Road construction dsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsdsddsds...
Production Rates Table
Road Construction
Production rates for reinforcement steel fixing
Production Rates TableFull description
Technical reference on road construction
Part 1
Full description
construction productivity
Construction equipment used in construction industriesFull description
Construction equipment used in construction industries
Soil Test Instructions and Methods
Full description
DUPAFull description
dpwh dupaFull description
dpwh dupaFull description
DescripciĆ³n: this is a WBM and WMM road cons. techniques.
unit PriceFull description
Australian engineering Project Cost Estimating ManualFull description
ROAD & BRIDGE CONSTRUCTION EQUIPMENT Satya Narayan Shah B.Sc. In Mechanical Engineering (India) MS in Manufacturing Engineering & Management (UK) JANUARY ,2012 1 Generally, we use the Equipment...DescripciĆ³n completa
Full description
ESTIMATING GUIDELINE I. MECHANIZED ASPECT A) CLEARING & GRUBBING DOZER (Horse Power) 120 140 160 180 200
0~50 360 420 480 540 600
PRODUCTION (m2/hr) DENSE OF VEGETATION (No. of Trees per Hectares) 51~100 101~200 201~250 250 190 160 290 220 185 330 255 210 375 285 240 420 310 265
ESTIMATING GUIDELINE II. MANUAL ASPECT A) EXCAVATION A.1 - COMMON MATERIAL CAPACITY (m3/day) BANK VOLUME TYPE DEPTH OF EXCAVATION OF WORK 1.5m 1.6~2.5m 2.6m+ Farm Ditch 3.00 Canal 2.50 2.00 1.75 Structure 2.00 1.75 1.50 Desilting 2.50 2.00 1.75
A.2 - SLIGHTLY HARD MATERIAL CAPACITY (m3/day/man) TYPE OF WORK BANK VOLUME Canal 1.00 Structure 0.75
B) MANUAL LOADING CAPABILITIES OF FIVE (5) LABORERS Sand & Gravel Common Cobbles Boulders (m3/hr) (m3/hr) (m3/hr) (m3/hr) 4 5 3.5 3
Cement (bags/hr) 300
RS Bars (kgs./hr) 6000
C) MANUAL UNLOADING CAPABILITIES OF FIVE (5) LABORERS Sand & Gravel Common Cobbles Boulders (m3/hr) (m3/hr) (m3/hr) (m3/hr) 6 8 5 4
Cement (bags/hr) 300
RS Bars (kgs./hr) 7000
D) CUT, BEND & PLACE RSB 1-Steelman & 1-Helper STRUCTURE with bar cutter Dam 96 kgs/day Siphon 112 kgs/day Bridge 100 kgs/day Other 80 kgs/day
T) BUILDING FACILITIES WORK DESCRIPTION Installation of Ceiling Joist Installation of Ceiling Board Installation of GI Roofing Installation of Panel Door Installation of Flush Door Installation of Flourescent Bulb Installation of Incandescent Bulb Installation of Panel Board Installation of Electric Conduit Installation of # 4 Wire Installation of # 8 Wire Installation of # 14 Wire Painting Tile Setting Installation of GI Flushing Installation of GI Ridge Roll Installation of Down Spout Installation of GI Gutter Installation of Jalousie & Accs.
Note: 1. Time of mixer per day = Total bags of cement x 10 min. per bag / 60 minutes per hour = ____ hrs/day 2. Labor Intensity: 1-Leadman per 10-Laborers 1-Foremen per 4-Leadman 1-Watcher per 4-Heavy Equipment 1-Mechanic per 4-Heavy Equipment
Lumber (bd. ft./hr) 4000
Plywood (pcs/hr) 250
Lumber (bd. ft./hr) 4000
Plywood (pcs/hr) 250
ESTIMATING GUIDELINE III. MATERIAL ASPECT STRENGTH
HAULING COST ANALYSIS 4. HAULING OF SAND & GRAVEL Ave. Haul. Dist. = 10 km (from Source to Jobsite) Utilized: 6~7 Tons Cargo Truck with 5-Laborers Base Cost of Plywood: UC/m3 Capacity of Cargo Truck: 250 bags per trip
4a) LOADING COST (MECHANIZED) Utilized: 1~1.50 Loader Capability of Loader: 80m3/hr LABOR COST: Driver: 1 x Rate/day / 8hrs/day x 80m 3/hr Laborer: 1 x Rate/day / 8hrs/day x 80m 3/hr