Actix Report generation process
© Samsung Electronics. All Rights Reserved. Confidential and
3
CLOT Analysis Work Procedure ActixOne Report Check N o
1
Owner
Coordinat or
Job Category
Check DT information
2 Analyzer Coordinat or
Description
Check Log File Count
- This stage is can be apply KPI Pass case only - If KPI fail case, go to next slide
Check Drive Test Date & Duration
- Drive start and end date
Compare Log file count
- Compare Log file counts with FMS and processed logs in Actix
Report Generation
3
4
Job Title
Generate Report
Analyzer
Preparatio n
- Check whether the KPI results are properly visible or not
Tool
- Acti x
Output
Next Step
Reference Material
- If mismatch log file count with Actix processed and FMS, request to roupload missing logs to FMS - If generated KPI report is having problems, request to NEO team to fix the problems
Preparation for create analysis Report
© Samsung Electronics. All Rights Reserved. Confidential and
ActixOne report gen eration methods
4
CLOT Analysis Work Procedure Preparation for Actix KPI Report Circle
FMS
ActixOne
Coordinator
Analyzer
NEO Team
Description
Upload Log files Inform to how many logs, DT start date and end date
Automatically synchronized log files
Request to re-upload missed log files
Log check
Should be check whether the log file counts are same with FMS and Actix Generate KPI Report
If KPI report is not properly generated such as not visible KPI result and etc, request to NEO Team to fix the problems
Infirm that cleared Actix problems Log check
Report Actix problem to responsible person (Codi)
Request to fix Actix Problems
© Samsung Electronics. All Rights Reserved. Confidential and
5
CLOT Analysis Work Procedure
KPI PASS CASE work procedure
© Samsung Electronics. All Rights Reserved. Confidential and
6
CLOT Analysis Work Procedure Work Procedure for KPI All pass case N o
Owne r
1
Analyze r
2 Analyze r
Job Category
Preparatio n for Report
Job Title
Description
Check KPI Result
- This stage is can be apply KPI Pass case only - If KPI fail case, go to next slide
Create X-Cap input data
- Need to create X-Cap input data through the CellRef
Tool
Output
X-Cap input file (Excel) - Excel Macro
Create Anyplan input data
- Need to create Anyplan input data through the CellRef
4
PCI Observed
- Check whether the PCIs in the cluster is detected all or not. If not must be describe why can’t detected
- AnyPlan
5
Sector Swap
- If observed sector swap, request to fix it to circle
- AnyPlan
Stationary Test
- Need to check how long time stationary test. If more than 20 min, Drive Reject.
- X-Cap - Excel Macro
- Check Result - Reject Report
Log files Re-used
- If there have log files are reused case, Drive Reject
- Actix Report
- Reject Report
3
6
Analyze r
Check Points
7
Next Step
Reference Material
Excel tool for create input data and check basic information
Anyplan Input file (CSV)
- If not observe on-air site PCIs, must be request to additional drive for that missed PCIs coverage
PCI Observed check method
Sector swap check method Stationary test che ck method
Mandatory - Compare update before submit SiteForge with items actual drive 8
9
Missing route check
Report Submit
and planned drive route. If (On-air) sites / Observed PCI) C1: Total scope (Planned sites / Actual - X-Cap - Compare Result less than 80% covered If mismatch count with Actual and observed PCI cell,- then must be include justification report - Mapinfo Reject Report planned DT route, Drive C2: Planned DTR (KML Format) C3: ActualReject. DT route If Actual DT covered is less than 80%, then must be include justification report) C4: DT Sequence and DT cycle.
Submit KPI PASS report to SiteForge
- If have no any issues that above mentioned issues, than upload KPI PASS report to SiteForge.
DT Route calculation method
- Excel Macro
© Samsung Electronics. All Rights Reserved. Confidential and
7
CLOT Analysis Work Procedure KPI PASS Case work procedure Circle
FMS
Whole Re-Drive
-
ActixOne
Below 80% covered DT rout Observed Stationary test Observed Log file ReUsed
Additional Drive Additional drive is below 2 cases only Not observed PCI / If between 80% and 99% DT Covered Verification test after fix sector swap issue
Coordinator
Analyzer
SiteForge
Description
KPI Result Check
Check several points - PCI Observed - Sector swap - Stationary test - Log file Reused - Missing route check
Pass Report
andatory update items before submit SiteForge
Request to Validate : Total scope (Planned sites / Actual (On-air) sites / Observed PCI) If mismatch count with Actual and observed PCI cell, then must be include justification report : Planned DTR (KML Format) : Actual DT route Request to upload SiteForge If less then 80% of Actual DT covered, then must be include justification report) : DT Sequence and DT cycle. Upload all KPI PASS report on SiteForge
Reject report
Share with Circle team
© Samsung Electronics. All Rights Reserved. Confidential and
8
Analysis DT2 KPI Pass rate
plan for Circle issue (Information mismatch with Actual and SiteForge) Not properly implemented on the field base on optimizer recommended parameters. [ NOPT ]
[ LSMR]
[ Circle Team]
[ SOLPAR ]
Most of non-observant step is here 1 Recommendatio n
2
Region Coordi.
2
Analyzer do not know whether the azimuth and tilt properly change or not until check related photos Anytime can request If analyzer needed related photos that antenna azimuth and tilt
SiteForge Physical parameter change by SOLPAR according to siteforge suggestion value Change PHY Suggestion Para. On site field
1
Change request E-Tilt/NBR through Jira LSMR Engineer
Provide changed E-Tilt/NBR value through Jira
Input Actual value into siteforge Inform Changed value to NOPT Region Coordi (Fill in value at recommend sheet feedback & Remark column)
013 © Samsung Electronics
RF Lead
Feedback updated value
CLOT Analysis Work Procedure Decisions for next step (KPI PASS Case)
Check points
Case of detail points
© Samsung Electronics. All Rights Reserved. Confidential and
Conclusion
10
CLOT Analysis Work Procedure
KPI FAIL CASE work procedure
© Samsung Electronics. All Rights Reserved. Confidential and
11
CLOT Analysis Work Procedure Work Procedure for KPI Fail case N o
1
2
3
4
5
Owner
Job Category
Job Title
Analyze r/ LSM Enginee r
Information Acquisition
Request LSM Information
Analyze r
Check antenna parameter
Compare with suggested physical antenna parameter and RET Status
Analyze r
Analyze r
Analyze r
Compare DT Route
Check points
Analysis
Missing Route Check
Description
Tool
Output
Next Step
Reference Material
Alarm History Neighbor List Ping Test Result UL Interference VSWR RET Status PKG Information Golden Parameter - GTP Loss -
- Should be check whether the physical antenna parameters are applied on the field or not
- Compare with actual drive and planned drive route. If less than 80% covered planned DT route, Drive Reject.
- LSM Info
- Compare Result
- MapInfo - X-Cap
- Compare Result - Reject Report
DT Route calculation M ethods
Stationary test check Methods
Stationary test
- Need to check how long time stationary test. If more than 20 min, Drive Reject.
- X-Cap - Excel Macro
- Check Result - Reject Report
Log file Re-Used
- If there have log files are reused case, Drive Reject
- Actix Report
- Reject Report
- In case of included L1 fail, perform to Anyplan analysis KPI Fail analysis - In case of without L1 fail, © Samsung Electronics. Rights perform to X-Cap All analysis
- In case of not properly applied Physical antenna parameters on the field, drive reject
AnyPlan X-Cap Mapinfo Global Mapper - Excel Macro Reserved. - LSM Info -
- Analysis Result - Recommendatio n Confidential and
L1 Analysis Methods L2 Analysis Methods L3 Analysis Methods
12
CLOT Analysis Work Procedure KPI FAIL Case work procedure Circle
FMS
ActixOne
Coordinator
Analyzer
KPI Result Check
Request LSM Information Below 80% covered DT rout - Observed Stationary test Re-Drive - Whole Observed Log file ReUsed
LSM -
Description
Alarm History Neighbor List Ping Test Result UL Interference VSWR RET Status PKG Information Golden Parameter GTP Loss
-
Check several points - PCI Observed - Sector swap - Stationary test - Log file Reused - Site Alarms - Missing route check
Additional Drive Additional drive is below 2 cases only Not observed PCI / If between 80% and 99% DT Covered Verification test after fix sector swap issue
Below than 80% Check DT Route
Between 80% and 99% Check whether the X-Cap Analysis any reason of impact to KPI results are there or not Anyplan Analysis - Sector Swap - Used wrong FTP server - Missing drive for KPI Analysis Report major road
Request to Validate
Share with Circle team Reject report
© Samsung Electronics. All Rights Reserved. Confidential and
13
CLOT Analysis Work Procedure Decisions for next step (KPI Fail Case)
Check points
Case of detail points
© Samsung Electronics. All Rights Reserved. Confidential and
Conclusion
14
CLOT Analysis Work Procedure
Analysis work procedure for each Layer
© Samsung Electronics. All Rights Reserved. Confidential and
15
CLOT Analysis Work Procedure L1 FAIL Analysis work procedure RF Design
SiteForg e
Coordinat or
Analyzer
LSM
Should be considering about SITEFORGE EMF Report That included surrounding photos.
Gathering the information
LSM Information - RET Information - Alarm history - UL RSSI - VSWR
Preparation for Analysis data
Refer to Tackle RSRP KPI Fail-Antenna parameter check process as next slide 25
Detail process for exceptional case
Preparation for necessary report
Slide 18
If not possible to reduce BSP, need to create exceptional case report
Drive route (KML) BSP (KML) RSRP Plot (KML) PCI Plot (KML) Analyzer opinion
★ Basic checks : implemented in system that tx_atten as type3 Ant 3dB(20 -> 50), type4 is 1dB(20 -> 30)
Define RSRP Fail area
Analysis for L1 KPI Fail reason
Poor Coverage (Need Optimization)
BSP Issue Terrain Block Block by high –Rise building or heavy dense trees or ETC Neighbor Issues
Anyplan Analysis
Site Alarms UE Issue SOLPAR Issues Should be reflect above issue in analysis report
Recommendation Create Report Request to validate
NEO Team
BSP Issue raise regulation - In case of DT1, should be try to more analyze. If the case is obviously BSP problem such as in correctly selected morphology, than can be BSP issue raise. - Basically, BSP issue can be raise only beyond DT2
Recommendation regulation - Electrical tilt: should be less then 7 degree (if necessary, may apply more then 7 degree but should describe to reason why? In analysis report. - Should be considering about Google Earth map and EMF Report if available when suggest to physical antenna parameters.
Share with circle team Create exceptional case Report
Analyzer decide, if can’t achieve for L1 KPI PASS
© Samsung Electronics. All Rights Reserved. Confidential and
16
CLOT Analysis Work Procedure Exceptional case detail process Circle
Analyzer
Adnan, Siksha
RJIL
CLOT fail reason analysis
Suggest physical antenna parameter Possible to improve via OPT Factor of Exceptional Unstable terrain High-Rise building block Heavy visitation location Scattered Clutters
Preparation for exceptional Report
Study
Discuss with RJIL for exceptional case
© Samsung Electronics. All Rights Reserved. Confidential and
17
CLOT Analysis Work Procedure RSRP KPI fail – antenna parameter check Circle
Complete DT1 Drive test
Coordinator
Analyzer
Check KPI Result If RSRPKPI is fail and < 90%
Description
Currently a large number of clots are failing due to only RSRP KPI failing. On of the reasons for this KPI failing, is that antenna parameters on field are not matching cellref So the suggestion is that, every time for a clot, RSRP KPI is fail-antenna parameter recommendations should be verified as left process
Plot RSRP KPI on Map
Check areas of very poor RSRP
Need to take photos of antenna and provide to optimization engineer
If the very poor RSRP area are suspected that particular sites antenna status is not properly implement on the field such as wrong azimuth, and tilt setting
Request to verify antenna parameters to circle team
Only once antenna parameter values are match with CellRef then proceed normal analysis process
Fallow normal analysis process
© Samsung Electronics. All Rights Reserved. Confidential and
18
CLOT Analysis Work Procedure L2 FAIL Analysis work procedure Coordinator
Analyzer
LSM
Refer to L1 analysis process
NEO Team
Check KPI Fail items
Define low throughput area
X-CAP Analysis
RF Issue
Other Issue
Overshooting Poor Coverage Shadow area
FTP Issue Backhaul Issues High UL Interference (RSSI) PCI Collusion Handover Issues UE Issues Site Alarms SOLPAR Issues
Create KPI Analysis Report
Request to Validate
Share with circle team
© Samsung Electronics. All Rights Reserved. Confidential and
19
CLOT Analysis Work Procedure L3 FAIL Analysis work procedure Coordinator
Analyzer
Refer to L1 analysis process
NEO
SI Team
Check KPI Fail items
Define L3 Fail Location
X-CAP Analysis For all of third party issue cases are must be inform to SI team to analysis with SI Tracker
SI Issue RF Issue
Other Issue
Overshooting Poor Coverage Shadow area
UE Configuration Error High UL Interference High GTP Loss 64QAM OCNS Loading Site Alarm SOLPAR Issues
Create KPI Analysis Report
Request to Validate Share with circle team
© Samsung Electronics. All Rights Reserved. Confidential and
20
CLOT Analysis Work Procedure
Appendix
© Samsung Electronics. All Rights Reserved. Confidential and
21
CLOT Analysis Work Procedure Any case of antenna optimization
Need to check other band cluster status
Not start CLOT Optimization
Physical antenna parameter Recommendation
KPI All passed
In-Progress CLOT Optimization
Should be same physical antenna parameters with configuration of other band settings
© Samsung Electronics. All Rights Reserved. Confidential and
22
© Samsung Electronics. All Rights Reserved. Confidential and
23