2 Balancing Tank Effectiv e volume HRT at Qavg,hrs Air required for effect ive mings SBR feed Pumps Sleetced feed Pumps Fill hours 3 SBR- operating details Operating cycle time No of SBR No of cyles per basin Total fill time Anoxic ( non aerated) fill time Aerated fill time Aeration time Settlement Time Decant time Idle time Total cycle time No of cycles per basin 5 SBR dimesnions Side water Depth Area Length W idth Selected dimesnions area Total volume
2 Wastewater Wastewater Quality Quality BOD TKN Ammonia TSS Assumptions Elev ation Yield coefficient, Y Kd Clean water efficiency Alpha Beta Sewage Temperature O2 solu.Tap water, field condnC'sw O2 solu.Tap water, 20deg C ,Csw DO Fine Bubble effeciency Design Air temperature 4 SBR Sizing Volume per cycle per basin BOD load, per SBR MLSS to be maitained F/M to be maintained Sludge Volume Index Size Approach -I, F/M based Sludge required Sludge after decant,concn Sludge Volume Approach -2, SVI based settled sludge volume Se le le ct ct ed ed vo vo lu lu me me of of SB SBR a dd dd v ol ol um um e o f d ec ec an an t Volume per basin add band betn Sludge layer/decant Total Volume 6 Water Levels Levels in SBR SBR and MLSS MLSS Depth of decant volume LW L Volume at LW L MLSS Concentration MLSS MLSS Conc Concen entr trat atio ion( n(wi with thou outt band band))
1.410 m 3.6 m 955.0 m3 4712.0 m g/l 6136 6136.4 .4 mg/l mg/l
Units mg/l mg/l mg/l mg/l
7 Decanter Sizing Decant Volume/cycle No fo SBR in decant mode at a time Decant Time in Hours Rate of flow Selected decnater (25 % extra for operational flexibility) 9 Sludge Production Sludge Production rate Sludge Produced SRT,d
11 Sludge Thickener Solids Loading rate(25-60) Surface loading rate ( 16-30) Solids flow rate Area of thickener Diameter Selected dia Area of thickener Conc of thickened sludge Volume of thickned sludge Depth of Thickenening at top at bottom average Volume of sludge Depth Depth of settling zone Clear effluent depth Free Board SWD Depth
a b
13 Air requirements Balancing Tank, at 1 m3/m3/hr Sludge Digestor Expected VS Destruction VS destroyed O2 required O2 required AOR/SOR for fine bubble SOR diffuser effeciency Air required Air supplied per m3 of digestor vol
kg/m2/d m 3/m2/d kg/hr m2 m m kg/m3 m3/d kg/m3 kg/m3 kg/m3 m3 m m m
10 WasteSludge Pump Sludge conc after decant Sludge Volume Per reactor per cycle Sludge Wasting Pump cap 12 Sludge Digestor VS destruction Degree days(from M&E) HRT Volume of sludge to be digested Volume as 7/5 concept Volume of digestor Sludge in reactor at 2 % conc Temperature at winter Sludge age required Sludge to be withdrawn everyday Volume of sludge withdrawn Consider sludge withdrawal Size of digestor Depth Length Width
8 Chlorine Contact Tank Flow rate to filters Max decant rate Duration of Decant Volume of CCT CCT contact period for 45 minutes HRT volume
1.53
SBR Sludge Yield Sludge Produced Kg of BOD removed Nitrogen to be nitrified AOR SOR Air Required Air required at Inlet Duty blowers Each Blower Fill time (Anoxic+Aerated) Anoxic fill Aerated fill time Settel time Decant time Idle available aeration time Total aeration Time