Inspection and Test Plan Project
:
P18136 Sonatrach exHg unit project
Scope
:
Design, Fabrication, Testing Testing and Supply of inlet and outlet Skid Assembly Assembly (Skid, piping and assembly)
Project Number
:
PRJ0010068
Tag Number
:
10068-1,10068-2,10068-3; Client Tag number: PS-PXE-SERVPACK-01, PS-PXE-SERVPACK-02 PS-PXE-SERVPACK-02
Client
:
Expro Production
Document Number
:
EP-18136-Q-ITP-0002-SPS (10068-ITP-SKD-01)
Client Purchase order number :
:
4500751807
By George Morris at 9:01 am, Nov 14, 2018
:
C
11 Nov 2018
Client comments incorporated
SR
KKN
RMS
B
07 Nov 2018
Issued for approval
SR
KKN
RMS
A
30 Oct 2018
Internal discipline check check
SR
KKN
RMS
Revision Number
Date
Description of revision
Prepared Prepared by
Reviewed Reviewed by
Approved by
Warning: The Warning: The controlled copy of this document is stored on Specialist Services server under (S:\forms\2 qa forms). If you are using a hard copy of this document it is uncontrolled and needs to be compared with the controlled copy at the time of use to ensure that it is up to date. This document is the property of the Specialist Services Group. It may not be copied, reproduced or used wholly or in part in any way without the written permission of Specialist Services. Form QA 26, Rev. 5, Page 1 of 10
ABU DHAB I I DUBAI I JUBAIL I YANBU I DELHI I ABERDEEN I ROTTERDAM I SINGAPORE I HOUSTON
www.specserve.com
Inspectio n and Test Plan
Item number
A A1
Description of operation and inspection activity
Document Number :
EP-18136-Q-ITP-0002-SPS
Level / type of involvement in inspection and testing
Reference document / Acc eptan ce cr iter ia
Record
Customer PO
ITP
QC Engineer
H
H
Project paint specification PS 1112
Painting procedure/ paint system
QC Engineer
H
H
ASME B31.3
Leak test procedure
QC Engineer
H
H
Responsibility
SS
TPI / CA
Client
Documents Inspection and Test plan
A2
Painting procedure
A3
Leak test procedure for assembly Structural
A4
Welding documents WPS, PQR and WPQ
AWS D1.1
Approved WPS,PQR/WPQ
QC Engineer
H
R/A
A5
Review of NDE Procedures (sub- contractor’s) MT
AWS D1.1
Approved NDE Procedures
QC Engineer
H
R/A
A6
NDE Operator Qualification (sub-contractors)
ASNT-SNT-TC-1A
NDE Level II certificate
QCI
H
R
Piping A7
Welding documents WPS, PQR and WPQ
ASME Section IX
Approved WPS,PQR and WPQ
QC Engineer
H
R/A
A8
NDE Procedures (Sub-contractors) RT,MT
ASME Section V ASME B31.3
Approved NDE procedures
QC Engineer
H
R/A
Inspectio n and Test Plan
Item number
Description of operation and inspection activity
Document Number :
Reference document / Acc eptan ce cr iter ia
Record
NDE Operator Qualification (sub-contractors)
ASNT-SNT-TC-1A
NDE level II certificate
A10
Hydrostatic test procedure
ASME B31.3 AFC drawings
Hydrostatic test procedure
GA drawing
AFC drawings
Purchase order , Material specification, International standards
Purchase order, Material specification, International standards
Design
B1
Issuance of fabrication drawings
C
Material
Level / type of involvement in inspection and testing SS
A9
B
Responsibility
EP-18136-Q-ITP-0002-SPS
TPI / CA
Client
H
R
H
R/A
Design Engineer/ Project Engineer
H
-
Material test certificate
Storekeeper / QCI
H
S
Material test certificate
Storekeeper / QCI
H
S
QCI QC Engineer
Structural materials (Steel sections, plates...) C1
C2
D
Incoming material inspection -Physical verification and review of material certificates Piping and assembly materials (Pipes, flanges, fitti ngs, valves, instruments...etc.) Incoming material inspection -Physical verification and review of material certificates Fabrication and Inspection Structural
Inspectio n and Test Plan
Item number
Description of operation and inspection activity
D1
Fit-up Inspection (inspection of weld edge preparation, transfer of material marking)
D2
Material traceability
D3
Welding
D4
Visual inspection of Welds -100%
D5
Dimensional Check
Reference document / Acc eptan ce cr iter ia
Document Number :
Record
Responsibility
EP-18136-Q-ITP-0002-SPS
Level / type of involvement in inspection and testing SS
TPI / CA
Client
AFC drawings
Weld inspection report
Fabrication Supervisor/QCI
H
S
AFC drawings
Material traceability record
Fabrication Supervisor/QCI
H
R
AWS D1.1 WPS
Weld inspection report
Welding Supervisor/QCI
H
S
AWS D1.1
Weld Inspection report
Fabrication Supervisor/QCI
H
W
AFC drawings
Dimensional inspection report
Fabrication Supervisor/QCI
H
W
MT procedure AWS D1.1
MT Reports
QCI
H
S
AFC drawing, Load test procedure, API RP 2A
Load test report
Rigging Supervisor/QCI
H
W
QCI
H
W
NDT D6
MT -100% Primary structure and lifting pad eye welds -10% MT on secondary structure welds Load Test
D7
Load test, 4 point load test on pad eyes, (1.5 X R)
D8
NDE (MT) on pad eyes (after load test) Painting
MT procedure
MT report
Inspectio n and Test Plan
Item number
Description of operation and inspection activity
Document Number :
Reference document / Acc eptan ce cr iter ia
Record
Responsibility
EP-18136-Q-ITP-0002-SPS
Level / type of involvement in inspection and testing SS
TPI / CA
Client
D9
Surface preparation (Check surface profile, cleanliness)
Painting procedure/ paint system
Paint report
Painting Supervisor/ QCI
H
W
D10
Inspection of primer coat
Painting procedure/ paint system
Paint report
Painting Supervisor/ QCI
H
S
D11
Inspection of 2nd coat
Painting procedure/ paint system
Paint report
Painting Supervisor/ QCI
H
S
D12
Inspection of final coat(Verification of final colour, DFT)
Painting procedure/ paint system
Paint report
Painting Supervisor/QCI
H
W
E
PIPING
E1
Fit up inspection
AFC drawings
Weld Inspection Report
Fabrication Supervisor
H
S
E2
Material traceability
AFC drawings
Material traceability record
Fabrication Supervisor/QCI
H
R
E3
Welding
ASME Section IX / WPS
Weld Inspection Report
Fabrication Supervisor/QCI
H
S
E4
Dimensional Inspection
AFC drawings
Dimensional Inspection Report
Fabrication Supervisor/QCI
H
W
E5
Weld Visual
ASME B31.3
Weld Inspection Report
Welding Supervisor/QCI
H
W
E6
NDE Inspection as per drawing -RT- 10% of total welds on butt joints - MT or PT -10% of total welds on fillet joints
ASME B31.3 NDE Procedures
NDE Reports
QCI
H
R/A
Inspectio n and Test Plan
Item number
Description of operation and inspection activity
Document Number :
Reference document / Acc eptan ce cr iter ia
Record
Responsibility
EP-18136-Q-ITP-0002-SPS
Level / type of involvement in inspection and testing SS
TPI / CA
Client
W
H
E7
Hydrostatic Test
Hydrostatic test procedure ASME B31.3
Hydrostatic Report
Fabrication Supervisor/QCI
H
E8
Cleaning and drying after hydro test
Spools cleaned and dried properly
-
Fabrication Supervisor / QCI
H
S
Painting procedure Paint system
Paint Report
Painting Supervisor / QCI
H
S
H
S
H
S
Surface preparation and paintin g E9
Surface preparation (Check surface profile, cleanliness)
E10
Inspection of primer coat
E11
Inspection of 2nd coat
E12
Inspection of final coat(Verification of final colour, DFT)
F
Painting procedure Paint system Painting procedure Paint system
Paint Report Paint Report
Painting Supervisor / QCI Painting Supervisor / QCI
Painting procedure Paint system
Paint report
Painting Supervisor / QCI
H
W
Ass embl y Skid assembly
F1
Assembly of pipe spools, valves and instruments on skid as per drawing
GA/P&I drawings
Check list
Assembly Supervisor
H
S
F2
In process inspection Verification of stud bolts and nuts, gaskets, tightening of bolted joints (bolt torque) as per drawing
P & ID Drawings
Check list
Assembly supervisor/QCI
H
S
Inspectio n and Test Plan
Item number
Description of operation and inspection activity
Reference document / Acc eptan ce cr iter ia
Record
P & ID Drawings
Check list
Leak test procedure Drawings No Leakage
Leak Test Report
Leak test procedure Dried and cleaned assembly
Check list
P & ID Drawings
Check list
F3
Verification of valves, instruments as per drawing
F4
Final assembly water leak test
F5
Drying and cleaning of assembly after water leak test
F6
Installation and testing of instrument line as per drawing
F7
Leak test of instrument line
Test procedure
F8
Verify calibration of instruments
G G1
Electrical and Instrumentation installation Installation and verification of cable trays, power cables, junction boxes
Document Number :
Responsibility
EP-18136-Q-ITP-0002-SPS
Level / type of involvement in inspection and testing SS
TPI / CA
Client
H
W
H
H
H
S
Instrument Supervisor / QCI
H
S
Check list
QCI
H
H
Valid calibration
Calibration certificate
QCI
H
R
AFC drawings
checklist
Electrical supervisor
H
S
AFC drawings
checklist
Electrical supervisor
H
S
QCI Assembly Supervisor / QCI Assembly Supervisor / QCI
G2
Installation and verification of transmitters
G3
Cable laying and cable termination
AFC drawings
ITP
Electrical supervisor
H
S
G4
Earthing of E&I equipment on skid
AFC drawings
ITP
Electrical supervisor
H
S
G5
Cable continuity and insulation resistance testing
Test procedure
Test report
Electrical Supervisor/QCE
H
W
Inspectio n and Test Plan
Item number
Description of operation and inspection activity
H
Final Inspection
H1
Final visual inspection, markings, name plate verification of the skid
H2
Weigh the unit & Issue weight report
H3
Inspection Release Note
I
Documentation
I1
Manufacturing Data Book(MDB)
Document Number :
EP-18136-Q-ITP-0002-SPS
Level / type of involvement in inspection and testing
Reference document / Acc eptan ce cr iter ia
Record
AFC drawings
Name plate photo
QCI
H
W
AFC drawings
Weight report
Rigging Supervisor / QCI
H
R
ITP / All activities as required as per ITP are completed & accepted
Inspection Release Note
Project Engineer / QC Engineer
H
A
MDB index
Completed MDB
Document controller / Project Engineer
H
R/A
Responsibility
SS
TPI / CA
Client
TERMINOLOGY OF QC SURVEILLANCE POINTS H-
HOLD
W-
Inspection points which require acceptance by the designee prior to the continuation of the work. Designee shall b e formally notified about the approaching hold point. Work shall not proceed until hold point is signed off. WITNESS Inspection points which require acceptance by the designee prior to the continuation of the work. The work proceeds if the de signee does not attend and gives his consent. Designee shall be formally notified on approaching witness points.
M/S -
MONITOR / SURVEILLA NCE Random check, by direct or indirect inspection, to ensure conformance of the item or activity.
R-
REVIEW
Inspectio n and Test Plan
Item number
Description of operation and inspection activity
Reference document / Acc eptan ce cr iter ia
Document Number :
Record
Responsibility
EP-18136-Q-ITP-0002-SPS
Level / type of involvement in inspection and testing SS
TPI / CA
Client
Review of documents/records in line with specified requirements. A -
APPROVAL Approval of documents/records to authorize start of activity or process (e.g. final release for shipment, approval to start the inspection activities, system completion and hand-over etc.).
List of applicable forms WP 2.1 WP 2.46 WP 2.15
Weld Inspection Report Welding Inspection Request / Report Weight Report
WP 4.1 WP 8.1
Paint report Pressure testing of piping
WP 7.24
Electrical installation certificate
List of procedures 1. OP06.1 – Procedure for incoming material inspection and testing 2. OP06.2 – Procedure for in process and final inspection 3. WI-AM-0039 – Works instruction for load testing 4.
Welding Procedures
5.
WI-QHSE-0013 rev.0 – Work instruction for Hydrostatic test
6. 7.
WI-AM-0038 rev.0 – Work instruction for Bolt torque NDE Procedures
Abb rev iat ion s us ed in ITP CA
Certification Authority
PT
Liquid Penetrant Testing
UT
Ultrasonic Inspection
Inspectio n and Test Plan
Item number
MT
Description of operation and inspection activity
Magnetic Particle Inspection
Reference document / Acc eptan ce cr iter ia
PWHT QAP
Document Number :
Record
Post Weld Heat Treatment
NCR
Non-Conformance Report
NDE
Non-Destructive Examination
QC
Quality Control
OP PO PQR
Operating Procedure Purchase Order Procedure Qualification Record
QCI RT TPI
Quality Control Inspector Radiographic Inspection Third party inspection
Quality Assurance Procedure
Responsibility
EP-18136-Q-ITP-0002-SPS
Level / type of involvement in inspection and testing SS
WI WPS
TPI / CA
Client
Work instructions Welding Procedure Specification
List of applicable specifications 1.
ASME Sec V – Non Destructive Examination
2.
ASME Sec IX - Qualification standard for welding Brazing Procedures
3.
D1.1 – Structural Welding Code
4.
ASME B31.3 –Process piping
App li cabl e Exp ro GQC GQC 2, GQC 3(P&ID, GA, ISO, Name plates), GQC 5, GQC 7, GQC 12,GQC 13(height of weld letters as per space availability),GQC 1 4(for instruments PSVs and control valves),GQC 17, GQC 18(as per API RP 2A -load factor 1.5 times for onshore application), GQC 21 (as applicable),GQC 32,GQC 37,GQC 44, GQC 54(as applicable),GQC 57