SBR sewage treatment plant Clear Water
Spiral filter
Sludge storage tanks
Buffer
SBR reactor
Mode of operation The sewage treatment plant consists of a spiral filter, the buffer tank, the SBR reactor and the sludge storage tank. In the first stage, domestic waste water flows through the spiral filter, where solid matter > 3mm is filtered out of the water. The pretreated water then flows into the buffer tank. The SBR sewage treatment plant works in impound mode. First, the intake water is stored in the buffer tank. It is then pumped into the SBR reactor. Here, the waste water is treated in the following five phases. 1. Filling: the SBR Reactor is filled with waste water from the buffer tank. 2. Aeration: a diaphragm pipe aerator blows oxygen into the water. This creates activated sludge which consists of microorganisms and bacteria. In this phase, impurities in the waste water are biologically decomposed. 3. Settling phase: during the settling phase, the water is no longer aerated. The activated sludge settles on the tank floor due to the cessation of turbulence. Since the sludge settles completely on the tank floor, the upper part of the clarified water is of extremely good quality. 4. Clarified water removal: in this phase, the clarified water is pumped out using the clarified water pump. 5. Excess sludge removal: since new activated sludge is formed during every aeration process, excess sludge is pumped to the sludge storage tank during this phase so that the reactor always contains the optimum amount of sludge.
Works
Benefits
· System proposal · Technical dimensioning · Construction & implementation plans · Mechanical system installation · Commissioning · Technical training · Technical documentation
· high purification performance · robust engineering · simple installation · easy to maintain and to repair · electronic fault reporting · remote monitoring · refitting existing tanks possible
Range
Scope of application
We offer the CLEAR WATER sewage treatment plant in construction sizes from 50 PE to 5.000 PE. The following system variants are available: · ring construction in concrete · compact construction in concrete or synthetics · rectangular construction in concrete · container construction in stainless steel. If the customer already has a tank or wishes to construct one himself, we can supply the necessary technical equipment.
The Clear Water waste water treatment system is dimensioned according to the purification performance required. A sewage treatment calculation for this is provided. We propose the following treatment stages for you: · C-elimination · Nitri-/ denitrification · Desinfection The functioning of the waste water treatment system is assured even during high load fluctuations, because the height adjustability of the pumps make it possible to adapt the volumetric loading to the actual loading at all times.
Construction project
Contact
SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343
13.05.07
CLEAR WATER CW 10000-S
Spiral filter
Sludge storage tanks
Buffer
SBR reactor
Pre-treatment
SBR reactor
1 0,0 875,0 875,0
Volume Safety reserve: Buffer: Sedimentation: Sludge: Volume total:
tot. 0,0 875,0 875,0
Volumes pre-treatment necessary 0,0 m³ 875,0 m³ m³ m³ 875,0 m³
Capacity
selected 0,7 m³ 375,0 m³ 1.153,4 m³ 1.018,9 m³ 2.548,0 m³
necessary 0,0 m³ 375,0 m³ 1.153,4 m³ 1.018,9 m³ 2.547,3 m³
Capacity
100%
3 0,2 125,0 384,5 339,6 849,3
tot. 0,7 375,0 1153,4 1018,9 2548,0
m³ m³ m³ m³ m³
COD BOD5 NH4-N Ntot.
< < < <
Intake 800 400 73
Outlet 90 20 10 18
mg/l mg/l mg/l mg/l
100%
SBR volume Safety reserve: Buffer: Sedimentation: Sludge: Total:
2 0,2 125,0 384,5 339,6 849,3
Waste water parameters
selected 0,0 m³ 875,0 m³ m³ m³ 875,0 m³
Safety reserve: Buffer: Sedimentation: Sludge: Total:
1 0,2 125,0 384,5 339,6 849,3
m³ m³ m³ m³ m³
Sludge disposal
100% 100% 100% 100%
3.908 m³/a 2,0 Months
Annual sludge amount Disposal frequency
Pumps / compressors Number of pumps Number of compressors Annual energy consumption
21 No. 6 No. 315.700 kWh/a
Data Type: Design capacity Daily water flow per PE Daily inflow capacity RW Daily inflow capacity Peak hourly flow Daily BOD5 load Metering temperature
Qd Qd,max Qmax Bd Tmin
CW 1000010.000 150 = 1500,0 = 1500,0 = 150,0 = 600,0 12 =
Construction project
S
Version
PE l/(PE*d) m³/d m³/d m³/h kg BOD5/d °C
Technical equipment Concrete ring construction Monolithic concrete Buoyancy protection Rectangular construction Intake with free fall Relief manhole/pumping station Spiral filter in the intake Number of buttom-diagonals
x
x x x
Contact
SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343
13.05.07
5,00
Spiral filter
Buffer
SBR reactor
10,00
12,49
10,00
17,51
10,00
Sludge storage tanks
5,30
0,30
Dimensions
10,43
Height dimensions from above Freeboard: Water level max.: Buffer max.: Sedimentation max: Sludge max.: Tank floor:
Sludge 1 0,30 0,00 0,00 5,00
0,0 651,4 651,4
16,99
Pre-treatment 1
m m m m m m
0,30 0,00 0,00 5,00 5,00 5,00
m³ m³ m³ m³ m³
SBR reactor 1 2
3
m m m m m m
0,30 0,00 0,00 0,74 3,00 5,00
0,30 0,00 0,00 0,74 3,00 5,00
0,30 0,00 0,00 0,74 3,00 5,00
m m m m m m
0,0 875,0 875,0
m³ m³ m³ m³ m³
0,2 125,0 384,5 339,6 849,3
0,2 125,0 384,5 339,6 849,3
0,2 125,0 384,5 339,6 849,3
m³ m³ m³ m³ m³
0,00 m 0,00 m
0,00 0,00
m m
0,00 0,00
0,00 0,00
10,43 m 12,49 m
10,43 17,51
m m
Volumen Safety reserve: Buffer: Sedimentation: Sludge: Total:
Intake / outlet Intake Outlet
0,00 m 0,00 m
Dimensions Length Width
Construction project
16,99 16,99 16,99 m 10,00 10,00 10,00 m
Contact
SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343
13.05.07
Spiral filter
Spiral filter
Specification Through the spiral sive foreign materials are removed from the waste water. So pumps and diffusers are protected against plugging and damage. The sewage sludge from the biological treatment is free of foreign material and it is further usable. The screenings arel pressed and dewaterrd in a pressing zone. After that the screening thrown out in a screeining container. A waste managing for screeningsis necessary.
Type: Spiral filter in the channel NSI 500 (80 l/s) 80,0 l/s Max water flow 400 V Voltage: Frequency: 50 Hz 1,10 kW Output: Total: 1 No.
Screenings Amount of screenings per E Volume of screenings per E Amount of screenings per year Volume of screenings per year
6,0 5,5 60,0 54,5
kg/(E*a) l/(E*a) t/a m3/a
Control Unit Spiral filter Compressor 5,00
4,00
Construction project
2,00
Size of plant building
System design The spiral sive is avaible for channel installation or as compact station inside a case. Creterias of the sive are: - case complete in stainlees steel - integrated campacting and dewatering zone - Self-cleaning of sieving zone by means of a spiral brush - Hygienic encapsulation for pressed screenings available
Contact
SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343
13.05.07
Buffer
Spiral filter
Sludge storage tanks
Water level heights Safety reserve: Buffer: Sedimentation: Sludge: Total:
Buffer
SBR reactor
Volume 0,00 5,00 5,00
m m m m m
Height dimensions from above Water level max.: 0,00 m 0,00 m Buffer max.: 5,00 m Sedimentation max: Sludge max.: 5,00 m Tank floor: 5,00 m
Safety reserve: Buffer: Sedimentation: Sludge: Total:
Version 0,0 875,0 875,0
m³ m³ m³ m³ m³
Dimensions Length Width
Construction project
10,43 m 17,51 m
Technical equipment Rectangular construction Buoyancy protection Floor slope 15° Sludge suction device sludge pump Pressure sensor
x x x
1
Pumps Type: Pump power output:
Head: Voltage: Frequency: Output: Total:
Amarex 70,0 m³/h 4,00 m 400 V 50 Hz 2,56 kW 9 No.
Contact
SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343
13.05.07
SBR reactor
Spiral filter
Sludge storage tanks
Water level heights Safety reserve: Buffer: Sedimentation: Sludge: Total:
SBR reactor
Volume 0,00 0,74 2,26 2,00 5,00
m m m m m
Height dimensions from above 0,00 m Water level max.: 0,00 m Buffer max.: Sedimentation max: 0,74 m Sludge max.: 3,00 m Tank floor: 5,00 m
Clear water pump Type: Pump power output: Head: Voltage: Frequency: Output: Number per tank:
Buffer
Version
Safety reserve: Buffer: Sedimentation: Sludge: Total:
0,7 375,0 1.153,4 1.018,9 2.548,0
m³ m³ m³ m³ m³
Dimensions 16,99 m 10,00 m
Length Width
Excess sludge pump Amarex 70,0 m³/h 4,0 m 400 V 50 Hz 2,56 kW 3 No.
Type: Pump power output: Head: Voltage: Frequency: Output: Number per tank:
Construction project
Ama-Porter 502 24,0 m³/h 4,0 m 400 V 50 Hz 1,50 kW 1 No.
Number of SBR tanks Technical equipment Rectangular construction Buoyancy protection Pressure sensor O2-sonde Sample removal shaft
3 x x 3 3
Compressor Type: Pump power output: Pressure: Voltage: Frequency: Output: Number per tank:
SAH 505 2.020 m³/h 560 mbar 400 V 50 Hz 15,00 kW 2 No.
Tube diffusers Number per tank: Slit image: Length per aerator: Diffuser length total Diffuser density
256 No. M 34 1,00 m 256,00 m 1,51 m/m²
Contact
SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343
13.05.07
Sludge storage tanks
Spiral filter
Sludge storage tanks
Dimensions Water depth: Volume:
Buffer
SBR reactor
Volume 5,00 m 651,4 m³
Version
Volume per tank Number of tanks Total volume
651,4 m³ 1 No. 651,4 m³
Dimensions Length Width
10,43 m 12,49 m
Height dimensions from above Water level max.: 0,00 m 5,00 m Tank floor:
Sludge outfeed Sludge accumulation per PE
Annual sludge amount Disposal frequency Disposal frequency
Construction project
391 3.908 2,0 60
l/(PE*a) m³/a Months d
Number of sludge storage tanks
Technical equipment Rectangular construction Buoyancy protection Floor slope 15° Sludge suction device sludge pump
1 x x x
Contact
SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343
13.05.07
Sewage treatment calculation CLEAR WATER CW 10000-S
Design capacity
Intake Waste water accumulation BOD5 load BOD5 load after PT Total solids after pre-treatment TKN load after PT Nitrate after pre-treatment
10.000 PE
Population-specific Qd,E Bd Bd, VK XTS,ZB STKN,ZB SNO3,ZB
150 0,060 0,060 0,070 0,011 0,000
Freight 1.500,00 600,00 600,00 700,00 110,00 0,00
l/(PE*d) kg/(PE x d) kg/(PE x d) kg/(PE*d) kg/(PE*d) kg/(PE*d)
Calculation assumptions Minimum temperature Maximum temperature Nitrogen effluent values Organic nitrogen Ammonium nitrogen Nitrate nitrogen Nitrogen tot. Nitrogen bonded to EF sludge Denitrifying nitrogen
Concentrations m3/d kg/d kg/d kg/d kg/d kg/d
Freight Tmin Tmax
400 400 467 73 0
mg/l mg/l mg/l mg/l mg/l
Concentrations
12 °C 20 °C
CorgN SNH4 SNO3 ΣNab NÜS NO3-ND
3,00 1,50 18,00 22,50 30,00 57,50
kg/d kg/d kg/d kg/d kg/d kg/d
2,00 1,00 12,00 15,00 20,00 38,33
mg/l mg/l mg/l mg/l mg/l mg/l
Determination of denitrification fraction Req´d. denitrification capacity VD / VBB VD / VBB selected
SNO3/CBSB
0,10 kg/kg 0,30 0,30
SF tTS,Bem tTS,Bem
1,8 11,7 d 11,7 d
Required denitrification volumes in accordance with ATV-DVWK A 131 Table 3
Metering sludge age Safety factor for nitri. Sludge age selected sludge age
Excess sludge production XTS,ZB/CBSB,ZB EF sludge production from C eliminate ÜSd,C EF sludge production from P eliminate ÜSd,P
EF sludge production
ÜSd
1,17 647,46 kg/d 3,90 kg/d 651,36 kg/d
Required aeration tank volume Required mass TS Selected total solids Aeration tank volume
MTS,BB TSBB VBB
7.641,9 kg 4,0 kg/m³ 1.910,5 m³
tSed tD tN VR
4,0 1,50 1,35 3,15 2.547,3
Required SBR reactor volume Cycles per day Sedimentation phase Denitrification phase Nitrification phase tN SBR reactor volume
Selected SBR volumes/characteristic values
Construction project
h h h m³
SBR reactor volume SBR volume per PE BOD5 volumetric loading BOD5 sludge loading
VR
2.548,0 255 0,31 0,08
m³ l/PE kg/(m³ *d) kg/(kg*d)
Contact
SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343
13.05.07
Aeration calculation Assumptions Sludge age Minimum temperature Maximum temperature Temperature factor Temperature factor BOD5 load after PT NO3 to be denitrified Nitrate in intake Nitrate in effluent
Oxygen feed tTS,Bem,gew Tmin Tmax FT,min FT,max SNO3,D SNO3,ZB SNO3,AN
11,7 12 20 0,8 1,4 600,0 38,3 0,0 12,0
d °C °C
kg/d mg/l mg/l mg/l
Loading case 1 C decomposition and nitrification Tmin
Oxygen consumption
OVd,C OVd,N fc OVh
663,27 kgO2/d 324,65 kgO2/d 1,00 78,41 kgO2/h
Loading case 2 denitrification at Tmax Oxygen consumption
OVd,C OVd,N OVd,D fc OVh
726,95 324,65 166,75 1,00 70,23
OVh Definitive loading case Max. temperature T O2 saturated vapour pressure Css,T hE Aeration depth Atmospheric pressure p Cs O2 saturation concentration Cx Intended concentration erf. αOC α Oxygen consumption OV Volume SBR reactor Oxygen consumption OV
78,41 20 9,09 5,00 1.013 11,29 2,00 95,29 0,70 136,1 2.548,0 53,4
kg O2/h kg O2/h m³ gO2/(m³*h)
Diffuser density Surface Diffuser length total Diffuser density
A L/A
509,6 m² 768 m 1,51 m/m²
kgO2/d kgO2/d kgO2/d kgO2/h
Air Flow 1,85
Oxygen consumption OV [gO2/(m³*h)]
kgO2/h °C mg O2/l m hPa mg O2/l
Diffuser density L/A [1/m²]
m³/h
Air content Q 1420,8
m³/h
Max. water depth 5,00
m
Water pressure 560
mbar
Compressor type 6 x SAH 505 (15)
Compressor 2.019,6
m³/h
Motor output 15,00
kW
Intake capacity 18,29
Construction project
kW
Contact
SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343
13.05.07
Water layout Plant building
Control Unit Spiral filter
Intake
Compressor
Buffer
Outlet Sample removal shaft
Sludge outfeed Sludge storage tanks
SBR reactor
Intake Spiral filter Outlet Plant building
Sample removal shaft
Sludge storage tanks
Buffer
SBR reactor SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343
13.05.07
calculation curve 1000,0 [m³]
Uhrzeit
water amount
pump volume
[m³]
[m³]
800,0 06:00
150,0
07:00
150,0
08:00
150,0
09:00
150,0
10:00
150,0
11:00
150,0
12:00
150,0
13:00
150,0
14:00
150,0
3
15:00
150,0
-125
16:00
600,0
400,0 Reaktoren V SBR
[m³] 150,0 175,0
-125,0
350,0
-125,0
525,0
-125,0
700,0
875,0
-125,0
750,0
-125,0
-125,0
750,0 625,0
-125,0
-125,0
625,0 500,0
-125,0
22:00
-125,0
500,0
23:00
375,0
-125,0
00:00
-125,0
375,0
01:00
250,0
-125,0
02:00
filling level
-125,0
875,0
21:00
pump volume
-125,0
850,0
20:00
water amount
-125,0
675,0 -125,0
19:00
-200,0
-125,0
500,0
18:00
0,0
-125,0
325,0
17:00
200,0
filling level
-125,0
250,0
03:00
125,0
-125,0
-125,0
06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 00:00 01:00 02:00 03:00 04:00 05:00 04:00
150,0 150,0 150,0 150,0 150,0 150,0 150,0 150,0 150,0 150,0 0,0
-125,0
0,0
-125,0
05:00
0,0
-125,0
0,0
1500,0
-125,0
-125,0
0,0
-1500,0
-125,0
0,0 0,0
125,0
0,0
0,0
0,0
-125,0
0,0
-125,0
0,0
0,0
0,0
0,0
-125,0
-125,0
0,0
-125,0
0,0
-125,0
0,0
-125,0
0,0
150,0 175,0 325,0 350,0 500,0 525,0 675,0 700,0 850,0 875,0 875,0 750,0 750,0 625,0 625,0 500,0 500,0 375,0 375,0 250,0 250,0 125,0 125,0
-125,0 0,0
[m³] SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343 13.05.07
experience curve 600,0 [m³]
500,0
Uhrzeit
400,0
water amount
pump volume
[m³]
[m³]
06:00
150,0
07:00
150,0
08:00
150,0
09:00
150,0
175,0
-125,0
350,0
-125,0
225,0
-125,0
150,0
250,0
-125,0
14:00 15:00 16:00
100,0
0,0
125,0
-125,0
17:00
150,0
18:00
150,0
19:00
150,0
20:00
150,0
21:00
150,0
150,0
-125,0
325,0
-125,0
filling level
-125,0
475,0 500,0
-125,0
-125,0
500,0 375,0
-125,0
00:00
-125,0
375,0 250,0
-125,0
02:00
pump volume
-125,0
300,0
01:00
water amount
-125,0
125,0
23:00
-200,0
-125,0
250,0
22:00
-100,0
-125,0
225,0
13:00
3
-125,0
350,0
12:00
-125
-125,0
325,0
11:00
200,0 Reaktoren V SBR
[m³] 150,0
10:00
300,0
filling level
-125,0
250,0
03:00
125,0
-125,0
-125,0
06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 18:00 19:00 20:00 21:00 22:00 23:00 00:00 01:00 02:00 03:00 04:00 05:00 04:00 125,0 17:00 150,0 150,0 150,0 150,0 0,0
-125,0
0,0
-125,0
150,0
05:00
0,0
-125,0
0,0
1500,0
-125,0
150,0 150,0 0,0 150,0 150,0 150,0 -125,0
-125,0
0,0
-1500,0
-125,0
0,0
-125,0
0,0
-125,0
0,0
-125,0
0,0
-125,0
0,0
-125,0
0,0
-125,0
0,0
150,0 175,0 325,0 350,0 350,0 225,0 225,0 250,0 250,0 125,0 125,0 150,0 300,0 325,0 475,0 500,0 500,0 375,0 375,0 250,0 250,0 125,0 125,0
-125,0 0,0
[m³] SBR sewage treatment plant Clear Water CW 10000-S with C-elimination, nitrification and denitrification Project: No.: I00343 13.05.07