Calculation for Short Circuit Current Calculation using IEC / IEEE Standard. This report contains the description for calculating the short circuit current using IEEE 909 and circuit breaker…Full description
MEAN,MEDIAN,MODEFull description
Standard Reinforced Concrete Details
Standard Reinforced Concrete Details
Full description
Full description
Sprinkler system hydraulic calculation as per NFPA 13.
Full description
Full description
Full description
Full description
Design of a shoring using sap2000 program with load diagrams
Full description
Sample Calculations
Concrete anchor bolt design - a design example through a case study, basically the same material as in the blog indicated in the document
ewFull description
Calculation Standard Coal Handling PlantFull description
contoh perhitungan struktur concrete u ditchFull description
Calculation Standard Coal Handling Plant
excel calculator
Package : SGEDT - P4 Period : 28.02.09 On Word Supplier : Gemencheh Granite Grade : G 35 Normal Symbols:x1, x2, x3,
:
- Compressive Strength of Cubes In a Batch
x
:
- Average Compressive Strength of All Cubes in a Batch at 28 Days
ẍ ẍ4
:
- Average Compressive Strength of All Batches During the Period Under Consideration
:
- Average of Four Consecutive Batches - Characteristic Strength, f k + 0.5 x current margin
BASE SLAB WALL ROOF SLAB BASE SLAB WALL BASE SLAB ROOF SLAB BASE SLAB WALL ROOF SLAB WALL ROOF SLAB BASE SLAB WALL ROOF SLAB BASE SLAB WALL & ROOF SLAB BASE SLAB WALL & ROOF SLAB BASE SLAB ROOF SLAB WALL & ROOF SLAB BASE SLAB BASE SLAB
C106 C101 C101 C104 C94 C104 C94 C93 C107 C93
WALL & ROOF SLAB WALL ROOF SLAB BASE SLAB BASE SLAB BASE SLAB WALL & ROOF SLAB BASE SLAB BASE SLAB ROOF SLAB
BASE SLAB WALL & ROOF SLAB BASE SLAB WALL WING W ALL - WALL WALL (RS & LS) WALL (RS & LS) WING W ALL - BASE SLAB WING W ALL - BASE SLAB WING W ALL - W&B SLAB WING W ALL - WALL (L&R)
1st STAG STAGE E CON CONST STRUC RUCTI TION ON - CRO CROSS SSHE HEAD AD - PIE PIER R 1& 2 ABUT BUT WA WALL & WIN WING G WA WALL - Abu Abutm tmen entt A
05.08.2009 02.09.2009 45.78
42.67
50.20
-
-
-
-
-
-
46.37 46.22
-1.23
1.51
46.72
42.04
4.68
12.22
01
11.08.2009 08.09.2009 44.89
42.22
47.56
-
-
-
-
-
-
44.89
-2.55
6.52 6.52
45.7 45.74 4
42.04
3.70
10.89
02
st
14.08.2009 11.09.2009 43.56
52.44
43.56
-
-
-
-
-
-
46.52
-0.92
0.85
46.00
42.04
3.96
12.52
st
20.08.2009 17.09.2009 44.44
44.00
43.11
-
-
-
-
-
-
43.85
-3.59
12.92 12.92
45.37 45.37
42.04
3.33 .33
9.85 .85
03 04
15. BRV31 16. ROB11 A
1 STAGE CONSTRUCTION - Abutment A
17. BRV30 18. BRV30
1 STAGE CAST- CROSSHEAD - PIER 1
19. BRV30 20. ROB11 A
1 LIFT COLUMN (4 Nos) - Abutment A st
28.08.2009 25.09.2009 49.56
46.89
48.44
-
-
-
-
-
-
0.73
45.89
42.04
3.85
14.30
05
28.08.2009 25.09. 25.09.20 2009 09 53.78 53.78
52.00 52.00
54.67
-
-
-
-
-
-
48.30 53.48
0.85
st
6.04
36.47
48.04
42.04
6.00
19.48
06
st 01.09.2009 29.09. 29.09.20 2009 09 47.11 47.11 1 STAGE CAST - Abutment A st 04.09.2009 02.10.2009 43.78 43.78 1 LIFT COLUMN (4 Nos) - Abutment B PRECAST R.C. SLAB (PERMANENT FORMWORK FOR DECK SLAB) 14.09.2009 12.10.2009 48.00
50.22 50.22
45.78
-
-
-
-
-
-
47.70
0.26
0.07
48.33
42.04
6.29
13.70
07
47.11 47.11
44.89
-
-
-
-
-
-
45.26
-2.18
4.77 4.77
48.6 48.69 9
42.04
6.64
11.26
50.44
46.67
-
-
-
-
-
-
48.37
0.93
0. 0.86
48.70
42.04
6.66
14.37
01 02
PILE CAP - Abutment B
17.10.2009 14.11. 14.11.20 2009 09 54.44 54.44
56.89 56.89
47.56
-
-
-
-
-
-
5.52
30.46 30.46
48.57 48.57
42.04
6.53 6.53
18.9 18.96 6
01
BRV32 2 23. BRV3 BRV32 2 24. BRV3
PIL PILE CAP CAP & ABUT BUTMENT MENT SLA SLAB
28.10.2009 25.11.2009 43.11
50.22
54.67
-
-
-
-
-
-
52.96 49.33
1.89
3.57
48.98
42.04
6.94
15.33
02
PIL PILE CAP CAP & ABUT BUTMENT MENT SLA SLAB
30.10.2009 27.11.2009 50.22
53.78
53.78
-
-
-
-
-
-
52.59
5.15
26.52 50.82
42.04
8.77
18.59
03
25. ROB 12 ROB 12 26. ROB
1st LIFT COLUMN (4nos) - Abutment B
04.11.2009 02.12.2009 52.89 52.89
46.89 46.89
48.00
-
-
-
-
-
-
49.26
1.82
3.30
74.45
42.04
32.40 32.40
15.26 15.26
01
2nd 2nd LIF LIFT T COL COLUM UMN N (4n (4nos os)) - Abut Abutme ment nt B
06.11.2009 04.12.2009 48.44
45.33
46.67
-
-
-
-
-
-
46.81
-0.63
0.40
74.83
42.04
32.79
12.81
02
ROB 12 27. ROB ROB 12 28. ROB
3rd LIFT LIFT COLU COLUMN MN (4no (4nos) s) - Abut Abutme ment nt B
07.11.2009 05.12.2009 47.56
49.33
41.78
-
-
-
-
-
-
46.22
-1.22
1.49
74.30
42.04
32.26
12.22
03
1st LIFT LIFT COLU COLUMN MN (4nos (4nos)) - Abut Abutme ment nt A 1st 1st LIF LIFT T ABU ABUTM TMEN ENT T WA WALL + WIN WINGW GWA ALL
11.11.2009 09.12.2009 48.44
46.67
48.89
-
-
-
-
-
-
48.00
0.56
0.31
73.06
42.04
31.01
14.00
13.11.2009 11.12.2009 47.33
55.33
52.22
-
-
-
-
-
-
51.63
4.18
17.50
73.63
42.04 31.59 42.04 31.12
17.63
04 05
16.74
06 07
1 STAGE CAST - Abutment B
21. BRV31 22. BRV29
BRV32 2 29. BRV3 BRV32 2 30. BRV3 ROB 12 12 31. ROB ROB 12 12 32. ROB BRV 33 33 33. BRV BRV 33 33 34. BRV
1st 1st LIF LIFT T COL COLUM UMN N (4n (4nos os)) - Abutm butmen entt A
28.11.2009 26.12.2009 48.89
52.22
51.11
-
-
-
-
-
-
10.86
73.17
28.11.2009 26.12.2009 48.00
53.33
48.89
-
-
-
-
-
-
50.74 50.07
3.30
CRO CROSSHE SSHEA AR - ABU ABUT TMENT MENT A
2.63
6. 6.91
73.37
CRO CROSSHE SSHEA AR - ABU ABUT TMENT MENT B ABUT BUTMENT MENT A - STA STAGE 1B
PRECAS PRECAST T R.C. R.C. SLAB SLAB (PERMA (PERMANEN NENT T FORM FORMWOR WORK K FOR FOR DECK DECK SLAB) SLAB) 03.0 03.03. 3.20 2010 10 31.0 31.03. 3.20 2010 10 48. 48.89 89
45.7 45.78 8
45.5 45.56 6
-
-
-
-
-
-
46.74
-0.70
0.49
69.65
42.04
27.61 27.61
12.74 12.74
05
45. BRV 30 RV V 28 28 46. B R
PRECAS PRECAST T R.C. R.C. SLAB SLAB (PERMA (PERMANEN NENT T FORM FORMWOR WORK K FOR FOR DECK DECK SLAB) SLAB) 12.03.2010 09.04.2010 46.67
CAB LE LE TR TRENCH CO COVER PRECA PRECAST ST SLAB SLAB (IN-S (IN-SIT ITU) U) - ABUT ABUT.A .A
15.04.2010 13.05.2010 46.67
43.56
45.33
-
-
-
-
-
-
45.19
-2.26
5.10
81.83
42.04
39.79 11.19
18.05.2010 15.06.2010 43.56
41.78
46.67
-
-
-
-
-
-
44.00
-3.44
11.84
92.83
42.04
50.79
01 01
4.41
19.44
94.11
42.04
52.07 52.07
17.85 17.85
01
-1.52
2.30
93.93
42.04
51.89
11.93
01
93.33
42.04 51.29 42.04 62.14
11.93
02
9.41
03
51. BRV 34 RV V 31 52. B R
TRANSITION SLAB
29.06.2010 27.07.2010 50.22
54.67
50.67
-
-
-
-
-
-
ROB 09 53. ROB ROB 10 54. ROB
PRECA PRECAST ST PARA PARAPE PET T PAN PANEL EL TYPE TYPE 2 (7 NOS) NOS)
09.07.2010 06.08.2010 42.67
48.44
46.67
-
-
-
-
-
-
51.85 45.93
R.C R.C SLA SLAB B PER PERMA MANE NENT NT FORM FORMWO WORK RK
09.07.2010 06.08.2010 42.67
48.44
46.67
-
-
-
-
-
-
45.93
-1.52
2.30
ROB 10 55. ROB 11A 56. ROB 11A
CRO CROSS HEA HEAD-A D-ABUT BUTMENT MENT B
09.07.2010 06.08.2010 41.33
48.00
40.89
-
-
-
-
-
-
43.41
-4.04
16.30 104.19
1ST LIFT LIFT COLUMN COLUMN (4NOS (4NOS)-A )-ABUT BUTMENT MENT A
20.08.2010 17.09.2010 44.44
44.00
43.11
43.85
-3.59
12.92 102.93
11A 1ST LIFT LIFT COLUMN COLUMN (4NOS (4NOS)-A )-ABUT BUTMENT MENT B 57. ROB 11A DIAPHRAGM M + 600MM GAP-ABUT GAP-ABUTMENT MENT D 58. ROB 11 B END DIAPHRAG
04.09.2010 02.10.2010 43.78
47.11
44.89
45.26
-2.1 -2.18 8
06.09.2010 04.10.2010 50.67
43.56
43.11
DECK SLAB 59. ROB 13 COPING (BASE (BASE SLAB)-AB SLAB)-ABUTMEN UTMENT TC 60. ROB 11 B RC COPING