e. %hec& %hec& for an ater ater lea&age lea&age fro' fro' connecte$ connecte$ !i!es !i!es or #al#es #al#es . f. Select Select the crucibl crucible e selector selector sitc sitch h hether hether crucibl crucible e (A) an$ (2). (2). g. %onnect %onnect G3D ire ire to selecte selecte$ $ crucible crucible.. Approved (y: ) S (ansal * Sr +
h. 4urnace control on an$ chec& all tri!!ing in$ication" G3D earth an$ if o& then go ahea$.(G3D sensiti#it shoul$ be at 15 as !er &nob) i. Ensure all tri!!ing 'echanis' is chec&e$ an$ if o& then han$o#er furnace to !ro$uction $e!art'ent for o!eration.
C,-C.S /0RI') O-RATIO' a. During full !oer con$ition of furnace te'!erature to be chec&e$ in !anel. (1) Panel bus bar connection 6$egree % 'a. (+)A$a!tor 6$egree % 'a. (-) %,lin& connection 6 $egree % 'a. (*)%hange o#er sitch 6$egree % 'a. b. %hec& D.M ater con$ucti#it b con$ucti#it 'eter , 1 'icro,oh'. (If the con$ucti#it ecee$s the $esire #alue then re!lace su!er change resin).