Air Blower is started, water is introduced to the downstream piping to humidify the air to its saturation point. Why do we introduce water to humidify the air… It eliminates the wet-dry interface between the Gypsum Slurry and Air Header Piping, thus minimizing the potential for deposits forming within the Air Headers and at the Header Nozzles.
Tanjung Jati B Training
FGD Operations Oxidation Air HUMIDIFICATION WATER
TEMPERATURE ELEMENT
MANUAL FLUSH VALVE
3.5 METERS
MANUAL CONTROL VALVE
MANUAL ISOL.VALVE
HUMIDIFICATION (SERVICE WATER) FROM OXIDATION AIR BLOWER FLUSH WATER (PROCESS WATER)
ABSORBER MODULE
Tanjung Jati B Training
FGD Operations Oxidation Air
Let’s go through the basic steps for starting and stopping an Oxidation Air Blower from the DCS and local PLC Panel… Once the “ start” command from the DCS is generated the PLC will automatically start Lube Oil Unit, set the Blower Dampers to their proper position and start the Blower.
Tanjung Jati B Training
FGD Operations Oxidation Air When starting an OA Blower from the DCS, the PLC will automatically perform the following… • • • • • • • •
Start Lube Oil Unit Opens Blower Inlet Valve to predetermined position Opens Blowoff Valve to full open Opens Discharge Valve to full open Closes/Opens Crosstie Valve as required Blower Starts Blowoff Valve closes slowly Inlet Valve to automatic control
• Operator to open manual Humidification Valve to full open position… Tanjung Jati B Training
FGD Operations Oxidation Air ATM
INLET SILENCER
BLOWOFF SILENCER
CROSSOVER TIE VALVE
TO ABSORBER-1
BLOWOFF VALVE
DISCHARGE VALVE
OUTLET SILENCER
INLET FILTER ATM
INLET VALVE
CLOSED CIRCUIT COOLING WATER
A OXIDATION AIR BLOWER
LUBE OIL SKID
STARTING BLOWER “A” FOR UNIT-1 ABSORBER
Tanjung Jati B Training
FGD Operations Oxidation Air Starting an OA Blower from the local PLC… • • • • • •
Blower Selector Switch to “ON” Position Select Blower “B” as Standby Open Blower Inlet Valve to predetermined position Open Discharge Valve to full open Start Blower Verify Blower Motor Amps and adjust Blower Inlet Valve if required..
• Operator to open manual Humidification Valve to full open position…
Tanjung Jati B Training
FGD Operations Oxidation Air
A
PLC
BREAKER
B
C
OXIDATION AIR BLOWER PANEL Tanjung Jati B Training
FGD Operations Oxidation Air INLET VALVE
OPEN
BLOWER “A” OR “C”
OPEN CLOSED
MIDPOINT CLOSED
BLOWOFF VALVE
RUNNING
FAULT
SWITCH ON OFF
PUSHBUTTONS START
STOP
JOG SWITCHES O I C
INLET VALVE
O
I C
BLOWOFF VALVE
Tanjung Jati B Training
FGD Operations Oxidation Air INLET VALVE
OPEN
BLOWER “B”
OPEN
MIDPOINT
CLOSED
CLOSED
BLOWOFF VALVE
RUNNING
FAULT
SELECTOR SWITCH OFF U1
PUSHBUTTONS START
JOG SWITCHES
STOP
U2
AUTO
INLET VALVE
BLOWOFF VALVE
Tanjung Jati B Training
FGD Operations Oxidation Air
OXIDATION AIR PANEL
POWER ON
INLET VALVES M A
GENERAL FAULT
Tanjung Jati B Training
FGD Operations Oxidation Air
The optimum position of the Blower Inlet Valve before the Blower is started is based upon the Blower Motor Amps during normal operation and this position will be determined during Commissioning. These positions should be recorded and used for future reference.
Tanjung Jati B Training
FGD Operations Oxidation Air Stopping an OA Blower from the DCS… Once a stop command is generated, the local PLC panel will automatically stop the Blower, stop the Lube Oil Unit and close the Blower Inlet and Outlet Valves. • The Operator will need to close the OA Isolation Valve located near the Absorber Module & the Humidification Water Valve. • It is good practice to keep cooling water flowing to the Blower Bearings until temperatures sufficiently low. Tanjung Jati B Training
FGD Operations Oxidation Air
OPERATING LEVEL & OA HEADER ELEVATION
TEMPERATURE ELEMENT
MANUAL FLUSH VALVE
3.5 METERS
MANUAL CONTROL VALVE
MANUAL ISOL.VALVE
HUMIDIFICATION (SERVICE WATER) FROM OXIDATION AIR BLOWER FLUSH WATER (PROCESS WATER)
ABSORBER MODULE
Tanjung Jati B Training
FGD Operations Oxidation Air Stopping an OA Blower from the local PLC… • Stop Blower • Close Inlet Damper • Close Outlet Damper • Keep cooling water circulating to the Blower Bearing to cool the bearings sufficiently (20-30 minutes) • Operator to close the OA Isolation Valve located near the Absorber Module and close the Humidification Water Valve
Tanjung Jati B Training
FGD Operations Oxidation Air If the Absorber Module is to be shutdown and the slurry level of the Reaction Tank will be lowered below the OA Headers, the following should be performed… • Close OA Isolation Valve located near the Module • Open the Flush Valve and flush for approximately 5-10 minutes.