Mobilink 2G 3G Site SWAP Solution www.huawei.com
HUAWEI TECHNOLOGIES CO., LTD.
Agenda: 1. 2. 3.
4. 5.
Project Background SWAP Solution and Scenarios Overview Indoor SWAP A. Indoor HOT SWAP B. Indoor COLD SWAP Outdoor SWAP A. Outdoor HOT SWAP Appendix
HUAWEI TECHNOLOGIES CO., LTD.
Page 2
2G3G Swap Background 2G3GProgram Delivery Map( 28 Cluster )
Footprint Regions Swap Regions Before Swap:
After Swap:
Swap
HUAWEI TECHNOLOGIES CO., LTD.
Page 3
BTS Swap Solution : Scenarios Place: Method:
Indoor & Out Door HOT SWAP & COLD SWAP
Existed Cabinets(All -48V DC): 1) RBS6201 (600x400)Indoor Feeder 2) RBS6101 (700x680)Outdoor Feeder 3) RBS6301 (450x500)Mini RRU Outdoor 4) RBS6102 (1300x700)Feeder Outdoor
Existed Technologies: 1) GSM (G900)
(2G),
2)
(2G + 3G),
GSM
(G900 +G1800) 3) 2GSM+UMTS (G900+G1800+U2100)
Proposed Cabinets: 1) Huawei APM 30 (DBS 3900 BBU, 2G) 2) Huawei APM 30 (DBS 3900 BBU, 2G & 3G) Dimensions of the cabinet (W x H x D) 600 mm x 700 mm x 480 mm
Locations/Regions: Karachi & Hyderabad HUAWEI TECHNOLOGIES CO., LTD.
Page 4
(2*2G + 3G),
BTS Swap Solution : Huawei Configurations Solution
Band G900
G1800
Configuration Product S444_000
S000_444
Wireless Macro Solution (DBS Combined) G900+D180 S444_444 RAN16.0 0 U2100
S222
G900+D180 S444_444+S22 0+U2100 2
HUAWEI TECHNOLOGIES CO., LTD.
RRU 3936
RRU 3936
Power Output 20W with 4 TRX
20W with 4 TRX
MultiMode GO
GO
Control Board
Backup
GTMU
UBRI(if more then 6 Carrier)
GTMU
GTMU
UBRI(if more then 6 Carrier
UBRI(if more then 6 Carrier
RRU 3936
20W
GO
RRU 3826
20W
UO
UMPT
RRU3936+RR 20W U 3826
GU
GTMU+UMP UBBPd2+UB T RI
Page 5
UBBPd2
BTS Swap Solution : Huawei Cabinet
3U HUAWEI TECHNOLOGIES CO., LTD.
Page 6
Main equipment – BBU3900 Specifications of BBU3900
2U Height, 8 slots
Standard 19 inch cabinet
Board
Description
442 mm x 310 mmx86 mm
WBBP
WCDMA BaseBand Processing unit(3G)
7~12 kg
UBRI
Universal BaseBand Radio Interface board(2G )
A single BBU: Max 24 cells Max CE UL: 3072 DL: 4608
UMPT
Typical Power consumption: 200W Maximal Power consumption: 325W
Universal Main Processing & Transmission unit(2G/3G/4G coProcessing unit)
UPEU
2 FE/GE + 4 E1; Max 12 E1 (able to share transmission with 2G)
Universal Power and Environment interface Unit
UEIU
Universal Environment Interface Unit
86.1 mm
UEIU
HUAWEI TECHNOLOGIES CO., LTD.
Page 7
Main equipment – RRU BBU3900
GSM/UMTS Multi-mode BBU
RRU3936 900M
RRU3826 2100M
RRU3936 1800M
CPRI (Optical Fiber)
GU
Weight: 15Kg Power: -48V DC 400mm × 300mm × 120mm (H*W*D) Power consumption: 270W IT2R Scenario:≤G444
HUAWEI TECHNOLOGIES CO., LTD.
GUL
UMTS only
Weight: 15Kg Power: -48V DC 400mm × 300mm × 120mm (H*W*D) Power consumption: 270W IT2R Scenario:≤D444
Page 8
Weight: 15 kg Power: –48 V DC 400mm x 300mm x 120mm (H*W*D) Power consumption: 260W IT2R UMTS only
BTS Swap IT/Mobile Tools
•Team Viewer •Get your Smartphone
•WeChat •WhatsApp •Line
•Add your contact in advance.
•Take and send pictures to show others.
•Huawei APP HUAWEI TECHNOLOGIES CO., LTD.
Page 9
BTS Swap IT/Mobile Tools
HUAWEI TECHNOLOGIES CO., LTD.
Team Viewer: http://www.teamviewer.com/
Page 10
BTS Swap IT/Mobile Tools WeChat Application: http://www.wechat.com/en/
HUAWEI TECHNOLOGIES CO., LTD.
Page 11
BTS Swap Solution A. B. C. D.
Feeder Site Solution. CRPI Site Solution. Feeder + CPRI site Solution. Micro Site Solution
HUAWEI TECHNOLOGIES CO., LTD.
Page 12
Karachi and Hyderabad Swap Scenarios
For All Scenario
New APM30 will be installed at all site BBU will be installed in Huawei APM30 cabinet IDU shifting to APM30 is required in case E/// IDU is in same cabinet with E/// BTS Reuse Jumper and DBC Install RRU Pole before SWAP in case there is no space for new RRU.(CIVIL Part monopole MUST )
Specific Scenario
Feeder (macro)
Hot SWAP Dismantle E/// BTS, Loop test Ping test, Install Huawei BTS,Integration Install Huawei RRU\RRU ( 2G + 3G ) power cable and CPRI fiber SWAP, Reuse exiting RCU. Reuse exiting DBC.
HUAWEI TECHNOLOGIES CO., LTD.
CPRI(macro)
MIX (Feeder + CPRI) (macro) Micro
Hot SWAP Dismantle E/// RRU first ,then install Huawei RRU during SWAP. Loop test Ping test, Reuse exiting RCU. Reuse exiting CPRI(if possible) Reuse exiting RRU power Cable(If possible ).
Hot SWAP Dismantle E/// RRU first ,then install Huawei RRU during SWAP. Loop test Ping test, Reuse exiting Feeder if no space available for RRU. Reuse exiting RCU. Reuse exiting CPRI(if possible) Reuse exiting RRU power Cable(If possible ).Install Jumper with feeder to RRU Page 13
Cold Swap / Hot Swap DAS part remain same . Dismantle E/// RRU first ,then install Huawei RRU during SWAP. Loop test Ping test Reuse exiting CPRI(if possible) Reuse exiting RRU power Cable(If possible ).
Overview of E/// Existing Site——Indoor Site
HUAWEI TECHNOLOGIES CO., LTD.
Page 14
E// BTS Swap solution : Indoor Site Key Points:
Before Swap
Remove E// cabinet; Remove Dual band Combiner ; Remove E// IDU if installed in BTS Cabinet if its in E// BTS cab; Install HW APM 30 then DBS3900; Reuse: • existing DC power ; •existing jumpers, antenna and DBC; New: •Power & GND cable •Transmission FE cable (New port if E1 2G IP 3G ) • External Alarm cable
HUAWEI TECHNOLOGIES CO., LTD.
Page 15
15
E// BTS Swap solution : Indoor Site & Outdoor Swap Key Points
1. Remove RBS Cab
1. Reuse Antenna
2. Remove Lighting protection
3. Remove Feeder
2. Reuse existing breaker
3. Reuse DBC and RCU
HUAWEI TECHNOLOGIES CO., LTD.
Page 16
16
Huawei DBS 3900 RCU ESN for RET
ESN needed BBU ESN for commissioning
BBU ESN
HUAWEI TECHNOLOGIES CO., LTD.
Page 17
Scenario 1A: Feeder site solution
E// BTS +MW in Separate Cab APM30 + DBS3900
Before
After Overall view of site after swapping
Overall view of site before swapping Equipment be swapped E1 cable AC power cable DC power cable Grounding cable 1/2” jumper 7/8” feeder MW IF cable Alarm Report Cable
MW ODU & Antenna
Antenna
ROOM
MW ODU & Antenna
New AC power cable New CPRI cable
Antenna+ RCU
RRU
ROOM
ACDB Grounding Bar
AC
ATS
Transmission Cable IP AC power cable DC power cable Grounding cable 1/2” jumper 7/8” feeder MW IF cable Alarm Report Cable RRU power Cable
Grounding Bar
Grounding Bar
Alarm Box
AC
ACDB
Alarm Box
Grounding Bar
Grounding Bar ATS DG
APM 30
DG GSM 900
GSM 1800
BT Existing MW Grounding Bar
Grounding Bar
Scenario description :
HUAWEI TECHNOLOGIES CO., LTD.
Page 18
2G&3G share BBU
19 inch rack
HW-MW
Scenario 1B: Feeder site solution
E// BTS +MW in single Cab APM30 + DBS3900
Before
After Overall view of site after swapping
Overall view of site before swapping Equipment be swapped E1 cable AC power cable DC power cable Grounding cable 1/2” jumper 7/8” feeder MW IF cable Alarm Report Cable
MW ODU & Antenna
Antenna
ROOM
MW ODU & Antenna
New AC power cable New CPRI cable
Antenna+ RCU
RRU
ROOM
ACDB Grounding Bar
AC
ATS
Transmission Cable IP AC power cable DC power cable Grounding cable 1/2” jumper 7/8” feeder MW IF cable Alarm Report Cable RRU power Cable
Grounding Bar
Grounding Bar
Alarm Box
AC
ACDB
Alarm Box
Grounding Bar
Grounding Bar ATS DG
APM 30
DG GSM 900
GSM 1800
BT IDU HW-MW
Existing MW Grounding Bar
Grounding Bar
Scenario description : In door to Indoor with IDU will be installed in DBS 3900 cab.
HUAWEI TECHNOLOGIES CO., LTD.
Page 19
Scenario 1C: Feeder site Outdoor solution
E// BTS +MW in Same Cab APM30 + DBS3900
Before
After Overall view of site after 2G & 3G
Overall view of site 2G Equipment be swapped E1 cable AC power cable DC power cable Grounding cable 1/2” jumper 7/8” feeder MW IF cable Alarm Report Cable
E1 cable AC power cable DC power cable Grounding cable CPRI Cable 7/8” feeder MW IF cable Alarm Report Cable
MW ODU & Antenna
Antenna
Existing Equipment AC power cable CPRI cable
MW ODU & Antenna Antenna + RCU
RRU
ACDB Grounding Bar
AC
ATS
Grounding Bar
Grounding Bar
AC
Grounding Bar
ATS
ACDB Grounding Bar
DG
Grounding Bar
DG Existing
MW
Existing MW
BBU APM 30
Grounding Bar
Grounding Bar
Scenario description : Feeder is installed in existing scenario, we will remove the feeder , install RRU on Tower.
HUAWEI TECHNOLOGIES CO., LTD.
Page 20
Page Page20 20
CPRI Cable
Scenario 2: CPRI Site solution
E// BTS +MW in Same Cab APM30 + DBS3900
Before
After Overall view of site after 2G & 3G
Overall view of site 2G/ 3G / 2G+3G Equipment be swapped E1 cable AC power cable CPRI cable DC power cable Grounding cable 1/2” jumper 7/8” feeder MW IF cable Alarm Report Cable
E1 cable AC power cable DC power cable Grounding cable CPRI Cable
MW ODU & Antenna
Existing Equipment AC power cable CPRI cable
MW ODU & Antenna Antenna + RCU
Antenna MW IF cable Alarm Report Cable RRU
ACDB Grounding Bar
AC
ATS
Grounding Bar
Grounding Bar
AC
Grounding Bar
ATS
ACDB Grounding Bar
DG
CPRI Cable
Grounding Bar
DG Existing
MW
Existing MW
BBU APM 30
Grounding Bar
Grounding Bar
Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU. HUAWEI TECHNOLOGIES CO., LTD.
Page 21
CPRI Cable
Scenario 3: MIX Feeder + CPRI Site solution
E// BTS +MW in Same Cab APM30 + DBS3900
Before
After Overall view of site after 2G & 3G
Overall view of site 2G/ 3G / 2G+3G Equipment be swapped E1 cable AC power cable CPRI cable DC power cable Grounding cable 1/2” jumper 7/8” feeder MW IF cable Alarm Report Cable BTS Shed
E1 cable AC power cable DC power cable Grounding cable CPRI Cable
MW ODU & Antenna
Existing Equipment AC power cable CPRI cable
MW ODU & Antenna Antenna + RCU
Antenna MW IF cable Alarm Report Cable BTS Shed
ACDB Grounding Bar
AC
ATS
RRU Grounding Bar
Grounding Bar
AC
Grounding Bar
ATS
ACDB Grounding Bar
DG
Grounding Bar
DG CPRI Cable
Existing
MW
Existing MW
BBU APM 30
Grounding Bar
CPRI Cable
Grounding Bar
RRU ion tower leg if no space on tower
Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU Install RRU on shed Leg in cross for load balance. HUAWEI TECHNOLOGIES CO., LTD.
Page 22
Per SWAP if possible : Indoor Site Pre Installation Before Swap
Steps: 1. Install HW Temporary APM30 & DBS3900; 2. Connect grounding and Power cables 3. Power on HW DBS3900 cabinet; 4. Lay FE cables 5. Install RRU if space available 6. Lay RF jumpers 7. Lay External Alarm connection
5 2 4
7 6
2
RBS E// Cab
3 IDU
1 HUAWEI TECHNOLOGIES CO., LTD.
Page 23
23
Pre swap if possible: Indoor Site Remove Key Steps: 0. SWAP preparation & Transmission check(ping)
Swap
1. Dismantle & Swap Transmission (E1/FE) cables 2. Power off E// cabinet; 3. Disconnect RF jumpers, Dismantle & Lightening cable, 3. connect HW Jumpers; 4. Connect external alarm cable 5. Disconnect Power & grounding cables 6. Remove Cabinet
CPRI
3 4 1 5
4
2 6
HUAWEI TECHNOLOGIES CO., LTD.
Dismantle
APM30
Page 24
24
RRU Connectivity for 2G A
B
C
*NOTE : Connect FE cable from BBU FE0 to IDU for Future use HUAWEI TECHNOLOGIES CO., LTD.
Page 25
RRU Connectivity for 2G Dual Band (6+ RRU) A
B
C
HUAWEI TECHNOLOGIES CO., LTD.
Page 26
RRU Connectivity for 2G Dual Band +3 G
HUAWEI TECHNOLOGIES CO., LTD.
Page 27
RRU Connectivity for Configuration more 1 RRU in 1 Sec in same Freq
IF more then 1 RRU required in 1 Frequency band then short CPRI will be used to cascade them.
HUAWEI TECHNOLOGIES CO., LTD.
Page 28
RRU Installation with minimum Space 2
1
5 4 Note : To install 3 Blade RRU with using only 1 Bracket. HUAWEI TECHNOLOGIES CO., LTD.
3
6 Page 29
RRU Installation with minimum Space Existing RRU Power cables will be reused for Newly installed RRUs. Existing RRU CPRI Optical cable will be reused for Newly installed RRU’s
RRU Mounting Options: Priority1: Install RRUs on back of Antenna using same Antenna Mounts,
Priority2: a.Install RRUs on tower Platform in case of railing tower or on Ring poles incase of monopole tower, Priority3: Install RRU on Tower leg,
HUAWEI TECHNOLOGIES CO., LTD.
Page 30
2. Macro RT Site – RRU and Antenna install on Wall Scenarios
New solution
New solution sketch
RRUs can’t be installed behind the antenna on For rooftop Macro existing pole due to loading issue. sites First option solution: install RRU on the wall, recommended distance between RRUs is 500mm, minimum distance between RRUs is 300mm.
HUAWEI TECHNOLOGIES CO., LTD.
Page 31
3 Micro / IBS RRU and Antenna install on Wall (installation location) First option:
HUAWEI TECHNOLOGIES CO., LTD.
Special case second option:
Page 32
DBS Swap solution: • RCU Connectivity RRU 1
RRU 0
Sector A HUAWEI TECHNOLOGIES CO., LTD.
RRU 2
Sector B
Sector C Page 33
Overview :Antenna System 3G Antenna 3G RCU
2G Antenna
HUAWEI TECHNOLOGIES CO., LTD.
Page 34
Overview :SBT Site solution Huawei Purposed SBT solution Existing SBT solution
HUAWEI TECHNOLOGIES CO., LTD.
Page 35
HW - Antenna Installation: Color Rings
Need confirm and mark color ring for existed system and Huawei jumpers BEFORE SWAP
Make feeder or jumper color rings for 2G & HUAWEI TECHNOLOGIES CO., LTD.
Page 36
3G
BTS Swap solution : Abis OverE1 & IUb IP Transmission E/// E1 Color Code 1st E1
White blue White orange
2nd E1
White green White brown
3rd E1
Red Blue
4th E1
RedGreen
IDU Board Layout
Red Orange
FE Port
Red Brown 3G
HUAWEI TECHNOLOGIES CO., LTD.
Page 37
37
BTS Swap solution : Transmission
20P 10 U space HUAWEI TECHNOLOGIES CO., LTD.
6P 3 U Space Page 38
2P / CN 1 U Space
BTS Swap solution : MW Transmission
20P 10 U space
6P 3 U Space HUAWEI TECHNOLOGIES CO., LTD.
Page 39
BTS Swap solution : CN 210
HUAWEI TECHNOLOGIES CO., LTD.
Page 40
BTS Swap solution : CN 210 E/// Node-B is connected.
This Port will be used for pretesting.
PMCL Will configure the Free Port as mirror of working port for testing. And Media will be tested Before swap on New Port.
HUAWEI TECHNOLOGIES CO., LTD.
Page 41
BTS Swap solution : TN
HUAWEI TECHNOLOGIES CO., LTD.
Page 42
BTS Swap solution : TN 2PB and TN 6PC
E/// Node-B is connected.
PMCL Will configure the Free Port as mirror of working port for testing. And Media will be tested Before swap on New Port. HUAWEI TECHNOLOGIES CO., LTD.
Page 43
This Port will be used for pretesting.
BTS Swap solution : TN 20PB
E/// Node-B is connected. This Port will be used for pre-testing. PMCL Will configure the Free Port as mirror of working port for testing. And Media will be tested Before swap on New Port. HUAWEI TECHNOLOGIES CO., LTD.
Page 44
BTS Swap solution : MW IDU Detail
HUAWEI TECHNOLOGIES CO., LTD.
MW IDU Type
Qty of sites
AMM 20PB
154
AMM 2PB
943
AMM 6PC
271
MINI-LINK CN210
101
SPO1410
13
SPO1460
38
Grand Total
1520
Page 45
DBC Reuse solution:
Description Clamp set
HUAWEI TECHNOLOGIES CO., LTD.
Page 46
Spec Quantity 30~127 mm 2PCS
External Alarm Swap solution : Extend Alarm Solution
BBU Box
UEIU+UPEU Board
HUAWEI TECHNOLOGIES CO., LTD.
Sensor DDF
Page 47
47
External Alarm Swap solution : Extend Alarm Solution
BBU Box
UEIU+UPEU Board
HUAWEI TECHNOLOGIES CO., LTD.
Sensor DDF DATB Page 48
48
External Alarm Swap solution : Indoor Site Extend Alarm Solution Indoor Scenario PIN NO P0
P1
P2
SA
P3
P4
P5
P6
Cable Color
Cable Color
1
White
14
Blue
2
White
15
Orange
3
White
16
Green
4
White
17
Brown
5
White
18
Gray
6
Red
19
Blue
7
Red
20
Orange
8
Red
Outdoor Scenario Mobilink Alarm Definition
always on/off
Seve rity
GENSET ON
off
3
PIN NO P0
P1 AC MAIN FAILURE
off
2
P2 INTRUDER
on
3
SA FIRE ALARM
on
3
HIGH TEMP
on
3
P3
P4
LOW VOLTAGE
RECTIFIER MAJOR
on
on
2
2
P5
P6
P7 P7
21
RECTIFIER MINOR
on
2
Cable Color
Cable Color
1
White
14
Blue
2
White
15
Orange
3
White
16
Green
4
White
17
Brown
5
White
18
Gray
6
Red
19
Blue
7
Red
20
Orange
8
Red
P8
Green
HUAWEI TECHNOLOGIES CO., LTD.
Page 49
49
Mobilink Alarm Definition
always on/off
Severi ty
GENSET ON
off
3
AC MAIN FAILURE
off
2
RECTIFIER DOOR
on
3
DC LOAD FUSE
on
3
BATTERIES HIGH TEMP
on
2
LOW VOLTAGE
on
2
RECTIFIER MAJOR
on
2
SYSTEM ON BATTERIES
on
3
Rectifier Door
on
3
Ping Test for 3G site solution:
HUAWEI TECHNOLOGIES CO., LTD.
Page 50
Pre Swap Testing , Swap Activity and Swap Troubleshooting RM Key Point
Mobilink
Huawei
Site access arrangement
● ●
O
Media Provisioning MW+ MSTP+ Datacom
Third party
O ●
Core and PS Core CGI ,LAC,RAC definitions ●
Neighbor addition
O
Acknowledgement on swap activity closure
●
Spares provision
● ●
Media verification MW+ MSTP+Datacom
Configuration and Troubleshooting of other vendor equipment
O
●
O ●
Conclusion of activity failure due to Other Vendor equipment
O
O
O
O
●
O
●
Decision of roll back
O
Perform Rollback
HUAWEI TECHNOLOGIES CO., LTD.
O
●
Configuration and Troubleshooting of Huawei equipment
"●" indicates the Owner, while "O" indicates the support.
O
Page 51
Page 51
Support Required from Mobilink 1. For 3G Sites additional port configuration to perform ping test before swap2. Involve other vendor support for joint troubleshooting with SLA of 30min 3. 2 hour and 50min troubleshooting window before decision of rollback 4. Extension ECRF if needed will apply before 5:30AM and need PMCL support to approve it before 5:45AM 5. One Swap TL from PMCL for each activity to coordinate with all internal teams and Huawei Swap TL to assure activity successful 6. Spares availability for swap include RAN , Power, MW 7. Enough NOC and planning engineer of MSTP+ MW+Datacom during activity consider work for cross connects , media verification of 50 sites per night HUAWEI TECHNOLOGIES CO., LTD. 8. MW,MSTP LLD await detailed topology +capacity+utilization from PMCL Page 52
Thank you www.huawei.com Copyright©2014 Huawei Technologies Co., Ltd. All Rights Reserved. The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.