CENTRAL MARKET BILL NO. 203 : SOUK - ROOF Item
Description
Quantity
Unit
Rate
SECTION C - CONCRETE WORK
POURED CONCRETE
Reinforced in situ concrete; grade C50; all in accordance with drawings and specification Suspended slabs, floors, landings, roofs or the like A
250 thick
2
m3
B
350 thick
2495
m3
824
m3
Beams, lintels, casings or the like C
roof beams REINFORCEMENT
Reinforcement bars; BS 4449; hot rolled deformed round high yield steel Suspended slabs D
16 diameter
158.15
t
E
20 diameter
278.26
t
Roof beams F
12 diameter
8.37
t
G
16 diameter
108.92
t
H
20 20 diameter
1.65
t
I
25 diameter
9.11
t
J
32 diameter
261.59
t
SHUTTERING
Shuttering; all in accordance with drawings and specification Soffits K
ro roof slabs
5341
m2
To Collection VOLUME 3 - BILLS OF QUANTITIES Bill 203/ Page 1
AED
CENTRAL MARKET BILL NO. 203 : SOUK - ROOF Item
Description
Quantity
Unit
Rate
Sides and soffit A
roof beams
5239
m2
PRECAST CONCRETE
Supply and installation of precast concrete roof elements (elements must be casted in such a way so as to enable the proper installation of roof lights); all in accordance with drawings and specification Roof B
C
precast concrete element for RFL 03A; glazing within vaulted roof; 2800 x 2800
10
nr
precast concrete element for RFL 03A/C; glazing within dome roof; 2800 x 2800
69
nr
SUNDRIES
Steel trowelled finish; all in accordance with drawings and specification Trowelled finish D
horizontally
7137
m2
To Collection VOLUME 3 - BILLS OF QUANTITIES Bill 203/ Page 2
AED
CENTRAL MARKET BILL NO. 203 : SOUK - ROOF Item
Description
Quantity
Unit
Rate
SECTION C - CONCRETE WORK
Collection Bill 203/ Page 1 Bill 203/ Page 2
To Summary VOLUME 3 - BILLS OF QUANTITIES Bill 203/ Page 3
AED
CENTRAL MARKET BILL NO. 203 : SOUK - ROOF Item
Description
Quantity
Unit
Rate
SECTION E - METALWORK
STRUCTURAL METALWORK
Structural steelwork; all in accordance with drawings and specification Beams A
W 14" x 30
7.39
t
B
W 27" x 84
14.60
t
Fittings C
allowance for fittings
ITEM
Fixings D
allowance for fixings
ITEM
Surface preparation; all in accordance with drawings and specification At works E
generally
501
m2
Surface treatments; all in accordance with drawings and specification At works F
generally
ITEM
To Summary VOLUME 3 - BILLS OF QUANTITIES Bill 203/ Page 4
AED
CENTRAL MARKET BILL NO. 203 : SOUK - ROOF Item
Description
Quantity
Unit
Rate
SECTION G - THERMAL AND MOISTURE PROTECTION
COVERINGS AND LININGS
Supply and installation of roof covering system to flat roof; all in accordance with drawings and specifiation Roof covering A
horizontal
B
vertical
7137
m2
476
m
751
m2
32
m
Supply and installation of louvre roof; all in accordance with drawings and specification Roof covering C
SHD 06; to plant room on level 03 Metal flashing; including fittings, fixings and accessories as required Flashings
D
120 girth; bent-4
E
180 to 230 girth; bent-3
192
m
F
180 to 250 girth; bent-3
2712
m
G
220 girth; bent-3
52
m
H
220 girth; bent-4
30
m
I
240 girth; bent-4
125
m
J
280 girth; bent-3
70
m
7137
m2
476
m
Allow for waterproofing Roof slabs K
horizontal
L
vertical
To Summary VOLUME 3 - BILLS OF QUANTITIES Bill 203/ Page 5